Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “safety margin”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 883 records · Page 49

Space Shuttle Solid Rocket Booster Lightweight Recovery System

The cancellation of the Advanced Solid Rocket Booster Project and the earth-to-orbit payload requirements for the Space Station dictated that the National Aeronautics and Space Administration (NASA) look at performance enhancements from all Space Transportation System (STS) elements (Orbiter Project, Space Shuttle Main Engine Project, External Tank Project, Solid Rocket Motor Project, & Solid Rocket Booster Project). The manifest for launching of Space Station components indicated that an additional 12-13000 pound lift capability was required on 10 missions and 15-20,000 pound additional lift capability is required on two missions. Trade studies conducted by all STS elements indicate that by deleting the parachute Recovery System (and associated hardware) from the Solid Rocket Boosters (SRBS) and going to a lightweight External Tank (ET) the 20,000 pound additional lift capability can be realized for the two missions. The deletion of the parachute Recovery System means the loss of four SRBs and this option is two expensive (loss of reusable hardware) to be used on the other 10 Space Station missions. Accordingly, each STS element looked at potential methods of weight savings, increased performance, etc. As the SRB and ET projects are non-propulsive (i.e. does not have launch thrust elements) their only contribution to overall payload enhancement can be achieved by the saving of weight while maintaining adequate safety factors and margins. The enhancement factor for the SRB project is 1:10. That is for each 10 pounds saved on the two SRBS; approximately 1 additional pound of payload in the orbiter bay can be placed into orbit. The SRB project decided early that the SRB recovery system was a prime candidate for weight reduction as it was designed in the early 1970s and weight optimization had never been a primary criteria.

Wolf, Dean↗

A Worst-Case Approach for On-Line Flutter Prediction

Worst-case flutter margins may be computed for a linear model with respect to a set of uncertainty operators using the structured singular value. This paper considers an on-line implementation to compute these robust margins in a flight test program. Uncertainty descriptions are updated at test points to account for unmodeled time-varying dynamics of the airplane by ensuring the robust model is not invalidated by measured flight data. Robust margins computed with respect to this uncertainty remain conservative to the changing dynamics throughout the flight. A simulation clearly demonstrates this method can improve the efficiency of flight testing by accurately predicting the flutter margin to improve safety while reducing the necessary flight time.

Lind, Rick C.↗

CEV OME/RCS Flow Health Monitor: Status Review

I. Primary purpose: detect propellant valve leakage: a) Reduce launch propellant mass by reducing leakage loss . margins, b) Improve safety by reducing risk of propellant ice build up in thruster. II. Secondary objectives: a) Wetness sensor to detect that lines have been flooded. b) Monitor engine performance (timing, mix ratio). c) Use in GSE as valve leakage monitor.

Youngquist, Robert↗

I’ll have the Porter: Interactively Visualizing the Results of Statistical Maneuver Analysis

Mission design and navigation relies on statistical maneuver analysis and Monte Carlo simulations when evaluating candidate mission trajectories. Engineers must analyze large quantities of data to optimize mission safety and propellant margins, but currently rely on static text files and dense PDF slide decks to review simulation results. This approach is time-intensive, non-interactive, and difficult to share or coordinate with other mission designers. To improve this process, we present Porter: a web-based interactive mission analysis tool. This work describes Porter’s user-centered design process, its processing pipeline for importing and processing LAMBIC simulation data, core interactive features, and preliminary user feedback.

Ramaswamy, Basak Alper↗

Digital Sensor Technology

The nuclear industry has been slow to incorporate digital sensor technology into nuclear plant designs due to concerns with digital qualification issues. However, the benefits of digital sensor technology for nuclear plant instrumentation are substantial in terms of accuracy and reliability. This paper, which refers to a final report issued in 2013, demonstrates these benefits in direct comparisons of digital and analog sensor applications. Improved accuracy results from the superior operating characteristics of digital sensors. These include improvements in sensor accuracy and drift and other related parameters which reduce total loop uncertainty and thereby increase safety and operating margins. An example instrument loop uncertainty calculation for a pressure sensor application is presented to illustrate these improvements. This is a side-by-side comparison of the instrument loop uncertainty for both an analog and a digital sensor in the same pressure measurement application. Similarly, improved sensor reliability is illustrated with a sample calculation for determining the probability of failure on demand, an industry standard reliability measure. This looks at equivalent analog and digital temperature sensors to draw the comparison. The results confirm substantial reliability improvement with the digital sensor, due in large part to ability to continuously monitor the health of a digital sensor such that problems can be immediately identified and corrected. This greatly reduces the likelihood of a latent failure condition of the sensor at the time of a design basis event. Notwithstanding the benefits of digital sensors, there are certain qualification issues that are inherent with digital technology and these are described in the report. One major qualification impediment for digital sensor implementation is software common cause failure (SCCF).

