Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “reuse”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 883 records · Page 49

Towards a Circular Economy for PET Bottles in the US

The United States generates the most plastic waste of any country. Along with that GHG emissions from the global plastic economy are expected to increase to 15% of the global carbon budget by 2050. It is imperative that plastic recycling is made a reality to reduce both plastic pollution in the environment and GHG emissions. A portfolio of end-of-life strategies must be implemented to minimize environmental impacts and retain valuable plastic material, but it is challenging to compare options that generate products with different utility and lifetime. Plastic use reduction, reuse and recycling are thus increasingly important, but making informed policy and research decisions within this space can be challenging given the diverse range of available solutions. The novel analysis framework, Plastic Parallel Pathways Platform (4P) has been equipped with consequential life cycle assessment, techno-economic analysis, and a plastic circularity indicator to estimate the greenhouse gas (GHG) emissions, circularity, and cost of polyethylene terephthalate (PET) down-cycling to lower-quality resin, closed-loop recycling to food-grade PET bottles, up-cycling to fiber-reinforced plastic (FRP), and conversion to non-plastic products (electricity, oil) on a United States economy-wide basis. Integrating system dynamics into this robust plastics model that already incorporates techno-economics, circularity, and environmental impacts will enable identification of key bottlenecks between manufacturers, waste sorters, and reclaimers that currently prevent rapid decarbonization of the plastics economy. System dynamics (SD) explore the evolution of activities and technologies based on changed macro parameters such as plastic demand and supply, market shifts, and cross-sectoral interactions. This project particularly aims to explore the interplay between, waste collection, plastic waste sorting, recycling, and manufacturing, as well as the effect of plastic bale quality and plastic reuse initiatives on the surrounding process stages. This functionality will facilitate combinatory analysis in which a portfolio of end-of-life pathways are assessed simultaneously, with the exact makeup of that portfolio affected by parameters such as technology scales, resource constraints, and waste mitigation efforts. Integrating SD with the 4P framework enables analyzing the effect of increased revenue and reinvestment into improving process efficiencies, sorting and collection quantities. Through that, market effects of increased recycled resin availability can be studied for the plastics systems model for the US. The results will help identify technical or economic bottlenecks that currently limit efforts to decarbonize the U.S. plastics economy.

circular economy↗

Web-Based Training on Reviewing Dose Modeling Aspects of NRC Decommissioning and License Termination Plans

NRC licensees at decommissioning nuclear facilities submit License Termination Plans (LTP) or Decommissioning Plans (DP) to NRC for review and approval. To facilitate a uniform and consistent review of these plans, the NRC developed training for its staff. A live classroom course was first developed in 2005, which targeted specific aspects of the LTP and DP review process related to dose-based compliance demonstrations or modeling. A web-based training (WBT) course was developed in 2006 and 2007 to replace the classroom-based course. The advantage of the WBT is that it will allow for staff training or refreshers at any time, while the advantage of a classroom-based course is that it provides a forum for lively discussion and the sharing of experience of classroom participants. The objective of this course is to train NRC headquarters and regional office staff on how to review sections of a licensee's DP or LTP that pertain to dose modeling. The DP generally refers to the decommissioning of non-reactor facilities, while the LTP refers specifically to the decommissioning of reactors. This review is part of the NRC's licensing process, in which the NRC determines if a licensee has provided a suitable technical basis to support derived concentration guideline levels (DCGLs)1 or dose modeling analyses performed to demonstrate compliance with dose-based license termination rule criteria. This type of training is one component of an organizational management system. These systems 'use a range of practices to identify, create, represent, and distribute knowledge for reuse, awareness and learning'. This is especially important in an organization undergoing rapid change or staff turnover to retain organizational information and processes. NRC is committed to maintaining a dynamic program of training, development, and knowledge transfer to ensure that the NRC acquires and maintains the competencies needed to accomplish its mission. This paper discusses one specific project related to training, developing, and transferring knowledge to NRC staff on how to review dose-modeling portions of licensee-submitted DPs and LTPs. This project identified specific cases and examples, created easily updateable educational modules, represented material in an engaging format through animations, video, and graphics, and distributed information on how to perform these reviews in an accessible, web-based format. WBT promotes consistency in reviews and has the advantage of being able to be used as a resource to staff at any time. The WBT will provide reviewers with knowledge needed to perform risk-informed analyses (e.g., information related to development of realistic scenarios and use of probabilistic analysis). WBT on review of LTP or DP dose modeling will promote staff development, efficiency, and effectiveness in performing risk-informed, performance-based reviews of decommissioning activities at NRC-licensed facilities. One of the key advantages of this type of web-based training is that it can be loaded on-demand and can be reused indefinitely. In addition to the benefits of on-demand training, the modules can also be used for reference. The presentations are hosted on a web server that can be accessed by registered users at any time. Staff can return to a particular module to review the material long after they have completed the course.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Preparation and characterization of Zr doped TiO{sub 2} nanotube arrays on the titanium sheet and their enhanced photocatalytic activity

