Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “arrival time”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 883 records · Page 49

Considerations in the Integration of Small Aircraft Transportation System Higher Volume Operations (SATSHVO) in the National Airspace System (NAS)

The Small Aircraft Transportation System Higher Volume Operations (SATS HVO) concept holds the promise for increased efficiency and throughput at many of the nations under-used airports. This concept allows for concurrent operations at uncontrolled airports that under today s procedures are restricted to one arrival or one departure operation at a time, when current-day IFR separation standards are applied. To allow for concurrent operations, SATS HVO proposes several fundamental changes to today's system. These changes include: creation of dedicated airspace, development of new procedures and communications (phraseologies), and assignment of roles and responsibilities for pilots and controllers, among others. These changes would affect operations on the airborne side (pilot) as well as the groundside (controller and air traffic flow process). The focus of this paper is to discuss some of the issues and potential problems that have been considered in the development of the SATS HVO concept, in particular from the ground side perspective. Reasonable solutions to the issues raised here have been proposed by the SATS HVO team, and are discussed in this paper.

Lohr, Gary W.↗

Modal Filters for Infrared Interferometry

Modal filters in the approximately equal to 10-micrometer spectral range have been implemented as planar dielectric waveguides in infrared interferometric applications such as searching for Earth-like planets. When looking for a small, dim object ("Earth") in close proximity to a large, bright object ("Sun"), the interferometric technique uses beams from two telescopes combined with a 180 phase shift in order to cancel the light from a brighter object. The interferometer baseline can be adjusted so that, at the same time, the light from the dimmer object arrives at the combiner in phase. This light can be detected and its infrared (IR) optical spectra can be studied. The cancellation of light from the "Sun" to approximately equal to 10(exp 6) is required; this is not possible without special devices-modal filters- that equalize the wavefronts arriving from the two telescopes. Currently, modal filters in the approximately equal to 10-micrometer spectral range are implemented as single- mode fibers. Using semiconductor technology, single-mode waveguides for use as modal filters were fabricated. Two designs were implemented: one using an InGaAs waveguide layer matched to an InP substrate, and one using InAlAs matched to an InP substrate. Photon Design software was used to design the waveguides, with the main feature all designs being single-mode operation in the 10.5- to 17-micrometer spectral range. Preliminary results show that the filter's rejection ratio is 26 dB.

Ksendzov, Alexander↗

Low-Cost Propellant Launch From a Tethered Balloon

A document presents a concept for relatively inexpensive delivery of propellant to a large fuel depot in low orbit around the Earth, for use in rockets destined for higher orbits, the Moon, and for remote planets. The propellant is expected to be at least 85 percent of the mass needed in low Earth orbit to support the NASA Exploration Vision. The concept calls for the use of many small ( 10 ton) spin-stabilized, multistage, solid-fuel rockets to each deliver 250 kg of propellant. Each rocket would be winched up to a balloon tethered above most of the atmospheric mass (optimal altitude 26 2 km). There, the rocket would be aimed slightly above the horizon, spun, dropped, and fired at a time chosen so that the rocket would arrive in orbit near the depot. Small thrusters on the payload (powered, for example, by boil-off gases from cryogenic propellants that make up the payload) would precess the spinning rocket, using data from a low-cost inertial sensor to correct for small aerodynamic and solid rocket nozzle misalignment torques on the spinning rocket; would manage the angle of attack and the final orbit insertion burn; and would be fired on command from the depot in response to observations of the trajectory of the payload so as to make small corrections to bring the payload into a rendezvous orbit and despin it for capture by the depot. The system is low-cost because the small rockets can be mass-produced using the same techniques as those to produce automobiles and low-cost munitions, and one or more can be launched from a U.S. territory on the equator (Baker or Jarvis Islands in the mid-Pacific) to the fuel depot on each orbit (every 90 minutes, e.g., any multiple of 6,000 per year).

