Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “launch software”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 883 records · Page 49

Exploration Supply Chain Simulation

The Exploration Supply Chain Simulation project was chartered by the NASA Exploration Systems Mission Directorate to develop a software tool, with proper data, to quantitatively analyze supply chains for future program planning. This tool is a discrete-event simulation that uses the basic supply chain concepts of planning, sourcing, making, delivering, and returning. This supply chain perspective is combined with other discrete or continuous simulation factors. Discrete resource events (such as launch or delivery reviews) are represented as organizational functional units. Continuous resources (such as civil service or contractor program functions) are defined as enabling functional units. Concepts of fixed and variable costs are included in the model to allow the discrete events to interact with cost calculations. The definition file is intrinsic to the model, but a blank start can be initiated at any time. The current definition file is an Orion Ares I crew launch vehicle. Parameters stretch from Kennedy Space Center across and into other program entities (Michaud Assembly Facility, Aliant Techsystems, Stennis Space Center, Johnson Space Center, etc.) though these will only gain detail as the file continues to evolve. The Orion Ares I file definition in the tool continues to evolve, and analysis from this tool is expected in 2008. This is the first application of such business-driven modeling to a NASA/government-- aerospace contractor endeavor.

Source record↗

Maestro Workflow Conductor

MaestroWF is a Python tool and software package for loading YAML study specifications that represents a simulation campaign. The package is capable of parameterizing a study, pulling dependencies automatically, formatting output directories, and managing the flow and execution of the campaign. MaestroWF also provides a set of abstracted objects that can also be used to develop user specific scripts for launching simulation campaigns.

Di Natale, Francesco↗

materialsCloudCompute

materialsCloudCompute (mCC) is a software package for running easily parallelizable materials science theoretical computations on Amazon Web Services (AWS) infrastructure. mCC provides tools to partition out computational problem into smaller subproblems which can be run in parallel, and ensure that each of those subproblems completes successfully. It utilizes the following AWS services: EC2, S3, and RDS. It operates by launch a managing EC2 instance, which can launch worker instances that perform the calculations. The Managing instance tracks the subproblems and ensures that the Worker instances continue to operation, killing and relaunching them if they fail.

Forbes, David↗

Automated Target Planning for FUSE Using the SOVA Algorithm

The SOVA algorithm was originally developed under the Resilient Systems and Operations Project of the Engineering for Complex Systems Program from NASA s Aerospace Technology Enterprise as a conceptual framework to support real-time autonomous system mission and contingency management. The algorithm and its software implementation were formulated for generic application to autonomous flight vehicle systems, and its efficacy was demonstrated by simulation within the problem domain of Unmanned Aerial Vehicle autonomous flight management. The approach itself is based upon the precept that autonomous decision making for a very complex system can be made tractable by distillation of the system state to a manageable set of strategic objectives (e.g. maintain power margin, maintain mission timeline, and et cetera), which if attended to, will result in a favorable outcome. From any given starting point, the attainability of the end-states resulting from a set of candidate decisions is assessed by propagating a system model forward in time while qualitatively mapping simulated states into margins on strategic objectives using fuzzy inference systems. The expected return value of each candidate decision is evaluated as the product of the assigned value of the end-state with the assessed attainability of the end-state. The candidate decision yielding the highest expected return value is selected for implementation; thus, the approach provides a software framework for intelligent autonomous risk management. The name adopted for the technique incorporates its essential elements: Strategic Objective Valuation and Attainability (SOVA). Maximum value of the approach is realized for systems where human intervention is unavailable in the timeframe within which critical control decisions must be made. The Far Ultraviolet Spectroscopic Explorer (FUSE) satellite, launched in 1999, has been collecting science data for eight years.[1] At its beginning of life, FUSE had six gyros in two IRUs and four reaction wheels. Over time through various failures, the satellite has been left with one reaction wheel on the vehicle skew axis and two gyros. To remain operational, a control scheme has been implemented using the magnetic torque rods and the remaining momentum wheel.[2] As a consequence, there are attitude regions where there is insufficient torque authority to overcome environmental disturbances (e.g. gravity gradient torques). The situation is further complicated by the fact that these attitude regions shift inertially with time as the spacecraft moves through earth s magnetic field during the course of its orbit. Under these conditions, the burden of planning targets and target-to-target slew maneuvers has increased significantly since the beginning of the mission.[3] Individual targets must be selected so that the magnetic field remains roughly aligned with the skew wheel axis to provide enough control authority to the other two orthogonal axes. If the field moves too far away from the skew axis, the lack of control authority allows environmental torques to pull the satellite away from the target and can potentially cause it to tumble. Slew maneuver planning must factor the stability of targets at the beginning and end, and the torque authority at all points along the slew. Due to the time varying magnetic field geometry relative to any two inertial targets, small modifications in slew maneuver timing can make large differences in the achievability of a maneuver.