This paper described a new method for the preparation of Zr doped TiO{sub 2} nanotube arrays by electrochemical method. TiO{sub 2} nanotube arrays were prepared by anodization with titanium anode and platinum cathode. Afterwards, the formed TiO{sub 2} nanotube arrays and Pt were used as cathode and anode, respectively, for preparation of Zr/TiO{sub 2} nanotube arrays in the electrolyte of 0.1 M Zr(NO{sub 3}){sub 4} with different voltage and post-calcination process. The nanotube arrays were characterized by field-emission scanning electron microscopy (FESEM), X-ray diffraction (XRD), X-ray photoelectron spectra (XPS) and UV-Vis diffusion reflection spectra (DRS). The photocatalytic activities of these nanotubes were investigated with Rhodamine B as the model pollutant and the results demonstrated that the photocatalytic efficiency of Zr doped TiO{sub 2} nanotubes was much better than that of TiO{sub 2} nanotubes under UV irradiation. Zr/TiO{sub 2} nanotube arrays doped at 7 V and calcined at 600 deg. C (denoted as TiO{sub 2}-7 V-600) achieved the best photocatalytic efficiency and the most optimal doping ratio was 0.047 (Zr/Ti). TiO{sub 2}-7 V-600 could be reused for more than 20 times and maintained good photocatalytic activities. - Graphical abstract: Zr-doped TiO{sub 2} nanotube arrays were prepared by two-step electrochemical process. The photocatalytic efficiency of Zr/TiO{sub 2} was much better than that of TiO{sub 2} nanotubes under UV irradiation. Nanotube arrays prepared by this method could be reused for more than 20 times and maintained good photocatalytic activities.

77 NANOSCIENCE AND NANOTECHNOLOGY↗

Opening Doors of Opportunity to Develop the Future Nuclear Workforce - 13325

The United States' long-term demand for highly skilled nuclear industry workers is well-documented by the Nuclear Energy Institute. In addition, a study commissioned by the SRS Community Reuse Organization concludes that 10,000 new nuclear workers are needed in the two-state region of Georgia and South Carolina alone. Young adults interested in preparing for these nuclear careers must develop specialized skills and knowledge, including a clear understanding of the nuclear workforce culture. Successful students are able to enter well-paying career fields. However, the national focus on nuclear career opportunities and associated training and education programs has been minimal in recent decades. Developing the future nuclear workforce is a challenge, particularly in the midst of competition for similar workers from various industries. In response to regional nuclear workforce development needs, the SRS Community Reuse Organization established the Nuclear Workforce Initiative (NWI{sup R}) to promote and expand nuclear workforce development capabilities by facilitating integrated partnerships. NWI{sup R} achievements include a unique program concept called NWI{sup R} Academies developed to link students with nuclear career options through firsthand experiences. The academies are developed and conducted at Aiken Technical College and Augusta Technical College with support from workforce development organizations and nuclear employers. Programs successfully engage citizens in nuclear workforce development and can be adapted to other communities focused on building the future nuclear workforce. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Operation of Bubblers in the Savannah River Site Defense Waste Processing Facility Melter - 12166

