Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “electric utility programs”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

880 records · Page 49

Concrete Thermal Energy Storage Enabling Flexible Operation without Coal Plant Cycling

The work described in this report is responsive to the Office of Fossil Energy program “Energy Storage for Fossil Power Generation.” The pilot plant built as a result of this project demonstrated the feasibility and performance of a concrete thermal energy storage (CTES) system integrated with a supercritical coal power plant. The 10 MWh electrical (>25 MWh thermal) CTES unit, developed by Storworks Power, was designed to enable flexible operation of coal plants without cycling damage. The project's key technical achievements showcase a significant advancement in energy storage technology. A modular CTES system using 42 “Bolderblocs” units was successfully designed and constructed at Alabama Power’s Plant Gaston Unit 5, with each block containing embedded stainless-steel coils in specialized, cost-effective high-temperature concrete. The system interfaced seamlessly with the plant's 3500 psig (241 barg), 1000°F (538°C) supercritical steam, demonstrating operational flexibility. Over 86 full cycles, the CTES exhibited rapid charging and discharging capabilities, effectively mimicking steam turbine feed conditions and handling varying load profiles and storage durations. Performance validation confirmed the system's ability to consistently meet design target steam conditions of 75 bar-a and ~400°C for nominal baseline discharge. The concrete material withstood repeated thermal cycling without degradation, validating earlier lab-scale tests. Integration of balance of plant components, including a condensate management system with storage tank and air-cooled condenser, minimized plant interfaces and water consumption. A robust control scheme ensured safe, automated operation across various scenarios. Key learnings from the project were invaluable: 1. Initial concrete drying and commissioning procedures were refined for future deployments, enhancing efficiency in subsequent installations. 2. System flexibility exceeded expectations, with rapid response to changing conditions. 3. Design improvements were identified including optimized insulation and piping that will enhance overall system efficiency in future deployments 4. Full cycle thermal roundtrip efficiencies exceeded 88%. While the roundtrip electrical efficiency was somewhat limited by known challenges using input steam, such constraints may be mitigated by swapping steam for hot air as thermal input. 5. A summary of key performance parameters for the pilot test and predicted performance of a full scale commercial system with specified improvements determined from the pilot are shown in Section 8. The project faced challenges, including COVID-19 delays and host plant availability constraints. However, these were overcome through adaptive planning and execution. The successful management of these obstacles demonstrated the resilience and adaptability of the project team and the robustness of the CTES technology. This successful pilot demonstrates the potential for CTES to enhance coal plant flexibility, supporting grid stability as renewable penetration increases. The validated design and operational data provide a solid foundation for scaling up to utility-scale implementations, potentially transforming how thermal plants operate in evolving energy landscapes. The system's ability to rapidly respond to changing grid conditions while maintaining high efficiency makes it a promising solution for balancing intermittent renewable energy sources. Furthermore, the project highlighted the potential for even greater efficiencies in future iterations. The use of air as an input medium could potentially eliminate the limitations observed with steam input, opening new possibilities for energy storage applications beyond coal plant integration. In conclusion, this pilot project not only achieved its primary goals but also uncovered additional benefits and potential applications of the CTES technology. It represents a significant step forward in addressing the challenges of grid stability and flexibility in an increasingly renewable-driven energy landscape.

01 COAL, LIGNITE, AND PEAT↗

Electrodynamic Dust Shield (EDS) Preparation for MISSE-11 Launch

The dusty surfaces of the Moon, Mars, and various asteroids present a significant challenge to NASA’s manned and unmanned space exploration efforts. The fine, electrostatically charged dust is difficult to remove and has resulted in vision obscuration, false instrument readings, contamination, elevated temperatures, performance reduction, and equipment failure. To alleviate these problems, NASA KSC’s Electrostatics and Surface Physics Laboratory (ESPL) is developing active dust mitigation systems for solar system exploration and in situ resource utilization (ISRU). Part of KSC’s Swamp Works system, the lab emphasizes fast-paced, hands-on, cost-effective, and collaborative innovation. The Electrodynamic Dust Shield (EDS) is an ESPL technology being developed to prevent dust accumulation on space components. It consists of a dielectric substrate embedded with parallel electrodes which, when applied with high voltage out-of-phase waveforms, produce a traveling electric field wave that scatters dust particles from its surface via dielectrophoretic and electrostatic forces. The EDS is currently fully functional and has been tested for scalability and endurance in reduced gravity/pressure flight. Next, it will be part of the May 2019 Materials International Space Station Experiment-11 (MISSE-11) payload, which will test small shield samples for performance durability with exposure to the harsh space environment. The summer objective was to test EDS functionality before active and passive dust shield samples launch on MISSE-11, in order to screen for good flight/control samples as well as to compare pre-flight and post-flight clearing efficiencies. I imaged glass and Kapton shields of 2-phase and 3-phase electrode configurations with the Keyence VHX-5000 digital microscope to check for damage before and after all testing for a qualitative pre-flight baseline; helped with vacuum testing of high-voltage shield breakdown; assembled shields and wires using Electrobond 004 silver epoxy; and helped with vacuum and cryogenic dust clearance testing of assembled EDS systems. I learned CAD (computer-aided design) and 3D printing skills to create parts for a shaker table/motor assembly, which will allow for repeatable experiments by evening out EDS dust distribution in a consistent manner prior to dust scattering testing. I will also be improving the interfacing with Alpha Space’s prototype Data Communications Unit (DCU), a payload component to control power to the EDS and store data, by mapping the DCU structure upon power-up and writing shell scripts to improve various processes. Finally, I also CADed and 3D-printed plastic supports for three different geometries of the Electrostatic Precipitator (ESP), a project that aims to use high voltage electrodes to charge and filter out dust from the Martian atmosphere drawn for ISRU devices. This work on dust mitigation technologies will help to support future robotic and human space exploration missions, including NASA’s Journey to Mars; the EDS has especially significant applications to spacecraft solar panels, thermal radiators, viewports, and astronaut visors. This opportunity has also allowed me to become more familiar with various lab equipment and hardware testing, develop key modeling skills in SolidWorks, explore past and present components critical to America’s space program, work with inspiring peers and mentors, and ascertain my dream of working permanently for NASA.

space↗

Front-End Engineering Design for Piperazine with the Advanced Stripper

This Department of Energy (DOE) funded project was executed with the goal of preparing a Front-End Engineering Design (FEED) for the capture and compression of 90% of the CO2 that would normally be emitted from an existing natural gas combined cycle (NGCC) plant. The FEED focused on the application of the piperazine advanced stripper (PZAS) process at Mustang Station of the Golden Spread Electric Cooperative (GSEC), which consists of two gas turbines with common heat recovery steam generator (HRSG). The University of Texas at Austin (UT) served as the prime contractor, and subcontracted AECOM Technical Services and Trimeric Corporation to support FEED development. This project team has worked together to advance PZAS for more than a decade. ExxonMobil, Chevron, and Total provided project co-funding. The objectives of this work included: 1. To advance engineering design such that a comprehensive estimate for the total installed cost of a full-scale PZAS CO2 Capture Plant with CO2 compression can be developed on an existing NGCC power plant. a. These detailed costs can also be used to qualify PZAS and other related second generation (2G) amine scrubbing processes for use on cogeneration facilities in refineries and chemical plants that use gas turbines with HRSGs to produce steam. b. These detailed costs will help qualify 2G amine scrubbing for use on NGCC power plants and establish a more accurate baseline cost to be used as a target by other capture technologies. 2. To provide cost details to be used in the economic optimization of the process features of PZAS and other 2G amine scrubbing processes. 3. To provide DOE with a more detailed understanding of carbon capture costs in a commercial application, enabling DOE to better design its R&D program to improve the economics for carbon capture. 4. To provide the host site and cost share partners with the information necessary to determine whether a commercial project to capture and use CO2 for enhanced oil recovery (EOR) or for sequestration can be justified (when accounting for the 45Q tax credit). A key component of the FEED is the estimated total installed cost, which provides a basis for the likely capital investment necessary to implement the PZAS carbon capture process at this location and scale. In combination with the included economic analysis, which accounts for potential revenue from the produced CO2, potential avenues to profitability are explored. The major findings of the FEED are as follows: The Mustang Station PZAS CO2 Capture Plant estimated total project cost of $698 MM of which $384 MM was direct costs. The annual operating costs were $32.6 MM. The total investment for a PZAS facility at Mustang Station is $725 MM. This estimate includes owner’s cost of $25 million and a contingency of $110 MM. • The study estimated the CO2 capture plant at Mustang Station would generate CO2 at $110/tonne for EOR, assuming a 12% IRR (internal rate of return) and an 85% capacity factor. For CO2 storage, the same case would achieve a 12% IRR at about $114/tonne. At a capacity factor of 52%, the storage and EOR cases would break even when carbon is priced ~$150/tonne. The economic analysis determined that the capacity factor and utility pricing, among other variable factors, had a significant effect on the economics and will need additional studied. • The energy penalty of the PZAS plant would be about 46 MW in connected power and 35 MW in operating load. The natural gas requirement (for the Gas Boiler package) would be about 354 MMBTU/hr. • The FEED revealed no major risks in process maturity. However, some areas were outlined for further engineering during detailed design, which included the Gas Boiler system, general arrangement and site layout, air coolers, schedule development, and optimization of the process for higher CO2 removal. • If PZAS were to be implemented at another host site, additional opportunities for cost reduction for would include cost reduction through use of cooling water and steam extraction.