Wilcox, Brian↗

The OSIRIS-Rex Asteroid Sample Return: Mission Operations Design

The OSIRIS-REx mission employs a methodical, phased approach to ensure success in meeting the missions science requirements. OSIRIS-REx launches in September 2016, with a backup launch period occurring one year later. Sampling occurs in 2019. The departure burn from Bennu occurs in March 2021. On September 24, 2023, the SRC lands at the Utah Test and Training Range (UTTR). Stardust heritage procedures are followed to transport the SRC to Johnson Space Center, where the samples are removed and delivered to the OSIRIS-REx curation facility. After a six-month preliminary examination period the mission will produce a catalog of the returned sample, allowing the worldwide community to request samples for detailed analysis.Traveling and returning a sample from an Asteroid that has not been explored before requires unique operations consideration. The Design Reference Mission (DRM) ties together space craft, instrument and operations scenarios. The project implemented lessons learned from other small body missions: APLNEAR, JPLDAWN and ESARosetta. The key lesson learned was expected the unexpected and implement planning tools early in the lifecycle. In preparation to PDR, the project changed the asteroid arrival date, to arrive one year earlier and provided additional time margin. STK is used for Mission Design and STKScheduler for instrument coverage analysis.

Targeting Low-Energy Transfers to Low Lunar Orbit

A targeting scheme is presented to build trajectories from a specified Earth parking orbit to a specified low lunar orbit via a low-energy transfer and up to two maneuvers. The total transfer delta V (velocity) is characterized as a function of the Earth parking orbit inclination and the departure date for transfers to each given low lunar orbit. The transfer delta V (velocity) cost is characterized for transfers constructed to low lunar polar orbits with any longitude of ascending node and for transfers that arrive at the Moon at any given time during a month.

mission designs↗

Mars Double-Flyby Free Returns

A subset of Earth-originating Mars double-flyby ballistic trajectories is documented. The subset consists of those trajectories that, after the first Mars flyby, perform a half-revolution transfer with Mars before returning to Earth. This class of free returns is useful for both human and robotic Mars missions because of its low geocentric energy at departure and arrival, and because of its extended stay time in the vicinity of Mars. Ballistic opportunities are documented over Earth departure dates ranging from 2015 through 2100. The mission is viable over three or four consecutive Mars synodic periods and unavailable for the next four, with the pattern repeating approximately every 15 years. Over the remainder of the century, a minimum Earth departure hyperbolic excess speed of 3.16 km/s, a minimum Earth atmospheric entry speed of 11.47 km/s, and a minimum flight time of 904 days are observed. The algorithm used to construct these trajectories is presented along with several examples.

Jesick, Mark↗

Characterizing Deposits Emplaced by Cryovolcanic Plumes on Europa

In the absence of direct observations of Europa’s particle plumes, deposits left behind during eruptive events would provide the best evidence for recent geological activity, and would serve as indicators of the best places to search for ongoing activity on the icy moon. Here, we model the morphological and spectral signatures of europan plume deposits, utilizing constraints from recent Hubble Space Telescope observations as model inputs. We consider deposits emplaced by plumes that are 1 km to 300 km tall, and find that in the time between the Galileo Mission and the arrival of the Europa Clipper spacecraft, plumes that are < 7 km tall are most likely to emplace deposits that could be detected by spacecraft cameras. Deposits emplaced by larger plumes could be detected by cameras operating at visible wavelengths provided that their average particle size is sufficiently large, their porosity is high, and/or they are salt-rich. Conversely, deposits emplaced by large plumes could be easily detected by near-IR imagers regardless of porosity, or individual particle size or composition. If low-albedo deposits flanking lineated features on Europa are indeed cryoclastic mantlings, they were likely emplaced by plumes that were less than 4 km tall, and deposition could be ongoing today. Comparisons of the sizes and albedos of these deposits between the Galileo and Europa Clipper missions could shed light on the size and frequency of cryovolcanic eruptions on Europa.