Savannah River Remediation (SRR) LLC acquired the liquid waste contract at the Savannah River Site (SRS) in the summer of 2009. In order to achieve the main goal of the contract, closing of High Level Waste (HLW) tanks, it was necessary to process more waste throughout the SRS liquid waste facilities. The Defense Waste Processing Facility (DWPF) would need to increase its production rate of radioactive waste glass filled canisters as a part of the plan to achieve this commitment. To attain the increased production rate, four bubblers were installed in the DWPF Melter in September 2010 to agitate the DWPF Melter glass pool. The four bubblers were designed to be installed in existing nozzles on the top-head of the DWPF Melter. The design and fabrication of the four (4) bubblers was accomplished through SRR critical subcontractor EnergySolutions LLC. In addition to the existing bubbler design, a new design concept has been approved and is in the process of fabrication. The new design will allow for the lower end (inside melter) of the bubbler to be replaced while the upper end (outside melter) of the bubbler is reused to minimize cost and waste at the DWPF. The bubblers have been operating in the DWPF Melter for approximately 1 year. The originally installed bubbler set was replaced in January 2011. The bubblers were visually examined once removed from the melter and showed minimal signs of wear. Material testing of the Inconel 690 is being performed to determine if the bubblers operational life can be extended. The use of the bubblers has changed the dynamics within the melter glass pool. This is shown through indications that the bubblers have increased the glass pool circulation. Overall, performance of the bubblers has been encouraging and the DWPF Melter has seen a significant improvement in its ability to process waste since the bubbler installation. The installation of the bubblers accomplished the goal of increasing the glass production capability of DWPF Melter. Currently the DWPF Melter is producing glass at a rate of 91 to 93 kg of glass/hour (200 to 205 lbs of glass/hour). As a result of this increased glass production rate the DWPF has been able to produce the most canisters since radioactive operations began in 1996. These accomplishments can be directly attributed to the bubblers ability to increase mixing/convection within the glass melt pool thereby improving the heat transfer from melt pool to the cold cap. Further, this has helped SRR take a significant step forward toward closing the HLW tanks at the aggressive pace set forth in the most recent liquid waste contract at the SRS. As a path forward, the DWPF is continuing work with SRNL to complete the final metallurgical examination of the bubbler samples to help determine methods to increase the design life of the bubblers beyond the current 6-month restriction. Also, the DWPF is continuing work with EnergySolutions on a new bubbler design concept to minimize cost and waste at the DWPF. The new design will allow for the lower end (inside melter) of the bubbler to be replaced while the upper end (outside melter) of the bubbler is reused. This new design is currently in the final design approval phase and EnergySolutions will be selecting a fabricator to begin the work to build bubbler sets 5 and 6 using the new design. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Overview of the U.S. Department of Energy Formerly Utilized Sites Remedial Action Program - 12189

The U.S. Department of Energy (DOE) Formerly Utilized Sites Remedial Action Program (FUSRAP) was established in 1974 to address residual radiological contamination at sites where work was performed for the Manhattan Engineer District and U.S. Atomic Energy Commission. Initially, FUSRAP activities began with a records search for sites that had the potential to contain residual radiological contamination; 46 sites were identified that were eligible for and required remediation. Remedial action began in 1979. In 1997, Congress assigned responsibility for the remediation of FUSRAP sites to the U.S. Army Corps of Engineers (USACE). DOE retains responsibility for determining if sites are eligible for FUSRAP remediation and for providing long-term surveillance and maintenance (LTS and M) of remediated FUSRAP sites. DOE LTS and M activities are designed to ensure that FUSRAP sites remain protective of human health and the environment and to preserve knowledge regarding FUSRAP sites. Additional elements include eligibility determinations, transition of remediated sites from USACE to DOE, LTS and M operations such as inspections and institutional controls management, stakeholder support, preservation of records, and real property and reuse. DOE maintains close coordination with USACE and regulators to ensure there is no loss of protectiveness when sites transition to DOE for LTS and M. Over the life of the FUSRAP program from 1974 to the present, DOE's primary mission and responsibility has been to ensure that FUSRAP sites remain protective of human health and the environment. In fulfilling this mission, the DOE program includes the following key elements: eligibility determinations, transition of remediated sites from USACE to DOE, LTS and M operations such as inspections and institutional controls management, stakeholder support, preservation of records, and real property and reuse. DOE maintains close communication stakeholders as well as state and federal regulators. DOE programs are designed to preserve and present the information that future stewards and stakeholders will need to maintain site remedies and knowledge. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A French Industrial Management Plan for Very Low Level Radioactive Wastes (VLLW) at the CIRES Facility - 17012

Since 2003, very-low-level waste has been disposed of at the Andra CIRES disposal facility, the first disposal facility in the world for this type. It is now the main route in terms of volumes for the management of French radioactive waste. The 2015 national inventory has identified 1.1 million m{sup 3} of VLLW to be produced until 2030. Several waste management scenarios were then analyzed, including issues associated with the flow reduction of the waste to be stored. The key avenues to reduce the volumes of waste, technical and economic viability of which still needing to be challenged, are at this stage: - Favor the reuse of large amounts of metallic VLLW to be produced within the next decade. - To service the recycling of metals, different opportunities for reuse should be considered -including within the non-nuclear sector. - 30% to 50% of VLLW produced in the so-called 'nuclear waste' areas probably have zero or non-detectable radioactivity levels and questions about the introduction of a clearance level. - A disposal route based on a concept derived from waste storage facility for non-nuclear and non-hazardous wastes could be an alternative to the clearance level for the least active inert waste. Therefore volumetric optimizations appear possible, even if the waste management costs will be higher than the current route. Furthermore, efficiency gains and progresses in operating modes would increase the technical capacity of the CIRES of about 250 000 m{sup 3}. In all cases studied, it appears essential to create around 2030 a new VLLW disposal facility, particularly for the dismantling of the current fleet of reactors. According to the proposed optimizations, the necessary capacity for a second VLLW disposal facility would range between 600 000 m{sup 3} and 1.2 million m{sup 3}. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Using Prescribed Fire to Manage the Fernald On-Site Disposal Facility Vegetated Cap - 17401

