Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “field testing”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 883 records · Page 49

Development of a Flow Field for Testing a Boundary-Layer-Ingesting Propulsor

The test section of the 8- by 6-Foot Supersonic Wind Tunnel at NASA Glenn Research Center was modified to produce the test conditions for a boundary-layer-ingesting propulsor. A test was conducted to measure the flow properties in the modified test section before the propulsor was installed. Measured boundary layer and freestream conditions were compared to results from computational fluid dynamics simulations of the external surface for the reference vehicle. Testing showed that the desired freestream conditions and boundary layer thickness could be achieved; however, some non-uniformity of the freestream conditions, particularly the total temperature, were observed.

embedded propulsion↗

Development of a Flow Field for Testing a Boundary-Layer-Ingesting Propulsor

In order to test embedded-propulsor technology, modifications were required of the 8x6 Supersonic Wind tunnel at NASA Glenn Research Center. The extent of the modifications required that a new tunnel calibration be completed to generate a new calibration dataset and operational procedures for the tunnel, as well as to map the boundary layer on the raised floor. This report describes the propulsor inflow that was to be simulated, documents the tunnel modifications that were required, and conveys the results of the calibration test that was completed to measure the resulting flow properties.

boundary layer↗

In-Field Performance Testing of the Fork Detector for Quantitative Spent Fuel Verification

Expanding spent fuel dry storage activities worldwide are increasing demands on safeguards authorities that perform inspections. The European Atomic Energy Community (EURATOM) and the International Atomic Energy Agency (IAEA) require measurements to verify declarations when spent fuel is transferred to difficult-to-access locations, such as dry storage casks and the repositories planned in Finland and Sweden. EURATOM makes routine use of the Fork detector to obtain gross gamma and total neutron measurements during spent fuel inspections. Data analysis is performed by modules in the integrated Review and Analysis Program (iRAP) software, developed jointly by EURATOM and the IAEA. Under the framework of the US Department of Energy–EURATOM cooperation agreement, a module for automated Fork detector data analysis has been developed by Oak Ridge National Laboratory (ORNL) using the ORIGEN code from the SCALE code system and implemented in iRAP. EURATOM and ORNL recently performed measurements on 30 spent fuel assemblies at the Swedish Central Interim Storage Facility for Spent Nuclear Fuel (Clab), operated by the Swedish Nuclear Fuel and Waste Management Company (SKB). The measured assemblies represent a broad range of fuel characteristics. Neutron count rates for 15 measured pressurized water reactor assemblies are predicted with an average relative standard deviation of 4.6%, and gamma signals are predicted on average within 2.6% of the measurement. The 15 measured boiling water reactor assemblies exhibit slightly larger deviations of 5.2% for the gamma signals and 5.7% for the neutron count rates, compared to measurements. These findings suggest that with improved analysis of the measurement data, existing instruments can provide increased verification of operator declarations of the spent fuel and thereby also provide greater ability to confirm integrity of an assembly. These results support the application of the Fork detector as a fully quantitative spent fuel verification technique.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Wind Turbine Gearbox Condition Monitoring Round Robin Study – Vibration Analysis

The Gearbox Reliability Collaborative (GRC) at the National Wind Technology Center (NWTC) tested two identical gearboxes. One was tested on the NWTCs 2.5 MW dynamometer and the other was field tested in a turbine in a nearby wind plant. In the field, the test gearbox experienced two oil loss events that resulted in damage to its internal bearings and gears. Since the damage was not severe, thetest gearbox was removed from the field and retested in the NWTCs dynamometer before it was disassembled. During the dynamometer retest, some vibration data along with testing condition information were collected. These data enabled NREL to launch a Wind Turbine Gearbox Condition Monitoring Round Robin project, as described in this report. The main objective of this project was to evaluatedifferent vibration analysis algorithms used in wind turbine condition monitoring (CM) and find out whether the typical practices are effective. With involvement of both academic researchers and industrial partners, the project sets an example on providing cutting edge research results back to industry.