Heatwole, Scott↗

Preparing for Veg-04 and Veg-05: Improving Pick-And-Eat Food Capabilities for the International Space Station

The capability to grow nutritious, palatable food for crew consumption during spaceflight has the potential to provide health-promoting, bioavailable nutrients, enhance the dietary experience, and reduce launch mass as we move toward longer-duration missions. Studies of edible produce during spaceflight have been limited, leaving a significant knowledge gap in the methods required to grow safe, acceptable, nutritious crops for consumption in space. Researchers from Kennedy Space Center, Johnson Space Center, Purdue University and ORBITEC have teamed up to explore the potential for plant growth and food production on the International Space Station (ISS) and future exploration missions. Ground testing of Chinese cabbage and dwarf tomato crops under different LED lighting and fertilizer conditions is being conducted to allow for a preliminary down selection of the two best lighting recipes and the best fertilizer treatment. Two trials of Chinese cabbage and one trial on dwarf tomato have been completed in on-going ground tests. Horticultural data on crop growth and productivity and chemical data on specific nutrients have been collected and are being analyzed to allow preliminary down selection. Taste test evaluations are planned on the preliminary down selection treatments to allow a final down selection for flight testing. Microbial assessment for hazard analysis critical control points (HACCP) evaluation is also underway to enable implementation of food consumption. Following down selection flight preparation will commence for testing these crops in the Veggie vegetable-production system on the ISS. A crew questionnaire has been developed to better understand the impact of crop growth in Veggie on crew behavioral health. A single Veggie plant growth chamber is currently installed on ISS, and preparations are underway to launch a second Veggie, allowing side-by-side testing under different lighting conditions. Veg-04 will be the first mission that will use this dual-Veggie capability, where the selected cultivar of Tokyo bekana Chinese cabbage will be grown under two different red-to-blue light ratios. ORBITEC has developed custom lighting software allowing independent selection of red and blue light levels. The VEG-05 experiment will test similar light treatments using Red Robin dwarf tomato. These tests offer an opportunity to develop a pick-and-eat fresh vegetable component to the ISS food system as a first step to regular supplemental food production. Our work will help define light colors, levels, and horticultural best practices to achieve high yields of safe, nutritious leafy greens and tomatoes to supplement a space diet of prepackaged food. With this work we will continue the synergistic research to help close gaps in the human research roadmap, and enable humans to venture to Mars and beyond. This research was co-funded by the Human Research Program and Space Biology (MTL1075) in the ILSRA 2015 NRA call.

International Space Station↗

VIIRS Thermal Emissive Bands L1B Calibration Uncertainty

The Visible Infrared Imaging Radiometer Suite (VIIRS) is a key instrument on-board the Suomi National Polar-orbiting Partnership (S-NPP) spacecraft. The S-NPP launched in October 2011 and it has been collecting valuable Earth science data with VIIRS and four other instruments for more than five years. The VIIRS Characterization Support Team (VCST) of the National Aeronautics and Space Administration (NASA) Science Investigator-led Processing Systems (SIPS) is designed to support the VIIRS sensor pre-launch geometric and radiometric characterization and to access on-orbit long-term Level-1B (L1B) calibration and performance. This paper reviews the VIIRS thermal emissive bands (TEB), covering wavelengths from 3.7 to 12.0 μm, L1B radiometric calibration algorithms and presents the calibration uncertainty methodology which will be implanted in the L1B processing software. Discussions will be focused on the key uncertainty parameters and the application in L1B.