03 NATURAL GAS↗

CryoCart Restoration and Vacuum Pipe Construction

Propulsion systems that utilize hypergolic propellants have been used to power space vehicles since the beginning of the space program. Liquid methane and oxygen propulsion systems have emerged as an alternative and have proven to be more environmentally friendly. The incorporation of liquid methane/liquid oxygen (LOX) into the propulsion system has demonstrated an increase in engine performance, as well as a reduction in the volume, size and complexity of the system. Consequently, reducing the total mass of the vehicle which is a crucial aspect that is considered when planning space missions to both the Moon and Mars [1]. Project Morpheus has made significant advancements in liquid oxygen/liquid methane propulsion system technologies by incorporating a LOX/methane propulsion system to a vertical test bed. The vehicle consisted of a 5,000 lb main engine and four 20 lb remote control system (RCS) engines that utilize liquid methane/LOX as its propellant [1]. The vehicle completed successful flight testing at Kennedy Space Center in 2014 which marked the completion of the Morpheus project. Subsequent projects utilizing Morpheus' vertical test bed have been developed to make further advancements. One of the subsequent projects consisted of the addition of a smaller 2,000 lb main engine and a cold helium heat exchanger which would make it possible for a pressurant tank systems to be send to Mars or the Moon by significantly decreasing the overall mass and volume of the pressurant tank. The hot fire tests of the integrated system with the smaller main engine and cold helium heat exchanger were successful at sea level, but further studies are being conducted to better understand how the vertical test bed will behave under thermal-vacuum conditions. For this reason, the integrated vehicle will be taken to Plum Brook to be tested in a chamber capable of simulating these conditions. To ensure that the vehicle will function properly under vacuum conditions, testing will be first completed at the component level. During this process, the igniter of the main engine and the RCS thrusters will be tested under a vacuum. To complete the testing of the components, the test setup first needed to be finalized. The CryoCart is being used to feed the propellants to the test article. The CryoCart is a movable test set-up that was developed in 2009 to provide a mobile platform for testing oxygen/methane systems with hot-fire capability up to 100 lbf. The CryoCart consists of three different systems: Oxygen, Methane, and liquid Nitrogen. The Oxygen and Methane systems are placed into two different carts while the liquid nitrogen system is mainly located in the methane cart. Over the years, the CryoCart has been utilized for different projects and has undergone deterioration. For this reason, a new phase has been developed to rebuild it to working conditions once again. During my internship, I was aiding in the construction and restoration of the CryoCart. In the initial stages of the process, I updated the fluid and electrical schematics for the oxygen, methane, and test article systems. The original CryoCart consisted of an electrical panel that utilized electromechanical relays and a terminal to drive the igniter power and signal, as well as the main fuel and oxygen valves. This electrical panel connected to the CryoCart through various wire harnesses that could be found exiting from the CryoCart. First, it was determined how these harnesses connected to the electromechanical relays so that they worked correctly. Once the electrical system was understood, an alternative for the electromechanical relays and the Molex connectors used throughout the system was sought since these components can often prove to be unreliable. Solid State relays and MIL connectors were purchased to serve as replacements. Upon arrival of the parts, crimping and wiring was completed to install the new solid state relays and MIL connectors. During the replacement of the relays and connectors, system checks of the electrical system were ran to ensure that the system was working correctly. While completing system checks, the pressure transducers that were not functioning properly were also replaced and any issue with the wiring or signal was addressed. Once the electrical components were replaced, the restoration of the fluid system began. Parts of the tubing in the CryoCart had to be rebuild and often consisted of sizing, cutting, bending, filing, and sanding the tubing to prepare it to be flared. Many components had to be proof-tested to bring their certifications up to date, and several components had to be replaced. Various flex hoses, valves, and fittings were send to the Clean Lab because they were new, dirty, or had gone through proof-testing. Once they arrived from the cleaning lab they had to be put back to the system and leak checks and functional tests were conducted. In the Nitrogen system, the copper tubing located in the Oxygen cart was rebuild and Aerogel insulation was added to this section. A new gaseous nitrogen system was added to the CryoCart to purge the vacuum tube which will serve as the test chamber. Once the CryoCart was completed, construction of parts of the vacuum tube began. A flange was manufactured with welded fittings to hold the line of the vacuum pump as well as some extra fittings which will serve as extra inlets used to introduce fluid lines to the vacuum tube. Stress analysis was ran in this flange to ensure that it would not fail under vacuum conditions. The fluid lines leading from the air side of the vacuum to the test article were also constructed and added to the mount that had already been manufactured. Three different sets of tubing were constructed to accommodate the seven different RCS thruster and the main engine igniter that are going to be tested. Full electrical system checks were completed to ensure that all the wire harnesses and valves were functioning. Upon the completion of the CryoCart and the vacuum tube, hot fire testing for the RCS thrusters and the main engine igniter are going to begin. During this time any issues encountered with the engines or igniter will be addressed to ensure that the components function under vacuum conditions. After successful completion of testing, the vertical test bed, Morpheus, will be rebuilt and prepared to be sent to Plum Brook. In Plum Brook, the vehicle will be tested in the thermal-vacuum chamber to demonstrate that integrated lox-methane propulsion system operation in space-like conditions. This internship has allowed me the opportunity to gain valuable hands on experience and to develop skills that will aid in my education as well as in the workforce, while at the same time helping me determine that I would like to further pursue a career in propulsion engineering.

Chaidez, Mariana↗

Dynamic and Responsive Distributed Energy Resource Education Solutions for Building, Fire, and Safety Department Officials (Final Technical Report)

From April 2021 through March 2024, the Interstate Renewable Energy Council (IREC) led a collaborative project to develop a free online clearinghouse of educational resources about solar photovoltaics (PV), energy storage systems (ESS), electric vehicle supply equipment (EVSE), and grid-interactive efficient building (GEB) technologies. Two websites—the Clean Energy Clearinghouse and CleanEnergyTraining.org—housed over 70 educational resources. Over the course of the three-year project, 154,272 unique visitors accessed the learning materials. Learner feedback was overwhelmingly positive. Even through the end of the project, there was sustained demand for education and communication. A primary innovation of the project was to drive multiple complementary audiences to the same place. Building owners, designers, installation contractors and developers, authorities having jurisdiction (AHJs), and fire service personnel all benefit from a shared understanding of clean energy technologies, including safety and code-related requirements. When considering the impact on the target audience, the project team worked with partners and advisors to inform resource creation and delivery in such a way as to address key motivational factors of the target audience and compel each user to seek additional information on the topic and return to the Clean Energy Clearinghouse website as their central location for more information. Resources were intentionally developed to be concise—five to 15 minutes—and accessible, meaning not overly technical. Providing basic information demystified the technologies and invited the professional to explore additional learning opportunities. Awardee and partner collaboration was key to project success. IREC facilitated collaboration among the other Topic 2 awardees, Southface and New Buildings Institute (NBI). The three awardees shared relevant information gained through discovery and validation questionnaires that informed product development and reduced duplication of effort by coordinating the development of complementary, and not competing, educational resources. Inspired by this collaboration, IREC brought on additional partners even in the final year of the project. Five regional energy efficiency organizations were part of the project, which expanded the connection between efficiency and distributed energy resources. We also included resources on the Clearinghouse that were developed through other federally funded projects, such as the Buildings Energy Efficiency Frontiers & Innovation Technologies (BENEFIT) program. The website was developed with the learner in mind, and not solely the funding source. Feedback from stakeholders throughout the project, and especially in its final year, indicated the need for continued education and facilitated communication among stakeholders to further the safe and widespread adoption of clean energy.