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Maximizing Operational Efficiencies in Waste Management on the Hanford Plateau Remediation Contract in a Down-turned Market - 13484

Recent changes in DOE priorities and funding have pressed DOE and its contractors to look for innovative methods to sustain critical operations at sites across the Complex. At the Hanford Site, DOE Richland Operations and its prime contractor, CH2M Hill Plateau Remediation Company (CHPRC), have completed in-depth assessments of the Plateau Remediation Contract (PRC) operations that compared available funding to mission and operational objectives in an effort to maintain requisite safety and compliance margins while realizing cost savings that meet funding profiles. These assessments included confirmation of current baseline activities, identification of potential efficiencies, barriers to implementation, and potential increased risks associated with implementation. Six operating PRC waste management facilities were evaluated against three possible end-states: complete facility closure, maintaining base operations, and performing minimum safe surveillance and maintenance activities. The costs to completely close evaluated facilities were determined to be prohibitively high and this end-state was quickly dropped from consideration. A summary of the analysis of remaining options by facility, efficiencies identified, impact to risk profiles, and expected cost savings is provided in Table I. The expected cost savings are a result of: - right-sizing and cross-training work crews to address maintenance activities across facilities; - combining and sequencing 'like-moded' operational processes; - cross-cutting emergency planning and preparedness staffing; - resource redistribution and optimization; - reducing areas requiring routine surveillance and inspection. For the efficiencies identified, there are corresponding increases in risk, including a loss of breadth and depth of available resources; lengthened response time to emergent issues; inability to invest in opportunities for improvement (OFIs); potential single-point failures or non-compliancies due to resource scarcity; limited cross-training capability; and reduced capability to respond to changes in DOE priorities. Finally, there are many challenges to achieving these cost savings. With a workforce nearing retirement effective succession planning becomes critical to success and requires establishing a balance between the cost of hiring and training and cost-saving activities. With six active waste management facilities spread across nearly 15 square miles, scheduling and deploying cross-trained surveillance and maintenance teams is a logistical challenge, particularly as the loss of funding has not diminished emphasis by regulatory agencies placed on the safe and compliant performance of DOE and its contractors. As reflected in Table I, efficiencies are currently being implemented on the Hanford Plateau Remediation Contract (PRC) that deliver cost savings that align with the current site budget while maintaining critical capabilities. It is currently estimated that these efficiencies will result in a cost savings of approximately $9 million for FY13 in base and minimum safe operations on the PRC - a cost reduction of more than 13 percent over FY12 and nearly 30 percent over FY09 levels. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Evidence Theory Representations for Properties Associated With Weak Link/Strong Link Systems, Part 3: Margins for Failure Time and Failure Temperature

The use of evidence theory and associated cumulative plausibility functions (CPFs), cumulative belief functions (CBFs), cumulative distribution functions (CDFs), complementary cumulative plausibility functions (CCPFs), complementary cumulative belief functions (CCBFs), and complementary cumulative distribution functions (CCDFs) in the analysis of time and temperature margins associated with loss of assured safety (LOAS) for one weak link (WL)/two strong link (SL) systems is illustrated. Article content includes cumulative and complementary cumulative belief, plausibility, and probability for (i) SL/WL failure time margins defined by (time at which SL failure potentially causes LOAS) – (time at which WL failure potentially prevents LOAS), (ii) SL/WL failure temperature margins defined by (the temperature at which SL failure potentially causes LOAS) – (the temperature at which WL failure potentially prevents LOAS), and (iii) SL/SL failure temperature margins defined by (the temperature at which SL failure potentially causes LOAS) – (the temperature of SL whose failure potentially causes LOAS at the time at which WL failure potentially prevents LOAS).

