Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “human operator support”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 883 records · Page 49

Dynamic Model of the BIO-Plex Air Revitalization System

The BIO-Plex facility will need to support a variety of life support system designs and operation strategies. These systems will be tested and evaluated in the BIO-Plex facility. An important goal of the life support program is to identify designs that best meet all size and performance constraints for a variety of possible future missions. Integrated human testing is a necessary step in reaching this goal. System modeling and analysis will also play an important role in this endeavor. Currently, simulation studies are being used to estimate air revitalization buffer and storage requirements in order to develop the infrastructure requirements of the BIO-Plex facility. Simulation studies are also being used to verify that the envisioned operation strategy will be able to meet all performance criteria. In this paper, a simulation study is presented for a nominal BIO-Plex scenario with a high-level of crop growth. A general description of the dynamic mass flow model is provided, along with some simulation results. The paper also discusses sizing and operations issues and describes plans for future simulation studies.

Finn, Cory↗

Development of High Power Hall Thruster Systems to Enable the NASA Exploration Vision

The next phase of space exploration missions requires high power Solar Electric Propulsion (SEP) systems for large-scale science missions and cargo transportation. Development is underway at Aerojet Rocketdyne on Hall thruster systems that are intended to bracket the needs of future NASA SEP missions in support of space exploration. The Advanced Electric Propulsion System (AEPS) program is developing and qualifying a 13.3kW Hall thruster system to be demonstrated on the Power and Propulsion Element (PPE), which is intended to be the first element of a Lunar Outpost Platform - Gateway (LOP-G). The NextSTEP program is integrating a nested Hall thruster into a 100kW system and testing it for 100 hours. These two programs will provide a path to efficient in-space propulsion that will allow NASA to transfer the large amounts of cargo that is needed to support human missions - first to the moon and then on to Mars. The Advanced Electric Propulsion System (AEPS) program is completing development, qualification and delivery of five flight 13.3kW EP systems to NASA. The flight AEPS system includes a magnetically shielded long-life Hall thruster, Power Processing Unit (PPU) and a Xenon Flow Controller (XFC). The Hall thruster, developed and demonstrated by NASA, operates at input powers up to 12.5kW while providing a specific impulse over an estimated 2800s at an input voltage of 600V. The power processor is designed to accommodate an input voltage range of 95-140V, consistent with operation beyond the orbit of Mars. The integrated system input power is continuously throttleable between 3 and 13.3kW. Component level testing of the EP String has begun with prototype hardware. The NextSTEP program is developing a 100kW Electric Propulsion (EP) system using a nested Hall thruster designed for powers up to 250kW, a modular power processor and a modular mass flow controller. While the program objective is to operate the integrated EP system continuously at 100kW for 100hrs to demonstrate thermal stability and support the development of system life time models, it builds on decades of experience with long-life Hall thrusters and the design is evolvable to a capability of 250kW. Design upgrades that demonstrate the 100kW EP system have been completed and tested. Aerojet Rocketdyne (AR) is excited to support NASA as it extends human reach into deep space and believes that these programs will provide the propulsion to make such missions affordable and sustainable. These systems provide NASA with a range of options to power its deep space transport vehicles. This paper presents the mission requirements for supporting the NASA exploration vision, as well as the status for the high power Hall thruster systems in development.

Jackson, Jerry↗

Development of High Power Hall Thruster Systems to Enable the NASA Exploration Vision