Lynnae C Quick↗

Characterizing Deposits Emplaced by Cryovolcanic Plumes on Europa

In the absence of direct observations of Europa’s particle plumes, deposits left behind during eruptive events would provide the best evidence for recent geological activity, and would serve as indicators of the best places to search for ongoing activity on the icy moon. Here, we model the morphological and spectral signatures of europan plume deposits, utilizing constraints from recent Hubble Space Telescope observations as model inputs. We consider deposits emplaced by plumes that are 1 km to 300 km tall, and find that in the time between the Galileo Mission and the arrival of the Europa Clipper spacecraft, plumes that are <7 km tall are most likely to emplace deposits that could be detected by spacecraft cameras. Deposits emplaced by larger plumes could be detected by cameras operating at visible wavelengths provided that their average particle size is sufficiently large, their porosity is high, and/or they are salt-rich. Conversely, deposits emplaced by large plumes could be easily detected by near-IR imagers regardless of porosity, or individual particle size or composition. If low-albedo deposits flanking lineated features on Europa are indeed cryoclastic mantlings, they were likely emplaced by plumes that were <4 km tall, and deposition could be ongoing today. Comparisons of the sizes and albedos of these deposits between the Galileo and Europa Clipper missions could shed light on the size and frequency of cryovolcanic eruptions on Europa.

Lynnae C Quick↗

Micro-grid for Future Planetary Surface Needs

Under the current Artemis Program, the National Aeronautics and Space Administration (NASA) will send its next set of astronauts (first woman and next man) to the Moon by 2024 and establish a sustainable presence on the lunar surface by 2028. The challenge of creating a sustained lunar surface presence is significantly different than previous efforts. Lunar surface operations will require access to continuous and highly reliable power to support mission needs, such as to support ISRU operations. Adding to this challenge, the lunar surface operations are not going to be established over a single effort, rather the system and operations will evolve and grow over time (years). The first initial loads that arrive on the lunar surface will be integrated to their own dedicated power sources. As the lunar surface operations grow, so will the demand for power and at some point these individual loads will require more power than can be generated with any single power device. This power demand drives the need for inter-connecting the loads and power devices to share power between them, resulting in a micro-grid. One of the advantages of developing a lunar surface micro-grid is that allows lunar surface operations to resemble electrical utility operations on Earth; it allows power to be generated where it is convenient and allows power to be consumed where it is convenient, rather than negotiating between generation and consumption. The micro-grid concept also provides another benefit of affording the ability to increase overall system reliability by integrating dissimilar power generation and energy storage devices together, for example modifying the power generation strategy to include both solar arrays and nuclear. Creating a lunar surface micro-grid has its advantages, however there are significant challenges associated with an evolvable micro-grid concept. The challenges include how to efficiently transmit large amounts of power (10kW+) long distances (1kW+), how to effectively integrate dissimilar power generation and energy storage devices to maximize power consumption and minimize downtime, and how to physically connect these devices together with a connector that can survive the lunar environment (dust, extreme cold temperatures) and is capable of both astronaut and robotic operation. The basic components of the micro-grid have to be designed to ensure the system is sustainable, modular, and reconfigurable. An interface to the micro-grid has to be designed that allows for additional technologies, some of which may not yet be fully designed, to easily integrate into the micro-grid concept. This presentation discusses these lunar challenges in some more depth and offers a path forward in designing an evolvable micro-grid to meet the needs of the lunar surface operations and proposes a Universal Micro-grid Interface Converter to connect these dissimilar power sources and mission loads to the micro-grid.

