Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “enclosure”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 883 records · Page 49

Novel Battery Management System with Distributed Wireless and Fiber Optic Sensors for Early Detection and Suppression of Thermal Runaway in Large Battery Packs, FY13 Q4 Report, ARPA-E Program: Advanced Management Protection of Energy Storage Devices (AMPE

Technology has been developed that enables monitoring of individual cells in highcapacity lithium-ion battery packs, with a distributed array of wireless Bluetooth 4.0 tags and sensors, and without proliferation of extensive wiring harnesses. Given the safety challenges facing lithium-ion batteries in electric vehicle, civilian aviation and defense applications, these wireless sensors may be particularly important to these emerging markets. These wireless sensors will enhance the performance, reliability and safety of such energy storage systems. Specific accomplishments to date include, but are not limited to: (1) the development of wireless tags using Bluetooth 4.0 standard to monitor a large array of sensors in battery pack; (2) sensor suites enabling the simultaneous monitoring of cell voltage, cell current, cell temperature, and package strain, indicative of swelling and increased internal pressure, (3) small receivers compatible with USB ports on portable computers; (4) software drivers and logging software; (5) a 7S2P battery simulator, enabling the safe development of wireless BMS hardware in the laboratory; (6) demonstrated data transmission out of metal enclosures, including battery box, with small variable aperture opening; (7) test data demonstrating the accurate and reliable operation of sensors, with transmission of terminal voltage, cell temperature and package strain at distances up to 110 feet; (8) quantification of the data transmission error as a function of distance, in both indoor and outdoor operation; (9) electromagnetic interference testing during operation with live, high-capacity battery management system at Yardney Technical Products; (10) demonstrated operation with live high-capacity lithium-ion battery pack during charge-discharge cycling; (11) development of special polymer-gel lithium-ion batteries with embedded temperature sensors, capable of measuring the core temperature of individual of the cells during charge-discharge cycling at various temperatures, thereby enabling earlier warning of thermal runaway than possible with external sensors. Ultimately, the team plans to extend this work to include: (12) flexible wireless controllers, also using Bluetooth 4.0 standard, essential for balancing large-scale battery packs. LLNL received $925K for this project, and has $191K remaining after accomplishing these objectives.

25 ENERGY STORAGE↗

Ventilation System Effectiveness and Tested Indoor Air Quality Impacts

Ventilation system effectiveness testing was conducted at two unoccupied, single-family, detached lab homes at the University of Texas - Tyler. Five ventilation system tests were conducted with various whole-building ventilation systems. Multizone fan pressurization testing characterized building and zone enclosure leakage. PFT testing showed multizone air change rates and interzonal airflow. Cumulative particle counts for six particle sizes, and formaldehyde and other Top 20 VOC concentrations were measured in multiple zones. The testing showed that single-point exhaust ventilation was inferior as a whole-house ventilation strategy. It was inferior because the source of outside air was not direct from outside, the ventilation air was not distributed, and no provision existed for air filtration. Indoor air recirculation by a central air distribution system can help improve the exhaust ventilation system by way of air mixing and filtration. In contrast, the supply and balanced ventilation systems showed that there is a significant benefit to drawing outside air from a known outside location, and filtering and distributing that air. Compared to the Exhaust systems, the CFIS and ERV systems showed better ventilation air distribution and lower concentrations of particulates, formaldehyde and other VOCs. System improvement percentages were estimated based on four System Factor Categories: Balance, Distribution, Outside Air Source, and Recirculation Filtration. Recommended System Factors could be applied to reduce ventilation fan airflow rates relative to ASHRAE Standard 62.2 to save energy and reduce moisture control risk in humid climates. HVAC energy savings were predicted to be 8-10%, or $50-$75/year.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Evaluation of Ventilation Strategies in New Construction Multifamily Buildings