14 SOLAR ENERGY↗

NFPA Distributed Energy Resources Safety Training (DERST) For Emergency Responders

The National Fire Protection Association, with support from the Department of Energy, executed a multi-year initiative to develop, enhance, and disseminate Distributed Energy Resources Safety Training (DERST) tools for U.S. emergency responders. As Distributed Energy Resources (DER)—such as solar photovoltaics, battery energy storage systems (ESS), electric vehicles (EVs), and associated infrastructure—become increasingly prevalent, the NFPA identified a critical need for up-to-date standardized, accessible, and effective safety training tailored for the fire service and related public safety professionals. The project delivered a comprehensive suite of educational resources to improve responders’ abilities to safely manage DER-related incidents. This included: • Revised Modular Training Courses: Updated classroom-based DER safety courses, now modular and accessible nationwide through fire academies and the North American Fire Training Directors (NAFTD) network. • Live Burn Testing & Research: A full-scale controlled burn of a DER-equipped residential structure provided real-world data and insights, forming the basis for updated best practices. • A Gamified Simulation Tool – Firefighters Incident Response Simulation Tool (FIRST): A first-of-its-kind, multiplayer, scenario-based simulation using the Unreal Engine 5.0 to train responders in a realistic virtual, multi-DER incident environment. • Field Familiarization Software Tools & Prop Guide: Digital DER field familiarization evolutions software guide and a prop development manual to support field-based DER training exercises, enhancing responders' hands-on familiarity with DER infrastructure and collaboration on virtual incident responses. • National Dissemination Strategy: Strategic partnerships with NAFTD, Vector Solutions, and others enabled wide-scale distribution, with over 5,000 departments accessing resources and 1,100+ departments adopting the simulator in the first seven months. Also provided a web portal for easy access to all training and simulation programs developed under this grant for the U.S. responder community. Key findings from the project—particularly from the burn test—led to paradigm shifts in fire response tactics. For example, traditional approaches to garage fires may be hazardous if DERs are present, due to explosive off gassing and thermal runaway risks. The new training emphasizes scene assessment, stand-off approaches, thermal imaging verification, and careful post-incident cooling of DER components to prevent reignition. This initiative has had a significant national impact, raising awareness, enhancing preparedness, and supporting safer DER incident response practices. Significant engagement from the media, public safety organizations, and PBS coverage has further amplified the reach and adoption of NFPA’s DER safety training, tools, and simulations.

14 SOLAR ENERGY↗

Emerging Pathways to Upgrade the US Housing Stock: A Review of the Home Energy Upgrade Literature

The residential buildings sector is responsible for about 20% of total US energy use. In order to achieve climate goals, we need ways to reduce carbon emissions and energy use in this sector. In addition, resiliency, electric grid stability, emergency survivability and other energy and building-related issues are becoming increasingly important challenges. New homes in most of the US meet various energy codes and are reasonably energy efficient. However, the vast majority of energy use is from existing homes that were not required to conform to energy performance requirements. It is becoming imperative to reach as many of these existing homes as possible and find ways to improve their energy-related performance. This must be done in such a way that it meets the needs and desires of homeowners and building occupants, as well as those of the contractors and design professionals engaged in doing the upgrades themselves. Energy retrofits of homes started in the 1970’s in response to the energy crisis, however, these retrofits were very limited in scope and relatively few homes were upgraded. Those homes that have been upgraded generally still have much scope for improvement. A huge effort is needed to get to scale to address the energy use in housing. The target population is effectively every home in the country, whether a large suburban single-family home, or a small downtown apartment. In order to provide a framework for analysis and the basis for plans to get to large-scale retrofits of homes, this literature review summarizes the state-of-the art in the US buildings industry. It identifies where more research, engineering, or technology is needed, as well as relevant industry trends, such as electrification, one-stop shop program design and others. It also examines other key topics, such as availability of financing, minimizing household disruption, and engaging home owners and occupants. This literature review builds on a similar review from several years ago (Less and Walker, 2014). The current review focuses on efforts in the intervening years. This literature review is part of a larger DOE study of deep energy upgrades that includes industry surveys and development of cost-stack analyses. For this review, we gathered data not just from the published literature, but also from practitioners in conjunction with other aspects of the larger DOE study. In some cases, we refer to comments from specific individuals or companies, or refer to specific products by name. This is not intended as an endorsement, but rather to provide clarity on sources of information and examples of relevant technologies.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

ISS Technology Demonstrations for Future Spaceflight Medical Systems

Throughout the history of human spaceflight, crewmembers have experienced various in-flight medical conditions including illness and injury. Planned missions to the Moon and Mars will require capabilities to maintain the health of future space travelers. Mass, power, and volume available in the vehicles and habitats for these missions will be severely constrained; resupply of resources will be limited or non-existent, as will opportunities for evacuation to Earth. Furthermore, ground-based support will be hampered by communication latencies and blackouts. These vehicle and mission constraints will necessitate a medical system that has been efficiently planned, providing on-board procedural guidance in addition to a variety of medical devices and consumable resources. Medical capabilities required for the diagnosis and treatment of potential medical conditions during future spaceflight missions may include real-time health monitoring, medical imaging, and biomarker analyses ( e.g., blood or urine). Terrestrial medicine shares these needs, thus many of these medical capabilities could likely be satisfied by Commercial-Off-The-Shelf (COTS) devices and methodologies; however, in some cases the unique space environment and increased mission duration will drive the need to modify technologies and the way care is provided. NASA’s Human Research Program (HRP) Exploration Medical Capability (ExMC) Element and Mars Campaign Office’s Exploration Medical Integrated Product Team (XMIPT) are working together to decrease medical risk during exploration missions. Flight-tested medical diagnostic and treatment technologies are necessary to effectively manage medical conditions relevant to exploration missions while meeting vehicle constraints, integrating with medical decision-support tools, and enabling increasingly Earth-independent operations. Several projects have leveraged the ISS as a testbed for exploration, including 1) i n- situ blood analysis, 2) medical inventory, 3) intravenous fluid generation, and 4) autonomous medical procedure guidance. Management of several in-flight medical conditions, such as bacterial and viral infections and acute radiation syndrome, is dramatically improved with ability to assess blood cell populations, electrolytes, and metabolites. I n December 2020 and January 2021 ExMC performed an ISS technology demonstration (Tech Demo) of the HemoCue® WBC DIFF analyzer (HemoCue, Brea, CA), a COTS device that was modified to enable functionality in a spaceflight environment. This Tech Demo marked the first time that hematology measurements were successfully performed real-time in microgravity. Also modified and demonstrated was the reusable Handheld Electrolytes and Lab Technology for Humans (rHEALTH) ONE analyzer (rHEALTH, Bedford, MA), which uses flow cytometry and sheath-based hydrodynamic focusing methodologies. The rHEALTH ONE ISS Tech Demo in May 2022 demonstrated test results obtained in-flight matched those on the ground. NASA currently relies on crew self-reporting to manage and maintain medical inventory on ISS.The ability to maintain an accurate inventory becomes more critical during long duration missions since the crew will need to be increasingly autonomous in finding and utilizing medical items, including those scenarios when alternative treatments need to be considered due to limited or no resupply. HRP’s Medical Consumables Tracking (MCT) project was developed by ZIN Technologies, Inc. (Cleveland, OH), and demonstrated real-time tracking of medical supplies aboard the ISS between December 2016 and July 2018. The MCT system design utilized Radio Frequency Identification Device (RFID) technology to perform automated inventory and was installed in the Crew Health Care System (CHeCS) Resupply Stowage Rack (RSR). The challenge of limited shelf life, exacerbated by the lack of resupply opportunities, affects a plethora of medical system components including consumables, pharmaceuticals, and intravenous (IV) fluid. In 2010, ExMC funded ZIN Technologies, Inc. (Cleveland, OH), to develop the Intravenous Fluid Generation (IVGEN) system. IV fluids were successfully generated with IVGEN using the potable water supply on ISS during ISS Expedition 23. The XMIPT is in the process of developing a miniaturized version of the original IVGEN hardware for a future Tech Demo aboard the ISS. Current ISS medical operations rely heavily on preflight training and real-time remote guidance, both of which become impractical or impossible for exploration missions. The primary goal of the Autonomous Medical Officer Support (AMOS) Software Tech Demos on ISS was to confirm telemedical proof-of-concept for autonomous medical imaging in an operational setting. This novel software tool shifts emphasis from preflight training and real-time remote guidance to in-flight just-in-time instruction, a new and necessary paradigm for crew medical autonomy. AMOS introduces a novel, streamlined skill management concept for exploration missions featuring comprehensive training and guidance modules for ultrasound examinations using the ISS Ultrasound 2 (a modified GE Vivid-q™; General Electric HealthCare, Chicago, IL). With no prior crew training or remote guidance, two Tech Demos on the ISS (April 2020 and June 2022) resulted in high quality, clinically useful image sets. We will provide a review of historical, current, and planned medical devices and technologies considered for inclusion within future spaceflight medical systems and summarize hardware development activities and medical device tech demos conducted on the ISS.