The Fernald Preserve is a former uranium processing plant that underwent extensive remediation pursuant to the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). It is situated on a 425 ha (1,050 acre) tract of land, approximately 29 km (18 miles) northwest of Cincinnati, Ohio. Remedial activities and subsequent ecological restoration have converted the site from an industrial production facility to an undeveloped park, encompassing a series of wetlands, prairies, and forested communities. The remediation of buildings and soil contamination was completed in 2006, but aquifer remediation is ongoing. Since 2007, the site has been managed by the US Department of Energy (DOE) Office of Legacy Management. Portions of the site are open to the public, with approximately 11 km (7 miles) of walking trails that are open year-round and a visitors center. Site remediation included the construction of an On-Site Disposal Facility (OSDF) for the long-term disposal of contaminated soil and building materials. The OSDF consists of eight disposal cells that encompass approximately 30 hectares (75 acres) on the eastern portion of the Fernald site. Cells are lined and capped, and each has a separate leak detection and leachate collection system. The integrated cap is vegetated with native grasses and forbs. Management of the Fernald Preserve includes the monitoring and maintenance of ecologically restored communities and the vegetated OSDF cap, as required by the site's institutional controls plan. Prescribed burning is recognized as the preferred method for prairie management. Prescribed fire has been used at the Fernald site since 2009 for established prairies in restored areas, but not on the OSDF cap. Stakeholders had reservations regarding the safety of using prescribed fire on the OSDF cap. Because of that, vegetation on the cap was managed as a grassland community. It was mowed, raked, and baled to remove thatch, and promote the continued establishment of native grasses and forbs. Since agricultural use is restricted at the site, the resulting hay bales were kept on property and reused as organic matter and mulch. Over time, more hay bales were being generated in a season than were reused. Therefore in 2015, DOE decided to revisit stakeholder acceptance of prescribed fire on the OSDF cap. Ongoing relationships with local stakeholders allowed for extensive discussions regarding the current management and proposed use of prescribed fire on the OSDF cap. The public was provided information about the planning and implementation of prescribed burns at the site and invited to observe the execution of a successful site burn. This approach led to stakeholder acceptance of DOE's proposal, and vegetation on the caps of cells 4, 5, and 6 was burned in late March 2016. The burn was successful and resulted in several benefits from a land stewardship and cost perspective. This paper details the stakeholder engagement approach and the resulting benefits from the use of prescribed fire on the OSDF cap. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Sustainable disposition of unneeded materials and chemicals at Y-12 national security complex - 15181

The Y-12 National Security Complex (Y-12) strives to integrate sustainability into all aspects of operations. In 2006, Y-12 conducted a site inventory to identify Unneeded Materials and Chemicals (UMC). The final inventory included over 9,400 materials and equipment and over 9,000 chemicals. A cross-functional UMC Project Team (Team) was established to manage and facilitate disposition of inventory items. A Site Plan was developed to outline the strategy to methodically disposition UMC's with the commitment to put sustainability practices first. The Team works to overcome challenges and find new lives for inventory items prior to dispositioning the materials as waste. Cost-effective strategies are used to transfer UMC items to a new owner. The Team utilizes a systematic disposition evaluation process, which does not simply manage UMC's as waste but focuses on reuse with waste disposal as last resort. The dedicated efforts of the Team to divert items from disposal as waste are reflected in the results. Through Fiscal Year 2013, 35 percent of all chemicals and 55 percent of equipment and materials have been reused or recycled. Through Fiscal Year 2013, the Team has dispositioned over 9.62 million pounds of materials (11,600 items) and down-posted over 97,000 square feet of radiological areas. In Fiscal Year 2014, a UMC Phase II inventory was developed to address UMCs that have accumulated since the original inventory was finalized. Lessons learned from the original UMC scope are being applied to phase II activities. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Optimised norm waste management taking benefit of 60 years of nuclear waste experience - 15357