Jeffrey Csank↗

Uncrewed Lunar Surface Operations and Support Activities

Sustained human presence on the surface of the Moon and future missions to Mars require increased independence from surface crews and Earth-based mission control to operate efficiently, safely, and reliably. The time for surface crews to perform tasks will be limited. Extravehicular activities by surface personnel are burdensome and time-consuming, even when a continuous human presence on the surface occurs. Identifying and balancing human/automation roles and tasks and infusing automation and autonomy practices early in a system’s lifecycle will be essential to achieve mission objectives. Among these objectives are attaining a sustained human presence, improving performance and mission effectiveness, reducing operations and maintenance (O&M) costs, and ensuring operations that are robust to communication delays. To achieve these objectives, an operational shift toward increased automation and autonomy with less reliance on humans is needed. Uncrewed lunar surface operations and support activities occur when surface crews are not present or are independent of surface crew timeline activities requiring no surface crew oversight or intervention. These uncrewed surface opportunities can also be planned to minimize crew workload that avoids routine maintenance and support tasks, thus maximizing crew exploration time. Uncrewed preparations such as staging and prepositioning equipment and materials before the crew arrives could improve crew task efficiency. Additional opportunities exist to conduct uncrewed science, exploration, and utilization. Uncrewed surface architecture functions can include science and exploration; habitation; launch and landing support; surface communication and navigation; surface power generation and distribution; human surface mobility; lifting, handling, manipulating; excavation, construction, and site preparation; logistics management; maintenance and repair; surface resource utilization; integrated site operations and shared support services (e.g., site scheduling/prioritization, dust mitigation/contamination control, and surface safety). Early robotic lunar surface campaigns will provide information on the availability of resources, such as oxygen and water, and demonstrate surface-based technologies. After the Artemis III human lunar return mission, a series of landers will deliver surface systems, cargo, supplies, science packages, spare parts, and commodities. A balance of crewed and uncrewed surface operations will enable a sustained lunar surface presence at the South Pole of the Moon at a site that will be known as the Artemis Base Camp (ABC). It is envisioned that base camp operations on and around the Moon will then help prepare for the mission durations and activities needed to support the first human mission to Mars. Before long-duration crew missions to the base camp can occur, the necessary surface infrastructure will be pre-deployed and verified operational. Surface assets will be teleoperated and remotely managed from Earth. Additionally, robotic and short-duration crewed missions to the ABC will ensure the site’s merit to achieve long-term science objectives, availability of usable resources, and that terrain, seasonal variations, and illumination conditions are acceptable. ABC will consist of different areas where specific functions and services are rendered, including: • Launch and Landing Area • Habitation Area • Power Production Area • Resource Areas Launch and Landing Area—The launch and landing area will support associated functions for the arrival and departure of vehicles, such as crewed landing and ascent and uncrewed cargo deliveries and offloading. It will evolve from an unimproved site at the beginning of the exploration campaign to a more sustainable landing and launch area that can support repeated arrivals and departures. Initial uncrewed Lunar Terrain Vehicle (LTV) surface operations may include emplacement of navigation beacons and communication equipment, real-time video and photography of landing/liftoff events, and element repositioning, such as portable utility power (PUP) (applicable for other landed assets at other areas). Site preparations, such as surface leveling, soil compaction, and berm/path construction, may be needed for a more sustainable launch and landing area capable of accommodating vehicles that are increasingly more reusable and reduce the effects of plume surface interactions and ejecta impacts on nearby surface assets. During the ABC missions, cargo and logistics will be delivered to the lunar surface via robotic cargo landers before the crew arrives. These shipments, which can arrive in pressurized logistics carriers, will deliver the logistics necessary to support a crewed mission and include items such as food, water, equipment spares, etc. Providing the capability to retrieve, offload, and