Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “program plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 883 records · Page 49

A computationally efficient algorithm for computing convex hull prices

Electricity markets worldwide allow participants to bid non-convex production offers. While non-convex offers can more accurately reflect a resource's capabilities, they create challenges for market clearing processes. For example, system operators may be required to execute side payments to participants whose costs are not covered through energy sales as determined via traditional locational marginal pricing schemes. Convex hull pricing minimizes this and other types of side payments while providing uniform (i.e., locationally and temporally consistent) prices. Computing convex hull prices involves solving either a large-scale linear program or the Lagrangian dual of the corresponding non-convex scheduling problem. Further, the former approach requires explicit descriptions of market participants' convex hulls. While linear programs for computing convex hull prices are large, their structure is naturally decomposable by generators. Here, in this work, we propose and empirically analyze a Benders decomposition approach to computing convex hull prices that leverages recent advances in convex hull formulations for thermal generating units. We demonstrate across a large set of test instances that our decomposition approach only requires modest computational effort, obtaining solutions at least an order of magnitude faster than the equivalent large-scale linear programming approach. Overall, we provide a computationally feasible method for computing convex hull prices for industrial scale market clearing problems, enabling the possibility of practical adoption of this advanced pricing mechanism.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

3D Modeling of Safety-Related Upgrade Pilot Project

Constellation Energy and the United States Department of Energy (DOE) have established a public/private partnership to implement a pilot digital upgrade to replace legacy analog, safety-related reactor protection and emergency safety feature actuation systems (RPS/ESFAS) with modern digital systems. This effort is occurring at Constellation’s Limerick Generating Station. This project is being performed in accordance with industry processes that have been adapted to better support digital upgrades. These processes include IP-ENG-001, Standard Design Process, NISP-EN-04, Standard Digital Engineering Process and Electric Power Research Institute Report 3002011816, Digital Engineering Guide. The Light Water Reactor Sustainability (LWRS) Program at the Idaho National Laboratory (INL) has been supporting this effort. Latest INL HFE efforts in support of this project have focused on definition and implementation of the Human Factors Engineering (HFE) Program in support of Constellation design and related licensing efforts. This paper will present the development of the HFE 3D modeling execution of the Main Control Room safety upgrades. New equipment and modifications are planned for upgrading the new safety systems. 3D modeling allows for visualization of the new equipment and modifications to be shared with engineering and design teams for evaluation and review. Anthropometric considerations such as sight lines and functional reach can be evaluated directly using the 3D model. This effort has helped to provide visualizations for additional review with operations personnel and project stakeholders.

3D Modeling↗

Paradox of sustainability in tobacco control in Thailand: A comprehensive assessment of three-decade experiences

Background: Over the past three decades of tobacco control, Thailand has gained international recognition as a middle-income country with sustained achievement of declining smoking prevalence. However, the number of key FCTC measures implementation is still far away from the highest-level implementation. As a result, we aim to explore explanatory factors for the paradoxical phenomenon of sustainability in tobacco control in Thailand, to understand what the paradox means, why it happens, and how to take further steps in minimizing the paradox. Methods: We used a mixed-method approach comprising qualitative (review of literature and documents plus Program Sustainability Assessment Tool (PSAT) guided key informant interviews) and semi-quantitative methods (PSAT scoring, Theory of change (TOC), and causal-loop diagram (CLD)) to synthesize all the findings from the qualitative data. Results: Across all eight domains, sustainability scores at the local level are lower than the national level. The highest total score was in three domains: political support, partnership, and organizational capacity. The lowest total score was for the strategic planning domain. We propose a set of key strategic elements and drivers for future strategic planning. Discussion: Using CLD, we capture a high-level view of tobacco control with dynamic interactions between contexts, mechanisms, interventions, and outcomes. Finally, we believe the deep understanding of tobacco control and the proposed strategy to counteract transnational tobacco companies in Thailand will guide future sustainable actions to reduce the prevalence of smoking, especially in the strategic planning domain that has the lowest PSAT score.