42 ENGINEERING↗

Beyond Design Basis Event Pilot Evaluations: Results and Recommendations for Improvements to Enhance Nuclear Safety at DOE Nuclear Facilities (DOE, 2013. A Report to the Secretary of Energy)

In the six months after the March 2011 Fukushima Daiichi nuclear power plant accident in Japan, the U.S. Department of Energy (DOE) took several actions to review the safety of its nuclear facilities and identify situations where near-term improvements could be made. These actions and recommendations were addressed in an August 2011 report to the Secretary of Energy, Review of Requirements and Capabilities for Analyzing and Responding to Beyond Design Basis Events. Based on recommendations in the August 2011 report, DOE embarked on a project to develop and refine guidance that supports improvements in DOE’s processes for analyzing and mitigating beyond design basis events (BDBEs), i.e., events such as earthquakes that are more severe than the events that formed the basis of the design for DOE’s nuclear facilities. The results of this BDBE project and recommendations for further DOE actions are provided in this follow-on report. The main activity of the BDBE project was the pilot application of guidance for evaluation of BDBE analysis and mitigation features at four DOE nuclear facilities representing a range of DOE sites, nuclear facility types/activities, and responsible program offices. The pilot evaluations focused on: (1) BDBE evaluations as documented in the facility Documented Safety Analysis (DSA); (2) potential BDBE vulnerabilities and margins to failure for facility safety features as obtained from general area and specific system walkdowns and design document reviews; and, (3) preparations made in facility and site emergency management programs to respond to severe accidents. The BDBE project also evaluated whether draft BDBE guidance on safety analysis and emergency management could be used to improve the analysis of, and preparations for, mitigating severe accidents and BDBEs. The pilot evaluation team paid close attention to related actions being pursued by the U.S. Nuclear Regulatory Commission, the U.S. commercial nuclear industry, and the international nuclear safety community to help refine the guidance developed for the pilot evaluations.

61 RADIATION PROTECTION AND DOSIMETRY↗

A simulation of I 2 S-LWR selected transients

The Integral Inherently Safe (I 2 S-LWR) reactor was designed to improve the safety performance of PWR types reactors, and several design basis accidents were eliminated using innovative approaches to the I 2 S-LWR plant layout. However, some accidents such as station blackout (SBO), main steam line break (MSLB) type accident – the secondary hot leg break (SHLB) – were deemed statistically relevant, and the work performed here was to simulate these events using the system thermal–hydraulics code RELAP5 coupled to the 3D spatial kinetics code PARCS. The safety response of the reactor to a station blackout is predicted to be acceptable at both beginning of cycle (BOC) and end of cycle EOC core conditions with either the UO 2 or U 3 Si 2 fuel options considered here. In the analysis of the SHLB performed here, an unprotected (no SCRAM) condition was assumed to highlight the I 2 S-LWR capabilities. Results indicate that with the UO 2 core, the fuel temperatures rise notably, but no fuel melting was predicted and departure from nucleate boiling ratio (DNBR) limits were not exceeded. Similarly, the U 3 Si 2 fuel performed well, but with lower fuel temperatures and decreased DNBR. Following the break of the steam line in the I 2 S-LWR, shutdown is achieved after about two minutes via negative reactivity from loss of primary flow. In all cases considered, the I 2 S-LWR appears to accomplish the goals of increased safety performance. Further design improvements and other fuel options may marginally improve on the observed safety performance. Additionally, higher fidelity analysis with the next generation subchannel, Computational Fluid Dynamics (CFD), or full core transport may be useful in refining the prediction of the peak fuel and cladding temperatures, as well limiting DNBR during the accidents.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Criticality safety analysis of as-loaded spent nuclear Fuel Casks - 14589

The final safety analysis report (FSAR) or the safety analysis report (SAR) for a particular spent nuclear fuel (SNF) cask (both bare fuel and canister-based) system documents models and calculations used to demonstrate that a system meets the regulatory requirements under all normal, off-normal, and accident conditions of spent fuel storage, as well as the normal and accident conditions of transportation. FSAR/SAR calculations and approved content specifications are intended to be bounding in nature to certify cask systems for a variety of fuel characteristics with simplified SNF loading requirements. Therefore, in general, loaded cask systems possess excess and uncredited criticality margins (i.e., the difference between the licensing basis and the as-loaded calculations). This uncredited margin could be quantified by (1) employing more detailed cask-specific evaluations that credit the actual as-loaded cask inventory and (2) taking into account full (actinide and fission product) burnup credit. This uncredited criticality margin could be used to offset uncertainties in the safety basis to account for the effects of system aging during extended dry storage prior to transportation. Additionally, the uncredited criticality margin could also potentially be credited to offset increases in SNF system reactivity that may occur over a repository performance period (e.g., 10,000 years or more) as the system undergoes degradation and internal geometry changes. This paper summarizes an assessment of cask-specific as-loaded criticality margins for 215 loaded casks of SNF stored at eight reactor sites under fully flooded conditions to assess the margins available during transportation after extended storage. It is observed that the calculated k{sub eff} margin varies from 0.05 to almost 0.3 Δk{sub eff} for the eight selected reactor sites, demonstrating that significant uncredited safety margins are present. In addition, this paper evaluates the sufficiency of this excess margin in applications involving direct disposal of currently loaded SNF canisters (for canister-based systems) in a repository. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Space-Based Telemetry And Range Safety Flight Demonstration #1