In multifamily buildings, particularly in the Northeast, exhaust ventilation strategies are the norm as a means of meeting both local exhaust and whole-unit mechanical ventilation rates. The issue of where the 'fresh' air is coming from is gaining significance as air-tightness standards for enclosures become more stringent, and the 'normal leakage paths through the building envelope' disappear. CARB researchers have found that the majority of high performance, new construction, multifamily housing in the Northeast use one of four general strategies for ventilation: continuous exhaust only with no designated supply or make-up air source, continuous exhaust with ducted make-up air to apartments, continuous exhaust with supply through a make-up air device integral to the unit HVAC, and continuous exhaust with supply through a passive inlet device, such as a trickle vent. Insufficient information is available to designers on how these various systems are best applied. Product performance data are based on laboratory tests, and the assumption is that products will perform similarly in the field. Proper application involves matching expected performance at expected building pressures, but there is no guarantee that those conditions will exist consistently in the finished building. This research effort, which included several weeks of building pressure monitoring, sought to provide field validation of system performance. The performance of four substantially different strategies for providing make-up air to apartments was evaluated.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Development of a Tender-Energy Microprobe for Geosciences at NSLS and NSLS-II

This funding is to develop a new Synchrotron user facility for microbeam X-ray absorption spectroscopy (XAS) and quantitative X-ray fluorescence (XRF) imaging, at the National Synchrotron Light Source (NSLS) and NSLS-II. It includes design, purchase of components, and construction of the microprobe endstation and controls. Initial development, commissioning, and application is ongoing at NSLS Beamline X15B, with planned transition in 2014-15 to the NSLS-II TES (Tender-Energy Spatially Resolved X-ray Absorption Spectroscopy) beamline. It is optimized for the “tender” energy range of 1-5 keV, reaching up to 8 keV. Thus it uniquely covers the K absorption edges of critical elements Mg, Al, Si, P, S, Cl, and Ca, and can reach up to Co. A stable, high-flux microbeam focus, user-tunable from ~50 to ~5 microns, has been achieved using two-stage achromatic focusing. Existing beamline optics collimate, monochromate, and macro-focus the X-ray beam to ~1 mm at a secondary source aperture (SSA). Beam from the SSA is then re-focused by a pair of mirrors in KB geometry to the microbeam scale. Size of the microbeam is tunable, at the expense of flux, by adjusting the size of the SSA as a virtual source. The new experimental endstation consists of 1) a sample chamber operable as a radiation enclosure with helium atmosphere to facilitate measurements in this energy range, 2) the KB microfocusing optics, 3) a sample-positioning stage for raster-scanning and positioning the sample, 4) X-ray fluorescence detectors, an existing Ge detector for low-signal sensitivity and a new Si detector for high count rates, 5) an optical camera for viewing samples and locating target locations, 6) beam intensity monitors and diagnostics, and 7) controls and data acquisition system. An important aspect of this project is the added capability for fast, on-the-fly scanning of the monochromator (energy), required for fast XAS and advanced XAS imaging. This instrument will be available for initial PI and Co-I measurements, and for General Users to apply for beamtime to use, at NSLS X15B for the remaining operation of NSLS, to September 30, 2014. Phase two of this project will transition this facility, both the primary optics and the endstation, to NSLS-II after NSLS ceases operation. While this transition itself is beyond the scope of the current grant, preparation and planning for it is included.

58 GEOSCIENCES↗

LAr1-ND: Testing Neutrino Anomalies with Multiple LAr TPC Detectors at Fermilab

This Proposal seeks to continue the development of the short-baseline neutrino oscillation program at Fermilab with the construction of the Liquid Argon Near Detector, or LArl-ND, to be located in an existing experimental enclosure 100 m from the Booster Neutrino Beam target. The physics program will contribute, in conjunction with MicroBooNE, to the in terpretation of the MiniBooNE neutrino-mode anomaly and will enable additional tests of high-$\Delta m^2$ neutrino oscillations through both disappearance and appearance searches. Leveraging the advanced design work performed for LBNE and the very recent experience of the MicroBooNE detector construction, the LArl-ND project has the potential to move forward quickly. Due to the high event rate at the near location, significant physics output can be achieved with a relatively short run. Beyond this near-term program, LArl-ND could also serve as the near detector in a three LAr TPC experiment capable of definitively addressing the existing anomalies also in antineutrinos and making precision measurements of high-$\Delta m^2$ neutrino oscillations. In addition to the physics program, LArl-ND, following the MicroBooNE model, will have a development program serving as an engineering prototype for LAr TPCs for long baseline CP-violation searches in the future (e.g.: LBNE).