Astronaut health and performance↗

Integrated protonic ceramic electrochemical cell for sustainable energy economy using water-energy nexus framework

Reliance on fossil fuels will continue for the next decades even though there are global pushes away from it to mitigate the overarching climate challenge, most especially by its highest consumers and availability. While there is a hastening global shift away from fossil fuel, integrating its assets into this technology helps limit the risk and future losses of stranded assets and reduce the cost of investment in the new technologies. Moreover, the generation of electricity from intermittent renewable sources like solar and wind has witnessed a significant surge in recent years, leading to a pressing demand for practical energy storage systems. Electrical energy storage is anticipated to play a pivotal role in the future global energy system, facilitating load-leveling operations to support the greater integration of renewable and distributed generation. Reversible electrochemical cells (RECs) offer a promising option for addressing the fossil fuel assets integration and energy storage challenges through the interconversion between electrical and chemical energy and concurrent utilizing carbon emission. In their electrolysis mode, the RECs convert electricity into durable, storable, and portable valuable chemical fuels such as syngas and methane. Conversely, the produced chemical fuels can be used as reactants in the fuel cell mode to generate electricity on demand with minimal (hydrocarbons) or zero when H2 or NH3 is used emissions. However, a challenging goal for this type of technology remains to achieve optimal operation and high roundtrip efficiencies, which has hindered the deployment of previous electrochemical cells. This dissertation demonstrates how reversible protonic ceramic electrochemical cells (RePCECs) can be integrated with fossil fuel power plants and renewable energy sources as a potential energy storage system. In this work, integrated RePCEC systems are designed and examined using computational modeling at scales to determine appropriate system configurations and operating conditions that achieve high roundtrip efficiencies. Cell level design of the PCEC is the first approach, several cells are assembled for the stack level model that is integrated into combined cycle powerplant and solar photovoltaic for the system level model. After critical literature review, this answered the operational and integration research questions proposed to address these challenges. The designed systems perform two functions, utilizing captured CO2 and storing renewable energy through co-electrolysis of steam and CO2. The co-electrolysis reaction involves endothermic water electrolysis and exothermic methanation reaction. To enhance high roundtrip efficiency, there is a need for thermal balance and management in the electrolysis mode. This involves operating the RePCEC stack under conditions that favor methane production to balance out heat needed by water electrolysis, it crucial for the RePCEC system operation. Methanation is enhanced by low temperatures. Leveraging on fabricated BCZYYb-electrolyte RePCEC, the cell model designed revealed that the optimum temperature for methane production is 450℃ at atmospheric pressure. Thus, to achieve optimum system performance, operating in the temperature range 450-525℃ is recommended at the given configuration, combining between the optimum temperature for methane production and temperature for the optimum stack roundtrip efficiency. Configuration with carbon capture system and purge stream is the optimum configuration from the seven conceptualized and evaluated. The modeling outcomes include a thermodynamic examination of integrated RePCEC systems, calibration of cell and stack level models, and steady-state simulation and integration into a 600MW combined cycle power plant retrofitted with two two-stage membrane-based carbon capture system and a wastewater treatment and recovery unit. At 100% powerplant loading, the stack and system roundtrip efficiencies are 72% and 51.37% respectively. Adding a purge stream for produced hydrogen at the system downstream improves the efficiencies to 74 and 55.48% respectively. At atmospheric pressure and 525℃, the system model suggests that a stack roundtrip of 82% is achievable, and overall system efficiency increases by reducing the energy consumption by the balance of plant components for steam generation and storage. Economic analysis of the process gives levelized cost of methane as $2.24/MMBtu lower than the conventional production route that range between $3.46/MMBtu and $9.85/MMBtu. The lifecycle analysis shows that the global warming potential for the production of methane and hydrogen from the RePCEC system is 3.83 kg CO2 eq which is lower than 9.35 kg CO2 eq emission during steam methane reforming for hydrogen production. This answered both the environmental and economic concerns in the raised research question. The proposed RePCEC configuration and analysis carried out in this dissertation to address the surge in renewable energy and challenges with PCEC technology hold significant potential in achieving large-scale energy storage while simultaneously reducing carbon emissions. These advancements, coupled with suitable governmental policies and incentive programs, have the potential to economically disrupt the natural gas industries by using RePCEC systems for methane production, thereby making them more favorable for eventual implementation and commercialization.

25 ENERGY STORAGE↗

EMPOWERED Distributed Energy Resources Permit Accelerator Pilot

This report summarizes the EMPOWERED Distributed Energy Resources (DER) Permit Accelerator Pilot project. Its primary objective was to streamline the design, installation, permitting, and inspections of targeted Distributed Energy Resource (DER) solutions. Streamlining these processes is critical to strengthening and accelerating the adoption of DER solutions nationwide. Moreover, streamlined processes help expedite the clean energy transition and expand energy resilience by improving understanding and capability among key stakeholders like property owners, code officials, and the general workforce. The project team accomplished this by developing and deploying a set of design and permitting guides for simple DER solutions, which they rolled out via a permitting pilot program. The project team developed nine permitting and inspection guides for simple DER solutions, as follows: 1. Single-Family and Duplex: Electric Vehicle Service Equipment (EVSE), and Storage, Solar + Storage (each in two code cycles) 2. Multi-family and Office: EVSE, Storage, Solar + Storage (each in two code cycles) 3. A permitting process guide to support the implementation of the permitting guides. The guides cover key code requirements via plan review and field inspection checklists for code officials and building owners to follow to streamline the permitting and inspections process for DER solutions. Following the development of the initial set of guides, the project team formed two cohorts, each made up of four jurisdictions, to participate in the Permit Accelerator Pilot. Each cohort received training and technical assistance to support them in incorporating the guides into use. The project successfully engaged jurisdictions in two disparate US regions: Chelsea, Somerville, Natick, and Norwood in metro Boston; and Pima County, Town of Gilbert, Flagstaff, and Sedona in Arizona. Feedback gathered from the project was valuable in refining the guides to better address jurisdictional needs. After the pilot period, the project team developed final versions of the guides based on extensive feedback from the cohorts and from external technical peer review. Feedback included needs and barriers related to implementation, as well as detailed technical improvements from external peer review. The final guides were presented in a series of webinars with a national reach, with 192 attendees from 35 states in the live session of the final webinar, and the final guides are posted online and available for use nationwide. Key findings: • The most receptive jurisdictions were those adjacent to other jurisdictions that had already adopted similar initiatives. The least receptive jurisdictions were those in the midst of adopting new code cycles. • The most common barrier to jurisdictional adoption of new guidelines were internal administrative and process delays, more so than technical barriers. • The main technical barrier to adoption proved to be the concern of fire hazard risks posed by energy storage systems. There is some apprehension in the code enforcement community about the safety of the batteries. Education coordinated with fire and safety services will help alleviate concerns and increase confidence in the acceptance of innovative technologies. • Opportunities to further leverage and advance the guides and related resources include outreach, education, and jurisdictional support; updates to the resources to align with code cycle changes and local requirements; and advancements supporting emerging technologies.

14 SOLAR ENERGY↗

Pilot-Scale Testing of an Integrated Circuit for the Extraction of Rare Earth Minerals and Elements from Coal and Coal Byproducts Using Advanced Separation Technologies

