Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “phase 1”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 883 records · Page 49

100 MW e Baseload Molten Salt Plant Phase 1 & 2 Summary Report: Summary of Conceptual Design, Preliminary Design, Commercialization and Risk Reduction Activities

This document describes steps taken to develop our conceptual and preliminary designs of a modular concept for deploying a 75% capacity factor, 100-MW e solar power plant. The modular approach consists of 14 solar power towers interconnected by hot and cold salt piping leading back to a central power block where the salt storage tanks and power generation systems are located. The plant is described in several sections. First, the overall plant is described, including the general arrangement, process and heat flow diagrams, system interface definitions, and electrical description. Next, each system is described in detail following the flow of energy from incident sunlight, through the plant, to the grid. These systems include the solar collector system (SCS), solar receiver system (SRS), thermal storage system (TSS), steam generator system (SGS), and power generation system (PGS). Then, the plant control system (PCS) and balance of plant (BOP) are discussed as supporting entities. Each system of the plant is described in sufficient detail to allow for the following to be developed: material cost, erection cost, project schedule, EPC bids, detailed performance modeling, and operations and maintenance cost. Cost, schedule, and performance estimates are not described in this document. Two approaches to demonstration of the technology are presented: a single tower integrated into an existing power block and a four tower stand alone 50 MW e power plant. Various demonstration partners have expressed interested in both approaches. The process by which a detailed plant performance model was developed is described to support the development of accurate LCOE data. Information on material and instrument testing is also provided for critical materials and instruments required for molten salt service.

14 SOLAR ENERGY↗

Columbia River Treaty 2014/2024 Review: Phase 1 Technical Studies

Since 1964, the Columbia River Treaty has provided significant benefits to the United States and Canada through coordinated river management by the two countries. It remains the standard against which other international water coordination agreements around the world are compared. When the Treaty was negotiated, its goals were to provide significant flood control and power generation benefits to both countries. However, the Treaty contains two provisions that may significantly change these benefits as early as the year 2024. First, in 2024 the 60 years of purchased flood control space in Canadian Treaty projects expires. Instead of a coordinated and managed plan to regulate both Canadian and U.S. projects for flood control, the Treaty calls for a shift to a Canadian operation under which the United States can call upon Canada for flood control assistance. The United States can request this “called upon” assistance as needed but only to the extent necessary to meet forecast flood control needs in the United States that cannot adequately be met by U.S. projects. When called upon is requested, the United States will then have to pay Canada for its operational costs and any economic losses resulting from the called upon flood control operation. Second, while the Treaty has no specified end date, it does allow either Canada or the United States the option to terminate most of the provisions of the Treaty on or after Sept. 16, 2024, with a minimum of 10 years advance written notice. Thus, the year 2024 is the first year a notice of termination would take effect assuming written notice of termination is given by the Canadian or U.S. governments by 2014. Unless the Treaty is terminated or the federal governments elect to modify the Treaty, its provisions continue indefinitely, except for the changes in flood control discussed above. Given the significance of both of these provisions, it is important that the parties to the Treaty understand the implications for post-2024 Treaty planning and Columbia River operations. The U.S. Army Corps of Engineers and the Bonneville Power Administration, the agencies that implement the Treaty in the United States on behalf of the U.S. Entity (see Treaty Governance sidebar), are conducting a multi-year effort to understand these implications. This effort is called the 2014/2024 Columbia River Treaty Review.

Columbia River Treaty, United States, Canada, tech↗