60 APPLIED LIFE SCIENCES↗

Exploring New Ways to Classify Industries for Energy Analysis and Modeling

As the US moves closer to embracing a net zero greenhouse gas emissions position, combustion processes outside the power sector are becoming urgent concerns. Industry is an important end user of energy and relies on fossil fuels used directly for process heating and as feedstocks for a diverse range of applications. Fuel and energy use by industry is heterogeneous, meaning that even a single product group can vary broadly in its production routes and associated energy usage. In the US, the North American Industry Classification System (NAICS) serves as the basis for data collection and reporting. In turn, data based on NAICS is the foundation of most US energy modeling. Thus, the effectiveness of NAICS at representing energy use is a limiting condition for plans to improve energy efficiency and alternatives to fossil fuels in industry. Facility-level data to build more detail into heterogeneous sectors is scarce. This work explores alternative classification schemes for industry based on energy use characteristics, and provides a validation of an approach to make facility-level energy use estimates based on publicly available data from the greenhouse gas reporting program. First, several approaches to industrial taxonomies and their usefulness for industrial energy modeling are summarized. Data from Industrial Assessment Centers is analyzed using unsupervised machine learning techniques to detect clusters. Cladistics, an approach from biology, is adapted to energy and process characteristics of industries. A cladogram is presented for evolutionary directions in the iron and steel sector. Cladograms are a promising tool for constructing scenarios and summarizing directions of sectoral innovation. Finally, validation is performed for facility-level energy estimates from the US EPA Greenhouse Gas Reporting Program. This validation assists in making this data source available for use in energy modeling. Together, this work explores alternative approaches for categorizing industries in a way that aids understanding energy use, and presenting pathways for the future.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Fiscal Year 2024 Software Quality Assurance Activities for the ARC Software

The continued goal of the ARC SQA project in the Advanced Reactor Technologies program of DOE is to resolve the QA gaps for the ARC software that limit, or prevent, commercialization of the software for industry users. This project started in earnest in fiscal year 2023 which saw the entire code system moved from a SVN repository to a GitLab repository and an associated software quality assurance plan (SQAP) developed and ratified. Most of the QA gaps in the ARC software were identified in collaboration with industry partners and work begin in fiscal year 2023 and continued in 2024. The primary documentation that is missing includes user manuals, user guides, software verification reports, and code coverage assessments. The SUMMAR manual was completed this fiscal year and work was started on creating manuals for SE2ANL, SE2RCT, and DASSH. Software verification work was carried out for DIF3D and REBUS in a previous program and the current fiscal year saw the completion of software verification reports for GAMSOR, GAMSRC, VARPOW, EvaluateFlux, and SUMMAR. The goal for the next fiscal year is to complete the PERSENT software verification work and begin planning the software verification work for DASSH, SE2ANL, and SE2RCT. The code coverage reports for DIF3D and MC2-3 were completed in the previous fiscal year and the goal is to generate code coverage reports for REBUS, GAMSOR, PERSENT, and DASSH in the coming fiscal year. A considerable amount of effort was spent in the current fiscal year working on the continuous integration capability for automated regression testing in GitLab. The first version of the testing was created in the previous fiscal year and applied to DIF3D and its utility programs. That testing was extended this year to cover GAMSOR, REBUS, and PERSENT. To accomplish this, the first version of the new testing methodology had to be updated to make a single output checking methodology viable for all of the ARC software. This will result in a single document to detail the automated regression testing methodology and minor documents to detail the tolerance settings that have been applied to the output for each ARC code. The previous methodology put into place with SVN would have required a separate document for each ARC code to detail the output checking methodology and the tolerance settings for the output from each code. Because some of our industry partners are providing funds to add new capabilities to the ARC software to meet their needs, all of which must be reviewed and approved by the SQA program funded by this project, a summary of that development work is detailed in this report. Overall progress on resolving the QA gaps has been good this year with the most impactful improvement for our industry partners in capability being the creation of a threaded version of DIF3D-VARIANT that allows the DIF3D, REBUS, and GAMSOR run times to be reduced by a factor of 4-6. The most impactful QA gap that was resolved was the software verification of GAMSRC and VARPOW.