The primary objective of this project was to develop and demonstrate an integrated pilot-scale circuitry for recovering high-value rare earth elements (REEs) from coal and coal byproducts. The target performance was to produce a mixed REE product with content of at least two percent by weight on a dry mass basis in a cost-effective and environmentally benign manner. During the first nine months of the project period (Phase 2 Budget Period 2), pilot plant construction was completed including all field site startup activities such as permitting, engineering design, procurement/bidding, unit fabrication, site construction, equipment installation, module assembly, safety training, and circuit shakedown. During the remaining 21 months of project period (Phase 2 Budget Period 3), detailed field-testing activities were performed including feedstock sample collection and preparation, exploratory testing, circuit modification, detailed parametric study, and performance optimization. A detailed techno-economic analysis was performed based on the pilot plant testing findings which provided various scenarios for REE production. The project successfully accomplished the proposed target performance by producing mixed rare earth oxide (REO) with greater than 90% purity by weight in a continuous pilot scale operation from two distinctly different coarse refuse materials (i.e., West Kentucky No. 13 and Fire Clay coal seams), and at least three secondary sources (i.e., heap leach process and naturally formed acid mine drainage system). Project partners included the University of Kentucky, Virginia Tech, West Virginia University, Alliance Coal, Blackhawk Mining, Mineral Refining Company, and Mineral Separation Technologies. The pilot scale test facility was constructed at a former mining complex owned by Alliance Natural Resource Partners (Alliance Coal). The site was rehabilitated to accommodate the equipment installation, construction and fabrication, electrical power requirement, water line management and containment. The process units constructed and installed included X-ray sorting unit, crushing and grinding unit, physical separation unit, acid leaching unit, solvent extraction unit, and wastewater management unit. A rare earth mineral concentration unit was constructed as a standalone unit for flexible operation. A detailed environmental assessment and control plan was carried out to identify and quantify any potential impacts of the pilot-scale processing circuitry on the human and eco-system health and well-being. Corresponding mitigation strategies and control measures were provided. A conceptual flowsheet was developed to effectively remove thorium and uranium from high purity rare earth oxide mix or any potential radionuclide enriched stream. The two distinct feedstock materials were secured from the Blackhawk Mining Complex in eastern Kentucky where the Fire Clay (Hazard No. 4) seam is processed. The West Kentucky No. 13 (Baker) coarse refuse material was collected from an active process stream at an Alliance coal preparation plant located in western Kentucky. Characterization analysis indicated that both of feed materials generated from the two sources contained >300 ppm of TREEs on a dry whole mass basis which met the requirements for a qualified feed stock. The two feedstocks were further upgraded using a dual x-ray sorter to prepare the feed material for hydrometallurgical circuit. Thermal treatment on feed material prior to leaching was found to: 1) improve the leaching recovery of REEs, 2) increase the leaching kinetics, and 3) allow the leaching reaction to occur at lower acidity. Roasting at 600°C was selected as the pre-treatment condition for both West Kentucky No. 13 and Fire Clay coarse refuse material. Over 40% of leaching recovery was achieved by roasting West Kentucky No. 13 material having a top particle size of 3 mm in the pilot scale operation using 1.2M sulfuric acid leaching at 75OC. Initial pilot scale testing involved continuous operation of the pilot plant for 94 hours. The leaching unit was operated at solid-to-liquid ratio of 1 to 10 (w/v) using 0.5M sulfuric acid solution at a temperature of 75°C. The continuous solvent extraction circuit utilized rougher and cleaner units with DEHPA and TBP as the extractants. An innovative stripping circuit was developed to accumulate the REE concentration in the stripping solution to a level above 600 ppm. A bleed stream from the recycled strip solution was treated using oxalic acid precipitation which produced a high grade rare earth oxalate. The oxalate product was roasted to remove the oxalate which produced a rare earth oxide product having a purity greater 90%. Due to high concentrations of contaminant ions in the pregnant leach solution (PLS), a modified flowsheet was developed that involved pre-concentration of the REEs using multiple stages of precipitation and redissolution. The advantage of this process was improved removal of contamination before the downstream purification process and a significant cost reduction relative to the circuit that utilized the solvent extraction process. The modified circuitry included processes involving leaching, multistage precipitation, redissolution, and oxalate precipitation followed by roasting of the oxalate product. The circuit produced a mixed REO that was 92.96% pure from the initial test. A detailed parametric test plan was carried out which involved varying key parameters including solids feed rate, acid flowrate, acid concentration, multistage precipitation pH, redissolution pH, oxalate precipitation dosage and pH. The response variables included REE recovery, contaminant recovery, REO product grade and overall chemical consumption. Test results indicated that the acid-to-solid ratio is the key parameter to leaching efficiency as performance deteriorated with an increase in solids concentration. The optimal pH determined for REE precipitation and redissolution was 6.5 and 2.5, respectively. Additional tests were conducted to further improve the flowsheet. Recirculating a portion of the PLS to the feed of the leach tanks improved the leaching performance by lowering the pH of the leaching system and reducing the contamination recovery by shortening the residence time. Moreover, the removal of Al prior to REE precipitation significantly reduced the oxalic acid consumption in the oxalate precipitation circuit. The modified circuit produced over 90% grade REO by weight from both West Kentucky No. 13 and Fire Clay coarse refuse material in pilot scale continuous test programs. A case analysis model was developed to project the REE and major contaminants concentration in each PLS stream based on the leaching condition, pH cut point, and oxalic acid dosage. A correlation was established using empirical and semi-empirical models. Using the models, chemical consumption required for each stage was predicted based on the projected performance of the hydrometallurgy circuit. After identifying the optimum conditions, validation tests were carried out for the treatment of both West Kentucky No. 13 and Fire Clay coarse refuse materials in the pilot plant. The actual circuit performance and chemical consumptions were very close to the model predictions. Other than the two coarse refuse sources, several secondary feedstocks were also tested in the pilot plant facility. A “heap leach” system was constructed using the coarse refuse material generated from cleaning the West Kentucky No. 13 seam coal. Using the two stage SX rougher and cleaner circuit, a concentrate with a grade >90% REO was produced while recovering >97% of the REEs from the heap leach PLS. Naturally generated acid mine drainage (AMD) from West Kentucky No.13 mine was processed using the multistage precipitation circuit in the pilot plant in a test conducted for a period of 32 hours. The final grade of the mix RE oxide produced from the AMD was 90.84% with an overall circuit recovery of 64%. The primary source of REE was the selective precipitation steps involving iron and aluminum rejection. The hydrophobic-hydrophilic separation (HHS) process was proven to effectively recover coal from fine waste materials. For REM recovery, the HHS process was able to produce concentrates at grades of approximately 1.8% REE on an ash basis; however, recovery values were typically low, <10%, under the optimal conditions determined in the laboratory-scale testing. Staged testing of the pilot-scale HHS process for coal recovery and semi-continuous laboratory testing for REM testing showed that a total concentration ratio of more than 15x was observed for the REM recovery process. A circuit simulation package was developed for REE extraction and purification using a spreadsheet-based platform (Microsoft Excel). The REESim circuit simulation package is configured to track the mass and volume flows of components passing through a series of unit operations specified and configured by the user. The mass rates can then be utilized by the user to determine important performance indicators such as product mass yields, concentrate purity levels, element-by-element recoveries, and so forth. The techno-economic analysis showed that the roasting and leaching operations were the most expensive capital items, each contributing approximately 30% to the total capital cost. One notable contributor to the high production costs was the low REE recovery observed in the pilot scale trials. The product basket price was shown to have a strong influence on the economic viability of the scenarios, with the scandium price being the most significant influencer. Operating cost was shown to be extremely sensitive to REE recovery, REE feed grade, and leaching acid consumption. An analysis of ten different scenarios for a 500 t/h commercial operation revealed that three were economically favorable, producing internal rates of return varying from 27.7% to 33.1% and payback periods of 4 to 5 years. The project successfully developed and demonstrated a process to recover REEs from coal and coal byproducts in a pilot-plant operation which consistently produced over 90% grade REO mix from varies types of feedstocks. Commercialization analysis showed that the technology readiness level successfully achieved TRL 6 at the end of the project and demonstrated the need and the potential for scaling the process to further advance the technologies toward the goal of providing a domestic supply of REEs at a commercial scale.