The next phase of space exploration missions requires high power Solar Electric Propulsion (SEP) systems for large-scale science missions and cargo transportation. Development is underway at Aerojet Rocketdyne on Hall thruster systems that are intended to bracket the needs of future NASA SEP missions in support of space exploration. The Advanced Electric Propulsion System (AEPS) program is developing and qualifying a 13.3kW Hall thruster system to be demonstrated on the Power and Propulsion Element (PPE), which is intended to be the first element of a Lunar Outpost Platform - Gateway (LOP-G). The NextSTEP program is integrating a nested Hall thruster into a 100 kW system and testing it for 100 hours. These two programs will provide a path to efficient in-space propulsion that will allow NASA to transfer the large amounts of cargo that is needed to support human missions - first to the moon and then on to Mars. The Advanced Electric Propulsion System (AEPS) program is completing development, qualification and delivery of five flight 13.3kW EP systems to NASA. The flight AEPS system includes a magnetically shielded long-life Hall thruster, Power Processing Unit (PPU) and a Xenon Flow Controller (XFC). The Hall thruster, developed and demonstrated by NASA, operates at input powers up to 12.5 kW while providing a specific impulse over an estimated 2800s at an input voltage of 600V. The power processor is designed to accommodate an input voltage range of 95-140V, consistent with operation beyond the orbit of Mars. The integrated system input power is continuously throttleable between 3 and 13.3kW. Component level testing of the EP String has begun with prototype hardware. The NextSTEP program is developing a 100kW Electric Propulsion (EP) system using a nested Hall thruster designed for powers up to 250kW, a modular power processor and a modular mass flow controller. While the program objective is to operate the integrated EP system continuously at 100kW for 100 hours to demonstrate thermal stability and support the development of system life time models, it builds on decades of experience with long-life Hall thrusters and the design is evolvable to a capability of 250kW. Design upgrades that demonstrate the 100kW EP system have been completed and tested. Aerojet Rocketdyne is excited to support NASA as it extends human reach into deep space and believes that these programs will provide the propulsion to make such missions affordable and sustainable. These systems provide NASA with a range of options to power its deep space transport vehicles. This paper presents the mission requirements for supporting the NASA exploration vision, as well as the status for the high power Hall thruster systems in development.

Jackson, Jerry↗

Guidance for Human-system Interfaces to Automatic Systems

Automation is ubiquitous in modern complex systems, and commercial nuclear- power plants are no exception. Automation is applied to a wide range of functions, including monitoring and detection, situation assessment, response planning, and response implementation. Automation has become a 'team player' supporting personnel in nearly all aspects of system operation. In light of its increasing use and importance in new- and future-plants, guidance is needed to conduct safety reviews of the operator's interface with automation. The objective of this research was to develop such guidance. We first characterized the important HFE aspects of automation, including six dimensions: Levels, functions, processes, modes, flexibility, and reliability. Next, we reviewed literature on the effects of all of these aspects of automation on human performance, and on the design of human-system interfaces (HSIs). Then, we used this technical basis established from the literature to identify general principles for human-automation interaction and to develop review guidelines. The guidelines consist of the following seven topics: Automation displays, interaction and control, automation modes, automation levels, adaptive automation, error tolerance and failure management, and HSI integration.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Human-system Interfaces for Automatic Systems

Automation is ubiquitous in modern complex systems, and commercial nuclear- power plants are no exception. Automation is applied to a wide range of functions including monitoring and detection, situation assessment, response planning, and response implementation. Automation has become a 'team player' supporting personnel in nearly all aspects of system operation. In light of its increasing use and importance in new- and future-plants, guidance is needed to conduct safety reviews of the operator's interface with automation. The objective of this research was to develop such guidance. We first characterized the important HFE aspects of automation, including six dimensions: levels, functions, processes, modes, flexibility, and reliability. Next, we reviewed literature on the effects of all of these aspects of automation on human performance, and on the design of human-system interfaces (HSIs). Then, we used this technical basis established from the literature to identify general principles for human-automation interaction and to develop review guidelines. The guidelines consist of the following seven topics: automation displays, interaction and control, automation modes, automation levels, adaptive automation, error tolerance and failure management, and HSI integration. In addition, our study identified several topics for additional research.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

The use of a model of human thermoregulation during the Apollo and Skylab programs

A model of thermoregulation in man was used operationally during the Apollo and Skylab programs. The evolution of this description of thermoregulation is discussed as well as the supporting research programs that led to its growth in representational detail and operational accuracy. A discussion of the operational use of the model is presented as well as future applications of the model.