97 MATHEMATICS AND COMPUTING↗

AI-Guided Reasoning-Based Operator Support System for the Nuclear Power Plant Management

The Decision-making process in the Nuclear Power Plant (NPP) control room faces some challenges: operator incomplete knowledge, insufficient time for responding to the highly dynamic events, and a large number of indicators to monitor. Because of the complexity of the NPP system, it is hard to pre-plan all the failures/mitigative actions. An intelligent operator support system is vital to mitigate these shortcomings. In this paper, an AI declarative approach (Answer Set Programming (ASP)) is employed to represent our knowledge of the nuclear power plant in the form of logic rules. This represented knowledge is structured to form a reasoning-based operator support system. When an incident occurs, this ASP-based reasoning support system is demonstrated to be capable of fault identification (diagnosis), informing the operator of different scenarios and consequences, and generating the control options (decision making).

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Progress on an Electron Beam Profile Monitor at the Fermilab Main Injector

The current program at Fermilab involves the construction of a new superconducting linear accelerator (LINAC) to replace the existing warm version. The new LINAC, together with other planned improvements, is in support of proton beam intensities in the Main Injector (MI) that will exceed 2 MW. Measuring the transverse profiles of these high intensity beams in a ring requires non-invasive techniques. The MI uses ionization profile monitors as its only profile system. An alternative technique involves measuring the deflection of a probe beam of electrons with a trajectory perpendicular to the proton beam. This type of device was installed in MI and initial studies of it have been previously presented. This paper will present the status and recent studies of the device utilizing different techniques.

43 PARTICLE ACCELERATORS↗

Large Plate Experiment of Chloride-induced Stress Corrosion Cracking in Spent Nuclear Fuel Storage Canisters

This report provides a description of the testing (in progress at the Savannah River National Laboratory) to evaluate the corrosion behavior of a large section of welded plate material harvested from the Sandia National Laboratories’ full-size mockup of a spent nuclear fuel (SNF) dry storage canister. The details of the establishment of this plate test, the interim corrosion results (from visual examination), and the general plan for examination of the plate in CY21 to evaluate crack growth behavior (if any) are provided. This work is intended to inform aging management programs for SNF canisters under conditions of extended dry storage. A “large plate” (approximately 51 x 46 cm with thickness 16 mm and weight about 30 kg) and containing a circumferential weldment from the mockup is the test specimen. The knowledge of the salt, temperature, humidity conditions for chloride-induced stress corrosion cracking (CISCC) including the threshold stress intensity factor, K iscc , were used to setup the large plate test in which a set of part-through-wall and through-wall electrical discharge machined (EDM) defects were positioned in the weld residual stress field of the welded plate material from the mockup canister. A marine salt solution was applied to this plate specimen with an air-brush spray, then dried, and then exposed to a sustained 71-73% RH condition at an ambient room temperature of 22 °C. The salt loading and environmental condition is expected to be aggressive to cause CISCC

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Savannah River National Laboratory (FY2021 LDRD Annual Report)

Research efforts to build upon the unique knowledge base of the Savannah River National Laboratory (SRNL) are funded through the Laboratory Directed Research and Development (LDRD) Program. The program yields foundational scientific research and development (R&D) essential to SRNL’s core business areas, while aligning optimally and continuously with SRNL’s Strategic Plan to provide long-term benefits to the Department of Energy (DOE), the National Nuclear Security Administration (NNSA), and other customers and stakeholders.