01 COAL, LIGNITE, AND PEAT↗

Residential Building Energy Efficiency Field Studies: Low-Rise Multifamily

In recent years, the U.S. Department of Energy (DOE) has conducted a series of research studies to validate energy efficient building technologies in the field. Much of the work has focused on single-family construction, and some has also addressed commercial energy codes. The work detailed in this DOE-funded study (EE0007616) focuses on low-rise multifamily buildings (three stories or fewer above grade) in various regions of the United States, and reports on how state-level building codes are being implemented, both in terms of observed characteristics and also in terms of estimated energy impacts. Nearly 100 buildings across four states—Illinois, Minnesota, Oregon, and Washington—were sampled, which represent a range of climate types from mild temperature to very cold continental. Both common entry and outdoor entry buildings were included, and a parallel research project evaluated envelope air tightness and current still-evolving air tightness testing methods. Finally, a set of structured interviews of building designers and other relevant professionals was carried to out to gain more insight into this market. To the greatest extent possible, the methodology developed under the project for low-rise multifamily buildings mirrored the approach established by Pacific Northwest National Laboratory (PNNL) for single-family residential buildings (https://www.energy.gov/eere/buildings/downloads/residential-building-energy-code-field-study). This included the general approach to sampling, recruitment, and data collection, as well as data analysis and presentation. The range of permitting dates for the sites encompassed two energy code cycles in most regions. All states in the study had adopted a variation of the International Energy Conservation Code (IECC) for the structure of their state code. The low-rise multifamily occupancy presents a hybrid building type: most of the building’s conditioned floor area was covered by the residential chapter of the code while portions of the building (such as corridors and common spaces) fell under the commercial code chapter. The key items assessed in this work were: Building Shell—exterior wall insulation, ceiling insulation, foundation insulation, windows. Common Areas—HVAC and lighting. Living Units—lighting, ventilation. A few items were not assessed in detail, given their relative paucity in this occupancy type; these included duct leakage, pipe insulation, and hot water circulation controls. Building characteristics were collected via a combination of architectural, mechanical, electrical, and plumbing plan reviews and field inspections, and entered into a spreadsheet-based tool that was later queried to build a database. Data went through quality control both upon arrival and via a later semi-automated review and assurance process. Most of the data are presented graphically so that the reader can quickly assess compliance with the applicable energy codes (both by state and by code year). As a final step, EnergyPlus™ simulations were created for all buildings in the study to estimate both the as-found energy use intensity (EUI) and the energy and CO 2 that could be saved if features that were found to not meet code minimums were brought up to code. The savings estimates were tabulated for each of the four states in the study. The research team found that the single-family approach was largely applicable to low-rise multifamily buildings. This applies to both the data collection and the prototype EUI analysis. Most of the occupied space is living units and falls under residential energy codes, and many characteristics use similar envelope construction and relatively straightforward mechanical systems and lighting. One of the most challenging aspects of this work was to build an effective spreadsheet-based data collection instrument that could allow efficient collection of both building plan and field data. The research team is of the view that other methods could be equally effective if the work is done carefully with diligent quality control. The primary findings for the work center around the thermal envelope and mechanical systems and lighting at the sites: For thermal envelope components, the majority of buildings met or were better than the prescriptive code.This suggests that building designers and builders are aware of code requirements. In some cases, surveyed buildings were designed to qualify for energy efficiency certification programs. These buildings made up at least 20% of sampled buildings in each state. Almost all buildings met mechanical system efficiency requirements (for both living units and common areas). In some cases, sites employed systems that were considerably more efficient than required by the applicable energy code. Dwelling units had a majority of high-efficacy lighting, often in excess of the state’s residential code requirements. While high-efficacy fixtures were also typical in common areas (corridors and stairwells), lighting power densities (LPDs) in these areas were sometimes higher than levels dictated by the applicable part of the state commercial energy code. The simulation models run on a series of low-rise multifamily prototypes, informed by a composite of the field data collected, calculated annual EUIs of between 20 and 50 kBtu/ft2-yr, with the range representing the effects of both building characteristics and building location (climate zone). A detailed process (based on simulations of prototype buildings) was used to estimate the amount of avoided energy use that would occur if 100% adherence to energy codes were attained. The results indicated modest savings are attainable for items such as window thermal performance and common area lighting. The result is overall only a modest potential for additional energy savings, averaging about 10% of EUI.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Small Reactors in Microgrids: Technology Modeling and Selection (Net-Zero Microgrid Program Project Report)

This report demonstrates the capabilities of the net-zero microgrid (NZM) Xendee platform for modeling an SR module with electricity, heat extraction and thermal storage in microgrids configurations. The model effectively captures the most important technical and economic considerations for SR technology specific analysis: cost and operational characteristics of SR technology and financial costs and incentives. The model can analyze multiple scenarios to establish metrics for cost-competitive and zero-carbon microgrids connected to the grid or completely isolated. The model is fully integrated within the Xendee platform for modeling and analysis of clean energy microgrids with storage and generation from renewable energy sources. The model captures the capabilities, constraints, and nuances of SR by incorporating parameters related to plant economics, design efficiency and performance, plant operation and component and fuel lifespan. The cost and operational parameters modeled in the SR module are specific to the technology selected for integration in the microgrid. Cost parameters recognize advanced nuclear technology for modular production and installation based on economies of scale from factory manufacture and related commissioning, and cost reduction through technology maturation—first-of-a-kind (FOAK) and nth-of-a-Kind (NOAK). The cost parameters include installation, operations and maintenance (O&M), fuel refueling cycle, and reactor life. Installation cost reflects economies of scale due to unit sizing at scale and colocation. O&M economies of scale for both fixed- and variable-cost fuel life-cycle costs are incurred at every refueling interval, with separate front- and back-end fuel costs, as well as waste-handling and disposition costs. This report investigates key characteristics of different SR technologies suitable for microgrid applications, including design principles, sizing, coolant properties, temperature ratings, fuel structures, and life-cycle considerations. This also includes fuel technologies applicable to these SR systems, alongside strategies for nuclear-waste and spent-fuel management and approaches to address safety, security, and proliferation challenges. Four primary groups of SR technologies are examined: water-cooled, liquid-metal-cooled, high-temperature gas-cooled, and molten-salt-cooled systems. In this report, an initial guideline for technology selection is established, aligning the characteristics of the technologies with the requirements of microgrids. The selection of technology in a microgrid is influenced by various factors, including financial capacity, location and accessibility, demand type and characteristics, reliability and resilience requirements, area constraints, and the lifespan of the microgrid. The types of electrical and non-electrical applications within the microgrid also play a significant role in technology selection. The characteristics of SRs, such as their smaller size, modularity, transportability, long refueling interval, improved safety features, ability to operate in autonomous or semi-autonomous mode, and provision of high-grade heat, are particularly appealing for microgrids. Furthermore, a list of considerations for implementing SRs in microgrids is outlined. The SR model is created to be continuously improved with the acquisition of actual data on investment and operational costs, experience with supply chains, production at scale, and field deployments. In the near term, performance data on applications in microgrids will become available from lessons learned from laboratory tests, such as those planned for the Microreactor Applications Research Validation and Evaluation Project (MARVEL), led by Idaho National Laboratory (INL). The SR model incorporates scenario data and known SR design specifications, enabling technoeconomic analysis for SR deployment in microgrids. It specifically considers the distinctive attributes of SRs as generators in technoeconomic studies. SRs can be modeled and analyzed with generation from renewable-energy sources, energy storage, and flexible loads over a range of functionality and applications. This offers a comprehensive tool for feasibility studies, scenario development, and sensitivity analysis for “what-if” consideration of any range of assumptions about SRs in microgrids and other aggregations of distributed-energy resources, including virtual power plants.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Sub-pilot-scale Production of High-Value Products from U.S. Coals