Admas, C.↗

Evaluation of Crawlspace Retrofits in Multifamily Buildings

In 2011 and early 2012, Building Science Corporation (BSC) collaborated with Innova Services Corporation on a multifamily community unvented crawlspace retrofit project at Oakwood Gardens in Lansdale, Pennsylvania. BSC provided design consulting services and pre- and post-retrofit evaluation, testing, and data monitoring. The existing condition was a vented crawlspace with an uninsulated floor between the crawlspace and the dwelling units above. The crawlspace was therefore a critically weak link in the building enclosure and was ripe for improvement. Saving energy was the primary interest and goal, but the greatest challenge in this unvented crawlspace retrofit project was working through a crawlspace bulk water intrusion problem caused by inadequate site drainage, window well drainage, foundation wall drainage, and a rising water table during rainy periods. While the unvented crawlspace retrofit was effective in reducing heat loss, and the majority of the bulk water drainage problems had been resolved, the important finding was that some of the wood joists embedded in masonry pockets behind the brick veneer were showing signs of moisture damage.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Measure Guideline: Three High Performance Mineral Fiber Insulation Board Retrofit Solutions

This Measure Guideline describes a high performance enclosure retrofit package that uses mineral fiber insulation board. The Measure Guideline describes retrofit assembly and details for wood frame roof and walls and for cast concrete foundations. This Measure Guideline is intended to serve contractors and designers seeking guidance for non-foam exterior insulation retrofit.

&#8203↗

Comprehensive Report For Proposed Elevated Temperature Elastic Perfectly Plastic (EPP) Code Cases Representative Example Problems

Background: The current rules in the nuclear section of the ASME Boiler and Pressure Vessel (B&PV) Code , Section III, Subsection NH for the evaluation of strain limits and creep-fatigue damage using simplified methods based on elastic analysis have been deemed inappropriate for Alloy 617 at temperatures above 1200F (650C)1. To address this issue, proposed code rules have been developed which are based on the use of elastic-perfectly plastic (E-PP) analysis methods and which are expected to be applicable to very high temperatures. The proposed rules for strain limits and creep-fatigue evaluation were initially documented in the technical literature 2, 3, and have been recently revised to incorporate comments and simplify their application. The revised code cases have been developed. Task Objectives: The goal of the Sample Problem task is to exercise these code cases through example problems to demonstrate their feasibility and, also, to identify potential corrections and improvements should problems be encountered. This will provide input to the development of technical background documents for consideration by the applicable B&PV committees considering these code cases for approval. This task has been performed by Hollinger and Pease of Becht Engineering Co., Inc., Nuclear Services Division and a report detailing the results of the E-PP analyses conducted on example problems per the procedures of the E-PP strain limits and creep-fatigue draft code cases is enclosed as Enclosure 1. Conclusions: The feasibility of the application of the E-PP code cases has been demonstrated through example problems that consist of realistic geometry (a nozzle attached to a semi-hemispheric shell with a circumferential weld) and load (pressure; pipe reaction load applied at the end of the nozzle, including axial and shear forces, bending and torsional moments; through-wall transient temperature gradient) and design and operating conditions (Levels A, B and C).

