Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “command and control”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 883 records · Page 49

STS-99 / Endeavour SRTM Science Briefing and Applications from JSC

The primary objective of the STS-99 mission was to complete high resolution mapping of large sections of the Earth's surface using the Shuttle Radar Topography Mission (SRTM), a specially modified radar system. This radar system produced unrivaled 3-D images of the Earth's Surface. This videotape shows a science press briefing. The panel members are Michael Kobrick, the SRTM Project Scientist at JPL; Thomas Henning, SRTM Program Manager at the National Imagery and Mapping Agency; Diane Evans, the Director of the Earth Sciences Program at NASA; and Marian Werner, XSAR Project Manager for the DLR, Deutschen Zentrum fur Luft- und Raumfahrt, Germany's National Aerospace Research Center. Michael Kobrick explained the mechanics of interferometric measurements of the Earth. He explained and demonstrated with a scale model the deployable mast's use. He also explained the importance of the attitude and orbit determination avionics. A brief animated video showing how four beams would give a 225 km wide swath of the Earth topography was viewed. Thomas Henning discussed some of the usage of the digital terrain elevation data for flood relief planning, cell phone station placement, military planning for command and control centers, and flight simulation. He explained that public access to the most precise data would be limited. Diane Evans described data usage in flood prediction, earthquake fault identification and archeology. Marian Werner described the German and Italian input to the project. The questions from the press concerned the time to process this data, and the reasons for the limited access to the more precise data.

Source record↗

STS-109 Flight Day 8 Highlights

Footage of the eighth day of STS-109 is shown during which Mission Specialists John Grunsfeld and Rick Linnehan service the Hubble Space Telescope (HST). A broad overview of the Columbia Orbiter mission is presented. On the fifth extravehicular activity (EVA) of the mission, Grunsfeld and Linnehan installed a new cryogenic cooling system and radiator on HST for NICMOS (Near Infrared Camera and Multi-Object Spectrometer) which had not been previously operational due to the failure of an earlier cooling system. Linnehan and Grunsfeld are both shown on the end of the Orbiter's robot arm, the Remote Manipulator System, which was controlled by Commander Scott Altman. Following the completion of their spacewalks, the two Mission Specialists make statements which include thanking the numerous support personnel. Linnehan answers questions on the differences between training simulation at facilities such as the Neutral Buoyancy Lab (NBL) and his actual experiences in space.

Source record↗

Cross-Cultural Barriers to Effective Communication in Aviation

Recent research on communication and performance in airline flight crews has led to a concept of shared mental models that is associated with effective, efficient team coordination in problem solving and decision making situations. Elements that characterize efficient communication have been identified. This research, however, was based strictly on US crews. More recent studies supported by NASA have identified cultural factors that influence communication among team members who vary in their status and roles. Research is just beginning to identify commonalities and culturally distinct strategies for accomplishing joint tasks. ASRS incident reports have been analyzed to identify language barriers in flight that have safety consequences. Implications of these concepts and findings for multi-cultural command and control will be explored.

Orasanu, Judith↗

SSBRP Communication & Data System Development using the Unified Modeling Language (UML)

The Unified Modeling Language (UML) is the standard method for specifying, visualizing, and documenting the artifacts of an object-oriented system under development. UML is the unification of the object-oriented methods developed by Grady Booch and James Rumbaugh, and of the Use Case Model developed by Ivar Jacobson. This paper discusses the application of UML by the Communications and Data Systems (CDS) team to model the ground control and command of the Space Station Biological Research Project (SSBRP) User Operations Facility (UOF). UML is used to define the context of the system, the logical static structure, the life history of objects, and the interactions among objects.

Windrem, May↗

Adaptive Resource Management Technology for Satellite Constellations

This manuscript describes the Sensor Web Adaptive Resource Manager (SWARM) project. The primary focus of the project is on the design and prototyping of middleware for managing computing and network resources in a way that enables the information systems of satellite constellations to provide realtime performance within dynamic environments. The middleware has been prototyped, and it has been evaluated by employing it to manage a pool of distributed resources for the ITOS (Integrated Test and Operations System) satellite command and control software system. The design of the middleware is discussed and a summary of the evaluation effort is provided.