Studsvik has more than 60 years of experience of managing radioactive waste from both our own operations as well from international and other domestic waste generators. During last 5 years our services to generators of NORM waste has increased significantly. Building upon the experience of managing nuclear waste the management of NORM waste can be optimised. An optimized NORM waste management strategy should be based upon a graded approach taking into account the actual conditions (technical as well as regulatory). In line with how work is carried out in the nuclear industry it is recommended that material should be treated for reuse or recycling when appropriate as opposed to conditioning for disposal. This paper covers the principals and practices that should be adopted when considering NORM waste management from initial characterisation to the safe disposal or clearance of the material for reuse or recycling. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Conservation and Recycling for Radiological-Contaminated Laundry Applications - 16044

Recovery and reuse of materials exposed to radioactive environments is a critical element for those whom are involved with processing such materials. In order to minimize the disposal of radiological-contaminated Personal Protective Equipment (PPE, laundry, respirators, etc.) the need for environmentally-friendly and cost-effective technologies to provide laundering services is needed for current and future processes. A by-product of the laundry process is contaminated water. In order to reduce waste generation, we developed a radiological water filtration system custom-designed for laundry applications, which is used as both a filtration device as well as a water recycling system. The filtration process utilizes membrane filtration, suspended solids and organic filtration, ion-exchange capture, and ozonization/UV as germicidal reducers. In addition, ultrafiltration is used as a final step in order to return clean water back to the washing process system. The system was originally designed for non-radiological industrial laundry applications (hospitality, health care, correctional and governmental settings, etc). This process reduces the water consumption and discharge by up to 75% while retaining heat to minimize energy input costs. Principle components of the system include lint shakers and collection tanks with ozone injection, suspended solids filter, activated charcoal, ultraviolet lamp treatment cell, ion exchange columns, ultrafiltration filters, and final holding tank with ozone injection. Although up-front equipment costs are required, we believe that the reduction in waste generated through recycle and reuse of the water, along with avoiding premature disposal of PPE as radioactive waste, greatly outweighs up-front effort. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Turbomachine blade trailing edge cooling circuit with turn passage having set of obstructions

A turbomachine blade, and a coupon for a turbomachine blade, are disclosed. The blade may include an airfoil body having a pressure side and a suction side connected by a leading edge and a trailing edge, a coolant feed passage defined in the airfoil body, and a coolant reuse passage defined in the airfoil body. The blade may also include a first cooling circuit defined in the airfoil body. The first cooling circuit may include a rearward passage extending toward the trailing edge from and fluidly coupled to the coolant feed passage, and a radially spreading return passage extending away from the trailing edge toward and fluidly coupled to the coolant reuse passage. The cooling circuit may also include a radially extending turn passage coupling the rearward passage and the radially spreading return passage. A first set of obstructions may be positioned in the radially extending turn passage.

Dyson, Thomas Earl↗

Management of Fissionable Equivalent Mass Materials at ORNL - 20146

The US DOE manages an inventory of materials that contains a range of long-lived radioactive isotopes that were produced from the 1960's through the 1980's by irradiating targets in production reactors to produce special heavy isotopes for US DOE programmatic use, scientific research, and industrial and medical applications. Since the production reactors and enrichment facilities that produced many of these materials have been shut down, they are considered unique materials that are not likely to be produced again. ORNL uses these materials in US DoE's center for production, storage, and distribution of TRU isotopes (plutonium through californium) and other related nuclear research programs. ORNL also operates the High Flux Isotope Reactor, which provides a high neutron source for production of isotopes for medical, industrial, and nuclear research programs. As a result, ORNL has an inventory of radioisotopes that are being managed for ongoing research programs and being held for reuse because they have potential intrinsic value to US DOE. An initiative is underway at ORNL to better manage these materials, particularly focusing on those with high fissionable equivalent mass that could impact the ability to perform ongoing or new research projects. This paper describes the actions ORNL is taking to manage these inventories, many of which consist of TRU materials, through reuse and disposal. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Need for International Consensus and Acceptance of Free Released Material - 20177

World Nuclear Association (WNA) believes that the waste hierarchy is best implemented when a good compromise exists between disposal and reuse/recycling methods of valuable materials and waste generated by the nuclear industry. The rapid normalization of recycling in both domestic and industrial worlds strengthens WNA's position, as new facilities worldwide emerge providing treatment for clearance. As a foundation for reuse and recycling, the International Atomic Energy Agency (IAEA) provided international guidance on clearance (Safety Guide RSG 1.7) [1], defining associated threshold values approved by all member states. Nevertheless, despite this consensus, a lack of alignment of national regulations has occurred as countries have departed for this international guidance, leading to confusion, even between neighborhood countries. As a consequence, this discrepancy between national rules, despite industrial and technical international consensus based on radiological and environmental considerations appeared as a brake, weakening public acceptance as well as nuclear industry credibility. As a matter of fact, what is allowed in one side of a border may be forbidden on the other side. Conversely, an international consensus on clearance would promote: - Sustainability improvements, including preservation of natural and rare resources resulting from optimized recycling and reuse practices; - A broader acceptance of free released materials; - taking advantage of the available technologies worldwide in materials treatment aiming for clearance; - Increased sharing and use of methods, know-how and operators, leading to better efficiency, innovation, improvement as well as technical and financial mastery. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Use of Historical EM Practices and Policies for Management of Cleanup Program and Address GAO Concerns - 20222