36 MATERIALS SCIENCE↗

Fast Charging Electric Vehicle Research & Development Project

The research and development project supported the engineering, design and implementation of on-road Electric Vehicle (“EV”) charging technologies. It included development of potential solutions for DC fast chargers (“DCFC”) capable of converting high voltage AC power to the DC power required by EVs. Additional development evaluated solutions related to the packaging of power electronic components and enclosure design, as well as for the design and evaluation of EV charging stations. Research compared different charging technologies to identify optimum applications in a municipal fleet. This project collected EV usage data and generated a report demonstrating that EVs, when supported by adequate charging infrastructure, are capable of replacing traditional internal combustion vehicles in many municipal applications. The project’s period of performance has demonstrated various methods of incorporating EVs into a municipal environment, and has identified three general categories for EV applications: Short Commute: Defined as EVs performing in limited duration, routine commutes. - Long Commute: Defined as tasks that require EVs to operate in longer daily mileage patterns. - Critical Needs: Defined as the need for EVs to be ready at every moment for indefinite periods. Together, the City of Charlottesville, VA (the “City”) and Aker Wade Power Technologies, LLC (“Aker Wade”) concluded that the EV has a viable position in many municipal fleets but with limited recommendation for use in Critical Needs applications such as Police fleets. The report also documented that, compared to internal combustion vehicles, BEVs have lower vehicle-related greenhouse gas (“GHG”) emissions and contribute to a reduction of air pollution in urban areas. The enhanced integration of EVs in a municipal fleet can result in reduced demand for imported oil and reduced municipal operating costs. The conclusions indicated in the project’s Engineering Report (see Attachment A) are intended to assist future implementation of electric vehicle technology. They are based on the cited research and on the empirical data collected and presented. The report is not expected to represent the entire operating conditions of any of the equipment under consideration within this project, and tested equipment may operate differently under other conditions.

42 ENGINEERING↗

APS-U Definitions of Signs and Conventions Related to Magnets

The APS-U is planned to be a 4th generation hard X-ray light source utilizing a multi-bend achromat (MBA) magnet lattice. The MBA lattice will be installed in the existing APS storage ring enclosure. The stored electron beam will circulate clockwise when viewed from above. The X-ray beamlines will for the most part exit at the same source points as the present APS. This document defines the signs and conventions related to the APS-U MBA magnets. Included in this document are: the local magnet coordinate system, definitions of mechanical and magnetic centers, definitions of multipole field errors, magnetic roll angle, and magnet polarities.

43 PARTICLE ACCELERATORS↗

Solid Phase Characterization of Solids Recovered from Failed Sluicer Arm

The Enclosure to this memo discusses the solid phase characterization of a solid sample that was retrieved from the single-shell Tank 241-C-111 extended reach sluicer #2. This sluicer, removed from riser #3 on September 25, 2014, was found to have approximately 0.4 gallons of solid tank waste adhering to the nozzle area.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Fast Spectrum Experiment Fuel Pin Payload Specification for Package 9330

This specification supports work to be conducted by AREVA Federal Services under Idaho National Laboratory (INL) Subcontract No. 45559, Release 50, including Statement of Work (SOW) -11417 addressing package transportation licensing. This document provides transportation payload specification for experiment fuel pins produced in the performance of INL CRADA 13-CR-15. The payload description provided in this document will be used to obtain licensing necessary to enable transportation of unirradiated experiments in ATR Fresh Fuel Shipping Containers (FFSCs). The FFSC has a current U. S. Department of Energy (DOE) certificate, USA/9330/AF-96, revision 0, which is available on the DOE RAMPAC website or upon request from the INL or DOE. Its desired payload will consist of individual experiment fuel pins (a.k.a. rods) loaded in a FFSC’s internal fuel handling enclosure (FHE), a.k.a. internal canister. Each package and its FHE arrangements should be prepared for a payload that contains less than critical mass and is certified for ground and air transportation per NRC 10 CFR 71 and International Atomic Energy Agency (IAEA) criteria. The unirradiated experiment fuel pins are all fabricated with uranium-based fuel and ferritic-martensitic stainless steel, HT-9, cladding and end plugs. The payload may include pins with and without spacer-wires. Solid pins will have minimal amounts of sodium bonding between the fuel and inside cladding. Annular pins will contain He gas installed at atmospheric pressure (~12.7 psia). Uranium fuel will be of varying enrichments with a maximum bounding enrichment of 94% U-235. Blanket material consists of depleted uranium and zirconium of varying weight percent. Section 2 provides pin parameters for NRC 10CFR71 and IAEA evaluations. Supplemental criteria titled functional and operating requirements is intended to convey other requirements, including those that protect the payload, rather than to demonstrate package compliance with regulations.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Definition of Capabilities Needed for a Single Event Effects Test Facility