S-NPP VIIRS TEB Uncertainty↗

IV&V Assurance Case Design for Artemis II

As human-rated missions like those in NASA’s Artemis program continue to grow in both size and complexity, and the role of software in achieving mission objectives expands dramatically, NASA’s Independent Verification and Validation (IV&V) Teams face evolving challenges in assuring the safety and performance of the safety- and mission-critical embedded software that is essential to landing astronauts on the surface of the Moon by 2024. Key among these challenges is IV&V’s desire to present a cohesive, integrated assurance statement to its stakeholders that encapsulates and summarizes our assurance positions across the integrated Artemis systems and their combined role in support of a safe and successful flight. In order to meet this challenge, the IV&V Teams have begun a transition to using formal assurance case concepts and documentation in the Goal Structuring Notation (GSN) to build an argument in support of software assurance. IV&V recognizes significant benefits to the logical argumentation structure provided by assurance cases and GSN over our current practices for documenting and managing assurance claims. In order to reap these benefits, IV&V is integrating the use of assurance case concepts with our paradigm of follow-the-risk capability based assurance. Because of this, assurance cases created and used by IV&V are distinct from the sort of assurance case created by a development project or embedded software assurance organization. IV&V’s assurance cases depend much less upon standards and regulations, and more on evidence captured by IV&V regarding the environment, requirements, design, and implementation. IV&V constructs an independent network of claims based on an independent decomposition of arguments. Based upon the risk posture of these claims and their associated software and software artifacts, IV&V then develops and executes engineering analyses and testing, which provide evidence to either support or refute the claim. This emerging risk-informed assurance case methodology is being put into practice as IV&V plans for support of the Artemis II mission, the first flight of the Orion capsule and Space Launch System with astronauts on board.

Gerek Whitman↗

IV&V Assurance Case Design for Artemis II

As human-rated missions like those in NASA's Artemis program continue to grow in both size and complexity, and the role of software in achieving mission objectives expands dramatically, NASA's Independent Verification and Validation (IV&V) Teams face evolving challenges in assuring the safety and performance of the safety- and mission-critical embedded software that is essential to landing astronauts on the surface of the Moon by 2024. Key among these challenges is IV&V's desire to present a cohesive, integrated assurance statement to its stakeholders that encapsulates and summarizes our assurance positions across the integrated Artemis systems and their combined role in support of a safe and successful flight. In order to meet this challenge, the IV&V Teams have begun a transition to using formal assurance case concepts and documentation in the Goal Structuring Notation (GSN) to build an argument in support of software assurance. IV&V recognizes significant benefits to the logical argumentation structure provided by assurance cases and GSN over our current practices for documenting and managing assurance claims. In order to reap these benefits, IV&V is integrating the use of assurance case concepts with our paradigm of follow-the-risk capability based assurance. Because of this, assurance cases created and used by IV&V are distinct from the sort of assurance case created by a development project or embedded software assurance organization. IV&V's assurance cases depend much less upon standards and regulations, and more on evidence captured by IV&V regarding the environment, requirements, design, and implementation. IV&V constructs an independent network of claims based on an independent decomposition of arguments. Based upon the risk posture of these claims and their associated software and software artifacts, IV&V then develops and executes engineering analyses and testing, which provide evidence to either support or refute the claim. This emerging risk-informed assurance case methodology is being put into practice as IV&V plans for support of the Artemis II mission, the first flight of the Orion capsule and Space Launch System with astronauts on board.

Whitman, Gerek↗

Flow Boiling and Condensation Experiment: Flow Boiling in a Rectangular Channel with Subcooled Inlet Conditions in Microgravity

