Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “risk analysis”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 883 records · Page 49

Digital Twin for Optimizing Real-time Economy of the Integrated Energy Systems

Economic and safe operation of integrated energy systems (IES) requires real-time optimization (RTO) of the control and actions conducted on each system component. In this regard, digital twins (DTs), which consist of a physical system, a virtual system, and the data communication that occurs between the two, are essential for effective RTO. Through the data warehouse, the virtual system is constantly updated with real-time data from the physical system, and functions as the model in the optimization framework. The reduced-order model of the dynamic process model in the virtual system is used in the optimization framework. The optimization results are then returned, via the data warehouse, as control actions to the physical system. This work demonstrates the software capabilities of DT assets for an IES in the context of preparing a DT for an experimental system comprised of Idaho National Laboratory (INL)’s Thermal Energy Delivery System and battery system. For the virtual demonstration, the DTs encompass (1) a physical system, including the Modelica models of the Thermal Energy Delivery System and the battery system; (2) virtual optimization via the Optimization of Real-Time Capacity Allocation (ORCA) platform; and (3) the open-source data warehouse software DeepLynx. This work assesses the performance of ORCA, which utilizes a reduced-order model built using the Risk Analysis Virtual Environment (RAVEN) and trained on the Modelica models and real-time data pipeline through the graph database hosted in DeepLynx. The proposed optimization workflow will be an RTO model based on DTs and the data they generate.

25 ENERGY STORAGE↗

Post-Fukushima Safety Enhancement Activities in Canada

In the immediate aftermath of the common-cause seismic and tsunami events that triggered the Fukushima Daiichi nuclear accident on March 11, 2011, the nuclear regulator, the Canadian Nuclear Safety Commission (CNSC), requested that all Cass I nuclear facilities re-examine the safety cases for their nuclear facilities. Lessons-learned task forces were established by the CNSC, and the nuclear utilities, Ontario Power Generation (OPG), Bruce Power (BP), and New Brunswick Power (NBP). The purposes of these independent task forces was to develop relevant lessons learned issues for the Candu nuclear power plants operating in Canada and to identify actions that could enhance safety. Subsequently, a CNSC Integrated Action Plan was developed to address the recommendations arising from the CNSC Task Force Report, and the licensees aligned their actions with this plan. The actions were grouped into four categories, as follows. 1. Strengthening defence in depth; Actions included re-assessment of a site-specific external hazards using PSA; physical plant changes to add further cooling water make-up capability to heat sinks; development of new Canadian standards and updated regulatory documents that address requirements for Beyond Design Basis Accidents (BDBA), Probabilistic Safety Assessment (PSA) and Period Safety Review (PSR); development of a new and novel methodology for assessing multi-unit risk that is consistent with the IAEA construct of defence-in-depth (including a safety goal hierarchy and complementary risk analysis methods that address 'Black Swan' events); enhanced management of hydrogen combustion challenges; and enhanced Severe Accident Management Guidelines (SAMG). 2. Enhancing emergency response; Actions included provision of Emergency Mitigation Equipment (EME) such as transportable diesel-driven pumps or fire engines, transportable diesel generators for AC and instrument power; pre-installed connections to in-plant equipment via easily accessible and protected quick-connect points for water and electrical power; upgraded emergency response centres; enhanced communication systems and protocols; and enhanced emergency response programs, training and exercises. 3. Improving the regulatory framework and processes; 4. Enhancing international collaboration. Actions assigned under categories 3 and 4 were placed upon the regulator. This presentation will focus on the assigned actions in categories 1 and 2. The underlying motivation, objectives, and safety benefits associated with the actions will be described within the context of broader aspects of severe accident mitigation in water-cooled reactors. (author)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

01-16 DOE Authorization Strategy

DOE-STD-1189-2016 Process Standard – Stage Gates Establishment of Regulatory Requirements Clarity of Path Forward Integration of Safety and Design Reduce Project Risk by Establishing Regulatory Certainty through formal regulatory approvals. Flexibility in risk analysis and presentation methods. ANSI/ANS 15.21, DOE-STD-3009, LMP/TICAP