transport the logistics closer to the ABC site before the arrival of the crew will increase the overall efficiency of crew operations once they arrive. In the sustained phase of exploration, other supporting services may be needed, such as lander propellant servicing, surface power services, commodity refreshes, and additional inspection, maintenance, and repair capabilities, to sustain a cadence of extended personnel stays and cargo arrivals and departures. Habitation Area—Uncrewed support to surface habitation could involve supporting activation and pre-entry operations of the habitat while the crew is in orbit at the Gateway outpost preparing for a surface landing. Surface Habitat (SH) uncrewed operations may include bringing the cabin environment to a habitable temperature and air mix and activating other critical crew support systems. Potential crop production uncrewed tasks in the SH could also include autonomous watering and tending. Additionally, when the crew departs, the SH enters dormancy for the long period of uncrewed operation. A logistical staging area could also be collocated near the SH. If so, staging operations for crew supplies, waste re-location, and recycling operations may be opportunities for uncrewed operations. Power Production Area—The Fission Surface Power (FSP) element and its supporting distribution equipment provide power to surface elements as needed across the ABC to supplement day-to-day operations and survive lunar nights. Uncrewed support of this power system includes any initial LTV-assisted deployments of cables and other distributed equipment, associated electrical connections, and system testing and activation operations. Robotically performing some inspections, maintenance, or repair tasks on the power distribution equipment could reduce the surface crew workload. Resource Area— Uncrewed resource prospecting, mapping, and characterizing possible resource sites is likely to be time-consuming and represents an opportunity for uncrewed operations between crewed missions. Uncrewed mobile equipment operations will be needed in the extreme environments of permanently shadowed locations where resource extractions occur. As In-Situ Resource Utilization (ISRU) pilot plant operations begin, uncrewed surface support activities with available mobile and portable assets (LTV, PUP, etc.) will better support these operations. Any produced commodities can be stored at a centralized storage location for future use. Also associated with these operations is the use of mobile robotic excavators for resource acquisition and robotic/autonomous regolith processing. The waste tailings generated during excavation and regolith processing would also need to be transported and deposited at a dedicated location. Surface assets will continue operating between crew visits to maintain surface capabilities, conduct lunar surface science, technology demonstrations, and public outreach opportunities. Additionally, certain sustaining tasks that would consume valuable crew time could be performed before crew arrival, or after their departure. This capability may offer more affordable options to construct, activate, test, and maintain a broad set of surface assets. Telerobotically operated human surface mobility systems, such as the LTV and Pressurized Rover (PR), can be utilized for various tasks. Surface environmental conditions pose a distinct challenge for all these activities. Surface illumination and localized shadows are one such factor. Night-survival operations could consist of thermal management, battery pre-charging, and load shedding. Some surface systems may hibernate through the night and then awake and continue nominal operations. Uncrewed mobile assets may use a more adaptive approach to optimize their power and operations; one method is to follow the sunlight. Night-survival operations may be initiated remotely by teleoperation, automated, or accomplished by supervised autonomous operation. The ability to pre-deploy and control remote assets in orbit or on Mars before the arrival of the mission crew is a key capability that can be simulated on the moon. The base camp provides a venue where these advanced operational concepts, technologies, and autonomous methods and techniques, including the incorporation of time delays to simulate Earth-Mars latency can be replicated to help buy down future Mars mission risks. This paper will examine the evolution of uncrewed lunar surface operations and support activities. It will also discuss the lunar surface environmental conditions (thermal, lighting, terrain, topography, communications) along with the challenges they pose on uncrewed surface operations, and the performance of these activities with limited to minimal human interaction and/or teleoperation. Since lunar missions include Mars mission analogs, such investigation provides the framework for future uncrewed Mars mission support.