Two-phase thermal management subsystems that take advantage of both the sensible and latent heat of a working fluid can potentially yield significant enhancements in overall performance by adopting heat transfer processes that are based on phase transition like boiling and condensation. Performance of terrestrial two-phase flow systems may be predictable because the hydrodynamic and body forces are understood, however, in microgravity, which is predominant during planetary space travel, forces that are masked by the strong body force on Earth (gravitational or buoyancy force) reappear with different magnitude and influence. The need arose for a facility that provides for two-phase flow with phase transition testing in microgravity. The Flow Boiling and Condensation Experiment (FBCE) is a facility that was launched to the International Space Station in August of 2021 and is in operation since February of 2022. This facility enables investigators to perform two-phase flow and phase transition research in flow boiling and condensation. Along with the test module that is experiment specific, the FBCE system consists of the fluid, avionics, and software subsystems. Currently two test modules, namely, the Flow Boiling Module (FBM) and the Condensation Module for Heat Transfer (CM-HT) are available. A third module, the Transfer Line test Module (TL) is being developed. The fluid subsystem conditions and delivers the fluid at the desired thermodynamic state to the test module. It consists of two fluid modules and a heater module that are connected by flex hoses for fluid circulation and by data and electrical cables for control and data acquisition. Two avionics modules acquire pressure and temperature data from various sensors in the flow loop. For FBM, a high-speed camera is available to acquire images of the boiling process. Experiments are operated autonomously by software and are based on an Experiment Parameters Master Table (EPMT) that is uploaded to ISS and is executed by the FBCE flight software. This presentation briefly introduces the objectives of FBCE and provides a system description of the experiment onboard of the ISS/Fluid Integrated Rack (FIR). Results of the test campaign carried out using the FBM are presented. Specifically, microgravity flow boiling of n-perfluorohexane (test fluid) is discussed with subcooled inlet conditions in a single-side-heated rectangular channel of dimensions 114.6-mm heated length, 2.5-mm heated width, and 5.0-mm height. Key operating parameters investigated are mass velocity (199.90 – 3200.13 kg/m2s), inlet subcooling (0.10 – 45.76°C), and inlet pressure (113.30 – 164.29 kPa). Image sequences acquired via high-speed-video are shown to elucidate the interfacial flow physics. The effects of various parameters on flow boiling heat transfer in microgravity, from the onset of boiling to the critical heat flux are discussed. Heat transfer results are presented in terms of flow boiling curves, streamwise profiles of wall temperature and heat transfer coefficient, and parametric trends of local and averaged heat transfer coefficient, and the critical heat flux.

