Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “contractors”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 883 records · Page 49

Space Station Workstation Technology Workshop Report

This report describes the results of a workshop conducted at Goddard Space Flight Center (GSFC) to identify current and anticipated trends in human-computer interface technology that may influence the design or operation of a space station workstation. The workshop was attended by approximately 40 persons from government and academia who were selected for their expertise in some aspect of human-machine interaction research. The focus of the workshop was a 1 1/2 brainstorming/forecasting session in which the attendees were assigned to interdisciplinary working groups and instructed to develop predictions for each of the following technology areas: (1) user interface, (2) resource management, (3) control language, (4) data base systems, (5) automatic software development, (6) communications, (7) training, and (8) simulation. This report is significant in that it provides a unique perspective on workstation design for the space station. This perspective, which is characterized by a major emphasis on user requirements, should be most valuable to Phase B contractors involved in design development of the space station workstation. One of the more compelling results of the workshop is the recognition that no major technological breakthroughs are required to implement the current workstation concept. What is required is the creative application of existing knowledge and technology.

Moe, K. L.↗

Summary of results of NASA F-15 flight research program

NASA conducted a multidisciplinary flight research program on the F-15 airplane. The program began in 1976 when two preproduction airplanes were obtained from the U.S. Air Force. Major projects involved stability and control, handling qualities, propulsion, aerodynamics, propulsion controls, and integrated propulsion-flight controls. Several government agencies and aerospace contractors were involved. In excess of 330 flights were flown, and over 85 papers and reports were published. This document describes the overall program, the projects, and the key results. The F-15 was demonstrated to be an excellent flight research vehicle, producing high-quality results.

Burcham, F. W., Jr.↗

Advancing automation and robotics technology for the space station and for the US economy

In April 1985, as required by Public Law 98-371, the NASA Advanced Technology Advisory Committee (ATAC) reported to Congress the results of its studies on advanced automation and robotics technology for use on the Space Station. This material was documented in the initial report (NASA Technical Memorandum 87566). A further requirement of the Law was that ATAC follow NASA's progress in this area and report to Congress semiannually. This report is the second in a series of progress updates and covers the period between October 4, 1985, and March 31, l986. NASA has accepted the basic recommendations of ATAC for its Space Station efforts. ATAC and NASA agree that thrust of Congress is to build an advanced automation and robotics technology base that will support an evolutionary Space Station Program and serve as a highly visible stimulator effecting the U.S. long-term economy. The progress report identifies the work of NASA and the Space Station study contractors, research in progress, and issues connected with the advancement of automation and robotics technology on the Space Station.

Source record↗

Distributed synthetic aperture radar simulation

Synthetic aperture radar (SAR) depends primarily on attainable frequency resolution rather than on large physical size of the antenna array. The distributed architecture concept (DSAR) incorporates active elements (amplifiers) at or near the elemental radiators of the array. Since SAR's are expensive to build and expensive to test, a computer modeling approach is a feasible method of predicting the quality or nature of the SAR image from the proposed system parameters. The goal of this project is to produce a DSAR simulation software package. This report describes the progress made thus far and the work which remains to be done. Extensive work on this project had been done previously by two NASA contractors. The principal task remaining involved the creation of a suitable interface between these programs and the hardware and software available at the Johnson Space Center.

Bourgeois, B. A.↗

Electrical power system for the U.S. space station

The Space Station Electrical Power System presents many interesting challenges. It will be much larger than previous space power systems, and it must be designed for on-orbit maintenance and replacement, along with having a growth capability. The power generation, energy storage, and power management and distribution (PMAD) subsystems comprise the primary elements of the overall system. Each was analyzed by NASA Lewis Research Center and its two contractors -- Rocketdyne and TRW -- in the definition studies of the program to determine the optimum approach to minimize initial costs and life cycle costs. For the PMAD subsystem, a ring bus architecture operating at 440 V, 20 kHz, single phase, was selected. Photovoltaic and solar dynamic power generation subsystems were both studied. Major tradeoffs were made for each subsystem and for the overall system, and a hybrid system (both photovoltaic and solar dynamic) was selected.

Nored, D. L.↗

Research instrumentation for hot section components of turbine engines

Programs to develop research instrumentation for use on hot section components of turbine engines are discussed. These programs can be separated into two categories: one category includes instruments which can measure the environment within the combustor and turbine components, the other includes instruments which measure the response of engine components to the imposed environment. Included in the first category are instruments to measure total heat flux and fluctuating gas temperature. High temperature strain measuring systems, thin film sensors (e.g., turbine blade thermocouples) and a system to view the interior of a combustor during engine operation are programs which comprise the second category. The paper will describe the state of development of these sensors and measuring systems and, in some cases, show examples of measurements made with this instrumentation. The discussion will cover work done at NASA Lewis and at various contractor facilities.

Englund, D. R.↗

Space Station planning

An overview of NASA Space Station planning activities is given. Among the specific topics addressed are: the role of private contractors in the construction and operation of Space Station; international cooperation in planning Space Station configurations; and optimum management strategies for Space Station planning activities. The division of work packages for the preliminary design definition phase of the Space Station program is described.

Freitag, R. F.↗

X-29A advanced technology demonstrator program overview

The present discussion of the X-29A forward-swept wing experimental aircraft's functional flight program and concept evaluation program gives attention to the program management structure for a test team that encompasses NASA, the U.S. Air Force, and the prime contractor for the X-29A. The preflight, flight-functional, envelope-expansion and flight research test objectives of the program are also noted, together with the qualitative characterizations obtained to date for both a limited envelope flight control system and one for an expanded envelope.

