Results for “lessons”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 883 records · Page 49

CONTROLLING ENERGY STORAGE SYSTEMS: LESSONS LEARNED FROM THE WASHINGTON CLEAN ENERGY FUND DEMONSTRATION PROJECTS

Washington Clean Energy Fund energy storage demonstration projects created opportunities for learning many aspects of Energy Storage Systems (ESS) including its control for economic operation. PNNL, as the lead for use case analytics program for the demonstration projects, had the opportunity to experience practical aspects of ESS control in terms of control strategy development, control systems deployment, and performance of ESS during actual operation. This paper presents some of those learning opportunities availed to date and a few key lessons with an intention to benefit the wider energy storage community.

Washington CEF, ESS control strategy, control syst↗

Y-12 Lessons Learned: Process Drift

Criticality Safety lessons learned in Uranium Chip Recovery, Briquettes, Reduction Sand Separator, Slag Accumulation, Holden Gas Furnace, and Accumulations in Casting Lines.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Industrial Cavity Production: Lessons Learned to Push the Boundaries of Nitrogen-Doping

Nitrogen doping has been proven now in several labs to enhance Q0 values of 1.3 GHz cavities in the gradient domain favored by CW operation. The choice of doping for the LCLS-II project has given the community a wealth of statistics and experience on the challenge of transferring the doping technology to industry. Overall, industry-produced nitrogen-doped cavities have shown excellent performance, however some technical issues have arisen. This talk focuses on lessons learned from the production of over 300 nitrogen-doped cavities for LCLS-II and how issues were mitigated to further improve performance. Finally, I will discuss pushing the boundaries of nitrogen-doping further by exploring different doping regimes in order to maintain excellent Q0 performance, while reaching higher quench fields.

Gonnella, D.↗

Validation of Maui PSCAD Model: Motivation, Methodology, and Lessons Learned: Preprint

As power systems become increasingly dependent on inverter-based resources, the dominant physical and control interactions that determine system stability may no longer be accurately captured in positive sequence dynamic simulation tools; electromagnetic transient (EMT) simulations may be needed. This paper describes the process of creating and validating an EMT model of the entire Maui island transmission system in PSCAD software. The model is validated against the utility's PSSE model and against field data for an event that consisted of a single-phase fault followed by a generation trip. The methodology and lessons learned are summarized here.

41 EE - Solar Energy Technologies Office (EE-4S)↗

Delivering Effective Virtual Energy-Focused Trainings: Successful Strategies and Lessons Learned from the Virtual Cohort In-Plant Training Pilot

While there are always barriers to energy efficiency efforts, few challenges have been as severe as the global COVID-19 pandemic. Many manufacturers throughout the United States and the world have been trying to determine how to safely open and operate their plants. To minimize the number of people working within facilities and maximize the physical distance between workers, only essential facility engineers are allowed into plants to ensure proper operations. The Department of Energy’s Better Plants Program created In-Plant Trainings (INPLTs) to help partners develop in-house expertise in energy efficiency. Delivering INPLTs in the traditional in-person fashion is infeasible under these circumstances. To continue providing INPLTs during this difficult time, the Better Plants Program piloted Virtual Cohort In-Plant Trainings (VINPLTs) on wastewater treatment and ammonia industrial refrigeration systems from October 27 to November 19, 2020. This paper provides an overview of the pilot, then discusses successful strategies and lessons learned from this pilot for delivering effective virtual energy-focused trainings.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

A Step Towards the Final Frontier: Lessons Learned from Acceptance Testing of the First HPE/Cray EX 3000 System at ORNL