Welch, Lonnie↗

Operational Limitations of the High Rate Frame Multiplexer (HRFM) Onboard the International Space Station(ISS)-and How These Limitations Affect Payload Developers (PDs) and International Partners (IPs)

The data system onboard the United States Operating Segment (USOS) of the ISS is currently used to capture, route, record and downlink high-rate science data from experiments inside the US Lab. Once NASDA's Japanese Experiment Module (JEM) and ESA's Attached Pressurized Module (APM) are launched - in the 2004 to 2005 timeframe - data from these facilities will also be routed to the ground using the USOS data system. A critical component of the USOS data system is the High Rate Frame Multiplexer (HRFM). The HRFM combines multiple data/video inputs and combines them into one data stream. This Ku-band data stream is then routed through the Tracking and Data Relay Satellite (TDRS) system to the ground. The Data Management Coordinator (DMC) - located at the Marshall Space Flight Center's Payload Operations Center (POC) - is responsible for commanding and controlling the HRFM. The HRFM can multiplex a maximum of eight digital data sources and four digital video sources. Thus far, this limitation has not been constraining to operations. However, once the JEM and APM are integrated, the HRFM limitations will become a major constraint to science operations onboard. The purpose of this paper is to characterize the limitations of the HRFM and to explain how these limitations can be successfully managed. With this information, Payload Developers and International Partners will be able to more effectively utilize the data systems onboard the ISS. Ultimately, more science data can be captured and downlinked to Flight Controllers and Scientists on the ground.

Mixson, Charles D.↗

Utilizing the US Lab Nadir Research Window for Remote Sensing Operations with The Window Observational Research Facility (WORF)

The Window Observational Research Facility (WORF) is an ISPR-based rack facility designed to take advantage of the high optical quality US Lab Nadir research window. The WORF is based on the ISS Expedite the Processing of Experiments to Space Station (EXPRESS) rack mechanical structure and electronic systems. The WORF has a unique payload volume located at the center of the rack that provides access to the window. The interior dimensions of the payload volume are 34-in. (86.36 cm) wide by 33-in. (83.82 cm) high by 23-in. (58.42 cm) deep. This facility supports the deployment of payloads such as 9 in. aerial photography cameras and 12 in. diameter optical equipment. The WORF coupled with the optical quality of the United States Lab window support the deployment of various payload disciplines. The WORF provides payloads with power, data command and control, air cooling, water cooling, and video processing. The WORF's payload mounting surfaces and interfaces include the interior payload mounting shelf and the interior and exterior aircraft-like seat tracks. The payload mounting shelf is limited to a maximum mass of 136 kg (299 pounds). The WORF can accommodate large payloads such as the commonly used Leica-Heerbrug RC-30 aerial photography camera (whose dimensions are 53.3 cm (21-in.) wide by 50.8 cm (20-in.) deep by 76.2 cm (30-in.) long). The performance characteristics of the WORF allow it to support an array of payload disciplines. The WORF provides a maximum of 3 Kw at 28 Vdc and has a maximum data rate of 10 Mbps. The WORF's unique payload volume is designed to be light-tight, down to 2.8 x 10(exp -11) Watts/cm2/steradian, and have low-reflective surfaces. This specially designed WORF interior supports payload investigations that observe low-light-level phenomenon such as aurora. Although the WORF rack does not employ any active rack isolation (i.e., vibration dampening) technology, the rack provides a very stable environment for payload operations (on the order of X microradians). The facility's software is capable of being updated during its period of deployment. The WORF project also includes a Suitcase Simulator to allow for a payload developer to verify data interfaces at his development site, a trainer rack for astronauts to learn how to operate the WORF prior to flight, and the use of the EXPRESS Functional Checkout Units to allow for payload checkout at the KSC prior to launch.

