Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “kW”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 883 records · Page 49

2021 Prototype Installation and Testing Awardee: XFlow Energy Company

XFlow Energy Company (XFlow Energy) aims to reduce the cost of wind energy by designing vertical-axis wind turbines (VAWTs), which have a cheaper blade manufacturing process and a mechanically simpler design than traditional wind turbines, among other cost-saving advantages. However, a lack of modeling or simulation tools that can predict the coupling between aerodynamic and structural forces poses a significant challenge to developers of VAWTs. Known as aeroelastic models, these are not just important design tools - they're critical for certifying VAWTs of 25 kilowatts (kW), which is the size of XFlow Energy's prototype wind turbine. Without certification, XFlow Energy will not be able to deliver an independently validated product to its customers, and those customers will not be eligible for state and federal incentives. An accurate aeroelastic model could provide less-conservative structural optimization tactics than are currently used, resulting in a wind turbine with lower capital costs.

CIP↗

2021 Small Turbine Certification Awardee: Intergrid LLC

Currently, there are no U.S., fully certified inverters for wind turbines in the 10-15-kilowatt (kW) range. The federal government's Competitiveness Improvement Project (CIP) and Small Business Innovation Research programs present the most viable paths for manufacturers in the distributed wind energy industry to conduct research, develop their products, and, ultimately, commercialize them. Through CIP, Intergrid LLC is reducing the cost, size, and weight of its legacy inverter for distributed wind turbines while increasing efficiency, reliability, and serviceability. To accomplish this, Intergrid will address three areas related to power electronics for distributed wind turbines: (1) Software verification and functional safety certification; (2) Simulation for grid-interconnecting testing; (3) Component alternatives that reduce cost and improve reliability and serviceability. The first two areas relate to long-term management of inverter software, which, for grid-connected inverters, must comply with three standards - one issued by Underwriters Laboratories (UL) and two issued by the Institute of Electrical and Electronics Engineers.

CIP↗

Detailed Evaluation of Electric Demand Load Shifting Potential of Heat Pump Water Heaters

Future utilities will emphasize home appliances to reduce greenhouse gas emissions while providing electric load shifting and demand profile management. Heat pump water heaters (HPWH) have demonstrated the ability to cut water heating energy by more than 65% compared with conventional electric resistance waters (ERWH). Laboratory research was conducted on the load shifting potential of grid-connected heat pump water heaters (HPWH), compared to ERWHs. Testing applied different CTA-2045 command designs. Highly-controlled laboratory experiments were conducted on one ERWH and four HPWHs, including a prototype incorporating the new CTA-2045-B protocol feature allowing ‘advanced’ load up above the tank setpoint. The prototype unit with the B-protocol increased tank temperature by 15oF (8.3C) under the advanced load up providing an increase of 1.8 kWh of storage for a 50-gallon (189 liter) tank. The prototype includes a built-in mixing valve to meet anti-scalding codes. With the load-shaping ability of CTA-2045-B, utilities might be able to store excess renewable energy in connected tanks when renewable wind and solar resource production is high. Tests were performed under baseline conditions (no load shift) and under several load-shifting schemes, including load up and advanced load up, ahead of shed commands. Grid-connected HPWHs reduced peak demand by as much as 0.5 kW, depending on tank volume, time of day, control scheme, and draw profile.

heat pump water heater, Demand flexibility, load s↗

Multi-modular capacitive wireless power transfer circuit and related techniques

A high performance kilowatt-scale large air-gap multi-modular capacitive wireless power transfer (WPT) system is provided for electric vehicle (EV) charging. In one particular implementation, the multi-modular system achieves high power transfer while maintaining fringing electric fields within prescribed safety limits. The fringing fields are reduced using near-field phased-array field-focusing techniques, wherein the adjacent modules of the multi-modular system are out-phased with respect to one another. The inter-module interactions in this multi-modular system can be modeled, and an approach to eliminate these interactions in a practical EV charging environment is provided. To illustrate one example implementation, a prototype 1.2-kW 6.78-MHz 12-cm air-gap multi-modular capacitive WPT system comprising two 600-W modules is provided. This prototype system achieves 21.2 kW/m2 power transfer density and a peak efficiency of 89.8%. This multi-modular system also achieves a fringing field reduction of 50% compared to its individual modules.