17 WIND ENERGY↗

TRIDENT Drill Validation at Mars and Lunar Analog Field Sites

Drilling on Earth is typically a human-intensive activity. Drilling on other planets is further complicated by the lack of prior local field surveys of their target area, hence blindly drilling into uncertain target rocks. Field conditions on the Moon or Mars are also different than for shallow drilling on Earth: lower temperatures and pressures, less power available, low masses (hence less weight-on-bit). Given the cost of transport from Earth, no drilling muds or working fluids are likely to be available to carry away cuttings. And impact-gardened regolith and dust vary mechanically and texturally from most terrestrial soils. The Regolith and Ice Drill for Exploration of New Terrains (TRIDENT) is a rotary-percussive 1m-class drill from Honeybee Robotics. It is low-power (rotary and percussive actuators are 200 W each) and lightweight (<20 kg) with the maximum weight on bit limited to 200 N. TRIDENT has been manifested for the Volatiles Investigating Polar Exploration Rover (VIPER) and PRIME-1 lunar south pole missions in 2024, has previously been field tested at a hot, dry analog site in the Atacama Desert, and in lunar conditions in thermal vacuum chamber tests. TRIDENT was also part of the 2019 Icebreaker Mars Discovery proposal, as well as in the Mars Life Explorer concept. During ARADS tests, drill control and fault recovery automation software enabled hands-off operations of a rover-mounted TRIDENT drill. TRIDENT Drill Analog Site Validation: Past TRIDENT tests in thermal vacuum (TVAC) chambers targeted containers of manufactured lunar simulants with added volatiles. 2022 TRIDENT ambient testing at NASA Ames drilled into cemented lunar simulant materials. Low cuttings-permeability led to cuttings buildup, and drill choking and binding was observed. The Atacama analog site in ARADS had desiccated unconsolidated sediments that did not challenge the TRIDENT design. However, lunar polar regolith is expected to be diverse and heterogeneous with varying clast sizes, with abundant impactites and perhaps subsurface ice deposits. Neither the simulants nor Atacama testing had completely covered the TRIDENT-targeted field characteristics, motivating further analog tests prior to the planned lunar missions. To gain more insight into the behavior of the TRIDENT hardware in diverse impactites and subsurface ice, and to verify the software automation in that environment, in August 2023 TRIDENT was brought to Haughton Crater, a field analog site in the Canadian Arctic. In September 2023 the same drill was brought to the Bishop Tuff in southern California to verify whether drilling binding behaviors previously seen in lunar simulant testing would be observed in naturally occurring fine-grained massive layers. The ~22 Ma Haughton Crater impact structure is located at 75 ̊22’ N, 89 ̊41’ W, on northwestern Devon Island, Nunavut, Canada. Numerous deposits of pale-grey crater-fill polymictic impact-melt breccia are found within the crater with a typical thickness reaching ~125 m or greater and covering ~60 km -2 . An approximately 600m-thick permafrost layer is also present with ice typically found within 0.5-0.6m of the surface. The volcanic tableland north of Bishop, CA exposes densely welded tuff laid down during the eruption that created the Long Valley Caldera at approximately 0.76 Ma. Extensional faults and the Owens River gorge expose cross-sections across the plateau. The area is viewed as an analog site for Mars features believed to be of pyroclastic origin. Results: Haughton Crater.Drilling tests were conducted 8-13 August 2023 at a previously undisturbed area separated 5-10 m from past years’ Drill Hill test sites (75.4208, -089.7613). In six days, TRIDENT drilled 8 holes to nearly 1 m depth each, totaling 7.80 m. The active layer/ice boundary was at ~67 cm depth, with a total of approximately 2.4 m drilled into ice or ice-cemented impact breccia. During drilling, five drill fault states were observed and successfully recovered. Holes 23-1, 4 and 7 were drilled under manual control, using Honeybee’s Thorax user interface. Holes 23-5, 6, and 8 were drilled with the Ames IBexec automated drilling control software. TRIDENT was observed to have little difficulty in the thawed uncemented impact breccia above the active layer boundary, but required percussion to make slower headway in the ice-cemented breccia. In Hole 23-7 (Fig.1), drilling slowed down in a massive unit just above the active-layer boundary (perhaps a large rock extending into the ice-cementation?), with only 7cm progress made in 27 minutes of high auger torque and constant percussion, leading to a choking fault and then a binding fault. A similar pattern had been observed in TRIDENT Rio Tinto test data from 2017 [6] as well as in the 2022laboratory tests.Bishop Tuff.A team from NASA Ames and the US Geological Survey deployed the same TRIDENT drill to Bishop Sites 1B and 1C (37.4203, -118.4289; 37.4265, -118.4215) on 13-16 September 2023, on the Bishop Tuff plateau. A third drill site was used 17-18 September 2023(37.4598, -118.3667) in an abandoned pumice mine. Four holes (totaling 2.5m depth) were drilled into the fine-grained, meters-thick tuff units at Sites 1B and 1C, and a further two boreholes (totaling 1.98m depth) were made at the pumice site. Drill behavior in the tuff below 10 cm depth was similar to that seen at 65-74 cm depth in Haughton Hole 23-7 (Fig. 1) and that seen in the 2022 lab simulant drilling. Drill safety torque limits were exceeded multiple times resulting in drill stops downhole. These freezes then required external added torques (with a pipe wrench) to resume rotation, to unstick the drill for withdrawal. To prevent this choking and binding behavior we found that more-frequent cuttings removal was necessary, e.g., reducing the “drill bite” size from the nominal 10 cm to 2 cm per bite --bringing the auger up to the surface more frequently, as seen in Bishop Site 1C Hole 2 (Fig.2). This permitted slow progress without drill binding and without external interventions. Conversely, TRIDENT drilling in the more porous pumice target material showed no cuttings buildup issue, and single bites as large as 40 cm were demonstrated. Discussion: We observed that TRIDENT easily penetrated unconsolidated heterogeneous soils (both above the active layer boundary at Haughton and previously in the Atacama). Cemented or consolidated targets that were cuttings-permeable (icy impact breccia, pumice) required more energy applied and percussion. However, in non-cuttings-permeable targets (welded microporous tuff, cemented simulants, boulder) TRIDENT was observed to be prone to excessive cuttings accumulation leading to choking/binding faults and stalling. The wedge cutting bit, used by TRIDENT in field tests and in its flight versions, pulverizes the target rock and creates fine cuttings that ideally are transported up the auger spirals for removal. In porous, fractured or vesicular target materials (such as at the Bishop pumice site) a significant portion of the cuttings are pushed aside, but for non-fractured, microporous targets the cuttings remain in the borehole and accumulate. Rock powder is relatively incompressible as a working fluid at only 100-200N downward force (TRIDENT limits) and hence eventual drilling progress slows or stops. Our recommended strategy for improving TRIDENT cuttings removal in massive target units with low cuttings-permeability is to reduce TRIDENT bite sizes when encountering these units, from 10cm to as little as 1-2cm, to effectively bail the accumulating cuttings. This approach was demonstrated to reduce choking and allowed slow progress to continue in cuttings-impermeable microporous target units (viz. the Bishop tuff in our September 2023 tests or cemented simulants in 2022 ambient tests).