Turner, Richard↗

The Extension of ISS Resources for Multi-Discipline Subrack Payloads

The EXpedite the processing of Experiments to Space Station or EXPRESS Rack System was developed to provide Space Station accommodations for subrack payloads. The EXPRESS Rack accepts Space Shuttle middeck locker type payloads and International Subrack Interface Standard (ISIS) Drawer payloads, allowing previously flown payloads an opportunity to transition to the International Space Station. The EXPRESS Rack provides power, data command and control, video, water cooling, air cooling, vacuum exhaust, and Nitrogen supply to payloads. The EXPRESS Rack system also includes transportation racks to transport payloads to and from the Space Station, Suitcase Simulators to allow a payload developer to verify data interfaces at the development site, Functional Checkout Units to allow payload checkout at KSC prior to launch, and trainer racks for the astronauts to learn how to operate the EXPRESS Racks prior to flight. Standard hardware and software interfaces provided by the EXPRESS Rack simplify the integration processes, and facilitate simpler ISS payload development. Whereas most ISS Payload facilities are designed to accommodate one specific type of science, the EXPRESS Rack is designed to accommodate multi-discipline research within the same rack allowing for the independent operation of each subrack payload. On-orbit operations began with the EXPRESS Rack Project on April 24, 2001, with one rack operating continuously to support long-running payloads. The other on-orbit EXPRESS Racks operate based on payload need and resource availability. Sustaining Engineering and Logistics and Maintenance functions are in place to maintain operations and to provide software upgrades.

Sledd, Annette M.↗

Development and Flight Testing of an Adaptable Vehicle Health-Monitoring Architecture

Development and testing of an adaptable wireless health-monitoring architecture for a vehicle fleet is presented. It has three operational levels: one or more remote data acquisition units located throughout the vehicle; a command and control unit located within the vehicle; and a terminal collection unit to collect analysis results from all vehicles. Each level is capable of performing autonomous analysis with a trained adaptable expert system. The remote data acquisition unit has an eight channel programmable digital interface that allows the user discretion for choosing type of sensors; number of sensors, sensor sampling rate, and sampling duration for each sensor. The architecture provides framework for a tributary analysis. All measurements at the lowest operational level are reduced to provide analysis results necessary to gauge changes from established baselines. These are then collected at the next level to identify any global trends or common features from the prior level. This process is repeated until the results are reduced at the highest operational level. In the framework, only analysis results are forwarded to the next level to reduce telemetry congestion. The system's remote data acquisition hardware and non-analysis software have been flight tested on the NASA Langley B757's main landing gear.

Woodard, Stanley E.↗

Intelligent Launch and Range Operations Virtual Test Bed (ILRO-VTB)

Intelligent Launch and Range Operations Virtual Test Bed (ILRO-VTB) is a real-time web-based command and control, communication, and intelligent simulation environment of ground-vehicle, launch and range operation activities. ILRO-VTB consists of a variety of simulation models combined with commercial and indigenous software developments (NASA Ames). It creates a hybrid software/hardware environment suitable for testing various integrated control system components of launch and range. The dynamic interactions of the integrated simulated control systems are not well understood. Insight into such systems can only be achieved through simulation/emulation. For that reason, NASA has established a VTB where we can learn the actual control and dynamics of designs for future space programs, including testing and performance evaluation. The current implementation of the VTB simulates the operations of a sub-orbital vehicle of mission, control, ground-vehicle engineering, launch and range operations. The present development of the test bed simulates the operations of Space Shuttle Vehicle (SSV) at NASA Kennedy Space Center. The test bed supports a wide variety of shuttle missions with ancillary modeling capabilities like weather forecasting, lightning tracker, toxic gas dispersion model, debris dispersion model, telemetry, trajectory modeling, ground operations, payload models and etc. To achieve the simulations, all models are linked using Common Object Request Broker Architecture (CORBA). The test bed provides opportunities for government, universities, researchers and industries to do a real time of shuttle launch in cyber space.