Afridi, Khurram K.↗

Charging Needs for Battery Electric Semi-Trucks

Battery-electric vehicles provide a pathway to decarbonize heavy-duty trucking, but the market for heavy-duty battery-electric semi-trailer trucks is nascent, and specific charging requirements remain uncertain. We leverage large-scale vehicle telematics data (>205 million miles of driving) to estimate the charging behaviors and infrastructure requirements for U.S. battery-electric semi-trailer trucks within three operating segments: local, regional, and long-haul. We model two types of charging; mid-shift (fast) and off-shift (slow), and show that off-shift charging at speeds compatible with current light-duty charging infrastructure (i.e., =350 kW) can supply 35 to 77% of total energy demand for local and regional trucks with =300-mile range. Megawatt-level speeds are required for mid-shift charging, which make up 44 to 57% of energy demand for long-haul trucks with =500-mile range. However, demand shifts from mid-shift to off-shift charging as the range for battery-electric trucks increases and when off-shift charging is widely available. Finally, we observe geographic trends in charging demand, finding that local trucks have greater demand within urban areas, whereas long-haul trucks have more demand along rural interstate corridors. As the range for battery-electric trucks increases, we show that charging demand shifts from rural to urban locations due to observed vehicle dwell tendencies.

ADVANCED PROPULSION SYSTEMS,ENERGY PLANNING, POLIC↗

Warm Compressor system Overview and status of the PIP-II cryogenic system

The Proton Improvement Plan-II (PIP-II) is a major upgrade to the Fermilab accelerator complex, featuring a new 800-MeV Superconducting Radio-Frequency (SRF) linear accelerator (Linac) powering the accelerator complex to provide the world's most intense high-energy neutrino beam. The PIP-II Linac consists of 23 SRF cryomodules operating at 2 K, 5 K, and 40 K temperature levels supplied by a single helium cryoplant providing 2.5 kW of cooling capacity at 2.0 K. The PIP-II cryogenic system consists of two major systems: a helium cryogenic plant and a cryogenic distribution system. The cryogenic plant includes a refrigerator cold box, a warm compressor system, and helium storage, recovery, and purification systems. The cryogenic distribution system includes a distribution box, intermediate transfer line, and a tunnel transfer line consisting of modular bayonet cans which supply and return cryogens to the cryomodules. A turnaround can is located at the end of the Linac to turnaround cryogenic flows. This paper describes the layout, design, and current status of the PIP-II cryogenic system.

43 PARTICLE ACCELERATORS↗

Charging Needs for Battery Electric Semi Trucks

Battery-electric vehicles provide a pathway to decarbonize heavy-duty trucking, but the market for electric trucks is nascent, and specific charging requirements remain uncertain. This paper summarizes methods and findings from Charging Needs for Electric Semi-Trailer Trucks [1] wherein we leverage large-scale vehicle telematics data (>205 million miles of driving) to estimate the charging behaviors and infrastructure requirements for U.S. battery-electric semi-trailer trucks within three operating segments: local, regional, and long-haul. We model two types of charging - mid-shift (fast en-route charging) and off-shift (slow depot charging) - and show that off-shift charging at speeds compatible with current light-duty charging infrastructure (i.e., =350 kW) can supply 35% to 77% of total energy demand for local and regional trucks with =300-mile range. Megawatt-level speeds are required for mid-shift charging, which make up 44% to 57% of energy demand for long-haul trucks with =500-mile range. However, the role of off-shift charging increases as the range for battery-electric trucks increases and when off-shift charging is widely available.

ADVANCED PROPULSION SYSTEMS↗

Analysis of a Continuous Halbach Array Permanent Magnet Motor for Electric Vehicles

Permanent magnets spirals with continuously varying magnetization directions to replace Halbach arrays have recently been developed. Ideal sinusoidal fields with the desired polarity are created in the machine airgap. In this paper we propose to compare a motor initially designed with a conventional discrete Halbach array with the innovative continuous Halbach array magnets. The continuous Halbach array comprises bonded magnets manufactured from anisotropic powder aligned and compacted without a bonding agent. The paper focuses on the impact of using these magnets on the performance of a motor designed for electric vehicle applications using 2D and 3D FEA simulations. The baseline motor is a 50-kW outrunner motor designed for light duty electric vehicles

Rallabandi, Vandana↗

PHIL Interface Design for Use With a Voltage-Regulated Amplifier: Preprint

As inverter controls have become increasingly complex, power hardware-in-the-loop (PHIL) has emerged as a leading strategy to thoroughly assess the impact of proprietary inverter controls on a specific power system. The development of a PHIL test bed typically involves the desired inverter, a power amplifier, and a digital real-time simulator (DRTS) to control the simulated power system. As a result of PHIL nonidealities, a form of digital compensation within the DRTS is used, which is commonly referred to as a PHIL interface. The interface design for PHIL test beds has been previously examined in the literature, but many existing methods use older power amplifiers that do not contain internal voltage regulation. These existing interface methods are based around a voltage regulator within the DRTS rather than one preexisting in hardware. In this study, a three-step approach of PHIL interface development for modern power amplifiers with built-in voltage regulation is introduced and validated in hardware with a single 30-kW grid-following inverter.