The basic ability of STARS to maintain a satellite communications link with TDRSS satellites during dynamic aircraft flights was successfully demonstrated during FD 1. The Range Safety and Range User systems' link margins were measured. The ability to acquire/reacquire and maintain lock between a high-dynamic vehicle and a satellite-based system was demonstrated. The Range Safety system simultaneously received and processed command links from space and ground transmitters and provided near real-time Range Safety telemetry to DFRC, which then sent it in near real time to KSC, GSFC, and WFF for monitoring. The GPS receiver maintained track except during extremely dynamic maneuvers. The Range User system sent data at three different data rates. There were excellent cooperation and support from the different Centers, contractors, and Ranges. A large amount of data was recorded and extensive post-flight analysis was performed. The Range User TDRSS link margin met or exceeded the predicted performance at three different data rates. The Range Safety launch-head link margins generally agreed with the predicted performance. The UPS positions and velocities agreed with those from tracking radar to within about 20 m and a few rn/s. The link margins for the Range Safety TDRSS telemetry link were less than expected. The link margin for one TDRSS command link LPT channel was occasionally much less than the other. Additional post-flight testing has yet to identify the root causes of these results. There were many lessons learned from this first set of test flights. The most important one is that more time and testing are needed for each step to deal with the inevitable problems. It is vital that these lessons be among the primary areas of study that will carry over from FD#1 to FD#2, which is currently scheduled for early FY05 at DFRC and will use a specially designed Ku-band phased array antenna for the Range User system. The next series of flight demonstrations scheduled for late 2004 at DFRC will incorporate many lessons learned from FD#1. A specially designed Ku-band phased array antenna will be used with the Range User system. A test flight on a hypersonic vehicle is planned by the end of 2006.

Demspm. Erol↗

Impacts of LEU+ and ATF on Fresh Fuel Storage Criticality Safety

The use of increased fuel enrichment, which is still in the realm of low-enriched uranium (LEU) fuel, has been of interest to commercial light water reactor operators as part of the next iteration in fuel cycle technological advances and research and development. Using increased enrichment fuel, or high-assay LEU (HALEU), in power plants has clear benefits for being able to load cores with additional power-producing fuel. Although HALEU enrichments can range up to 20%, the more guarded approach of investigating enrichments above current fuels within 10% enrichment is referred to as LEU plus (LEU+) to reflect the less drastic change in operating conditions and requirements and similarity to current fuel cycles. Of additional interest and increasing maturity is the incorporation of accident-tolerant fuel (ATF) concepts, which are also applicable to the current fleet. This class of technologies involves changes such as cladding (e.g., chromium coating or FeCrAl) and fuel composition (e.g., chromia dopant) alterations to demonstrate improved fuel performance under accident scenarios. The ability to properly store fuel before and after residence time in the reactor is crucial to plant operation. Typically, this is done in either a new fuel vault (NFV) or spent fuel pool (SFP). Storing, loading, and unloading dozens of fuel assemblies within the same general area provides opportunities for obvious criticality concerns. These concerns are addressed with regulations to the subcriticality margin that the NFV and SFP must maintain in certain conditions. Adopting LEU+ fuel results in inherent reactivity increases, which are extremely relevant for safe fuel storage. Therefore, a clear understanding of the effects of LEU+ fuel and ATF on criticality safety margins to regulatory limits is required, as well as an understanding of the degree of absorber crediting under normal and accident conditions.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Probabalistic Risk Analysis and Thermal Margin Process for an Inflatable Aeroshell