Two-phase flow and phase transition↗

Solar Dynamics Observatory Guidance, Navigation, and Control System Overview

The Solar Dynamics Observatory (SDO) was designed and built at the Goddard Space Flight Center, launched from Cape Canaveral on February 11, 2010, and reached its final geosynchronous science orbit on March 16, 2010. The purpose of SDO is to observe the Sun and continuously relay data to a dedicated ground station. SDO remains Sun-pointing throughout most of its mission for the instruments to take measurements of the Sun. The SDO attitude control system (ACS) is a single-fault tolerant design. Its fully redundant attitude sensor complement includes sixteen coarse Sun sensors (CSSs), a digital Sun sensor (DSS), three two-axis inertial reference units (IRUs), and two star trackers (STs). The ACS also makes use of the four guide telescopes included as a part of one of the science instruments. Attitude actuation is performed using four reaction wheels assemblies (RWAs) and eight thrusters, with a single main engine used to provide velocity-change thrust for orbit raising. The attitude control software has five nominal control modes, three wheel-based modes and two thruster-based modes. A wheel-based Safehold running in the attitude control electronics box improves the robustness of the system as a whole. All six modes are designed on the same basic proportional-integral-derivative attitude error structure, with more robust modes setting their integral gains to zero. This paper details the final overall design of the SDO guidance, navigation, and control (GN&C) system and how it was used in practice during SDO launch, commissioning, and nominal operations. This overview will include the ACS control modes, attitude determination and sensor calibration, the high gain antenna (HGA) calibration, and jitter mitigation operation. The Solar Dynamics Observatory mission is part of the NASA Living With a Star program, which seeks to understand the changing Sun and its effects on the Solar System, life, and society. To this end, the SDO spacecraft carries three Sun-observing instruments: Helioseismic and Magnetic Imager (HMI), led by Stanford University; Atmospheric Imaging Assembly (AIA), led by Lockheed Martin Space and Astrophysics Laboratory; and Extreme Ultraviolet Variability Experiment (EVE), led by the University of Colorado. The basic mission is to observe the Sun for a very high percentage of the 5-year mission (10-year goal) with long stretches of uninterrupted observations and with constant, high-data-rate transmission to a dedicated ground station to be located in White Sands, New Mexico. These goals guided the design of the spacecraft bus that will carry and service the three-instrument payload. Overarching design goals for the bus are geosynchronous orbit, near-constant Sun observations with the ability to fly through eclipses, and constant HGA contact with the dedicated ground station. A three-axis stabilized ACS is needed both to point at the Sun accurately and to keep the roll about the Sun vector correctly positioned with respect to the solar north pole. This roll control is especially important for the magnetic field imaging of HM I. The mission requirements have several general impacts on the ACS design. Both the AIA and HMI instruments are very sensitive to the blurring caused by jitter. Each has an image stabilization system (ISS) with some ability to filter out high frequency motion, but below the bandwidth of the ISS the control system must compensate for disturbances within the ACS bandwidth or avoid exciting jitter at higher frequencies. Within the ACS bandwidth, the control requirement imposed by AIA is to place the center of the solar disk no more than 2 arc sec, 3 , from a body-defined target based on one of the GTs that accompany the instrument. This body-defined target, called the science reference boresight (SRB), was determined from the postlaunch orientation of the GTs by averaging the bounding telescope boresights for pitch to get a pitch SRB coordinate, and by averaging the bounding boresights for yaw toet the yaw SRB coordinate. The location of this SRB in the 0.5-deg field-of-view for each GT then becomes the central target for each telescope; one GT is selected for use as the ACS controlling guide telescope (CGT) at any given time. Fine Sun-pointing is effected based on this SRB for all three instruments when the Sun is within the linear range of the CGT. In addition to limiting jitter, HMI science requires averaging several observations, making the instrument sensitive to low frequency motion that induces differential motion between each observation. This requires the spacecraft attitude to be stable about the roll axis to approximately 10 arcsec over a ten-minute period. Instrument calibrations require that the spacecraft point the SRB up to 2.5 degrees in pitch and yaw away from the center of the Sun, placing the Sun outside the field-of-view of the guide telescopes. In such instances, when the GTs cannot provide the definitive target for the ACS, on-board attitude determination combined with ephemeris prediction of the Sun direction must provide the definitive target. EVE is capable of observing the Sun with less dependence on attitude control. However, the ground data processing needs for calibrations result in the most strict attitude knowledge requirements for the mission: [35,70,70] arcsec, 3 , of knowledge with respect to the center of the solar disk. In addition to driving the ACS sensor selection, the knowledge requirements, which have their effect primarily during Inertial mode calibrations, drive the accuracy requirements for the solar ephemeris. The need to achieve and maintain geosynchronous orbit (GEO) drove the need for high-efficiency propulsive systems and appropriate attitude control. The main engine provided high specific impulse for the maneuvers to attain GEO, while the smaller ACS thrusters managed the disturbance torques of the larger engine and provided the capability for much smaller adjustment burns on orbit. SDO s large solar profile means that solar radiation pressure is a large torque disturbance, and the momentum buildup from this disturbance and the GEO altitude drives the ACS to use thrusters to manage vehicle momentum. The demanding data capture budget for the mission, however, requires SDO to avoid frequent thruster maneuvers, while concerns about on-orbit jitter restrict the maximum desired wheel speeds desired from the RWAs. The plan for on-orbit wheel speed and momentum management will be discussed as well as what is now being done in operation after the jitter environment was characterized. The SDO ACS hardware complement is single-fault tolerant. Two main processors carry virtually identical copies of the command and data handling and ACS software, and two identical attitude control electronics (ACE) boxes carry Coldfire processors with contingency ACS software and other hardware interface cards; the ACE structure allows reaction wheels to be commanded by the Sun-pointing Safehold independent of the Mil Std 1553 data bus. The sixteen Adcole CSSs are grouped into primary and backup sets of eight sensors, each set providing the ability to calculate a sun vector. Each set of eight eyes provides full 4 -steradian coverage. The Adcole DSS comprises an optics head and a separate electronics box providing a 1553 data interface. The electronics box is mounted inside the Faraday cage created by the spacecraft bus module. The DSS head with its 32- deg square FOV is mounted on the instrument module with its boresight along the spacecraft X axis, nearly aligned with the Sun during observations. Adcole has designed the DSS calibration parameters so that the accuracy is 0.24 arcminutes within 10 deg of the boresight, and diminishes to 3 arcminutes as the Sun moves towards the edges of its FOV . This DSS calibration scheme provides higher accuracy attitude determination over the range of the instrument calibration maneuvers.

Morgenstern, Wendy M.↗

SeaSat-A Satellite Scatterometer Mission Summary and Engineering Assessment Report

The SeaSat-A satellite was launched on June 26, 1978 and operated in orbit through October 9, 1978. The SeaSat-A satellite scatterometer ocean surface wind field sensor began taking data on July 10, 1978 with virtually continuous operation for 95-1/2 days. A review of mission events significant to the scatterometer and a report on the hardware and software engineering assessment are presented.