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Steam Generator Model Design Parameter Sensitivity Study Using Advanced Optimization Tools

This study focuses on design parameter sensitivity studies pertaining to a steam generator (SG) model, using both Python and machine-learning tools. The SG model is a mathematical representation (including fluid flow and heat transfer equations/models/correlations) of a steam-generating unit in a pressurized water reactor (PWR)-type small modular reactor (SMR) system. Design studies involve changing the model’s input design parameters (e.g., temperature, pressure, mass flow rate) to observe the resulting effects on the output of the system (e.g., heat transfer coefficient [HTC], Nusselt number, heat transfer performance). Sensitivity studies analyze the degree to which system output and/or desired parameters (e.g., HTC or heat transfer performance) are sensitive to changes in input parameters. By using machine-learning tools such as the Risk Analysis Virtual Environment (RAVEN) developed at Idaho National Laboratory (INL), detailed design parametric sensitivity studies and model optimization were performed. Six input parameters—namely, the pressure, temperature, and mass flow rate for the inlet of the primary-side (hot fluid) and secondary-side (cold fluid) of the SG—were randomly perturbed via RAVEN’s Monte Carlo Sampler module, using uniform distributions (±1% relative changes). The analysis results give valuable insights into SG system performance and optimization, and provide justification for researching optimized sensor placement to effectively monitor and obtain experimental data.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Steam Generator Model Design Parameter Sensitivity Study Using Advanced Optimization Tools

This study focuses on design parameter sensitivity studies pertaining to a steam generator (SG) model, using both Python and machine-learning tools. The SG model is a mathematical representation (including fluid flow and heat transfer equations/models/correlations) of a steam-generating unit in a pressurized water reactor (PWR)-type small modular reactor (SMR) system. Design studies involve changing the model’s input design parameters (e.g., temperature, pressure, mass flow rate) to observe the resulting effects on the output of the system (e.g., heat transfer coefficient [HTC], Nusselt number, heat transfer performance). Sensitivity studies analyze the degree to which system output and/or desired parameters (e.g., HTC or heat transfer performance) are sensitive to changes in input parameters. By using machine-learning tools such as the Risk Analysis Virtual Environment (RAVEN) developed at Idaho National Laboratory (INL), detailed design parametric sensitivity studies and model optimization were performed. Six input parameters—namely, the pressure, temperature, and mass flow rate for the inlet of the primary-side (hot fluid) and secondary-side (cold fluid) of the SG—were randomly perturbed via RAVEN’s Monte Carlo Sampler module, using uniform distributions (±1% relative changes). The analysis results give valuable insights into SG system performance and optimization, and provide justification for researching optimized sensor placement to effectively monitor and obtain experimental data.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Proposed SPAR Modeling Method for Quantifying Time Dependent Station Blackout Cut Sets

Abstract: The U.S. Nuclear Regulatory Commission’s (USNRC’s) Standardized Plant Analysis Risk (SPAR) models and industry risk models take similar approaches to analyzing the risk associated with loss of offsite power and station blackout (LOOP/SBO) events at nuclear reactor plants. In both SPAR models and industry models, core damage risk resulting from a LOOP/SBO event is analyzed using a combination of event trees and fault trees that produce cut sets that are, in turn, quantified to obtain a numerical estimate of the resulting core damage risk. A proposed SPAR method for quantifying the time-dependent cut sets is sometimes referred to as a convolution method. The SPAR method reflects assumptions about the timing of emergency diesel failures, the timing of subsequent attempts at emergency diesel repair, and the timing of core damage that may be different than those often used in industry models. This paper describes the proposed SPAR method.

