Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “program plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 883 records · Page 49

Joint IAMAS/IAHS Symposium J1 on Global Monitoring and Advanced Observing Techniques in the Atmosphere and Hydrosphere

Seventy papers were presented at the two-and-a-half-day Symposium on Global Monitoring and Advanced Observing Techniques in the Atmosphere and Hydrosphere. The symposium was jointly organized by the International Association of Meteorology and Atmospheric Sciences (IAMAS) and the International Association of Hydrological Sciences (IAHS). Global observing systems are receiving increased attention in connection with such problems as monitoring global climate change. The symposium included papers on observational requirements; measurement methodologies; descriptions of available datasets; results of analysis of observational data; plans for future observing systems, including the Global Climate Observing System (GCOS) and the Global Ocean Observing System (GOOS); and the programs and plans of the space agencies.

Ohring, G.↗

Guidance system operations plan for manned CM earth orbital missions using program SKYLARK 1. Section 4: Operational modes

The operational modes for the guidance system operations plan for Program SKYLARK 1 are presented. The procedures control the guidance and navigation system interfaces with the flight crew and the mission control center. The guidance operational concept is designed to comprise a set of manually initiated programs and functions which may be arranged by the flight crew to implement a large class of flight plans. This concept will permit both a late flight plan definition and a capability for real time flight plan changes.

Dunbar, J. C.↗

NASA's Radioisotope Power Systems - Plans

NASA's Radioisotope Power Systems (RPS) Program continues to plan and implement content to enable planetary exploration where such systems could be needed, and to prepare more advanced RPS technology for possible infusion into future power systems. The 2014-2015 period saw significant changes, and strong progress. Achievements of near-term objectives have enabled definition of a clear path forward in which payoffs from research investments and other sustaining efforts can be applied. The future implementation path is expected to yield a higher-performing thermoelectric generator design, a more isotope-fuel efficient system concept design, and a robust RPS infrastructure maintained effectively within both NASA and the Department of Energy. This paper describes recent work with an eye towards the future plans that result from these achievements.

Program↗

Summary of NASA-Lewis Research Center solar heating and cooling and wind energy programs

NASA is planning to construct and operate a solar heating and cooling system in conjunction with a new office building being constructed at Langley Research Center. The technology support for this project will be provided by a solar energy program underway at NASA's Lewis Research Center. The solar program at Lewis includes: testing of solar collectors with a solar simulator, outdoor testing of collectors, property measurements of selective and nonselective coatings for solar collectors, and a solar model-systems test loop. NASA-Lewis has been assisting the National Science Foundation and now the Energy Research and Development Administration in planning and executing a national wind energy program. The areas of the wind energy program that are being conducted by Lewis include: design and operation of a 100 kW experimental wind generator, industry-designed and user-operated wind generators in the range of 50 to 3000 kW, and supporting research and technology for large wind energy systems. An overview of these activities is provided.

Vernon, R. W.↗

Space shuttle wind tunnel testing program

The wind tunnel testing rationale and the associated test program management plan for the STS design and development stage are reviewed. Noting that estimates of the total ground testing facilities needed exceeded any previous program for an aircraft or space vehicle, tests were intended to cover launch, separation, and entry. An Orbiter flight profile is outlined, and the aerodynamic, aerothermodynamic, and structural dynamics testing objectives for launch, Orbiter, and ferry concepts are explored. The division of the STS development tasks between the Johnson Space Center and the Marshall Space Flight Center also included the formation of a coordinating panel with representatives of various wind tunnel programs and other phases of the STS development program. A total of 42,200 wind tunnel hr were used for the Shuttle development, with an additional 23,000 run in NASA supporting centers.

Whitnah, A. M.↗

iSat Surface Charging and Thruster Plume Interactions Analysis

NASA is designing the Iodine Satellite (iSAT) cubesat mission to demonstrate operations of an iodine electric thruster system. The spacecraft will be deployed as a secondary payload from a launch vehicle which has not yet been identified so the program must plan for the worst case environments over a range of orbital inclinations. We present results from a NASA and Air Force Charging Analyzer Program (NASCAP-2K) surface charging calculation used to evaluate the effects of charging on the spacecraft and to provide the charging levels at other locations in orbit for a thruster plume interaction analysis for the iSAT mission. We will then discuss results from the thruster interactions analysis using the Electric Propulsion Interactions Code (EPIC). The results of these analyses are being used by the iSAT program for a range of environments that could be encountered when the final mission orbit is selected.