Mark E Lewis↗

Simulation studies of time-control procedures for the advanced air traffic control system

The problem of mixing aircraft equipped with time-controlled guidance systems and unequipped aircraft in the terminal area has been investigated via a real-time air traffic control simulation. These four-dimensional (4D) guidance systems can predict and control the touchdown time of an aircraft to an accuracy of a few seconds throughout the descent. The objectives of this investigation were to (1) develop scheduling algorithms and operational procedures for various traffic mixes that ranged from 25% to 75% 4D-equipped aircraft; (2) examine the effect of time errors at 120 n. mi. from touchdown on touchdown time scheduling of the various mix conditions; and (3) develop efficient algorithms and procedures to null the initial time errors prior to reaching the final control sector, 30 n. mi. from touchdown. Results indicate substantial reduction in controller workload and an increase in orderliness when more than 25% of the aircraft are equipped with 4D guidance systems; initial random errors of up to + or - 2 min can be handled via a single speed advisory issued in the arrival control sector, thus avoiding disruption of the time schedule.

Tobias, L.↗

Tactical Conflict Detection in Terminal Airspace

Air traffic systems have long relied on automated short-term conflict prediction algorithms to warn controllers of impending conflicts (losses of separation). The complexity of terminal airspace has proven difficult for such systems as it often leads to excessive false alerts. Thus, the legacy system, called Conflict Alert, which provides short-term alerts in both en-route and terminal airspace currently, is often inhibited or degraded in areas where frequent false alerts occur, even though the alerts are provided only when an aircraft is in dangerous proximity of other aircraft. This research investigates how a minimal level of flight intent information may be used to improve short-term conflict detection in terminal airspace such that it can be used by the controller to maintain legal aircraft separation. The flight intent information includes a site-specific nominal arrival route and inferred altitude clearances in addition to the flight plan that includes the RNAV (Area Navigation) departure route. A new tactical conflict detection algorithm is proposed, which uses a single analytic trajectory, determined by the flight intent and the current state information of the aircraft, and includes a complex set of current, dynamic separation standards for terminal airspace to define losses of separation. The new algorithm is compared with an algorithm that imitates a known en-route algorithm and another that imitates Conflict Alert by analysis of false-alert rate and alert lead time with recent real-world data of arrival and departure operations and a large set of operational error cases from Dallas/Fort Worth TRACON (Terminal Radar Approach Control). The new algorithm yielded a false-alert rate of two per hour and an average alert lead time of 38 seconds.

Tang, Huabin↗

Interval Management Display Design Study

In 2012, the Federal Aviation Administration (FAA) estimated that U.S. commercial air carriers moved 736.7 million passengers over 822.3 billion revenue-passenger miles. The FAA also forecasts, in that same report, an average annual increase in passenger traffic of 2.2 percent per year for the next 20 years, which approximates to one-and-a-half times the number of today's aircraft operations and passengers by the year 2033. If airspace capacity and throughput remain unchanged, then flight delays will increase, particularly at those airports already operating near or at capacity. Therefore it is critical to create new and improved technologies, communications, and procedures to be used by air traffic controllers and pilots. National Aeronautics and Space Administration (NASA), the FAA, and the aviation industry are working together to improve the efficiency of the National Airspace System and the cost to operate in it in several ways, one of which is through the creation of the Next Generation Air Transportation System (NextGen). NextGen is intended to provide airspace users with more precise information about traffic, routing, and weather, as well as improve the control mechanisms within the air traffic system. NASA's Air Traffic Management Technology Demonstration-1 (ATD-1) Project is designed to contribute to the goals of NextGen, and accomplishes this by integrating three NASA technologies to enable fuel-efficient arrival operations into high-density airports. The three NASA technologies and procedures combined in the ATD-1 concept are advanced arrival scheduling, controller decision support tools, and aircraft avionics to enable multiple time deconflicted and fuel efficient arrival streams in high-density terminal airspace.

Baxley, Brian T.↗

Impact vaporization: Late time phenomena from experiments

While simple airflow produced by the outward movement of the ejecta curtain can be scaled to large dimensions, the interaction between an impact-vaporized component and the ejecta curtain is more complicated. The goal of these experiments was to examine such interaction in a real system involving crater growth, ejection of material, two phased mixtures of gas and dust, and strong pressure gradients. The results will be complemented by theoretical studies at laboratory scales in order to separate the various parameters for planetary scale processes. These experiments prompt, however, the following conclusions that may have relevance at broader scales. First, under near vacuum or low atmospheric pressures, an expanding vapor cloud scours the surrounding surface in advance of arriving ejecta. Second, the effect of early-time vaporization is relatively unimportant at late-times. Third, the overpressure created within the crater cavity by significant vaporization results in increased cratering efficiency and larger aspect ratios.

Schultz, P. H.↗

IFR Operations at Non-Towered, Non-Radar Airports: Can we do Better Than One-at-a-Time?