DRTS↗

2022 Prototype Installation and Testing Awardee: Windward Engineering

The 60-kilowatt (kW) Zephyr 21/60 wind turbine from Windward Engineering uses a low-cost, full-span independent pitch system that can act as a redundant aerodynamic braking system. This design uses a relatively simple pneumatic rotary vane actuator, allowing each of the turbine's three blades to be pitched independently and any single blade to activate emergency braking for the entire turbine. A previous Competitiveness Improvement Project (CIP) funding award enabled Windward Engineering to design and develop the Zephyr 21/60 wind turbine's aeroelastic model and pitch system. At the end of this current Competitiveness Improvement Project award, a fully validated aeroelastic model will make it possible to certify Windward Engineering's Zephyr 21/60 design and quantify the technology's levelized cost of energy in preparation for certification and entry into the distributed wind market. The Zephyr 21/60 will feature an attractive levelized cost of energy, improved reliability, and a full-span pitch system for safe and redundant protection against rotor overspeed (which occurs when the rotor turns beyond its design limit).

CIP↗

DEMONSTRATION OF A PASSIVE CONDENSER LOOP

Building HVAC consumes significant amount of energy. It is estimated that about 7% of the total electricity consumed by water cooled chiller is used to drive the condenser water pump. A passive condenser loop is developed to curb this energy consumption by replacing the open pumped loop to a closed loop thermosyphon system. The loop thermosyphon uses waste heat to circulate the condenser fluid, eliminating the electrical pumping power requirement and the large circulation pump. Since it is a closed loop, it also reduces the maintenance cost and enables both wet and dry cooling modes. A demonstration unit with a riser about 40 feet (12.2 meters) tall is fabricated and tested at powers up to 25 kW. The result has successfully showed that the loop thermosyphon is able to transfer the heat near isothermally (∆T < 0.4C) over the long distance without the need of any pump and consuming any electricity.

Loop thermosyphon, building HVAC, condenser loop↗

Examining Light-Induced Degradation with Combined-Accelerated Stress Testing

While further understanding is sought, the results suggest that a module can show no degradation in performance through a qualification test light soak, (IEC 61215: 2021 MQT 19.1 requirement of 10 kW minimum on one side). Yet, such cells may degrade significantly by LID under conditions within the statistical extremes of the natural environment applied in combined-accelerated stress testing (CAST).

combined-accelerated stress testing↗

Biomethanation to Upgrade Biogas to Pipeline Grade Methane

NREL is working closely with DOE, Electrochaea GmbH, and Southern California Gas Company (SoCalGas) to reduce costs of a biomethanation process capable of megawatt-scale deployment that upgrades organic biogas waste streams to produce pipeline quality renewable natural gas (RNG). Biomethanation is a two-step process using a single-celled methanogenic archaea that converts low-carbon low-cost hydrogen (H2) and waste carbon dioxide (CO2) to produce renewable methane (CH4). The process upgrades the biogenic CO2 - while allowing the CH4 to pass through - from biogas sources like dairies, wastewater treatment plants, and landfills. The CH4 produced is a drop-in direct replacement fuel and producers can participate in the growing number of carbon markets; like California's Low Carbon Fuel Standard and the Federal Renewable Fuel Standard. NREL and Argonne National Laboratory have completed a life cycle analysis using the GREET model to show that the biomethanation process produces RNG that is carbon negative even when H2 production via low-temperature water electrolysis is driven by the existing carbon intensity of California's electricity grid. And of course, even further carbon negative (-233 kg CO2e/kWh) when the electricity is produced from low-carbon sources like wind and solar. Leveraging lessons learned from operating SoCalGas' 700L 18-bar bioreactor system, NREL is designing and building a flexible RD&D platform that will enable field trials at biogas and other CO2 sources. A custom 16' long trailer will house a 20L 18-bar bioreactor, 3 - 25 kW proton exchange membrane electrolyzer, and dosing, thermal, and controls systems to support operations with only power, biogas, and water feedstocks required by the field locations. The end-of-project goal is to demonstrate pipeline quality RNG production (> 95% CH4, < 4% H2, <1% CO2, < 0.2% O2 and < 4 parts per million H2 sulfide) using real biogas feedstocks - thereby recycling both greenhouse gases for injection into the natural gas network or to be used onsite.

biogas upgrading↗

Disrupting EV Charging Sessions and Gaining Remote Code Execution with DoS, MITM, and Code Injection Exploits using OCPP 1.6