Waligora, J. M.↗

Communications protocols for a fault tolerant, integrated local area network for Space Station applications

The evolutionary growth of the Space Station and the diverse activities onboard are expected to require a hierarchy of integrated,local area networks capable of supporting data, voice and video communications. In addition, fault tolerant network operation is necessary to protect communications between critical systems attached to the net and to relieve the valuable human resources onboard Space Station of day-to-day data system repair tasks. An experimental, local area network is being developed which will serve as a testbed for investigating candidate algorithms and technologies for a fault tolerant, integrated network. The establishment of a set of rules or protocols which govern communications on the net is essential to obtain orderly and reliable operation. A hierarchy of protocols for the experimental network is presented and procedures for data and control communications are described.

Meredith, B. D.↗

Environmental projects. Volume 3: Environmental compliance audit

The Goldstone Deep Space Communications Complex is part of NASA's Deep Space Network, one of the world's largest and most sensitive scientific telecommunications and radio navigation networks. Activities at Goldstone are carried out in support of six large parabolic dish antennas. In support of the national goal of the preservation of the environment and the protection of human health and safety, NASA, JPL and Goldstone have adopted a position that their operating installations shall maintain a high level of compliance with Federal, state, and local laws governing the management of hazardous substances, abestos, and underground storage tanks. A JPL version of a document prepared as an environmental audit of Goldstone operations is presented. Both general and specific items of noncompliance at Goldstone are identified and recommendations are provided for corrective actions.

Source record↗

Terrestrial analogs for space exploration habitation systems

The Space Exploration Initiative (SEI) can use early earth-based analogs to simulate many aspects of space flight missions and system operation. These analogs can thus provide information supporting future missions to the moon and to Mars. A study was performed to investigate the potential of terrestrial analogs in simulating human space exploration missions. The study resulted in preliminary requirements and concepts for analog habitation systems, and further study in this area is necessary for SEI terrestrial analog development.

Campbell, Paul D.↗

The design of a commercial space infrastructure

Space Services and Logistics, Inc. represents the complete engineering design of a technically and financially viable commercial space company. The final proposal offers an economically sound program of space vehicles and systems designed to substantially affect a variety of space markets and produce a vertically integrated structure within the next 20 years. Throughout this design process, particular stress has been placed on attaining the highest possible levels of safety and reliability. The final program financial design requires a considerable initial outlay, but promises a relatively quick return on invested capital, culminating in large annual profits by the end of the 20-year scope of the cost outlook. The overall design has been extensively researched and was primarily driven by the present and near-term projected market demands for services uniquely or competitively offered only by space-oriented operations. Heretofore, available capabilities, rather than these market demands, have determined the degree and type of commercial market access. Removing this limitation through extensive use of modularity and reconfigurability allows the company to gear itself to the market, while still remaining extremely competitive with existing systems. The markets identified as lucrative, and that have governed much of the design requirements, are: low-cost launch services to LEO over a wide range of payload masses and inclinations; upper stage payload delivery from LEO to GEO; manned space operations and human transport to and from orbit; EVA assembly and maintenance of large space structures; satellite servicing and repair by both humans and telerobotic operations; a line of customized satellites designed for extended life and capable of reconfiguration or technology upgrade on orbit; small-scale microgravity experimentation and manufacturing supported by spacecraft retrieval capabilities for experimental specimens and manufactured goods; and a full-range of payload integration, testing, design, and support services before launch and once in orbit.

Source record↗

Design and Testing of Non-Toxic RCS Thrusters for Second Generation Reusable Launch Vehicle