Parker, L. Neergaard↗

Goldstone R/D High Speed Data Acquisition System

A digital data acquisition system that meets the requirements of several users (initially the planetary radar program) is planned for general use at Deep Space Station 14 (DSS 14). The system, now partially complete, is controlled by VAX 11/780 computer that is programmed in high level languages. A DEC Data Controller is included for moderate-speed data acquisition, low speed data display, and for a digital interface to special user-provided devices. The high-speed data acquisition is performed in devices that are being designed and built at JPL. Analog IF signals are converted to a digitized 50 MHz real signal. This signal is filtered and mixed digitally to baseband after which its phase code (a PN sequence in the case of planetary radar) is removed. It may then be accumulated (or averaged) and fed into the VAX through an FPS 5210 array processor. Further data processing before entering the VAX is thus possible (computation and accumulation of the power spectra, for example). The system is to be located in the research and development pedestal at DSS 14 for easy access by researchers in radio astronomy as well as telemetry processing and antenna arraying.

Deutsch, L. J.↗

Formulation of consumables management models. Volume 1: Mission planning

Development of an STS (Space Transportation System) interactive computer program MPP (Mission Planning Processor) working model was conducted. A summary of the computer program development and those supporting tasks conducted is presented. Development of the MPP Computer Program is discussed. This development was supported by several parallel tasks. These tasks either directly supported the program development, or provided information for future application and/or modification to the program in relation to the flight planning and flight operations of the STS and advanced spacecraft. The supporting tasks also included development of a Space Station MPP to demonstrate the applicability of the analytical methods developed under this RTOP to more advanced spacecraft than the STS.

Torian, J. G.↗

A Complex Brownfields Case Study—The Former Bannister Federal Complex, Kansas City, Missouri

Abstract In November 2017, 225 acres (91 ha) of the former Bannister Federal Complex (BFC) in Kansas City, Missouri were transferred from the Federal Government to Bannister Transformation & Development, LLC (BTD), for demolition; environmental corrective measures; and preparation of the site for redevelopment. This presented a once‐in‐a‐lifetime opportunity to reconfigure groundwater remedies and address long‐standing soil contamination issues. The property included more than 40 previously‐identified Solid Waste Management Units, 3.9 million square feet (362,000 m 2 ) of buildings, subsurface utilities dating back to the 1940s, and an active groundwater containment system. Demolition of buildings and installation of an interim groundwater containment system began almost immediately after property transfer. In 2018, BTD substantially modified its project schedule to incorporate the construction of the first new buildings while demolition and remedial activities were ongoing. By October 2020, construction of the first new warehouse commenced while excavation and capping of contaminated soils, installation of a groundwater containment treatment systems, and abandonment of legacy utilities were still underway. Completion of this work, within the originally planned timeframe, was made possible by factors including up‐front multi‐year funding, early and ongoing engagement of regulators, an extended 3‐year due diligence program and planning stage, and establishment of well‐defined environmental targets. Both the soil and groundwater remedies were also designed with the flexibility needed to accommodate unknown conditions, changing schedules, and revisions to the regrading and redevelopment plans. This case study highlights key technical and management factors that led to the successful completion of this complex brownfields remediation project.

Water Resources↗

Development of experimental facilities for processing metallic crystals in orbit

This paper discusses the evolution, current status, and planning for facilities to exploit the microgravity environment of earth orbit in applied metallic materials science. Space-Shuttle based facilities and some precursor flight programs are reviewed. Current facility development programs and planned Space Station furnace capabilities are described. The reduced gravity levels available in earth orbit allow the processing of metallic materials without the disturbing influence of gravitationally induced thermal convection, stratification due to density differences in sample components, or the effects of hydrostatic pressure.

Duncan, Bill J.↗

Program Tracks Cost Of Travel

Travel Forecaster is menu-driven, easy-to-use computer program that plans, forecasts cost, and tracks actual vs. planned cost of business-related travel of division or branch of organization and compiles information into data base to aid travel planner. Ability of program to handle multiple trip entries makes it valuable time-saving device.