As Department of Energy (DOE) Environmental Management (EM) program policies and management practices are revised over time, it might be useful to periodically reflect on the DOE EM program's past to identify practices that have worked and those that might be appropriate for possible reuse in the future. An added impetus to examine alternative approaches is the recent Government Accountability Office (GAO) report entitled 'Nuclear Waste Cleanup - DOE Could Improve Program and Project Management by Better Classifying Work and Following Leading Practices.' The February 2019 GAO report states that EM categorizes most of its work in a way that does not adequately involve independent experts and DOE senior leadership. It also noted that EM has not followed leading practices for program and project management that could help keep the cleanup efforts on schedule and control costs. The GAO report recommended that EM, working with DOE Office of Project Management (PM): - Establish requirements and then assess EM's ongoing operations activities to determine if some activities should be reclassified as capital asset projects based on these newly established requirements. - Review and revise EM's 2017 cleanup policy to include program management leading practices related to scope, cost, schedule performance, and independent reviews. - Update the cleanup policy to require that earned value management (EVM) systems be maintained and used in a way that follows EVM best practices. - Develop a policy to ensure that work is categorized as level of effort (LOE) only in appropriate, specified circumstances, such as when work is not measurable or when measurement is impractical. - Integrate EVM data into EM's performance metrics for operations activities. To assist with improving program performance and implementing audit recommendations, this paper reviewed past successful cleanups such as Weldon Springs, Rocky Flats, Fernald, Ashtabula, Battelle Columbus (abs, and other historical resources and people with experience during the early years of EM program. As such, there are several past practices which may well be suited for reuse today. Some of these practices include: - In 1990's, as the DOE EM cleanup program, known as Environmental Restoration came into effect, the known cleanup scope at each geographic location or site was organized into four levels ranging from overall site-wide cleanup effort to the individual 'release sites', providing high granularity to the program. - The cleanup program was organized by geography (Northwest, Southwest, Eastern Area Programs, etc.). These 'sub-program' managers provided a degree of Headquarters oversight and management allowing upper management (EM-1, 2, and 3) to focus on major decisions and issues. - Budget levels at selected cleanup sites were funded above 'minimum-safety' levels to accelerate actual cleanup work. - Past practice utilized EVM techniques and uniform EM oversight over all discrete project-like activities, providing for a coordinated cleanup effort. - EM managed LOE activities using benchmarking and best in class management practice techniques to help manage costs. - EM managed and reviewed entire site cleanup baselines, not only individual projects, focusing on a successful overall outcome. - Sites had a 'Road map' or 'Management Action Plan' that provided the overall strategy or plan for that site's cleanup - this helped with understanding and coordination of efforts. - EM had a robust lessons-learned program and database to capture and transmit worthy ideas. - EM had well-structured cleanup baseline change control policies to control cost and schedule changes, at the contractor and higher Headquarters levels. Finally, some of the GAO observations may be valid, however it is not clear as to their extent. For example, for some operation types of work, the use of the Level of Effort (LOE) earned value method to track progress may be appropriate. Also, to ensure independence of thought, and to obtain useful insight on past practices, it may be suitable to have former EM employees to assist with understanding past practices or to verify that activities have been properly identified. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