The current NASA Space Shuttle auxiliary propulsion system utilizes nitrogen tetroxide (NTO) and monomethylhydrazine (MMH), hypergolic propellants. This use of these propellants has resulted in high levels of maintenance and precautions that contribute to costly launch operations. By employing alternate propellant combinations, those less toxic to humans, the hazards and time required between missions can be significantly reduced. Use of alternate propellants can thereby increase the efficiency and lower the cost in launch operations. In support of NASA's Space Launch Initiative (SLI), TRW proposed a three-phase project structured to significantly increase the technology readiness of a high-performance reaction control subsystem (RCS) thruster using non-toxic propellant for an operationally efficient and reusable auxiliary propulsion system (APS). The project enables the development of an integrated primary/vernier thruster capable of providing dual-thrust levels of both 1000-lbf class thrust and 25-lbf thrust. The intent of the project is to reduce the risk associated with the development of an improved RCS flight design that meets the primary NASA objectives of improved safety and reliability while reducing systems operations and maintenance costs. TRW proposed two non-toxic auxiliary propulsion engine designs, one using liquid oxygen and liquid hydrogen and the other using liquid oxygen and liquid ethanol, as candidates to meet the goals of reliability and affordability at the RCS level. Both of these propellant combinations offer the advantage of a safe environment for maintenance, while at the same time providing adequate to excellent performance for a conventional liquid propulsion systems. The key enabling technology incorporated in both TRW thrusters is the coaxial liquid on liquid pintle injector. This paper will concentrate on only the design and testing of one of the thrusters, the liquid oxygen (LOX) and liquid hydrogen (LH2) thruster. The LOX/LH2 thruster design includes a LOX-centered pintle injector, consisting of two rows of slots that create a radial spoke spray pattern in the combustion chamber. The main fuel injector creates a continuous sheet of LH2 originating upstream of the LOX pintle injector. The two propellants impinge at the pintle slots, where the resulting momentum ratio and spray pattern determines the combustion efficiency and thermal effects on the hardware. Another enabling technology used in the design of this thruster is fuel film cooling through a duct, lining the inner wall of the combustion chamber barrel section. The duct is also acts as a secondary fuel injection point. The variation in the amount of LH2 used for the duct allows for adjustments in the cooling capacity for the thruster. The Non-Toxic LOX-LH2 RCS Workhorse Thruster was tested at the NASA Marshall Space Flight Center's Test Stand 500. Hot-fire tests were conducted between March 08, 2002 and April 05, 2002. All testing during the program base period were performed at sea-level conditions. During the test program, 7 configurations were tested, including 2 combustion chambers, 3 LOX injector pintle tips, and 4 LH2 injector stroke settings. The operating conditions that were surveyed varied thrust levels, mixture ratio and LH2 duct cooling flow. The copper heat sink chamber was used for 16 burns, each burn lasting from 0.4 to 10 seconds, totaling 51.4 seconds, followed by Haynes chamber testing ranging from 0.9 to 120 seconds, totaling 300.9 seconds. The total accumulated burn time for the test program is 352.3 seconds. C* efficiency was calculated and found to be within expectable limits for most operating conditions. The temperature on the Haynes combustion chamber remained below established material limits, with the exception of one localized hot spot. The test results demonstrate that both the coaxial liquid-on-liquid pintle injector design and fuel duct concepts are viable for the intended application. The thruster head-e design maintained cryogenic injection temperatures while firing, which validates the concept for minimal heat soak back. By injecting fuel into the duct, the throat temperatures were manageable, yet the split of fuel through the cooling duct does not compromise the overall combustion efficiency, which indicates that, provided proper design refinement, such a concept can be applied to a high-performance version of the thruster. These hot fire tests demonstrate the robustness of the duct design concept and good capability to withstand off-nominal operating conditions without adversely impacting the thermal response of the engine, a key design feature for a cryogenic thruster.

Calvignac, Jacky↗

Columbia Accident Investigation Board. Volume One

The Columbia Accident Investigation Board's independent investigation into the February 1, 2003, loss of the Space Shuttle Columbia and its seven-member crew lasted nearly seven months. A staff of more than 120, along with some 400 NASA engineers, supported the Board's 13 members. Investigators examined more than 30,000 documents, conducted more than 200 formal interviews, heard testimony from dozens of expert witnesses, and reviewed more than 3,000 inputs from the general public. In addition, more than 25,000 searchers combed vast stretches of the Western United States to retrieve the spacecraft's debris. In the process, Columbia's tragedy was compounded when two debris searchers with the U.S. Forest Service perished in a helicopter accident. This report concludes with recommendations, some of which are specifically identified and prefaced as 'before return to flight.' These recommendations are largely related to the physical cause of the accident, and include preventing the loss of foam, improved imaging of the Space Shuttle stack from liftoff through separation of the External Tank, and on-orbit inspection and repair of the Thermal Protection System. The remaining recommendations, for the most part, stem from the Board's findings on organizational cause factors. While they are not 'before return to flight' recommendations, they can be viewed as 'continuing to fly' recommendations, as they capture the Board's thinking on what changes are necessary to operate the Shuttle and future spacecraft safely in the mid- to long-term. These recommendations reflect both the Board's strong support for return to flight at the earliest date consistent with the overriding objective of safety, and the Board's conviction that operation of the Space Shuttle, and all human space-flight, is a developmental activity with high inherent risks.