Mauldin, Lemuel E., III↗

iSat Surface Charging and Thruster Plume Interactions Analysis

Characterizing the electromagnetic interaction of a satellite in low Earth, high inclination orbit with the space plasma environment and identifying viable charging mitigation strategies is a critical mission design task. High inclination orbits expose the vehicle to auroral charging environments that can potentially charge surfaces to kilovolt potentials and electric thruster propulsion systems will interact with the ambient plasma environment throughout the orbit. NASA is designing the Iodine Satellite (iSAT) cubesat mission to demonstrate operations of an iodine electric thruster system. The spacecraft will be deployed as a secondary payload from a launch vehicle which has not yet been identified so the program must plan for the worst case environments over a range of orbital inclinations. We will first present results from a NASA and Air Force Charging Analyzer Program (Nascap) -2k surface charging calculation used to evaluate the effects of auroral charging on the spacecraft and to provide the charging levels at other locations in orbit for a thruster plume interaction analysis for the iSAT mission. We will then discuss results from the thruster interactions analysis using the Electric Propulsion Interactions Code (EPIC) with inputs from Nascap-2k. The results of these analyses are being used by the iSAT program to better understand how their spacecraft will interact with the space plasma environment in the range of environments that could be encountered when the final mission orbit is selected.

Parker, L. Neergaard↗

The program manager's problem

Saturn V program management problems induced by failure to plan for integrated logistics program and contractor logistics activities

MANAGEMENT PLANNING↗

A Technology Plan for Enabling Commercial Space Business

The National Aeronautics and Space Administration's (NASA) Advanced Space Transportation Program is a customer driven, focused technology program that supports the NASA Strategic Plan and considers future commercial space business projections. The initial cycle of the Advanced Space Transportation Program implementation planning was conducted from December 1995 through February 1996 and represented increased NASA emphasis on broad base technology development with the goal of dramatic reductions in the cost of space transportation. The second planning cycle, conducted in January and February 1997, updated the program implementation plan based on changes in the external environment, increased maturity of advanced concept studies, and current technology assessments. The program has taken a business-like approach to technology development with a balanced portfolio of near, medium, and long-term strategic targets. Strategic targets are influenced by Earth science, space science, and exploration objectives as well as commercial space markets. Commercial space markets include those that would be enhanced by lower cost transportation as well as potential markets resulting in major increases in space business induced by reductions in transportation cost. The program plan addresses earth-to-orbit space launch, earth orbit operations and deep space systems. It also addresses all critical transportation system elements; including structures, thermal protection systems, propulsion, avionics, and operations. As these technologies are matured, integrated technology flight experiments such as the X-33 and X-34 flight demonstrator programs support near-term (one to five years) development or operational decisions. The Advanced Space Transportation Program and the flight demonstrator programs combine business planning, ground-based technology demonstrations and flight demonstrations that will permit industry and NASA to commit to revolutionary new space transportation systems beginning at the turn of the century and continuing far into the future.

Lyles, Garry M.↗

Planetary and Stellar Data Products Expected From The Kepler Mission

The Kepler Mission is a Discovery-class mission scheduled to be launched in the 2006-2007 time frame. It is a wide field of view photometer with a 95 m aperture designed to attain a photometric precision of 2 parts in 10^5 for the 12th magnitude stars. It will continually observe 100,000 main-sequence stars from 9th to 14th magnitude for a period of four years with a cadence of 4/hour. This database should be unique in its photometric precision, cadence, and duration of observations. Several hundred terrestrial-size planets will be detected if they are common around solar-like stars. Based on the current results of Doppler-velocity searches, over a thousand giant planets will also be found. A guest investigator program is planned that would provide the opportunity to observe thousands of other objects in the 105 square degree FOV. Such objects could include stars with micro-variability, other intrinsic variables, cataclysmic variables, eclipsing binaries (including x-ray binaries), and possibly AGN. A ground-based program to classify all 225,000 stars in the FOV and to do a detailed examination of a subset of the stars that show planetary companions is planned. Doppler-velocity observations will be made to find the presence of giant planets not seen in transit. The data will be rapidly released to the community for follow up observations and for changes to the guest investigator program.

Borucki, W. J.↗