99 GENERAL AND MISCELLANEOUS↗

Robust Decision Making

The Idaho National Laboratory (INL) is funded through the Department of Energy (DOE) Office of Nuclear Energy and other customers who have direct contracts with the Laboratory. The people, equipment, facilities and other infrastructure at the laboratory require continual investment to maintain and improve the laboratory’s capabilities. With ever tightening federal and customer budgets, the ability to direct investments into the people, equipment, facilities and other infrastructure which are most closely aligned with the laboratory’s mission and customers’ goals grows increasingly more important. The ability to justify those investment decisions based on objective criteria that can withstand political, managerial and technical criticism also becomes increasingly more important. The Systems Engineering tools of decision analysis, risk management and roadmapping, when properly applied to such problems, can provide defensible decisions.

99 GENERAL AND MISCELLANEOUS↗

Pitfalls and Precautions When Using Predicted Failure Data for Quantitative Analysis of Safety Risk for Human Rated Launch Vehicles

Launch vehicle reliability analysis is largely dependent upon using predicted failure rates from data sources such as MIL-HDBK-217F. Reliability prediction methodologies based on component data do not take into account system integration risks such as those attributable to manufacturing and assembly. These sources often dominate component level risk. While consequence of failure is often understood, using predicted values in a risk model to estimate the probability of occurrence may underestimate the actual risk. Managers and decision makers use the probability of occurrence to influence the determination whether to accept the risk or require a design modification. The actual risk threshold for acceptance may not be fully understood due to the absence of system level test data or operational data. This paper will establish a method and approach to identify the pitfalls and precautions of accepting risk based solely upon predicted failure data. This approach will provide a set of guidelines that may be useful to arrive at a more realistic quantification of risk prior to acceptance by a program.

Hatfield, Glen S.↗

Analysis of Casualty Risk per Police-Reported Crash for Model Year 2000 to 2004 Vehicles, using Crash Data from Five States

In this report we compare two measures of driver risks: fatality risk per vehicle registration-year, and casualty (fatality plus serious injury) risk per police-reported crash. Our analysis is based on three sets of data from five states (Florida, Illinois, Maryland, Missouri, and Pennsylvania): data on all police-reported crashes involving model year 2000 to 2004 vehicles; 2005 county-level vehicle registration data by vehicle model year and make/model; and odometer readings from vehicle emission inspection and maintenance (I/M) programs conducted in urban areas of four of the five states (Florida does not have an I/M program). The two measures of risk could differ for three reasons: casualty risks are different from fatality risk; risks per vehicle registration-year are different from risks per crash; and risks estimated from national data are different from risks from the five states analyzed here. We also examined the effect of driver behavior, crash location, and general vehicle design on risk, as well as sources of potential bias in using the crash data from five states.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

A systematic decision-making methodology to formalize the selection of degree of realism in screening analysis of probabilistic risk assessment

In the nuclear power domain, Probabilistic Risk Assessment (PRA) is used to inform decision-making for Nuclear Power Plants (NPPs). Recently, there has been an increase in the utilization of modeling and simulation (M&S) to support the estimation of PRA inputs. Risk analysts should carefully select the PRA items that require M&S and their degree of realism (DoR) with consideration of the required resources. To support this selection, this article formulates a systematic decision-making approach for the DoR selection. The DoR selection is made based on two predictive decision-making attributes: the predicted differences in safety risk estimate (ΔSaRi) and the cost of analysis (ΔCAN). This research also develops and quantifies causal models to estimate ΔSaRi and ΔCAN. The causal model-based prediction of ΔSaRi and ΔCAN helps reduce the trial-and-error nature of the DoR selection in the PRA screening analysis and provides insights for DoR selection and the gradual refinements of PRA realism. This approach is demonstrated for a case study on fire PRA of NPPs, where an adequate DoR is selected from two fire models: an engineering correlation and a zone model.

Alkhatib, Sari [Department of Nuclear, Plasma, and↗

Failure risk assessment by analysis and testing

The sources of information on which to base an evaluation of reliability or failure risk of an aerospace flight system are (1) experience from tests and flights and (2) engineering analysis. It is rarely feasible to establish high reliability at high confidence by testing aerospace systems or components. Moreover, failure prediction by conventional, deterministic methods of engineering analysis can become arbitrary and subject to serious misinterpretation when uncertain or approximate information is used to establish analysis parameter values and to calibrate the accuracy of engineering models. The limitations of testing to evaluate failure risk are discussed, and a statistical approach which incorporates both engineering analysis and testing is presented.