The Federal Aviation Administration (FAA) is contemplating new regulations mandating testing of the vulnerability of flight-critical avionics to single event effects (SEE). A limited number of high-energy neutron test facilities currently serve the SEE industrial and institutional research community. The FAA recognizes that existing facilities have insufficient test capacity to meet new demand from such mandates; it desires more flexible irradiation capabilities to test complete, large systems and would like capabilities to address greater concerns for thermal neutrons. For this reason, the FAA funded this study by Spallation Neutron Source (SNS) staff with the ultimate aim of developing options for SEE test facilities using high-energy neutrons at the SNS complex. After an investigation of current SEE test practices and assessment of future testing requirements, three concepts were identified covering a range of test functionality, neutron flux levels, and fidelity to the atmospheric neutron spectrum. The costs and times required to complete each facility were also estimated. SEE testing is generally performed by accelerating the event rate to a point where the effects are still dominated by single events and double event causes of failures are negligible. In practice, acceleration factors of as high as 10 6 are applicable for component testing, whereas for systems testing acceleration factors of 10 4 seem to be the upper limit. It is strongly desirable that the irradiation facility be tunable over a large range of high-energy neutron fluxes of 10 2 - 10 4 n/cm²/s for systems testing and from 10 4 - 10 7 n/cm²/s for components testing. The most capable, most flexible, and highest-test-capacity option is a new stand-alone target station named the High-Energy neutron Test Station (HETS). It is also the most expensive option, with a cost to complete of approximately $100 million. Dual test enclosures would allow for simultaneous testing activity effectively doubling overall test capacity per HETS operating hour. Using about 1 kilowatt (kW) of proton power extracted from the accelerator before injection in the accumulator ring, its operation would be unnoticeable by neutron scattering users at the SNS target station. The H beam laser stripping technique would allow for control of beam power on the HETS target independent from power delivered to the SNS. Large systems with frontal areas of up to 1 x 2 m² could be accommodated with integral high-energy flux values (above 10 megaelectron-volt, or MeV) to at most 10 4 n/cm²/s; components could also be tested with flux levels to at most 10 7 n/cm²/s on beam sizes of up to 0.2 x 0.2 m². Selectable moderating material and neutron filters would allow tailoring of the neutron spectrum to user demands; charged particle deflectors could be switched to allow or deflect protons, pions, and muons. It is estimated that HETS would take 5 years to complete after award of contract, including engineering design and construction. Commissioning would take at least another 6 months. Interference with SNS principal operations was not considered in the construction time estimate; connection of the proton transport line and tunnel from the accelerator high energy beam transport (HEBT) and construction around existing site utilities would require careful planning and coordination with beam operations at the SNS. A high-energy (HE) neutron test facility using an available beam line on the SNS target station is a technically and financially attractive option. Inspired by the new ChipIR instrument on the ISIS TS 2 spallation source in the UK, a similar facility could be placed on an unused beam line in the SNS instrument hall [e.g., on beam line 8 (both A and B channels would be needed) or on beam line 10]. The performance would approach that of an HETS (~80%), but it would be operationally more limited, with only a single user at a time. Space is more limited, so the maximum system size would be about half of that in an HETS. Flexibility to tailor the spectrum would be somewhat more limited. While this concept was not as fully developed and characterized, preliminary work indicates very high HE flux levels should be possible, with ample thermal neutrons as well. Flux control would be more difficult than at HETS because proton power on target be whatever the SNS was operating at for neutron scattering. Neutron attenuation devices would have to be employed with as-yet undetermined control resolution. However, no new buildings would be needed, and the necessary utilities are already present in the SNS Experiment Hall. The estimated cost for a beam line option is around $15 million; the time to complete would be 3 years after award of contract, plus at least 6 months for commissioning. Interference of construction activities with SNS operations should be negligible. This option would require negotiation with the Department of Energy Basic Energy Sciences (BES) office -- the primary stakeholder of SNS -- for an application outside the usual scope of neutron scattering sciences. Furthermore, these presently open beam lines are highly desirable locations for proposed neutron scattering instruments and obtaining one of them for an SEE test facility will come only with persuasive and timely arguments to SNS leadership and the DOE BES. The third option is a tunnel extension/target cave facility providing the most basic system-level irradiation capability with minimal flexibility. Again not as well developed a concept as HETS, it would use a laser-stripping technique like an HETS, redirecting protons to a tunnel similar to the initial HETS proton transport tunnel. Indeed, this concept is intended to be upgradable to a full HETS facility. Only a small fraction of a watt of proton power would be used in this basic configuration, though. An uncooled target and primitive shielding arrangement would provide beam on modestly sized systems that must be placed in close proximity to the target. The neutron fluence would be less uniform over the system than with the HETS or the beam line option. A data acquisition room and support area would be located on the ground level; access to the target cave would be via elevator and/or stairway. As a result of the required excavation, new tunnel construction, shielding, data acquisition building, utilities, and other items, the estimated cost is $30 million. The time to complete is expected be more than 3 years; here again construction interference with SNS operations has not been accounted for, but it could have a significant impact.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Exterior Insulation Implications for Heating and Cooling Systems in Cold Climates