Investigators from the University of Utah, University of Wyoming and Marshall University pursued a program to study the conversion of raw coal to high-value products of carbon fiber and silicon carbide. Team members also developed an initial framework for a data portal that can incorporate laboratory data on coal processing and product quality, and also work with tools for machine learning for data analysis, data visualization and economic assessment. Experimental R&D efforts focused on the conversion of raw coal to coal tar and other byproducts, and the resulting tar intermediates were upgraded to form anisotropic and isotropic pitch materials. These pitch materials were produced from coal using both thermal (pyrolysis) and chemical (mild solvolysis liquefaction) decomposition of raw coal. Four different coals were studied: Utah bituminous coal (Sufco), Wyoming PRB coal (Black Thunder), Illinois bituminous coal (Illinois #6), and West Virginia bituminous coal (Flying Eagle). Both metallurgical-grade coking coals and lower-grade steam coals were investigated, and controlled secondary gas-phase reactions were used during a two-stage pyrolysis process to induce cracking and condensation reactions among the pyrolytic tar species. This approach successfully improved the performance of the lower grade coals for yielding pitch materials, with properties more consistent with a commercial-grade pitch that had previously demonstrated success for quality carbon fiber production. The use of waste plastic materials was also studied, to help improve physical and chemical characteristics of the intermediate tars and final pitch product; in particular, for lowering the pitch softening point to an acceptable level for melt spinning carbon fiber. Mild solvolysis liquefaction was also used as a method for producing pitch for carbon fiber production. As expected, significantly higher pitch yields were obtained using this approach, and waste plastic materials were also successfully used to reduce pitch softening point to an acceptable level. The plastic materials were also utilized to create a solvent for the mild solvolysis process, and this plastic-derived solvent was shown to provide results consistent with more expensive commercial chemical solvents, and could thus avoid the need for costly recovery and recycle of a liquefaction solvent. Additional experimental R&D focused on the production of silicon carbide (β-SiC) from the residual char byproduct from pitch production, and also on the production of carbon fiber from the anisotropic pitch. SiC was successfully synthesized using a mixture of residual char and sandstone at a ratio of 1:1. Reaction temperature and residence time were optimized and yielded a product purity of 81%. For carbon fiber production, the most successful pitch samples were obtained from the mild solvolysis liquefaction approach, combined with the use of a plastic (HDPE)-derived solvent. Fiber properties improved over time as laboratory fiber production methodologies improved, and final yields of carbon fiber were obtained with a diameter of 12.14 ± 1.10 um, Modulus of 173.73 ± 15.25 GPa, and Tensile Strength of 1.04 ± 0.10 GPa. A proof-of-concept Modern Community Research Data Portal (MCRDP) was developed and deployed for coal and coal-derived pitch characterization, with the full support of (i) remote web-based access, (ii) distributed analysis, (iii) interactive visualization and exploration, (iv) shared and long-term data access, (v) advanced query capabilities and (vi) real-time collaboration. The Coal to Products Data Portal “coaltoproducts.org” provides researchers with space to store and share data within a project, tools for analyzing and understanding data for scientific investigation, and the ability to publish data to the broader community for reproducibility. The portal leverages the Material Commons 2.0 (MC) platform developed by the Center for PRedictive Integrated Structural Materials Science (PRISMS) of the University of Michigan, to achieve long-term longevity of data collections and, more importantly, collaborative science. A number of data visualization tools were also assessed and implemented for interrogating the experimental and modeling data. The machine learning portion of this project analyzed datasets from two different coal conversion processes performed on a diverse set of coal samples from both the coal pyrolysis experiments and the solvent liquefaction experiments. The work was initiated by exploring standard regression models on the pyrolysis data, aiming to understand the impact of sample characteristics and processing conditions on key product metrics. Over the course of the project, the focus expanded to include a variety of machine learning tools, delving into both supervised and unsupervised learning methods. Models tested on the pyrolysis data included linear, ridge, lasso, elastic-net, Gaussian process, random forest regression, and AutoSklearn, and the approach was continually refined to enhance predictive accuracy and model interpretability. Similar techniques were applied to the liquefaction data with an additional focus on feature engineering. Along with mesophase content, additional outputs of interest were the pitch yield, softening point, and QI content. Insights derived from these analyses are crucial in determining the factors influencing the quality and yield of coal-derived products. As the work progressed, the research evolved from foundational model comparisons to analyses of random forests, decision paths, and feature importance scores. A thorough market analysis was performed to examine the prospects of coal-based carbon fibers. The best opportunities for coal come from its lower and more stable price relative to petroleum, particularly for subbituminous coals, which is the primary advantage that a coal refinery may have over a petroleum refinery. Before a commercial CTP production facility can be modeled, however, several things need to be understood regarding the nature of the would-be coal refinery. These include the technology to be deployed, the size of facility, the volume(s) of co-product(s), and the waste and emissions profile of the plant. The volume of co-products and waste may be substantial and will require separate market analysis to ensure viability. In the near-term, the importance of coal tar pitch, in the form of carbon pitch, to the aluminum and steel industries is likely to overshadow the alternative use of this material as an input for carbon fiber. The importance of steel and aluminum in building materials, and the need for carbon materials in their manufacturing, will ensure that demand for these products remains for the long run. In addition, carbon fiber may also be the best substitute for steel and aluminum well into the future. While society will eventually be able to shift production of much of its electricity needs to renewables, it will not be able to shift away from fossil fuels for production of high-strength construction and vehicular materials. Demand for carbon fiber is expected to increase quickly, but the volume of carbon fiber and the amount of coal that would be needed to produce even a sizeable share of this market may still be relatively small compared to current coal production. Thus, other coal-based products like graphene, graphite, carbon foams, resins, and carbon-based building products will play important roles in sustaining coal production as coal-fired power generation continues to decline.

01 COAL, LIGNITE, AND PEAT↗

Innovating the next generation of commercial smart building software

Nearly 30% of commercial building energy use is wasted due to equipment faults and HVAC controls problems. The result is increased emissions, compromised comfort and productivity, and less reliable coordination of building power needs with a clean grid. The energy impact alone represents $17 billion in potential savings. Today’s smart building software provides a robust solution to address these operational deficiencies. Energy management and information systems (EMIS) are saving up to 9% on average, with two-year paybacks. They are being incorporated into energy management processes, commissioning services, and utility programs. As effective as they are, two barriers prevent even deeper benefits; limited personnel to fix problems once they are identified, and the expense and time to manually implement changes in control systems. In partnership with the research community, the EMIS industry is developing new capabilities to overcome these barriers. Moving beyond siloed products for either fault detection and diagnostics, or optimal control, these new capabilities empower users to not only automatically identify faults, but also to push corrective action, and control improvements to their buildings. In this paper, several areas for enhancements are documented: ‘one-time’ correction of faults such as setpoints, schedules, and economizer lockouts; short-term active testing for automated proportional integral derivative (PID) loop tuning and functional testing; and continuous supervisory control for demand flexibility and year-round efficiency. Results are presented from a pair of partner implementations out of a dozen providers integrating these enhancements into their products, including field tests from across the country, and insights into operator acceptance and integration into operations and maintenance practices.

Casillas, Armando↗

Field Validation of Thermoelectric Generation System at Holcim Cement Plant in Alpena, Michigan