Moore, N.↗

Non-Rhabdomyosarcoma Soft Tissue Sarcomas in Children: A Surveillance, Epidemiology, and End Results Analysis Validating COG Risk Stratifications

Purpose: Non-rhabdomyosarcoma soft tissue sarcomas (NRSTS) are a heterogeneous group of sarcomas that encompass over 35 histologies. With an incidence of ∼500 cases per year in the United States in those <20 years of age, NRSTS are rare and therefore difficult to study in pediatric populations. We used the large Surveillance, Epidemiology, and End Results (SEER) database to validate the prognostic ability of the Children's Oncology Group (COG) risk classification system and to define patient, tumor, and treatment characteristics. Methods and Materials: From SEER data from 1988 to 2007, we identified patients ≤18 years of age with NRSTS. Data for age, sex, year of diagnosis, race, registry, histology, grade, primary size, primary site, stage, radiation therapy, and survival outcomes were analyzed. Patients with nonmetastatic grossly resected low-grade tumors of any size or high-grade tumors ≤5 cm were considered low risk. Cases of nonmetastatic tumors that were high grade, >5 cm, or unresectable were considered intermediate risk. Patients with nodal or distant metastases were considered high risk. Results: A total of 941 patients met the review criteria. On univariate analysis, black race, malignant peripheral nerve sheath (MPNST) histology, tumors >5 cm, nonextremity primary, lymph node involvement, radiation therapy, and higher risk group were associated with significantly worse overall survival (OS) and cancer-specific survival (CSS). On multivariate analysis, MPNST histology, chemotherapy-resistant histology, and higher risk group were significantly poor prognostic factors for OS and CSS. Compared to low-risk patients, intermediate patients showed poorer OS (hazard ratio [HR]: 6.08, 95% confidence interval [CI]: 3.53-10.47, P<.001) and CSS (HR: 6.27; 95% CI: 3.44-11.43, P<.001), and high-risk patients had the worst OS (HR: 13.35, 95% CI: 8.18-21.76, P<.001) and CSS (HR: 14.65, 95% CI: 8.49-25.28, P<.001). Conclusions: The current COG risk group stratification for children with NRSTS has been validated with a large number of children in the SEER database.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Integrated Cost and Schedule using Monte Carlo Simulation of a CPM Model - 12419