In this paper, we summarize the deployment of the Air Force Weather (AFW) HPC11 system at Oak Ridge National Laboratory (ORNL) including the process followed to successfully complete acceptance testing of the system. HPC11 is the first HPE/Cray EX 3000 system that has been successfully released to its user community in a federal facility. HPC11 consists of two identical 800-node supercomputers, Fawbush and Miller, with access to two independent and identical Lustre parallel file systems. HPC11 is equipped with Slingshot 10 interconnect technology and relies on the HPE Performance Cluster Manager (HPCM) software for system configuration. ORNL has a clearly defined acceptance testing process used to ensure that every new system deployed can provide the necessary capabilities to support user workloads. We worked closely with HPE and AFW to develop a set of tests that used the United Kingdom’s Meteorological Office’s Unified Model (UM) and 4DVAR. We also included benchmarks and applications from the Oak Ridge Leadership Computing Facility (OLCF) portfolio to fully exercise the HPE/Cray programming environment and evaluate the functionality and performance of the system. Acceptance testing of HPC11 required parallel execution of each element on Fawbush and Miller. In addition, careful coordination was needed to ensure successful acceptance of the newly deployed Lustre file systems alongside the compute resources. In this work, we present test results from specific system components and provide an overview of the issues identified, challenges encountered, and the lessons learned along the way.

Melesse Vergara, Veronica↗

2021 ROMANIA TRANSPORT SECURITY TABLE-TOP EXERCISE (TTX) – LESSONS LEARNED AND GOOD PRACTICES

During the period of 15-18 March 2021, the IAEA conducted a national workshop addressing the security of radioactive material in transport. The workshop was jointly hosted by the Romanian regulatory authority and the General Inspectorate of Romanian Gendarmerie. The workshop assisted Romania in improving its capability to evaluate the ability of response forces to counter a malicious act against radioactive material in transport. The event consisted of briefings, exercises, a demonstration of transport security equipment, and a transport security table-top exercise (TTX). The workshop was conducted in a virtual-hybrid format in such a way as to meet the COVID-19 related requirements in compliance with Romania’s guidelines. This paper provides an overview of the workshop’s activities, lessons-learned, and good practices related to the transport security TTX exercises.

Maican, Catalin↗

Sustainability, Scalability and Resiliency of the Town of Innisfil Mobility-on-Demand Experiment: Preliminary Results, Analyses, and Lessons Learned: Preprint

In 2017, the Town of Innisfil, Ontario launched Innisfil Transit in partnership with Uber, a transportation network company, to provide a subsidized on-demand public mobility service as an alternative to investing in a new fixed-route bus service. The performance of Innisfil Transit is documented in a 2021 Ryerson University report which shows greater cost effectiveness of the mobility provided over the proposed bus alternative (Sweet, Mitra, and Benaroya 2021). This paper expands on those findings by assessing Innisfil Transit with respect to sustainability, scalability, and resiliency. First, we quantify the energy and emissions of this program relative to traditional transit and driving alone across varying powertrains. We then characterize a conservative first-order estimate of the percentage of US communities that fall within a similar spatial-demographic tier as Innisfil. Replicability also hinges on service cost and performance in comparison to average values for low-density transit in the US. Lastly, most transit agencies experienced a significant drop in demand (as much as 90%) with slowly rebounding ridership since the onset of the COVID-19 pandemic. The resiliency of the Innisfil program to the pressures induced by the pandemic is examined in comparison to other transit operations. The lessons learned across these three dimensions complement prior work to better understand the efficiency and sustainability of on-demand public mobility service for low-density communities like Innisfil.

ADVANCED PROPULSION SYSTEMS↗

Lessons Learned for Rapid Decarbonization of Power Sectors

This report covers key lessons learned for the rapid decarbonization of power sectors, emphasizing best practices in planning, building, and operating electricity systems. Decarbonization covers all greenhouse gases, including carbon dioxide and methane. The intended audience of this report consists of energy ministers and other high-level energy sector decisionmakers.