This paper describes a new concept for operations in non-radar terminal airspace around small, nontowered airports. Currently, air traffic operations in instrument meteorological conditions (IMC) at airfields without control towers and radar service are severely constrained by what is known as the one-in/one-out paradigm. Under these conditions only one operation (either arrival or departure) is allowed to occur at a time. Since these operations can take over 15 minutes to complete, capacity at these airports is severely restricted in IMC. The proposed concept is an attempt to break this current paradigm by applying emerging airborne and ground-based technologies to enable simultaneous operations by multiple aircraft in nonradar terminal airspace around small non-towered airports in IMC. The general philosophy underlying this concept of operations is the establishment of a newly defined area surrounding these airports called a Self-Controlled Area (SCA). Aircraft operating within the SCA are required to have a specified minimum level of equipage. Within the SCA, pilots are responsible for separating themselves from other similarly equipped aircraft through the use of new onboard systems and procedures. This concept also takes advantage of newly developed automation at the airport, which provides appropriate sequencing information to the pilots for safe and improved operations. Such operations would enhance the opportunity for point-to-point air taxi or charter operations into smaller airfields that are closer to a traveler s origin and destination. A description of this concept of operations and a simulation environment used for evaluation is provided in this paper.

Jones, K.↗

Characteristics of wave-particle interactions during sudden commencements. II - Spacecraft observations

Wave data from the DE 1 spacecraft for 50 sudden commencements were analyzed for amplitude and spectral modifications and correlated with data from ground-based observatories. Changes in wave activity were identified in 14 of the events studied. The changes, which were commonly observed at frequencies below the local electron gyrofrequency, exhibited a complex structure both in frequency and in time and varied considerably among events. The typical event lasted 1-10 min with a maximum narrowband amplitude increase or decrease of 10-30 dB. The onset time of the wave growth was correlated with the arrival of the magnetic disturbance at the spacecraft. Changes were most commonly observed at L shells in the range of L values between 3 and 6. Growth was observed on the nightside as well as the dayside, and no clear local time dependence was found. In several cases, growth at frequencies above the local gyrofrequency was noted and identified as auroral kilometric radiation.

Gail, W. B.↗

Experiment Description and Results for Arrival Operations Using Interval Management with Spacing to Parallel Dependent Runways (IMSPiDR)

The predicted increase in the number of commercial aircraft operations creates a need for improved operational efficiency. Two areas believed to offer increases in aircraft efficiency are optimized profile descents and dependent parallel runway operations. Using Flight deck Interval Management (FIM) software and procedures during these operations, flight crews can achieve by the runway threshold an interval assigned by air traffic control (ATC) behind the preceding aircraft that maximizes runway throughput while minimizing additional fuel consumption and pilot workload. This document describes an experiment where 24 pilots flew arrivals into the Dallas Fort-Worth terminal environment using one of three simulators at NASA?s Langley Research Center. Results indicate that pilots delivered their aircraft to the runway threshold within +/- 3.5 seconds of their assigned time interval, and reported low workload levels. In general, pilots found the FIM concept, procedures, speeds, and interface acceptable. Analysis of the time error and FIM speed changes as a function of arrival stream position suggest the spacing algorithm generates stable behavior while in the presence of continuous (wind) or impulse (offset) error. Concerns reported included multiple speed changes within a short time period, and an airspeed increase followed shortly by an airspeed decrease.

Baxley, Brian T.↗

Computer assisted thermal-vacuum testing

In testing complex systems and components under dynamic thermal-vacuum environments, it is desirable to optimize the environment control sequence in order to reduce test duration and cost. This paper describes an approach where a computer is utilized as part of the test control operation. Real time test data is made available to the computer through time-sharing terminals at appropriate time intervals. A mathematical model of the test article and environmental control equipment is then operated on using the real time data to yield current thermal status, temperature analysis, trend prediction and recommended thermal control setting changes to arrive at the required thermal condition. The data acquisition interface and the time-sharing hook-up to an IBM-370 computer is described along with a typical control program and data demonstrating its use.

Petrie, W.↗