99 GENERAL AND MISCELLANEOUS↗

Progress on an Electron Beam Profile Monitor at the Fermilab Main Injector

The current program at Fermilab involves the construction of a new superconducting linear accelerator (LINAC) to replace the existing warm version. The new LINAC, together with other planned improvements, is in support of proton beam intensities in the Main Injector (MI) that will exceed 2 MW. Measuring the transverse profiles of these high intensity beams in a ring requires non-invasive techniques. The MI uses ionization profile monitors as its only profile system. An alternative technique involves measuring the deflection of a probe beam of electrons with a trajectory perpendicular to the proton beam. This type of device was installed in MI and initial studies of it have been previously presented. This paper will present the status and recent studies of the device utilizing different techniques.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Introduction to Evolve Central Appalachia

The Evolve-CAPP project is developing and implementing strategies to enable the Central Appalachian basin to realize its full economic potential for producing high-value, non-fuel, carbon-ore (CO) products, rare earth elements (REE), and critical minerals (CM). The Basinal Assessment of CORE-CM Resources is a state-of-the-art geological model and comprehensive database that will be used to identify, locate, and quantify in-situ resources in the basin. Restrictive aspects of resource recovery, such as ownership and legal restrictions, are being considered in estimating recoverable resources. A gap analysis of missing or unavailable data that could not be fully integrated in the initial assessment due to budget, access, or other constraints during the assessment effort is planned. A characterization and data acquisition plan to fully characterize the basin’s CORE-CM potential will address gaps in data. The plan will be developed with input from project team members and relevant stakeholders, including land and mineral holding companies and coal operators, who maintain sampling programs as part of their normal operations.

Bishop, Richard↗

FCIC Task X - Project Management and Consortium Overview

The objective of the FCIC Program Management Task is to provide scientific direction and leadership to the nine participating labs, and to provide robust project management to ensure robust operational planning and execution. The FCIC directly supports the BETO portfolio by focusing on feedstock variability across the bioenergy value chain, and the Project Management Task ensures the smooth operation of the FCIC, making sure that the 9 independent projects with different objectives have a common focus - understanding and mitigating the impacts of feedstock variability across the value chain.