MH-1A Sturgis Decommissioning and Dismantlement - 20281

The U.S. Army Corps of Engineers (USACE) with its prime contractor, Aptim Federal Services, LLC (APTIM), recycled 5,260 metric tons (11.6 million pounds) of material from Sturgis Barge (Sturgis) during the Decommissioning and Dismantlement of the MH-1A nuclear power reactor. The overall objective of the project was to reduce residual radioactivity associated with MH-1A to levels that permitted release of Sturgis for dismantlement and termination of the Army Reactor Office permit. By effectively applying waste hierarchy's three Rs - reduce, reuse and recycle - the Sturgis project not only minimized the amount of waste that required disposal at landfills, but also reduced the potential for long-term environmental liability emanating from these landfills. The project team completed the physical decommissioning efforts in June 2018 in Galveston, TX. In September 2018, radiological surveys were completed to demonstrate the vessel could be released for shipbreaking. Sturgis was towed from Galveston, TX to Brownsville, TX in late September 2018. Shipbreaking, dismantlement and recycling efforts began in early October 2018 and were completed on 15 March 2019. As part of the decommissioning effort in Galveston, the team shipped 69 shipments (860 metric tons) of low-level radioactive waste and radioactive components to the Waste Control Specialist (WCS) facility in Andrews TX for disposal. Certain radioactive components had to be transferred to the Department of Energy prior to placing the materials into the Federal Waste Facility located within WCS. However, most of the radioactive waste was characterized, profiled, approved and managed under the WCS permitted radioactive waste exemption process authorized and implemented by the Texas Commission on Environmental Quality (TCEQ) and the Radioactive Materials Division. This allows LLRW and LLMW to be shipped as regulated waste and then upon receipt at WCS through satisfying the relevant waste acceptance criteria the waste is exempted and placed into the WCS RCRA permitted cell. An additional 35 shipments (544 metric ton) of contaminated hazardous waste water were transported to U.S. Ecology in Robstown, TX for treatment/disposal. An additional 36 shipments (500 metric tons) of non-hazardous wastewater was sent to Republic Waste Services' facility in Fresno, TX. The disposal of these materials required close coordination with State of Texas regulators. During decommissioning, the project team recycled approximately 270 metric tons (600,000 pounds) of lead and steel. As part of the dismantlement in Brownsville, TX the team recycled approximately 5,000 metric tons (11 million pounds) of ferrous and non-ferrous material, limiting our disposal requirements to about 180 metric tons (400,000 pounds) of material (<4% from entire shipbreaking activity). Although the primary hazard being mitigated by this project was radiological, recycling was always a priority for the project. The team strived to achieve sustainability goals as we implemented this one of a kind project. Scrap metal recycling has a large positive impact on the environment and can also favorably impact project disposal costs. Steel is among the most recycled material in the world. Nearly 40% of the world's steel production is made from scrap. Recycling steel also requires 75% less energy than producing it from raw materials. By using recycled steel rather than virgin materials, 2.33 kg of carbon emissions are eliminated per kg of steel [1]. The project recycled more than 4,500 metric tons (10 million pounds) of steel, which eliminated about 10,400 metric tons (23 million pounds) of CO{sub 2}. By implementing a recycling initiative for the Sturgis project, the team was able to realize cost avoidance for disposal of scrap, cost savings from the metals recycled, plus the project provided benefits to the environment through our recycling efforts. Once the dismantlement was complete, the team prepared a detailed decommissioning closure report, which allowed for the termination of the Army Reactor Decommissioning Permit. While it not only reduced any potential long-term environmental liability, this project to decommission and dismantle a floating nuclear power plant is truly unprecedented - it is a prime example of the USACE mission which is: 'Engineering solutions for the Nation's toughest challenges'. This unique, one of a kind, historical power plant was never designed to be taken apart, and the available information about its construction was lacking in many details. The hazards that required mitigation dictated a painstaking and deliberate process in order to avoid any release to the environment and the community, and to protect the health and safety of the workers involved while keeping the waste hierarchy's three R's - reduce, reuse and recycle at the forefront. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Opportunities to Implement Solutions to Achieve Remedial Action Objectives in Consideration of Stakeholder Interests - 20365