Sefic, W. J.↗

Initiation of the next step - The acquisition of a Space Station Program

Attention is given to NASA's Space Station Program acquisition strategy, as well as the internal implementation of the strategy and the nature of NASA's relations with industry. While the acquisition strategy addresses phased procurement, design-to-cost, and advanced development emphasis, internal implementation concerns itself with 'skunk works' activities and the exploitation of the Technical and Management Information System. NASA's relationship to contractors will stress competition, extensive commercial and international involvement, and design/development phase competition flexibility.

Mancuso, T. G.↗

Productivity improvement and quality enhancement at NASA

NASA's Productivity Improvement and Quality Enhancement (PIQE) effort has as its objectives the encouragement of greater employee participation in management decision-making and the identification of impediments as well as opportunities for high productivity. Attempts are also made to try out novel management practices, and to evolve productivity trend analysis techniques. Every effort is made to note, reward, and diffuse successfully instituted PIQE approaches throughout the NASA-contractor organization.

Braunstein, D. R.↗

Evolution of area access safety training required for gaining access to Space Shuttle launch and landing facilities

Assuring personnel and equipment are fully protected during the Space Shuttle launch and landing operations has been a primary concern of NASA and its associated contractors since the inception of the program. A key factor in support of this policy has been the area access safety training requirements for badging of employees assigned to work on Space Shuttle Launch and Facilities. This requirement was targeted for possible cost savings and the transition of physical on-site walkdowns to the use of television tapes has realized program cost savings while continuing to fully satisfy the area access safety training requirements.

Willams, M. C.↗

Summary of results of NASA F-15 flight research program

NASA conducted a multidisciplinary flight research program on the F-15 airplane. The program began in 1976 when two preproduction airplanes were obtained from the U.S. Air Force. Major projects involved stability and control, handling qualities, propulsion, aerodynamics, propulsion controls, and integrated propulsion-flight controls. Several government agencies and aerospace contractors were involved. In excess of 330 flights were flown, and over 85 papers and reports were published. This document describes the overall program, the projects, and the key results. The F-15 was demonstrated to be an excellent flight research vehicle, producing high-quality results.

Burcham, F. W., Jr.↗

A technique for lowering risks during contract negotiations

In this day and age of sophisticated weapon and space system procurements, negotiations of the statement of work, technical requirements, and schedule may be as protracted as the negotiation of costs and profit. A major problem facing the program manager during contract negotiations is what affect changes in schedule, technical requirements, and contract terms have on the price. In many instances, after the statement of work has been redrafted, the contractor will be obliged to reprice the work, either on the spot or after a short recess in the negotiations. In this paper, a method for organizing the negotiation process is presented to reduce the risks incurred by the seller. The method is built upon regression analysis and two illustrative examples of its use are provided.

Lehman, D. H.↗

Updated Conceptual Cost Estimating

16-page report discusses development and use of NASA TR-1508, the Kennedy Space Center Aerospace Construction Price Book for preparing conceptual, budget, funding, cost-estimating, and preliminary cost-engineering reports. Updated annually from 1974 through 1985 with actual bid prices and government estimates. Includes labor and material quantities and prices with contractor and subcontractor markups for buildings, facilities, and systems at Kennedy Space Center. While data pertains to aerospace facilities, format and cost-estimating techniques guide estimation of costs in other construction applications.

Brown, J. A.↗

Orbital transfer vehicle launch operations study. Volume 1: Executive summary

The purpose was to use the operational experience at the launch site to identify, describe and quantify the operational impacts of the various configurations on the Kennedy Space Center (KSC) and/or space station launch sites. Orbital Transfer Vehicle (OTV) configurations are being developed/defined by contractor teams. Lacking an approved configuration, the KSC Study Team defined a Reference Configuration to be used for this study. This configuration then become the baseline for the identification of the facilities, personnel and crew skills required for processing the OTV in a realistic manner that would help NASA achieve the lowest possible OTV life cycle costs. As the study progressed, researchers' initial apraisal that the vehicle, when delivered, would be a sophisticated, state-of-the-art vehicle was reinforced. It would be recovered and reused many times so the primary savings to be gained would be in the recurring-cycle of the vehicle operations--even to the point where it would be beneficial to break from tradition and make a significant expenditure in the development of processing facilities at the beginning of the program.

Source record↗

The meteorological interactive data display system

During FY-85 the data gathering process was completed. This gave researchers a reasonably complete picture of the Shuttle's operational weather support units and requirements. They expanded on the site visits of FY-84 with telephone follow-up. They finalized recommendations and wrote the final report. The final report was accepted by NASA and has been published as NASA Contractor Report CR-171418.

Suomi, V. E.↗

A design concept for an MMIC microstrip phased array

A conceptual design for a microstrip phased array with monolithic microwave integrated circuit (MMIC) amplitude and phase controls is described. The MMIC devices used are 20 GHz variable power amplifiers and variable phase shifters recently developed by NASA contractors for applications in future Ka band advanced satellite communication antenna systems. The proposed design concept is for a general NxN element array of rectangular lattice geometry. Subarray excitation is incorporated in the MMIC phased array design to reduce the complexity of the beam forming network and the number of MMIC components required. The proposed design concept takes into consideration the RF characteristics and actual phyical dimensions of the MMIC devices. Also, solutions to spatial constraints and interconnections associated with currently available packaging designs are discussed. Finally, the design of the microstrip radiating elements and their radiation characteristics are examined.

Lee, R. Q.↗