bioenergy↗

AGC-4 Experiment Irradiation Monitoring Data Qualification Final Report

The Graphite Technology Development Program ran a series of six experiments to quantify the effects of irradiation on nuclear grade graphite. This report focuses on the fourth experiment, Advanced Graphite Creep 4 (AGC 4). The Advanced Reactor Development (ARD) Technology Development Office (TDO) Program for research and development activities require documentation of qualified monitoring data to design and license the first high-temperature reactor nuclear plant. Qualified data meets the requirements for use as described in the experiment planning and quality assurance documents. Failed data do not meet the requirements and provide no useable information. Trend data may not meet all requirements but still provide some useable information. Use of Trend data requires assessment of how any deficiencies affect a particular use of the data. AGC-4 began with Advanced Test Reactor (ATR) Cycle 157D on May 30, 2015. After irradiating the graphite for two cycles, the capsule was removed from the reactor after ATR Cycle 158A, which ended on January 2, 2016, due to interference with another experiment. Irradiation was resumed with Cycle 162A on October 7, 2017 after the interfering experiment was removed from the reactor. AGC-4 irradiation completed by the end of Cycle 166B on January 10, 2020. Between Cycles 162A and 166B, AGC-4 capsule was removed from the reactor core during two Powered Axial Locator Mechanism (PALM) Cycles 163A and 165A to avoid overheating. All thermocouples (TCs) have functioned throughout the AGC-4 experiment. A total of 9,256,184 out of all 11,167,213 temperature records (or 82.9%) are Qualified for use by the ARD Program and 1,911,029 missing values are Failed. Argon, helium, and total gas flow data were within expected ranges, except only eight out-of-range values occurred during outages. A total of 21,240,627 out of all 22,288,5103 gas flow rates (or 92.8%) are Qualified for use by the ARD Program and 1,644,476 are Failed records mostly due to missing values. Discharge gas line moisture values were consistently low during full ATR power, except for 162B, when moisture content was increasing to more than 200 ppmv by the end of this cycle. During outages, moisture content reached as high as 700 ppmv. 1,089,941 out of a total of 1,107,331 moisture values (or 98.4%) are within the measurement range of the instrument and are Qualified for use by the ARD Program and 17,390 missing moisture values are Failed. Graphite creep specimens were subjected to one of three loads: 393, 491, or 589 lbf. For a brief period during Cycle 157D between 12:19 on June 2, 2015, and 08:23 on June 11, 2015, the load cells were wired incorrectly, resulting in missing stack load data. Missing stack loads were estimated from measured ram pressures using regression equations developed from the existing data from Cycle 157D. Estimated stack loads during this period are considered to be an accurate representation of actual load applied to the stacks. These loads deviate slightly from the planned loads. This deviation does not prevent the data from being Qualified for use but must be taken into account when analyzing the effect of load on creep. 6,095,728 out of a total of 6,403,985 moisture values (or 95.2%) are within the measurement range of the instrument and are Qualified for use by the ARD Program and 308,257 missing load values are Failed. Stack displacement increased consistently throughout the eight cycles, with total displacement reached highest value of 2.4 in by the end of irradiation. During ATR outages, a set of pneumatic rams raised the stacks of graphite creep specimens to ensure the specimens were not stuck within the test train. This stack raising was performed seven times throughout irradiation. All stacks were raised successfully each time. 4,744,974 out of a total of 6,094,513 displacement values (or 77.9%) are within the measurement range of the instrument and are Qualified for use by the ARD Program and 1,349,539 displacement values are Failed mostly due to missing values. Analyses were conducted on correlations between TCs to look for trends and step changes that might indicate instrument degradation or failure. Correlation analysis was used to identify instances when TCs form short circuits, referred to as virtual junctions, which result in TCs reporting temperatures from some location in the capsule other than the location where they were intended to read. No evidence of virtual junctions was found. Analyses were also conducted on control charts of temperature differences of between two TCs, which are expected to behave consistently throughout the entire irradiation period. Upward or downward trend over time indicates at least one TC in the pair was drifted. Examining control charts for all 66 possible pairs out of twelve TCs installed in the AGC-4 capsules reveal no clear drift failures occurred, except unstable behavior of two TCs in Zone 3, TC-7 and TC-8, over irradiation time. In conclus

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Resource distribution under spatiotemporal uncertainty of disease spread: Stochastic versus robust approaches

We consider the problem of optimizing locations of distribution centers (DCs) and plans for distributing resources such as test kits and vaccines, under spatiotemporal uncertainties of disease spread and demand for the resources. We aim to balance the operational cost (including costs of deploying facilities, shipping, and storage) and quality of service (reflected by demand coverage), while ensuring equity and fairness of resource distribution across multiple populations. We compare a sample-based stochastic programming (SP) approach with a distributionally robust optimization (DRO) approach using a moment-based ambiguity set. Numerical studies are conducted on instances of distributing COVID-19 vaccines in the United States and test kits, to compare SP and DRO models with a deterministic formulation using estimated demand and with the current resource distribution plans implemented in the US. We demonstrate the results over distinct phases of the pandemic to estimate the cost and speed of resource distribution depending on scale and coverage, and show the “demand-driven” properties of the SP and DRO solutions. Furthermore, our results further indicate that if the worst-case unmet demand is prioritized, then the DRO approach is preferred despite of its higher overall cost. Nevertheless, the SP approach can provide an intermediate plan under budgetary restrictions without significant compromises in demand coverage.