SPACE SHUTTLE COLUMBIA↗

NASA Ares I Crew Launch Vehicle Upper Stage Overview

By incorporating rigorous engineering practices, innovative manufacturing processes and test techniques, a unique multi-center government/contractor partnership, and a clean-sheet design developed around the primary requirements for the International Space Station (ISS) and Lunar missions, the Upper Stage Element of NASA's Crew Launch Vehicle (CLV), the "Ares I," is a vital part of the Constellation Program's transportation system. Constellation's exploration missions will include Ares I and Ares V launch vehicles required to place crew and cargo in low-Earth orbit (LEO), crew and cargo transportation systems required for human space travel, and transportation systems and scientific equipment required for human exploration of the Moon and Mars. Early Ares I configurations will support ISS re-supply missions. A self-supporting cylindrical structure, the Ares I Upper Stage will be approximately 84' long and 18' in diameter. The Upper Stage Element is being designed for increased supportability and increased reliability to meet human-rating requirements imposed by NASA standards. The design also incorporates state-of-the-art materials, hardware, design, and integrated logistics planning, thus facilitating a supportable, reliable, and operable system. With NASA retiring the Space Shuttle fleet in 2010, the success of the Ares I Project is essential to America's continued leadership in space. The first Ares I test flight, called Ares I-X, is scheduled for 2009. Subsequent test flights will continue thereafter, with the first crewed flight of the Crew Exploration Vehicle (CEV), "Orion," planned for no later than 2015. Crew transportation to the ISS will follow within the same decade, and the first Lunar excursion is scheduled for the 2020 timeframe.

McArthur, J. Craig↗

NASA Ares I Crew Launch Vehicle Upper Stage Overview

By incorporating rigorous engineering practices, innovative manufacturing processes and test techniques, a unique multi-center government/contractor partnership, and a clean-sheet design developed around the primary requirements for the International Space Station (ISS) and Lunar missions, the Upper Stage Element of NASA's Crew Launch Vehicle (CLV), the "Ares I," is a vital part of the Constellation Program's transportation system. Constellation's exploration missions will include Ares I and Ares V launch vehicles required to place crew and cargo in low-Earth orbit (LEO), crew and cargo transportation systems required for human space travel, and transportation systems and scientific equipment required for human exploration of the Moon and Mars. Early Ares I configurations will support ISS re-supply missions. A self-supporting cylindrical structure, the Ares I Upper Stage will be approximately 84' long and 18' in diameter. The Upper Stage Element is being designed for increased supportability and increased reliability to meet human-rating requirements imposed by NASA standards. The design also incorporates state-of-the-art materials, hardware, design, and integrated logistics planning, thus facilitating a supportable, reliable, and operable system. With NASA retiring the Space Shuttle fleet in 2010, the success of the Ares I Project is essential to America's continued leadership in space. The first Ares I test flight, called Ares 1-X, is scheduled for 2009. Subsequent test flights will continue thereafter, with the first crewed flight of the Crew Exploration Vehicle (CEV), "Orion," planned for no later than 2015. Crew transportation to the ISS will follow within the same decade, and the first Lunar excursion is scheduled for the 2020 timeframe.

Davis, Daniel J.↗

1-G Human Factors for Optimal Processing and Operability of Ground Systems up to CxP GOP PDR

During the mid stages of design development, up to Constellation Program (CxP) Preliminary Design Review (PDR), the requirements for leveraging I-G human factors for optimizing ground processing of Flight Hardware were mature for levels - 2, 3, 4, and 5. This paper gives an overview of the accomplishments achieved during that time. The main focus of this paper will be on the CxP Ground Operations Project human factors engineering analysis process using a Human Factors Engineering Analysis Tool (HFEAT) for developing the level- 5 requirements effecting the design development of the subsystems for Ground Support System (GSS), and Ground Support Equipment (GSE).

