W-4 W88 Systems Engineering Summer 2023 Project [Slides]

The purpose is to create a simple, streamlined process to produce reports on out of tolerance conditions with CMM data. The methods are to develop the code or process within MATLAB to import the data (import tool can be used) and to develop the code to be able to plot the data of interest. The end states are to use MATLAB to analyze CMM data from the PA and document the process for a user with some knowledge of MATLAB and an engineering background.

42 ENGINEERING↗

Commercial Off-the-Shelf Flexible Contact Stress Sensor System: Design Thinking and Systems Engineering Assignment

NNSA has a need to measure the contact stress over long-term durations with minimal impact on the element of interest. The sensor and package should have a small footprint, thin, flexible, modular, and preferably commercially available. There exists an opportunity to leverage expertise within LLNL in sensor development to provide a minimally invasive contact stress sensing solution for NNSA and potentially external customers.

42 ENGINEERING↗

CFD and systems engineering to minimize membrane-based carbon capture costs

In this study, we propose a superstructure for membrane-based carbon capture, addressing these challenges through the formulation of an optimization problem. The case study considers a flue gas with a flowrate of 1000 mol/s and a 30 % CO2 (molar basis), which is representative of steel plants. Reduced models, derived from rigorous CFD simulations of membrane modules, are utilized to enhance the efficiency of the optimization process. The reduced model includes specific input variables such as inlet flow rate, retentate and permeate pressures, and inlet CO2 concentration; while the CO2 recovery and purity in the permeate side are considered as output variables. In this way, we exploit the information from the CFD simulations in the superstructure, aiding in the selection of the optimal configuration for the multi-stage membrane process. The results underscore the efficiency of a multi-stage membrane design, showing capture costs around 45 $/t-CO2.

Pedrozo, Hector A.↗

Process systems engineering enables efficient and sustainable membrane-based critical material separations

This presentation summarizes work completed over the past year for PrOMMiS Task 2.1. The first half of the preseation motivates the need to develop sustainable critical mineral separation technology, and how PSE is particularly well-suited to tackle this problem. The second half of the presentation presents preliminary results for the custom cost model for diafiltration (2.1) using the superstructure flowsheet developed by Carnegie Mellon University. The presentation serves to emphasize the multi-disciplinary and collaborate nature of developing a circular economy of critical minerals and materials.

Dougher, Molly↗

SOLID STATE HYDRIDE SYSTEM ENGINEERING

A typical hydrogen refueling station was designed based on DOE targets and existing gasoline filling station operations. The purpose of this design was to determine typical heat loads, how these heat loads will be handled, and approximate equipment sizes. For the station model, two DOE targets that had the most impact on the design were vehicle driving range and refueling time. The target that hydrogen fueled vehicles should have the equivalent driving range as present automobiles, requires 5 kg hydrogen storage. Assuming refueling occurs when the tank is 80% empty yields a refueling quantity of 4 kg. The DOE target for 2010 of a refueling time of 3 minutes was used in this design. There is additional time needed for payment of the fuel, and connecting and disconnecting hoses and grounds. It was assumed that this could be accomplished in 5 minutes. Using 8 minutes for each vehicle refueling gives a maximum hourly refueling rate of 7.5 cars per hour per fueling point.

02 PETROLEUM↗