21CPP↗

Accelerator Science and Technology Breakthroughs, Achievements and Lessons from the Tevatron

For almost a quarter of a century, the Tevatron proton-antiproton collider was the centerpiece of the world's high energy physics program - beginning operation in December of 1985 until it was overtaken by LHC in 2011. The aim of this unique scientific instrument was to explore the elementary particle physics reactions with center of mass collision energies of up to 1.96 TeV. The initial design luminosity of the Tevatron was 1030cm-2s-1, however as a result of two decades of upgrades, the accelerator has been able to deliver 430 times higher luminosities to each of two high luminosity experiments, CDF and D0. The Tevatron will be shut off September 30, 2011. The collider was arguably one of the most complex research instruments ever to reach the operation stage and is widely recognized for many technological breakthroughs and numerous physics discoveries. In this John Adams lecture, I briefly present the history of the Tevatron, major advances in accelerator physics, and technology implemented during the long quest for better and better performance. Lessons learned from our experience are also discussed.

43 PARTICLE ACCELERATORS↗

Design, Manufacturing, Assembly, and Lessons Learned of the Pre-production 325 MHz Couplers for the PIP-II Project at Fermilab

Five 325 MHz high-power couplers will be integrated into the pre-production Single Spoke Resonator Type-II (ppSSR2) cryomodule for the PIP-II project at Fermilab. Couplers were procured by both Fermilab and IJCLAB for this effort. The design of the coupler is described, including design optimizations from the previous generation. This paper then describes the coupler life cycle, including design, manufacturing, and assembly, along with the lessons learned at each stage.

43 PARTICLE ACCELERATORS↗

Decarbonization of the power sector with CCS: Case study in two regions in the U.S. and lessons for Latin America

This work consists of estimates of potential changes in the total systems cost (TSC) of two RTOs of the United States (U.S.), MISO-N and SPP RTO West, under the traditional decarbonization pathway of replacement of fossil-power plants with variable renewable energy (VRE) and the less traditional pathway of retrofitting fossil fuel units with carbon capture and storage (CCS). Although the power mixes of MISO-N and SPP RTO West are particular to these regions, results can apply to other regions, including Latin American countries that are planning to decarbonize their power sectors. This case study serves to highlight lessons on differences in technology costs between these two pathways, as well as the cost associated with decarbonization rates close to 100%.

Pena-Cabra, Ivonne A.↗

Decarbonization of the power sector with CCS: Case study in two regions in the U.S. and lessons for Latin America

This paper estimates potential changes in the total systems cost (TSC) of two RTOs of the United States (U.S.), MISO-N and SPP RTO West, under the traditional decarbonization pathway of replacement of fossil-power plants with variable renewable energy (VRE) and the less traditional pathway of retrofitting fossil fuel units with carbon capture and storage (CCS). Although the power mixes of MISO-N and SPP RTO West are particular to those regions, the results can apply to other regions, including Latin American countries that are planning to decarbonize their power sectors. This case study serves to highlight lessons on the difference of technology costs between these two pathways, as well as the cost associated with decarbonization rates close to 100%.

Pena-Cabra, Ivonne A.↗

Management and integration of engineering and construction activities: Lessons learned from the AP1000{sup R} nuclear power plant China project

The lessons learned during the early phase of design engineering and construction activities for the AP1000 China Project can be applied to any project involving multiple disciplines and multiple organizations. Implementation of a first-of-a-kind design to directly support construction activities utilizing resources assigned to design development and design delivery creates challenges with prioritization of activities, successful closure of issues, and communication between site organizations and the home office. To ensure successful implementation, teams were assigned and developed to directly support construction activities including prioritization of activities, site communication and ensuring closure of site emergent issues. By developing these teams, the organization is better suited to meet the demands of the construction schedule while continuing with design evolution of a standard plant and engineering delivery for multiple projects. For a successful project, proper resource utilization and prioritization are key for overcoming obstacles and ensuring success of the engineering organization. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Overall results of and lessons learned from the IAEA CRP on sodium natural circulation test performed during the Phenix end-of-life experiments