Bardina, Jorge↗

EXPRESS Rack: The Extension of International Space Station Resources for Multi-Discipline Subrack Payloads

The EXpedite the PRocessing of Experiments to Space Station or EXPRESS Rack System was developed to provide Space Station accommodations for subrack payloads. The EXPRESS Rack accepts Space Shuttle middeck locker type payloads and International Subrack Interface Standard (ISIS) Drawer payloads, allowing previously flown payloads an opportunity to transition to the International Space Station. The EXPRESS Rack provides power, data command and control, video, water cooling, air cooling, vacuum exhaust, and Nitrogen supply to payloads. The EXPRESS Rack system also includes transportation racks to transport payloads to and from the Space Station, Suitcase Simulators to allow a payload developer to verify data interfaces at the development site, Functional Checkout Units to allow payload checkout at KSC prior to launch, and trainer racks for the astronauts to learn how to operate the EXPRESS Racks prior to flight. Standard hardware and software interfaces provided by the EXPRESS Rack simplify the integration processes, and facilitate simpler ISS payload development. Whereas most ISS Payload facilities are designed to accommodate one specific type of science, the EXPRESS Rack is designed to accommodate multi-discipline research within the same rack allowing for the independent operation of each subrack payload. On-orbit operations began with the EXPRESS Rack Project on April 24, 2001, with one rack operating continuously to support long-running payloads. The other on-orbit EXPRESS Racks operate based on payload need and resource availability. Sustaining Engineering and Logistics and Maintenance functions are in place to maintain operations and to provide software upgrades.

Sledd, Annette↗

Air Traffic Control Response to Delays: A System Study of Newark International Airport

Airport delays are a significant problem in the United States air transportation system. Between 1999 and 2000 the number of flights delayed increased by 20 percent despite only a 0.4% increase in total operations. Newark International Airport (EWR), one of New York City's primary airports, is one of the airports in the United States most impacted by delays. Newark had the highest percentage of operations delayed in 1999, and was second only to LaGuardia Airport in 2000. Nearly 85% of delays at Newark are caused by adverse weather impacting an airport that may be characterized as having limited capacity and a very full schedule. Although Newark is heavily impacted by weather, delays have not increased significantly since 1998. This indicates that the airlines, air traffic control (ATC), and the Port Authority of New York and New Jersey have successfully adapted. On June 29, 2000, a research team from MIT visited Newark airport to assess the effectiveness of any adaptations made, and to collect data on airline and ATC departure operations, and of the national and local weather affecting the airport. Airline and ATC personnel were also interviewed. Results of this study indicate that airspace capacity limitations downstream of the airport are a primary flow constraint at the airport, and that these constraints are the source of most surface delays. A number of tactical ATC responses to delays were examined, including the application of restrictions, re-routing with the help of the National Playbook, and the use of decision-aiding tools such as the Dynamic Spacing Program (DSP) and the Integrated Terminal Weather System (ITWS). Improved interfacility communications and further utilization of runway 11-29 were identified as other tactical responses to delays, whilst the formation of the Air Traffic Control System Command Center and the New York Airspace redesign were identified as thekey strategic ATC responses to delays. Particularly the New York airspace redesign has great potential to reduce delays at the airport. Because delays at Newark are caused by downstream flow constraints, the responses at the airport can be applied to other airports as delays from downstream constraints increase. Such an increase in delays system wide from downstream constraints is inevitable as the system becomes more congested.

Evans, Antony D.↗

Corpus-Based Optimization of Language Models Derived from Unification Grammars

We describe a technique which makes it feasible to improve the performance of a language model derived from a manually constructed unification grammar, using low-quality untranscribed speech data and a minimum of human annotation. The method is on a medium-vocabulary spoken language command and control task.

Rayner, Manny↗

Autonomous Sciencecraft Experiment (ASE) Operations on EO-1 in 2004

The Autonomous Sciencecraft Experiment (ASE) has been selected for flight demonstration by NASAs New Millennium Program (NMP) as part of the Space Technology 6 (ST6) mission. NASA has identified the development of an autonomously operating spacecraft as a necessity for an expanded program of missions exploring the Solar System. The versatile ASE spacecraft command and control software, image formation software, and science processing software will be uploaded to the Earth Observer 1 (EO-1) spacecraft in early 2004 to detect surface modification related to volcanism, ice formation and retreat, and flooding.