Uncertainties always exist in atmospheric entry aeroheating environments and the thermal response of thermal protection system (TPS) material. These uncertainties are mitigated in the design by ap-plying margin and factors of safety to the TPS. Entry vehicle TPS is often conservatively over-sized for the heat loads that are experienced along the entry trajectory by stacking worst-case scenarios together. Additionally, the current TPS design and margin process used by NASA offers very little insight into the risk of over-temperature during flight and the reliability of the heat shield performance [1,3]. A probabilistic margin process can be used to calculate the amount of TPS margin necessary to survive a given entry heat load at a specified level of risk [2,3,4]. The vehicle’s initial entry state (entry velocity, flight path angle, and entry mass) determines the expected atmospheric entry environmental conditions and resulting heat load that the entry vehicle will experience. If there is flexibility in the entry state, then this process can be used to select an appropriate combination of entry state parameters and TPS size to target a desired reentry reliability. This probabilistic margin process allows engineers to make informed aeroshell design, entry-trajectory design, and TPS performance risk trades while preventing excessive TPS margin from being applied. The probabilistic TPS margin process has been performed to determine TPS thickness and entry heating constraints given an acceptable risk level for the Low Earth Orbit Flight Experiment of an Inflatable Decelerator (LOFTID) flight project. The process is used in a manner to size the entry heat load for a given flexible TPS (FTPS) thickness so that it meets project reliability standards while allowing the FTPS and the underlying inflatable structure (IS) to be pushed to adequately high temperatures. Since the LOFTID project is an experimental flight demonstration, it is de-sired to drive the FTPS and IS to temperatures that cover a large range of their thermal response models’ applicability. This will allow the thermal response models to be better improved and validated post-flight using LOFTID’s extensive instrumentation embedded within the aeroshell. The presentation demonstrates how uncertainty analysis is carried out using an end-to-end Monte Carlo process where three separate Monte Carlo simulations are run in sequence. The first Monte Carlo simulation operates on the entry trajectory model to generate trajectory parameter dispersions that are fed into the second Monte Carlo simulation. The second Monte Carlo simulation operates on the aerothermodynamics model to generate aeroheating parameter dispersions that are fed into the third Monte Carlo simulation. The third Monte Carlo simulation operates on the FTPS material thermal response model to generate the final FTPS/IS thermal response dispersions. The end-to-end Monte Carlo simulation propagates the uncertainties of each model into the next to quantify the resulting uncertainty of the FTPS/IS thermal response. The fractional contributions of the uncertain parameters in the trajectory, aerothermal, and thermal response models to the variance in the FTPS/IS thermal response is determined as a byproduct of the Monte Carlo analysis. The structural uncertainty of the FTPS thermal response model is evaluated by flight relevant ground testing and model error analysis using test measurements. This probabilistic TPS margin process had never been applied to an entry vehicle and it is one of the LOFTID project’s goals to demonstrate its merits.

Steven A. Tobin↗

SU-E-T-277: Raystation Electron Monte Carlo Commissioning and Clinical Implementation

Purpose: To evaluate the Raystation v4.0 Electron Monte Carlo algorithm for an Elekta Infinity linear accelerator and commission for clinical use. Methods: A total of 199 tests were performed (75 Export and Documentation, 20 PDD, 30 Profiles, 4 Obliquity, 10 Inhomogeneity, 55 MU Accuracy, and 5 Grid and Particle History). Export and documentation tests were performed with respect to MOSAIQ (Elekta AB) and RadCalc (Lifeline Software Inc). Mechanical jaw parameters and cutout magnifications were verified. PDD and profiles for open cones and cutouts were extracted and compared with water tank measurements. Obliquity and inhomogeneity for bone and air calculations were compared to film dosimetry. MU calculations for open cones and cutouts were performed and compared to both RadCalc and simple hand calculations. Grid size and particle histories were evaluated per energy for statistical uncertainty performance. Acceptability was categorized as follows: performs as expected, negligible impact on workflow, marginal impact, critical impact or safety concern, and catastrophic impact of safety concern. Results: Overall results are: 88.8% perform as expected, 10.2% negligible, 2.0% marginal, 0% critical and 0% catastrophic. Results per test category are as follows: Export and Documentation: 100% perform as expected, PDD: 100% perform as expected, Profiles: 66.7% perform as expected, 33.3% negligible, Obliquity: 100% marginal, Inhomogeneity 50% perform as expected, 50% negligible, MU Accuracy: 100% perform as expected, Grid and particle histories: 100% negligible. To achieve distributions with satisfactory smoothness level, 5,000,000 particle histories were used. Calculation time was approximately 1 hour. Conclusion: Raystation electron Monte Carlo is acceptable for clinical use. All of the issues encountered have acceptable workarounds. Known issues were reported to Raysearch and will be resolved in upcoming releases.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Preliminary Results From a Prospective Study Using Limited Margin Radiotherapy in Pediatric and Young Adult Patients With High-Grade Nonrhabdomyosarcoma Soft-Tissue Sarcoma