The New York State Energy Research and Development Authority (NYSERDA) is interested in finding cost-effective solutions for deep energy retrofits (DERs) related to exterior wall insulation in a cold climate, with targets of 50% peak load reduction and 50% space conditioning energy savings. The U.S. Department of Energy Building America team, IBACOS, in collaboration with GreenHomes America, Inc. (GHA), was contracted by NYSERDA to research exterior wall insulation solutions. In addition to exterior wall insulation, the strategies included energy upgrades where needed in the attic, mechanical and ventilation systems, basement, band joist, walls, and floors. Under Building America, IBACOS is studying the impact of a “thermal enclosure” DER on the sizing of the space conditioning system and the occupant comfort if the thermal capacity of the heating and cooling system is dramatically downsized without any change in the existing heating and cooling distribution system (e.g., size, tightness and supply outlet configurations).

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

National Grid Deep Energy Retrofit Pilot

Through discussion of five case studies (test homes), this project evaluates strategies to elevate the performance of existing homes to a level commensurate with best-in-class implementation of high-performance new construction homes. The test homes featured in this research activity participated in Deep Energy Retrofit (DER) Pilot Program sponsored by the electric and gas utility National Grid in Massachusetts and Rhode Island. Building enclosure retrofit strategies are evaluated for impact on durability and indoor air quality in addition to energy performance.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Leveraging Limited Scope for Maximum Benefit in Occupied Renovation of Uninsulated Cold Climate Multifamily Housing

This project examines a large-scale renovation project within a 500 unit, 1960's era subsidized urban housing community. This research focuses on the airflow control and window replacement measures implemented as part of the renovations to the low-rise apartment buildings. The window replacement reduced the nominal conductive loss of the apartment enclosure by approximately 15%; air sealing measures reduced measured air leakage by approximately 40% on average.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Water Management of Noninsulating and Insulating Sheathings (Final Report)

There is an increasing market in liquid (or fluid) applied water management barriers for residential applications that could be used in place of tapes and other self-adhering membranes if applied correctly, especially around penetrations in the enclosure. This report discusses current best practices, recommends ways in which the best practices can be improved, and looks at some current laboratory testing and testing standards.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Measure Guideline: Combination Forced-Air Space and Tankless Domestic Hot Water Heating Systems

This document describes design and application guidance for combination space and tankless domestic hot water heating systems (combination systems) used in residential buildings, based on field evaluation, testing, and industry meetings conducted by Building Science Corporation. As residential building enclosure improvements continue to drive heating loads down, using the same water heating equipment for both space heating and domestic water heating becomes attractive from an initial cost and space-saving perspective. This topic is applicable to single- and multi-family residential buildings, both new and retrofitted.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