Executive Summary Project Background The Industrial Technology Validation (ITV) program aims to identify and demonstrate the performance of new, emerging, and underutilized energy-saving technologies in the industrial sector to help inform decisions to help accelerate their commercialization and deployment, as well as to help make industries more competitive. This ITV demonstration evaluated a thermoelectric generation (TEG) technology at a cement plant, aiming to reduce energy demand in the cement industry. A median cement plant consumes 5.73 million British thermal units per ton of clinker production (resulting in 0.838 metric tons of carbon dioxide [CO₂] emissions per ton of clinker) (Boyd and Zhang 2011, EPA 2021), equivalent to approximately 6.9 trillion British thermal units (TBtu) per year in energy consumption at a cement plant producing 3,300 tons of clinker per day.¹ Collaborating with Holcim, Advanced Thermovoltaic Systems (ATS) developed and deployed a pilot-scale thermoelectric power system to efficiently capture and convert waste heat to electricity. The system leverages the Seebeck effect to convert temperature differences on two sides of semiconductor cartridges into electrical power (ScienceDirect, n.d.). This generation is realized with minimal moving parts compared to existing waste-heat-to-generation solutions and allows capture from heat sources with temperatures as low as 150°C. This project aimed to validate a scalable solution applicable for capturing medium-temperature waste heat, including ambient losses from other high-temperature processes, and high-temperature sources less suitable for other waste-heat-to-power solutions. By recovering this otherwise wasted heat, this project intends to validate improvements to overall process efficiency through reduction in purchased electricity, thereby reducing operational costs while enhancing resiliency and competitiveness. Description and Scope This study evaluated the performance of a TEG system from ATS as a solution to convert waste heat into useful power at a Holcim cement plant in Alpena, Michigan. This plant is a fully integrated cement plant that has been operating since 1907. The facility operates continuously (24/7/365) with approximately 250 employees and five long dry kilns, yielding a total production capacity of 7,852 tons of cement per day (EPA 2023). Currently, the Alpena plant uses waste heat boilers to convert waste heat from the exhaust of each kiln into steam, which drives steam turbine generators. The ATS TEG is being evaluated for its potential to supplement the steam turbines by capturing the remaining lower grade heat. This technology is also being considered for other Holcim plants where steam turbines are not a viable option. ATS installed a pilot-scale TEG unit with an array of 582 individual thermoelectric semiconductor cartridges, of which 573 were operational. The cartridges are sandwiched between 48 hot plates and 49 cold plates. Each cartridge is designed to generate 20 watts (W) of gross power at a hot-side temperature of 240°C and cold-side temperature of 20°C. As such, the total gross generation capacity of the installed system is 11.5 kilowatts (kW) at design conditions. The system configuration for the evaluation was designed to prioritize convenience of installation and minimize disruption to production at the site, while ensuring that the heat required can be obtained for evaluating the TEG system at various operational conditions. To accomplish this, a portion of the steam supplied to Alpena’s steam turbine generation system was diverted to be used as the heat source for the TEG system, while water was supplied to the cold side of the system from nearby Lake Huron. This configuration was designed for the evaluation of the pilot-scale system to assess the performance at different conditions. A commercial-scale system will likely vary from the pilot system depending on typical configurations, including both scale and application. Future commercial applications of the ATS system would involve integrating the system into the exhaust from kiln preheaters, clinker coolers, or radiant heat capture from kiln shells for the heat source. For the cold source, a range of cooling solutions can be considered, including a mechanical cooling system, depending on the location and the application. To increase the generation capacity for commercial applications, the technology provider is working toward developing a commercial-scale TEG system, which would combine multiple TEG units (each similar in design to the pilot system) together. The scope of this evaluation includes the pilot-scale TEG system and all impacted equipment including pumps, controllers, and power handling equipment. Study Objectives The evaluation's goal was to assess the potential of the ATS TEG system to generate useful electrical power by capturing waste heat from cement production kilns. The objectives of this study are to evaluate and verify the following claims made by ATS regarding the pilot-scale system installed at the Holcim Alpena plant. The following design parameters and claims are also outlined in Table ES- 1 and Table ES- 2: • Gross Power: The thermoelectric system converts heat into power to create gross power, the total measured power generated by the system. The 573 active cartridge pilot-scale system is expected to generate 11.5 kW of gross power at the designed hot-side temperature of 240°C and cold-side temperature of 20°C. Power production is dependent on the temperature difference between the heat source (ultimately from the waste heat) and cold temperature supply source. • Net Power: The net power is the total usable power provided to the site by the TEG system after deducting parasitic power loads from the gross generated power. Supplementary equipment is required to operate the TEG system including pumps, controllers, and, in certain anticipated applications, mechanical cooling, which introduce parasitic loads to system operation. After deducting the parasitic loads from the gross power generation, ATS anticipates achieving a net power generation of 7.5 kW from the pilot-scale system. • Thermal Efficiency: The thermal efficiency is the percent of the total heat transferred to the TEG system that is converted to gross power. Historically, TEGs have a thermal efficiency of 2%–5% (DOE 2008). Prior industrial-scale TEG systems, such as the E1 TEG offered by Alphabet Energy, operated at an efficiency of 2.5% (Lamonica, 2014). ATS anticipates achieving an average efficiency of 4.8% or higher in converting heat energy to usable electricity. • Cartridge Performance: The TEG system comprises 573 active individual semiconductor cartridges, each of which generates a portion of the total power. Cartridge optimization and selection is an important design consideration for potential future TEG system design performance. Therefore, understanding the distribution of gross power and efficiency within the pilot system is vital to understanding what is achievable. At a design hot-side temperature of 240°C and cold-side temperature of 20°C, ATS anticipates a cartridge performance of 20 W of gross power per cartridge at an efficiency of 4.8% per cartridge. In addition to evaluating the claimed performance of the TEG pilot-scale unit, the study estimated the potential annual impacts of a scaled-up commercial system used to capture kiln waste heat over annual operations. The evaluation estimated the gross and net annual electric generation achievable by capturing heat from the two proposed tap-in points: the kiln exhaust and the clinker cooler exhaust; see Section 2.1 for details. Two use cases were examined: • Holcim Alpena: The Holcim Alpena site consists of long dry kilns with superheater boilers, which differs from the rest of Holcim’s cement plant portfolio and results in lower waste heat temperatures. The study estimates gross and net annual generation using the superheater boiler exhaust and clinker cooler exhaust, based on 2023 operational data. • Typical Installation: Common cement plants have preheater kilns with higher exhaust temperatures than Holcim Alpena across a range of production rates. The study estimates gross and net annual generation using the preheater exhaust and clinker cooler exhaust, with a sensitivity analysis to account for the typical range of preheater exhaust temperatures, clinker cooler exhaust temperatures, and clinker production rates. Methodology The evaluation methodology followed a measurement and verification (M&V) strategy based on the International Performance Measurement and Verification Protocol Option B through comprehensive measurements and analyses of the affected systems. Evaluation data was collected from March 9 to March 11, 2024, the test period of the pilot TEG system. During the test period, in coordination with the ITV team, the ATS team adjusted system operations to capture the range of variability expected for each of the variables pertinent to performance of the system. The methodology consisted of two parts: evaluating the performance of the pilot unit's TEG system and estimating the annual TEG impact in terms of gross and net power based on a given waste heat profile. First, the evaluation of the thermoelectric generation performance of the pilot unit relative to the claims was performed by analyzing the collected test data. Gross power of the pilot TEG system was directly measured. Net power was determined by deducting the measured parasitic power from the gross power. The gross power generation was compared to heat transferred to the system by the working fluid (which was heated by steam generated from the kiln waste heat) to calculate the thermal efficiency achieved by the system. Performance of individual semiconductor cartridges within the pilot array was also assessed in terms of measured gross cartridge power and calculated cartridge thermal efficiency. The second part of the evaluation estimated the annual TEG impacts in terms of gross power and net power (calculated from the difference between gross power and parasitic power). This analysis comprised development of mathematical regression models for gross power and parasitic power, with assessment of each model’s goodness-of-fit characteristics to ensure satisfaction of statistical requirements. The models predicted the gross power generation, the parasitic load based on the temperature difference between the hot working fluid and the cold-side fluid (cold water from Lake Huron) entering the system, the volumetric flow rate of the cold-side fluid at the inlet, and the volumetric flow rate of the hot working fluid at the inlet. The annual impact analysis considered a theoretical commercial-scale system sized to capture the available waste heat at a cement plant, consisting of linked pilot-scale units that receive heat from a theoretical gas-to-working-fluid heat exchanger. To estimate annual impacts at the Alpena plant, the gross power and parasitic power regression models were applied to the arrays in the theoretical commercial-scale system. The heat supplied to the unit was calculated based on the kiln run time, annual production, kiln exhaust waste heat, and clinker cooler waste heat derived from 2023 Holcim Alpena kiln operational data. Net power impacts were calculated by deducting the resulting parasitic power from the estimated gross power. Inputs for the model were generated from a combination of hourly data, assumed design considerations for TEG system scale-up from the pilot-scale unit, and assumptions regarding TEG system operations. This analysis was then used as the basis for estimating annual impacts of typical TEG installation at cement plants, by applying sensitivity analyses to key kiln operational characteristics including kiln preheater exhaust temperatures, cooler clinker exhaust temperatures, and plant daily production rates across a range of expected values. Project Results/Findings Table ES- 2 and Table ES- 2 provide a summary of the operating conditions and evaluation results compared to the stated claims from the technology provider. Key takeaways include: • Gross Power: The peak gross power achieved during the testing period was 10.0 kW, compared to the 11.5 kW expected for 573 active cartridges. The claimed gross power was associated with a target hot side of 240°C; however, the system only received a maximum hot-side mean plate temperature of 212°C during the testing period. • Net Power: The pilot-scale unit exceeded the claims for net power, achieving a peak of 7.7 kW net compared to a claim of 7.5 kW. One factor contributing to the higher achieved net power is the relatively high water pressure available through Lake Huron. The pilot TEG system did not require cold-side pumps during the test, whereas most installations would. This reduced the parasitic loads on the system, ultimately contributing to higher net power relative to the gross power. • Thermal Efficiency: The pilot-scale unit outperformed the claimed efficiency, achieving a peak system efficiency of 5.0% thermal efficiency compared to the stated 4.8%. • Cartridge Performance: To compare cartridge performance against claims, the study focused on the third day of testing, which aimed for conditions closest to the design specifications, with a hot side of 240°C and cold-side exit temperature of 6.4°–30°C. On this day, the mean gross power observed in the cartridges within the TEG array was 18.1 W/cartridge, and the peak performance was 34.7 W/cartridge. The estimated mean cartridge efficiency was 5.2%, and the estimated efficiency at peak gross cartridge power was 10%. The regression models developed for gross power generation and parasitic loads were used to estimate the generation impact for given heat input to the TEG from the working fluid (captured from the waste heat) and from the cold loop (Lake Huron) on an hourly basis for a year of operation. Based on this analysis, installation of a commercial-scale TEG system at the Holcim cement plant in Alpena, Michigan, with a waste heat exchanger of 0.85 effectiveness, would generate up to 391 kW of net power, translating to between 920,000 and 1,800,000 kilowatt-hours (kWh) in net electricity per year. Based on typical grid emissions for Alpena, this would avoid estimated net emissions by 752 metric tons of CO₂ annually.² The sensitivity analysis estimated that typical TEG system installations at cement plants could generate an average of 56–1,040 kW of net power, or between 488,000 and 9,110,000 kWh of net energy. This generation potential is most significantly affected by plant production rates and also influenced by preheater and clinker cooler exhaust temperatures. Applying the national average emission rate, typical commercial-scale installations at Holcim plants are projected to avoid between 182 and 3,401 metric tons of CO₂ annually per site. Table ES- 3 shows a summary of the estimated annual impacts.³ While parasitic loads are significant and vary by application, this analysis assumed the use of heating loop pumps and access to Lake Huron as a cold sink. This setup assumed no need for cooling loop pumps due to the available water pressure at the test site. Applications that require cooling towers or additional equipment are likely to experience higher parasitic loads. Therefore, the study’s estimates are most applicable to scenarios with similar parasitic load configurations—namely, access to a high-pressure cold sink. Applicability to other locations may be limited, as differing conditions could necessitate additional pumps and cooling systems, potentially impacting performance significantly.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