In 2007, the International Atomic Energy Agency (IAEA) launched the Coordinated Research Project (CRP) 'Control Rod Withdrawal and Sodium Natural Circulation Tests Performed during the Phenix End-of-Life Experiments'. The overall purpose of the CRP, performed within the framework of the IAEA programme in support of innovative fast reactor technology development and deployment, is to improve the Member States' analytical capabilities in the various fields of research and design of sodium-cooled fast reactors through data and codes verification and validation. In particular the CRP, taking advantage of the End-of-Life set of experiments performed before the final shut-down of the French prototype fast breeder power reactor Phenix, aims at improving fast reactor simulation methods and design capabilities in the field of temperature and power distribution evaluation, as well as of the analysis of sodium natural circulation phenomena. The paper presents the overall results of the CRP, including blind calculations and post-test and sensitivity analyses carried out by the CRP participants, as well as lessons learned and recommendations for further future implementations to resolve open issues. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Project Plan, Status, and Lessons Learned for the LANL 3,706 m{sup 3} TRU Waste Campaign - 13085

The Los Alamos National Laboratory (LANL) is currently engaged in a campaign to disposition 3,706 m{sup 3} of transuranic (TRU) waste stored above grade at its Technical Area 54 (TA-54) Area G waste management facility before June 30, 2014. This campaign includes complete removal of all non-cemented above-grade TRU waste that was in storage on October 1, 2011, and is defined as 3,706 m{sup 3} of material. TRU waste containers were placed into storage up to 40 years ago, and most of the older containers must be remediated to address compliance issues before the waste can be characterized, certified as meeting the Waste Isolation Pilot Plant (WIPP) Waste Acceptance Criteria (WAC), and shipped for disposition. More than half of the remaining TRU waste volume stored above grade is contained within oversize boxes that contain waste items that must be repackaged or size reduced. Facilities and major types of equipment needed to remediate and characterize the TRU waste inventory include two additional oversize box processing lines that are being brought into service as Nuclear Hazard Category III facilities in fiscal year (FY) 2013. Multiple work shifts are scheduled for most remediation lines in FY 2013. An integrated risk-based project management schedule for all disposition activities has been developed that is based on a 'Solution Package' approach. Inventories of containers that have issues in common were compiled into about 15 waste categories and about 75 'Solution Packages' that identify all of the activities needed to disposition the inventory of TRU waste in storage. Scheduled activities include all precursor activities to begin remediation, remediation processing, characterization and certification to the WIPP WAC, and shipping of containers to WIPP. Other industrial processing practices that have been adopted to improve efficiency include staging of containers for remediation, characterization, and shipping; establishment of a transportation center; and load management practices for transportation payloads. Progress and accomplishments during FY 2012 are reviewed, and plans for FY 2013 are presented in some detail. Lessons learned on adoption of industrial processing practices are also discussed. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Experience and Lessons Learned from Conditioning of Spent Sealed Sources in Singapore - 13107

In 2010, IAEA requested KAERI (Korea Atomic Energy Research Institute) to support Singapore for conditioning spent sealed sources. Those that had been used for a lightning conductor, check source, or smoke detector, various sealed sources had been collected and stored by the NEA (National Environment Agency) in Singapore. Based on experiences for the conditioning of Ra-226 sources in some Asian countries since 2000, KAERI sent an expert team to Singapore for the safe management of spent sealed sources in 2011. As a result of the conditioning, about 575.21 mCi of Am-241, Ra-226, Co-60, and Sr-90 were safely conditioned in 3 concrete lining drums with the cooperation of the KAERI expert team, the IAEA supervisor, the NEA staff and local laborers in Singapore. Some lessons were learned during the operation: (1) preparations by a local authority are very helpful for an efficient operation, (2) a preliminary inspection by an expert team is helpful for the operation, (3) brief reports before and after daily operation are useful for communication, and (4) a training opportunity is required for the sustainability of the expert team. (authors)

07 ISOTOPE AND RADIATION SOURCES↗