Stambolian, Damon B.↗

Synergistic Allocation of Flight Expertise on the Flight Deck (SAFEdeck): A Design Concept to Combat Mode Confusion, Complacency, and Skill Loss in the Flight Deck

This paper presents a new design and function allocation philosophy between pilots and automation that seeks to support the human in mitigating innate weaknesses (e.g., memory, vigilance) while enhancing their strengths (e.g., adaptability, resourcefulness). In this new allocation strategy, called Synergistic Allocation of Flight Expertise in the Flight Deck (SAFEdeck), the automation and the human provide complementary support and backup for each other. Automation is designed to be compliant with the practices of Crew Resource Management. The human takes a more active role in the normal operation of the aircraft without adversely increasing workload over the current automation paradigm. This designed involvement encourages the pilot to be engaged and ready to respond to unexpected situations. As such, the human may be less prone to error than the current automation paradigm.

Schutte, Paul↗

Human-in-the-Loop Assessment of Alternative Clearances in Interval Management Arrival Operations

Interval Management Alternative Clearances (IMAC) was a human-in-the-loop simulation experiment conducted to explore the Air Traffic Management (ATM) Technology Demonstration (ATD-1) Concept of Operations (ConOps), which combines advanced arrival scheduling, controller decision support tools, and aircraft avionics to enable multiple time deconflicted, efficient arrival streams into a high-density terminal airspace. Interval Management (IM) is designed to support the ATD-1 concept by having an "Ownship" (IM-capable) aircraft achieve or maintain a specific time or distance behind a "Target" (preceding) aircraft. The IM software uses IM clearance information and the Ownship data (route of flight, current location, and wind) entered by the flight crew, and the Target aircraft's Automatic Dependent Surveillance-Broadcast state data, to calculate the airspeed necessary for the IM-equipped aircraft to achieve or maintain the assigned spacing goal.

Baxley, Brian T.↗

ISS Payload Operations Training Throughout the COVID-19 Pandemic: Impacts, Opportunities and Solutions

The onset of the COVID-19 pandemic brought a dramatic and rapid transformation to almost every aspect of humanity. The world’s space agencies and their missions were not immune to the wide-sweeping changes. One discipline principally affected was mission operations and the various groups supporting that function. Mission support teams, especially for complex and crewed missions like the International Space Station (ISS) were forced to rethink how and where control center staff performed their vital work. Operations training – an essential element to mission ops, had unique hurdles to overcome. Operations training is responsible for preparing astronaut crews for their missions, training and certifying flight controllers, as well as ensuring that new team members are ready to join their colleagues. Every element of training was impacted during the pandemic. From orientation and introductory classes for new controllers, simulations, and advanced lessons, On the Job Training (OJT) and final evaluations; all aspects faced challenges. Trainers at NASA’s Marshall Space Flight Center in Huntsville, Alabama were forced to become more efficient with trainees and resources to continue supporting ISS payload operations. The pandemic arrived in the USA in March 2020. Immediately, NASA mandated that the support for ISS real-time operations was critical. As a result, physical access to key facilities was restricted. Trainers and trainees had to quickly shift to 100% remote learning. In the short term, this was not a problem. However, instructors discovered lessons they were accustomed to delivering in a classroom environment often did not translate to remote teaching. Another hurdle to operations training was the mandate that all simulations could only be held remotely. The logistics of even small simulations proved to be challenging due to Information Technology (IT) restrictions and public internet limitations. With simulations essentially halted, as well as the restrictions on most OJT, trainees were essentially stopped in their advancement towards certification. Once limitations were identified, trainers prioritized new options. Transitioning to all electronic learning materials was a relatively easy fix. Teaching to large groups took additional shifts in the training paradigm. Methods for preparing astronauts for their missions were revised. Simulation supervisors found efficient techniques to provide realistic training experiences. Communication and coordination with management was essential. In every case, the payload operations instructors found novel solutions to all functions listed. This paper discusses the factors and solutions payloads operations trainers found to keep scientific research on the ISS flying forward to mission success.

ISS↗