A case study in the implementation of a soils excavation and removal project conducted at a Formerly Utilized Sites Remedial Action Program (FUSRAP) Maywood Superfund Site (FMSS) vicinity property; an active commercial business, in a densely populated area, with significant operational, technical and, logistical constraints that were expected to limit areas that could be remediated. The United States Army Corps of Engineers-led (USACE) team successfully navigated complex overlapping stakeholder interests to achieve a more efficient and complete removal of contaminated soils and debris while minimizing unnecessary excess costs to the Government. This paper centers on FUSRAP activities at the FMSS vicinity property located at 149-151 Maywood Avenue, Maywood, Bergen County, New Jersey. For most of its FUSRAP history, this ∼109,000 square meter (27-acre) property housed a now-demolished ∼26,000 square meter (6.5-acre) warehouse operated by Sears Logistics Services, a unit of the Sears Roebuck Company (Figure 2). Sears ended its property lease and vacated the warehouse in December 2016. Given that long history and for the purposes of this paper, the property will be referred to as the 'Sears property' or simply 'the property.' The Sears property is approximately 109,000 square meters (27-acres) and is currently zoned for commercial use. The property is bound to the north and northwest by 100 West Hunter Avenue (the Stepan Company), to the northeast by 205 Maywood Avenue, to the east by Maywood Avenue, to the south by 23 West Howcroft Road, and to the west by businesses on NJ Route 17 and the NJ Route 17 roadway. Until December 2016, the property housed a warehouse and distribution center operated by Sears Logistical Services. On-site structures were demolished by the property owner in 2017. The warehouse covered the north section of the property along the Stepan Company property line. A railroad spur from the adjacent property now known as the Maywood Interim Storage Site (MISS) ended at the northeast corner of the warehouse. Wetlands were located east of the warehouse; the rest of the property was covered with paved parking lots and grassed areas. During remediation at the property, opportunities frequently arose where the project team was able to coordinate effectively with stakeholders to sequence remediation activities to facilitate removal of otherwise inaccessible soils and identify opportunities for materials reuse when supported by residual radiological and chemical levels. Some specific opportunities include: - remediating individual truck loading dock bays to maintain tenant operations; - working along a busy highway and in a utility corridor containing a 30-inch high pressure gas main; - remediating Lodi Brook and associated wetlands requiring bypass pumping and other diversionary structures to maintain local community stormwater drainage; - protecting during remediation and supporting access to facilitate tenant/owner maintenance of critical fire protection and water supply system service lines buried in contaminated soils and necessary for safe warehouse operations; and - coordinating with stakeholders to ensure non-radiological contaminants of concern for the site (unaffiliated with FUSRAP) were addressed by the responsible party in a manner that maximized benefit to all parties while supporting an efficient overall site remediation program. Once the property was vacant and the warehouse structure and radiologically non-impacted above-grade structures were demolished, the project identified an opportunity to significantly reduce the volume of waste associated with the foundation of the former warehouse, a foundation suspected of being partially constructed in radiologically contaminated soils. The project developed and implemented supplemental radiological verification survey and sampling strategies based on radiological cross-contamination risk potential with process flow-charts and screening-level based decision points; a program that classified saw-cut sections of concrete based on observed residual surface radioactivity conditions using a combination of gamma sensitive sodium-iodide scans and beta sensitive Geiger-Muller direct measurements. The proposed approach was reviewed with stakeholders with feedback, including consideration of applicable State of New Jersey Site Remediation Program criteria and guidance before implementation. Once classified, additional sampling was performed at frequencies driven by screening. The sampling methods, stockpile sampling frequencies, criteria and, approach to data evaluation were developed in consideration of existing site cleanup standards, regional background ranges, State of New Jersey radiological remediation program guidance, and specific stakeholder input With the property remediation and survey efforts nearly completed, it is relevant to examine retrospectively the objectives, assumptions and limitations in the remedial design (i.e., what was planned) versus what was able to be accomplished through effective teaming. Benefits to other environmental remediation site programs include better understanding of how to work effectively with stakeholders to achieve win-win outcomes, and approaches to site remediation, waste minimization and materials reuse that were successful in their overall outcomes. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Uranium from Seawater Cost Analysis: Recent Updates

While it is not meant to be a direct competitor with conventionally mined uranium, seawater uranium has significant potential to sway policy makers and the public toward the long term viability of nuclear power. Given the large mass of uranium contained within the ocean and its continual replenishment by freshwater run-off and the ocean floor, seawater uranium can be considered for all practical purposes a renewable resource. In addition to this assurance of supply security placing nuclear power on equal footing with other renewable energy generation technologies, seawater uranium removes a key uncertainty by establishing a cost ceiling on uranium based fuels. Given the evolving nature of this technology, this paper aims to provide an update of the economic model to reflect recent progress. This analysis will reference a passive collection system currently under development by Oak Ridge and Pacific Northwest National Labs. This system consists of a polymer modified to contain amidoxime functional groups, a ligand with high uranium affinity. The adsorbing material is then braided into long segments so it may be moored to the bottom of the ocean where it passively collects uranium for a period on the order of weeks to months. Upon completion of its soaking campaign adsorbent is winched to the surface by work boats so the uranium may be eluted off the braids. After a chemical rinse the braids may then be redeployed for another soaking campaign and uranium elution. The adsorbent can be redeployed as many times as is economically feasible, which is a function of the degradation the material suffers upon each reuse. Noteworthy experimental progress has tightened the gap separating estimates of the optimistic and pessimistic case uranium production cost relative to the most recent analysis. It has been demonstrated before that significant uncertainty in adsorbent performance, and thus recovery cost, arises primarily from variability in adsorbent degradation upon reuse and the effects of marine biofouling on uptake. While the underlying recovery mechanism remains, significant changes have been made regarding the method of adsorbent synthesis, propagating to improvements in adsorbent durability. Additionally, further experimentation regarding the area of marine biofouling has tightened the range of expected adsorbent performance when placed in true marine conditions.

07 ISOTOPE AND RADIATION SOURCES↗