Davies, A. G.↗

The Case for Deep Space Telecommunications Relay Stations

Each future mission to Jupiter and beyond must carry the traditional suite of telecommunications systems for command and control and for mission data transmission to earth. The telecommunications hardware includes the large antenna and the high-power transmitters that enable the communications link. Yet future spacecraft will be scaled down from the hallmark missions of Galileo and Cassini to Jupiter and Saturn, respectively. This implies that a higher percentage of the spacecraft weight and power must be dedicated to telecommunications system. The following analysis quantifies this impact to future missions and then explores the merits of an alternative approach using deep space relay stations for the link back to earth. It will be demonstrated that a telecommunications relay satellite would reduce S/C telecommunications weight and power sufficiently to add one to two more instruments.

Chandler, Charles W.↗

James Webb Space Telescope: Supporting Multiple Ground System Transitions in One Year

Ideas, requirements, and concepts developed during the very early phases of the mission design often conflict with the reality of a situation once the prime contractors are awarded. This happened for the James Webb Space Telescope (JWST) as well. The high level requirement of a common real-time ground system for both the Integration and Test (I&T), as well as the Operation phase of the mission is meant to reduce the cost and time needed later in the mission development for re-certification of databases, command and control systems, scripts, display pages, etc. In the case of JWST, the early Phase A flight software development needed a real-time ground system and database prior to the spacecraft prime contractor being selected. To compound the situation, the very low level requirements for the real-time ground system were not well defined. These two situations caused the initial real-time ground system to be switched out for a system that was previously used by the Bight software development team. To meet the high-!evel requirement, a third ground system was selected based on the prime spacecraft contractor needs and JWST Project decisions. The JWST ground system team has responded to each of these changes successfully. The lessons learned from each transition have not only made each transition smoother, but have also resolved issues earlier in the mission development than what would normally occur.

Detter, Ryan↗

Identification of Communication and Coordination Issues in the US Air Traffic Control System

Today's air traffic control system is approaching the point of saturation, as evidenced by increasing delays across the National Airspace System (NAS). There exists an opportunity to enhance NAS efficiency and reduce delays by improving strategic communication throughout the ATC system. Although several measures have been taken to improve communication (e.g., Collaborative Decision Making tools), communication issues between ATC facilities remain. It is hypothesized that by identifying the key issues plaguing inter-facility strategic communication, steps can be taken to enhance these communications, and therefore ATC system efficiency. In this report, a series of site visits were performed at Boston and New York ATC facilities as well as at the Air Traffic Control System Command Center. The results from these site visits were used to determine the current communication and coordination structure of Traffic Management Coordinators, who hold a pivotal role in inter-facility communications. Several themes emerged from the study, including: ambiguity of organizational structure in the current ATC system, awkward coordination between ATC facilities, information flow issues, organizational culture issues, and negotiation behaviors used to cope with organizational culture issues.

Davison, Hayley J.↗

Mission simulation as an approach to develop requirements for automation in Advanced Life Support Systems

This paper examines mission simulation as an approach to develop requirements for automation and robotics for Advanced Life Support Systems (ALSS). The focus is on requirements and applications for command and control, control and monitoring, situation assessment and response, diagnosis and recovery, adaptive planning and scheduling, and other automation applications in addition to mechanized equipment and robotics applications to reduce the excessive human labor requirements to operate and maintain an ALSS. Based on principles of systems engineering, an approach is proposed to assess requirements for automation and robotics using mission simulation tools. First, the story of a simulated mission is defined in terms of processes with attendant types of resources needed, including options for use of automation and robotic systems. Next, systems dynamics models are used in simulation to reveal the implications for selected resource allocation schemes in terms of resources required to complete operational tasks. The simulations not only help establish ALSS design criteria, but also may offer guidance to ALSS research efforts by identifying gaps in knowledge about procedures and/or biophysical processes. Simulations of a planned one-year mission with 4 crewmembers in a Human Rated Test Facility are presented as an approach to evaluation of mission feasibility and definition of automation and robotics requirements.

NASA Discipline Number 61-10↗