robotic drilling↗

Bulk Electrical Cable Non-Destructive Examination Methods for Nuclear Power Plant Cable Aging Management Programs

This Pacific Northwest National Laboratory milestone report describes progress to date on the investigation of nondestructive test methods focusing particularly on bulk electrical test methods that provide key indicators of cable aging and damage. The work includes a review of relevant literature as well as hands-on experimental verification of inspection capabilities. As nuclear power plants consider applying for second, or subsequent, license renewal to extend their operating period from 60 years to 80 years, it is important to understand how the materials installed in plant systems and components will age during that time and develop aging management programs to assure continued safe operation under normal and design basis events (DBE). Normal component and system tests typically confirm the cables can perform their normal operational function. The focus of the cable test program, however, is directed toward the more demanding challenge of assuring the cable function under accident or DBE. The industry has adopted 50% elongation at break (EAB) relative to the un-aged cable condition as the acceptability standard. All tests are benchmarked against the cable EAB test. EAB, however, is a destructive test so the test programs must apply an array of other nondestructive examination (NDE) tests to assure or infer the overall set of cable’s system integrity. Assessment of cable integrity is further complicated in many cases by vendor’s use of dissimilar material for jacket and insulation. Frequently the jacket will degrade more rapidly than the underlying insulation. Although this can serve as an early alert to cable damage, direct test of the cable insulation without violating the protective jacket becomes problematic. This report addresses the range of bulk electrical NDE cable tests that are or could be practically implemented in a field-test situation with a particular focus on frequency domain reflectometry (FDR). The FDR test method offers numerous advantages over many other bulk electrical tests. Two commercial FDR systems plus a laboratory vector network analyzer are used to test an array of aged and un-aged cables under identical conditions. Several conclusions are set forth, and a number of knowledge gaps are identified.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