This discussion of the recommended practice (RP) 57R-09 of AACE International defines the integrated analysis of schedule and cost risk to estimate the appropriate level of cost and schedule contingency reserve on projects. The main contribution of this RP is to include the impact of schedule risk on cost risk and hence on the need for cost contingency reserves. Additional benefits include the prioritizing of the risks to cost, some of which are risks to schedule, so that risk mitigation may be conducted in a cost-effective way, scatter diagrams of time-cost pairs for developing joint targets of time and cost, and probabilistic cash flow which shows cash flow at different levels of certainty. Integrating cost and schedule risk into one analysis based on the project schedule loaded with costed resources from the cost estimate provides both: (1) more accurate cost estimates than if the schedule risk were ignored or incorporated only partially, and (2) illustrates the importance of schedule risk to cost risk when the durations of activities using labor-type (time-dependent) resources are risky. Many activities such as detailed engineering, construction or software development are mainly conducted by people who need to be paid even if their work takes longer than scheduled. Level-of-effort resources, such as the project management team, are extreme examples of time-dependent resources, since if the project duration exceeds its planned duration the cost of these resources will increase over their budgeted amount. The integrated cost-schedule risk analysis is based on: - A high quality CPM schedule with logic tight enough so that it will provide the correct dates and critical paths during simulation automatically without manual intervention. - A contingency-free estimate of project costs that is loaded on the activities of the schedule. - Resolves inconsistencies between cost estimate and schedule that often creep into those documents as project execution proceeds. - Good-quality risk data that are usually collected in risk interviews of the project team, management and others knowledgeable in the risk of the project. The risks from the risk register are used as the basis of the risk data in the risk driver method. The risk driver method is based in the fundamental principle that identifiable risks drive overall cost and schedule risk. - A Monte Carlo simulation software program that can simulate schedule risk, burn WM2012 rate risk and time-independent resource risk. The results include the standard histograms and cumulative distributions of possible cost and time results for the project. However, by simulating both cost and time simultaneously we can collect the cost-time pairs of results and hence show the scatter diagram ('football chart') that indicates the joint probability of finishing on time and on budget. Also, we can derive the probabilistic cash flow for comparison with the time-phased project budget. Finally the risks to schedule completion and to cost can be prioritized, say at the P-80 level of confidence, to help focus the risk mitigation efforts. If the cost and schedule estimates including contingency reserves are not acceptable to the project stakeholders the project team should conduct risk mitigation workshops and studies, deciding which risk mitigation actions to take, and re-run the Monte Carlo simulation to determine the possible improvement to the project's objectives. Finally, it is recommended that the contingency reserves of cost and of time, calculated at a level that represents an acceptable degree of certainty and uncertainty for the project stakeholders, be added as a resource-loaded activity to the project schedule for strategic planning purposes. The risk analysis described in this paper is correct only for the current plan, represented by the schedule. The project contingency reserve of time and cost that are the main results of this analysis apply if that plan is to be followed. Of course project managers have the option of re-planning and re-scheduling in the face of new facts, in part by mitigating risk. This analysis identifies the high-priority risks to cost and to schedule, which assist the project manager in planning further risk mitigation. Some project managers reject the results and argue that they cannot possibly be so late or so overrun. Those project managers may be wasting an opportunity to mitigate risk and get a more favorable outcome. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Implementation of a Bayesian Engine for Uncertainty Analysis

In probabilistic risk assessment, it is important to have an environment where analysts have access to a shared and secured high performance computing and a statistical analysis tool package. As part of the advanced small modular reactor probabilistic risk analysis framework implementation, we have identified the need for advanced Bayesian computations. However, in order to make this technology available to non-specialists, there is also a need of a simplified tool that allows users to author models and evaluate them within this framework. As a proof-of-concept, we have implemented an advanced open source Bayesian inference tool, OpenBUGS, within the browser-based cloud risk analysis framework that is under development at the Idaho National Laboratory. This development, the “OpenBUGS Scripter” has been implemented as a client side, visual web-based and integrated development environment for creating OpenBUGS language scripts. It depends on the shared server environment to execute the generated scripts and to transmit results back to the user. The visual models are in the form of linked diagrams, from which we automatically create the applicable OpenBUGS script that matches the diagram. These diagrams can be saved locally or stored on the server environment to be shared with other users.

99 GENERAL AND MISCELLANEOUS↗

Modeling and Quantification of Team Performance in Human Reliability Analysis for Probabilistic Risk Assessment

Probabilistic Risk Assessment (PRA) and Human Reliability Assessment (HRA) are important technical contributors to the United States (U.S.) Nuclear Regulatory Commission’s (NRC) risk-informed and performance based approach to regulating U.S. commercial nuclear activities. Furthermore, all currently operating commercial NPPs in the U.S. are required by federal regulation to be staffed with crews of operators. Yet, aspects of team performance are underspecified in most HRA methods that are widely used in the nuclear industry. There are a variety of "emergent" team cognition and teamwork errors (e.g., communication errors) that are 1) distinct from individual human errors, and 2) important to understand from a PRA perspective. The lack of robust models or quantification of team performance is an issue that affects the accuracy and validity of HRA methods and models, leading to significant uncertainty in estimating HEPs. This paper describes research that has the objective to model and quantify team dynamics and teamwork within NPP control room crews for risk informed applications, thereby improving the technical basis of HRA, which improves the risk-informed approach the NRC uses to regulate the U.S. commercial nuclear industry.

99 GENERAL AND MISCELLANEOUS↗