97 MATHEMATICS AND COMPUTING↗

Bishop Paiute Single Family Solar Home Project: Phase 4 (Final Technical Report)

The Bishop Paiute Tribe is committed to energy efficiency, renewable energy, and environmental protection and has a vision to install solar energy systems on all buildings on the Reservation where technically feasible. Through completion of the Bishop Paiute Tribe Residential Solar Program – Phase 4, Bishop Paiute Tribe continued its successful model partnering with non-profit solar installer GRID Alternatives to advance its vision and build energy self-sufficiency on the Bishop Paiute Reservation. The Bishop Paiute Tribe Residential Solar Program – Phase IV deployed 67 kW-AC of new clean, renewable energy through grid-tied, net-metered rooftop solar electric systems installed on a total of 20 (one more than the planned 19) existing owner-occupied, single-family homes for low-income families on the Reservation. This represents nearly 14% of the Reservation’s total “unsolarized” homes. These systems were provided at no cost to the homeowners, who will also receive energy efficiency education to further reduce energy consumption and lower electric bills. GRID led a solar installation for three (3) of the homes where Tribal/community members, were given an opportunity in participating in on-the-roof trainings to gain new skills while installing solar for their low-income community members. Subcontractors through GRID Sub Contractor Partnership Program (GRID SPP) led solar installations for seventeen (17) of the homes. Each installation provided paid employment for a solar trainee trainees hired by the SPP subcontractors as entry level solar installers. It is estimated that the installed 67 kW-AC of solar will produce at least 120,000 kWh/year, displacing at least 30-75% of the 20 homes’ total electricity use for a combined system lifetime electricity cost savings for the low-income homeowners of about $\$$500,000. It is further estimated that the installed renewable energy systems installed will prevent greenhouse gases by about 1,000 tons, equivalent to planting approximately 25,000 trees. Following the successful completed installations, it is expected that the Reservation and surrounding communities will benefit from improved air quality via reduced wood stove use for heating. Cumulatively with other initiatives, the project will result in nearly 40% of the Reservation’s solarizable homes being solarized. Overall, the triple impact of the phase 4 of the Bishop Paiute Tribe Residential Solar Program – Phase 4 is: 1) affordable energy for low-income families; 2) on-site clean energy production, 3) hands on training and paid solar installation work for local tribal/community workers. These impacts will support and grow the Tribe’s energy, economic, environmental, and social self-sufficiency and sovereignty amongst the neediest on the Reservation.

14 SOLAR ENERGY↗

Building Tune-Up Accelerator Program (Final Technical Report)

In 2016, the City of Seattle passed a mandatory Building Tune-Up requirement for all commercial buildings 50,000 square feet (SF) and larger as part of its Climate Action strategy. The requirement is phased in by size with large buildings (greater than 200,000 SF) required first. This allowed Seattle’s Office of Sustainability & Environment (OSE) to offer the Building Tune-Up Accelerator (TUA) Program to the “mid-size” building market (less than 100,000 SF) to meet the requirements early. With funding from the US DOE, a package of technical and financial support was developed for building owners and energy service providers to encourage this hard-to-reach market to participate in the tune-up—and even go beyond requirements for greater energy savings. Seattle City Light, the municipal electric utility, offered participants a simple per square foot financial incentive. Partners at the University of Washington Integrated Design Lab, Smart Buildings Center and Pacific Northwest National Lab (PNNL) offered service provider trainings, analytical tools and technical support. This final technical report summarizes the program, projected energy and emissions savings and lessons learned from program development to implementation to final evaluation for the 102 buildings that participated.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Utility Combined Heat and Power (CHP) Programs

This issue brief provides an overview of energy efficiency portfolios offered by electric and gas utilities that include CHP incentive programs, with examples of program drivers, structures, and eligibility criteria. The document discusses best practices for designing and administering a utility CHP incentive program, including cost-effectiveness tests and market outreach strategies.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Commercial PACE Project Origination: Leverage Points for Growing the Project Pipeline

Greater use of Commercial Property Assessed Clean Energy (C-PACE) financing within communities where it is enabled will increase energy savings, drive economic development, and result in additional public benefits. Some states with active C-PACE programs have ramped up activity significantly while others have not achieved and sustained a high volume of transactions. This brief details C-PACE project origination trends, barriers, and market practices for state and local government C-PACE program sponsors looking to grow their C-PACE project pipeline.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