Johnson, J. W.↗

HL-20 subsystem design

The NASA Langley Research Center has been developing a lifting-body configuration called the HL-20 for potential application as a personnel launch system orbiter that will provide the crew changeout at the Space Station Freedom. The objectives have been to provide an alternate manned access to space with a more cost-effective, efficient, reliable, and safer system for the routine transportation of people to LEO. The detailed study of this concept includes the subsystem design, flight software sizing, and mass properties that are discussed in this paper. The goals were to develop a subsystem complement to maximize operational efficiency with minimum development costs while using current technology. Subsystem selection and trade studies showed that current technology components will provide the required performance and operational effectiveness. Many of the selected components have Shuttle flight histories or considerable development heritage from other programs that will help minimize development costs.

Stone, H. W.↗

The SAX Italian scientific satellite. The on-board implemented automation as a support to the ground control capability

This paper presents the capabilities implemented in the SAX system for an efficient operations management during its in-flight mission. SAX is an Italian scientific satellite for x-ray astronomy whose major mission objectives impose quite tight constraints on the implementation of both the space and ground segment. The most relevant mission characteristics require an operative lifetime of two years, performing scientific observations both in contact and in noncontact periods, with a low equatorial orbit supported by one ground station, so that only a few minutes of communications are available each orbit. This operational scenario determines the need to have a satellite capable of performing the scheduled mission automatically and reacting autonomously to contingency situations. The implementation approach of the on-board operations management, through which the necessary automation and autonomy are achieved, follows a hierarchical structure. This has been achieved adopting a distributed avionic architecture. Nine different on-board computers, in fact, constitute the on-board data management system. Each of them performs the local control and monitors its own functions while the system level control is performed at a higher level by the data handling applications software. The SAX on-board architecture provides the ground operators with different options of intervention by three classes of telecommands. The management of the scientific operations will be scheduled by the operation control center via dedicated operating plans. The SAX satellite flight mode is presently being integrated at Alenia Spazio premises in Turin for a launch scheduled for the end of 1995. Once in orbit, the SAX satellite will be subject to intensive check-out activities in order to verify the required mission performances. An overview of the envisaged procedure and of the necessary on-ground activities is therefore depicted as well.

Martelli, Andrea↗

A Case Study of 4 & 5 Cost Effectiveness

This paper looks at the Independent Verification and Validation (IV&V) of NASA's Space Shuttle Day of Launch I-Load Update (DoLILU) project. IV&V is defined. The system's development life cycle is explained. Data collection and analysis are described. DoLILU Issue Tracking Reports (DITRs) authored by IV&V personnel are analyzed to determine the effectiveness of IV&V in finding errors before the code, testing, and integration phase of the software development life cycle. The study's findings are reported along with the limitations of the study and planned future research.

Neal, Ralph D.↗

A Procedure for Structural Weight Estimation of Single Stage to Orbit Launch Vehicles (Interim User's Manual)

This is an interim user's manual for current procedures used in the Vehicle Analysis Branch at NASA Langley Research Center, Hampton, Virginia, for launch vehicle structural subsystem weight estimation based on finite element modeling and structural analysis. The process is intended to complement traditional methods of conceptual and early preliminary structural design such as the application of empirical weight estimation or application of classical engineering design equations and criteria on one dimensional "line" models. Functions of two commercially available software codes are coupled together. Vehicle modeling and analysis are done using SDRC/I-DEAS, and structural sizing is performed with the Collier Research Corp. HyperSizer program.

Martinovic, Zoran N.↗

A Model-based Approach to Controlling the ST-5 Constellation Lights-Out Using the GMSEC Message Bus and Simulink