Open Charge Point Protocol (OCPP) 1.6 is widely used in the electric vehicle (EV) charging industry to communicate between Charging System Management Services (CSMSs) and Electric Vehicle Supply Equipment (EVSE). Unlike OCPP 2.0.1, OCPP 1.6 uses unencrypted websocket communications to exchange information between EVSE devices and an onpremise or cloud-based CSMS. In this work, we demonstrate two machine-in-the-middle (MITM) attacks on OCPP sessions to terminate charging sessions and gain root access to the EVSE equipment via remote code execution (RCE). Second, we demonstrate a malicious firmware update with a code injection payload to compromise an EVSE. Lastly, we demonstrate two methods to prevent availability of the EVSE or CSMS. One of these, originally reported by SaiFlow, prevents traffic to legitimate EVSE equipment using a DoS-like attack on CSMSs by repeatedly connecting and authenticating several CPs with the same identities as the legitimate CP. These vulnerabilities were demonstrated with proof-of-concept exploits in a virtualized Cyber Range at Wright State University and/or with a 350 kW Direct Current Fast Charger (DCFC) at Idaho National Laboratory. The team found that OCPP 1.6 could be protected from these attacks by adding secure shell (SSH) tunnels to the protocol, if upgrading to OCPP 2.0.1 was not an option. Index Terms—Electric vehicle charging, cybersecurity, OCPP, cyberattack, cyber-resilience. INSPEC Accession Number: 23981565

99 GENERAL AND MISCELLANEOUS↗

2022 System Optimization Awardee: XFlow Energy Company

Vertical-axis wind turbines offer several cost-saving advantages over traditional horizontal-axis wind turbines, including lower blade manufacturing costs and a simpler mechanical design. Unfortunately, until now, vertical configurations have not been able to match the power production and durability of more conventional horizontal-axis models. XFlow Energy Company (XFlow Energy) plans to improve the design and reduce the production costs of its 25-kilowatt (kW) vertical-axis wind turbine, delivering a levelized cost of energy that is competitive with that of U.S. retail electricity generated by coal-fired power plants. XFlow Energy's efficient turbine also is designed to maximize power production and longevity. Two previous Competitiveness Improvement Project (CIP) awards funded XFlow Energy's development of a 10-meter vertical-axis turbine prototype.

CIP↗

ECAR-5139 MARVEL Radiological Source Term

As part of the Microreactor Applications Research Validation and Evaluation Project (MARVEL) design effort, a preliminary end of life reactor fuel radiological source term is calculated in support of the MARVEL preliminary hazard evaluation. The source term calculation assumes a two-year uninterrupted operating life at a power of about 111 kW for a total energy of 7,000,000 MJ. A final source term for the final hazard evaluation will need to be generated or an evaluation performed to determine the applicability of the source term documented here for use in the final hazard evaluation.

38 RADIATION CHEMISTRY, RADIOCHEMISTRY, AND NUCLEA↗

Approach to nuclear criticality in IAN-R1 research reactor

The Republic of Colombia is operating a small 100 kW(t) research reactor. The reactor was provided to Colombia under the U.S. Atoms for Peace Program, and which was fueled with MTR HEU fuel enriched nominally to 93% U{sup 235}. With the cooperation of the International Atomic Energy Agency IAEA, it was prepared a new safety analysis report for performing an HEU to LEU conversion of the IAN-R1 reactor and manufacture TRIGA type LEU (19.7%, enriched) fuel to replace the original MTR-HEU fuel plate assemblies. This paper describes the activities which were achieved during the approach to nuclear criticality. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Bifacial Photovoltaic Module Degradation Dynamics

In a comprehensive study conducted at NREL's 75 kW bifacial single-axis-tracked field, accelerated degradation was observed in four out of five bifacial silicon photovoltaic (PV) module technologies when compared to their monofacial counterparts. Root cause analysis of accelerated bifacial degradation involved various analytical tools and techniques. This included employing RdTools to identify rates of power loss, conducting measurements on fielded and control modules using infrared imaging, electroluminescence (EL) and photoluminescence (PL), quantum efficiency (QE) analysis, IV-curves assessment, as well as utilizing handheld Raman and reflectance measurement targeted at anti-reflective coating. Most cases pointed to carrier lifetime degradation causing Voc loss and simultaneous Isc loss. In some cases, Isc further decreases likely due to optical effects from encapsulant degradation. The outcomes and methodologies employed in this investigation are documented in this publication. This study's significance is further emphasized by placing the findings within the broader context of the performance and degradation of various bifacial systems, as identified in the PV Fleets data.

bifacial↗