Purpose: To demonstrate the safety and efficacy of limited margin radiotherapy in the local control of pediatric and young adult patients with high-grade nonrhabdomyosarcoma soft tissue sarcoma (NRSTS). Methods and Materials: Pediatric patients with high-grade NRSTS requiring radiation were treated on an institutional review board approved prospective institutional study of conformal/intensity-modulated/interstitial brachytherapy using a 2-cm anatomically constrained margin. Results: A total of 32 patients (median age, 15.3 years; range, 2-22 years) received adjuvant (27 patients) or definitive (5 patients) irradiation. With a median follow-up of 32 months, the 3-year cumulative incidence of local failure was 3.7% for patients undergoing irradiation after surgical resection. Four patients experienced local failure; the mean dose to the volume of recurrence was >=97% of the prescribed dose. Conclusions: Delivery of limited margin radiotherapy using external beam or brachytherapy provides a high rate of local tumor control without marginal failure. Further follow-up is required to determine whether normal tissue effects are minimized using this approach.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Status of Multiple Channel Fuel Performance Capabilities Within the SAS4A/SASSYS-1 Safety Analysis Software

SAS4A/SASSYS-1 (SAS) is a fast-running simulation tool used to perform deterministic analysis of anticipated events as well as design basis and beyond design basis accidents for advanced liquid-metal-cooled nuclear reactors. It is a critical element of safety analysis capabilities for the U.S. Department of Energy and is utilized within industry to perform the transient safety analyses required to support the licensing of Liquid Metal-cooled Fast Reactors (LMFRs). Although SAS is exceptionally fast for most transient scenarios, fuel performance calculations, along with the associated pre-transient characterization of the fuel pin, may be required for transient scenarios where fuel pin failure is hypothesized. Both the pre-transient characterization and the transient fuel performance calculation are necessary to properly quantify margins to potential fuel failure and assess the time spent potentially exceeding such margins during events. While safety analysis calculations with fuel performance models provide a more detailed characterization of the reactor during a transient, the pre-transient characterization can be time-consuming and computationally expensive. Often, large numbers of fuel pins have been exposed to similar pre-transient irradiation conditions. Similarly, the same pre-transient fuel characterization may be applicable to numerous transient conditions. This provides an opportunity to optimize the SAS computational framework such that pre-transient fuel characterization can be shared across multiple channels (fuel pins) and across multiple simulations, thus dramatically reducing overall computational costs. This report summarizes progress toward enhancing the SAS computational framework to support shared, multiple channel fuel performance characterizations intended to significantly reduce computational costs. Preliminary testing has shown that the computational time saved by using the pre-transient sharing capability is approximately equal to the time it takes to perform the pre-transient characterization.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Improvement of the thermal margins in the Swedish Ringhals-3 PWR by introducing new fuel assemblies with thorium

Thorium is a fertile material and most of the past research has focused on breeding thorium to fissile material. In this paper, the focus is on using thorium to improve the thermal margins by homogeneously distributing thorium in the fuel pellets. A proposed uranium-thorium-based fuel assembly is simulated for the Swedish Ringhals-3 PWR core in a realistic demonstration. All the key safety parameters, such as isothermal temperature coefficient of reactivity, Doppler temperature of reactivity, boron worth, shutdown margins and fraction of delayed neutrons are studied in this paper, and are within safety limits for the new core design using the uranium-thorium-based fuel assemblies. The calculations were performed by the two-dimensional transport code CASMO-4E and the two group steady-state three dimensional nodal code SIMULATE-3 from Studsvik Scandpower. The results showed that the uranium-thorium-based fuel assembly improves the thermal margins, both in the pin peak power and the local power (Fq). The improved thermal margins would allow more flexible core designs with less neutron leakage or could be used in power uprates to offer efficient safety margins. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