Space Technology 5 (ST-5) is a three-satellite constellation, technology validation mission under the New Millennium Program at NASA to be launched in March 2006. One of the key technologies to be validated is a lights-out, model-based operations approach to be used for one week to control the ST-5 constellation with no manual intervention. The ground architecture features the GSFC Mission Services Evolution Center (GMSEC) middleware, which allows easy plugging in of software components and a standardized messaging protocol over a software bus. A predictive modeling tool built on MatLab's Simulink software package makes use of the GMSEC standard messaging protocol to interface to the Advanced Mission Planning System (AMPS) Scenario Scheduler which controls all activities, resource allocation and real-time re-profiling of constellation resources when non-nominal events occur. The key features of this system, which we refer to as the ST-5 Simulink system, are as follows: Original daily plan is checked to make sure that predicted resources needed are available by comparing the plan against the model. As the plan is run in real-time, the system re-profiles future activities in real-time if planned activities do not occur in the predicted timeframe or fashion. Alert messages are sent out on the GMSEC bus by the system if future predicted problems are detected. This will allow the Scenario Scheduler to correct the situation before the problem happens. The predictive model is evolved automatically over time via telemetry updates thus reducing the cost of implementing and maintaining the models by an order of magnitude from previous efforts at GSFC such as the model-based system built for MAP in the mid-1990's. This paper will describe the key features, lessons learned and implications for future missions once this system is successfully validated on-orbit in 2006.

Witt, Kenneth J.↗

Evolution of the JPSS Ground Project Calibration and Validation System

The Joint Polar Satellite System (JPSS) is the National Oceanic and Atmospheric Administrations (NOAA) next-generation operational Earth observation Program that acquires and distributes global environmental data from multiple polar-orbiting satellites. The JPSS Program plays a critical role to NOAAs mission to understand and predict changes in weather, climate, oceans, coasts, and space environments, which supports the Nation’s economy and protection of lives and property. The National Aerospace and Atmospheric Administration (NASA) is acquiring and implementing the JPSS, comprised of flight and ground systems on behalf of NOAA. The JPSS satellites are planned to fly in the afternoon orbit and will provide operational continuity of satellite-based observations and products for NOAA Polar-orbiting Operational Environmental Satellites (POES) and the Suomi National Polar-orbiting Partnership (SNPP) satellite. To support the JPSS Calibration and Validation (CalVal) node Government Resource for Algorithm Verification, Independent Test, and Evaluation (GRAVITE) services facilitate: Algorithm Integration and Checkout, Algorithm and Product Operational Tuning, Instrument Calibration, Product Validation, Algorithm Investigation, and Data Quality Support and Monitoring. GRAVITE is a mature, deployed system that currently supports the SNPP Mission and has been in operations since SNPP launch. This paper discusses the major re-architecture for Block 2.0 that incorporates SNPP lessons learned, architecture of the system, and demonstrates how GRAVITE has evolved as a system with increased performance. It is now a robust, stable, reliable, maintainable, scalable, and secure system that supports development, test, and production strings, replaces proprietary and custom software, uses open source software, and is compliant with NASA and NOAA standards.

Data Processing↗

Evolution of the JPSS Ground Project Calibration and Validation System

The Joint Polar Satellite System (JPSS) is the National Oceanic and Atmospheric Administration's (NOAA) next-generation operational Earth observation Program that acquires and distributes global environmental data from multiple polar-orbiting satellites. The JPSS Program plays a critical role to NOAA's mission to understand and predict changes in weather, climate, oceans, coasts, and space environments, which supports the Nation's economy and protection of lives and property. The National Aeronautics and Space Administration (NASA) is acquiring and implementing the JPSS, comprised of flight and ground systems, on behalf of NOAA. The JPSS satellites are planned to fly in the afternoon orbit and will provide operational continuity of satellite-based observations and products for NOAA Polar-orbiting Operational Environmental Satellites (POES) and the Suomi National Polar-orbiting Partnership (SNPP) satellite. To support the JPSS Calibration and Validation (CalVal) node Government Resource for Algorithm Verification, Independent Test, and Evaluation (GRAVITE) services facilitate: Algorithm Integration and Checkout, Algorithm and Product Operational Tuning, Instrument Calibration, Product Validation, Algorithm Investigation, and Data Quality Support and Monitoring. GRAVITE is a mature, deployed system that currently supports the SNPP Mission and has been in operations since SNPP launch. This paper discusses the major re-architecture for Block 2.0 that incorporates SNPP lessons learned, architecture of the system, and demonstrates how GRAVITE has evolved as a system with increased performance. It is now a robust, stable, reliable, maintainable, scalable, and secure system that supports development, test, and production strings, replaces proprietary and custom software, uses open source software, and is compliant with NASA and NOAA standards.

Next-Generation↗