Status of the ATF Damping Ring BPM Upgrade Project

A substantial upgrade of the beam position monitors (BPM) at the ATF (Accelerator Test Facility) damping ring is currently in progress. Implementing digital read-out signal processing techniques in line with an optimized, low-noise analog downconverter, a resolution well below 1 mum could be demonstrated at 20 (of 96) upgraded BPM stations. The narrowband, high resolution BPM mode permits investigation of all types of non-linearities, imperfections and other obstacles in the machine which may limit the very low target aimed vertical beam emittance of < 2 pm. The technical status of the project, first beam measurements and an outlook to it's finalization are presented.

43 PARTICLE ACCELERATORS↗

Status Update: Uranyl Nitrate Calibration Loop Equipment (UNCLE) at ORNL

The successful completion of a field trial of safeguards monitoring equipment at a natural uranium conversion plant (NUCP) demonstrated the need for a facility in which to perform full-scale equipment testing under controlled conditions prior to field deployment of safeguards systems at additional plants. Oak Ridge National Laboratory has developed a Uranyl Nitrate Calibration Loop Equipment (UNCLE) facility to simulate the full-scale operating conditions for a purified uranium-bearing aqueous stream exiting the solvent extraction process conducted in an NUCP. In addition to calibrating instruments such as the neutron detector developed at Los Alamos National Laboratory, UNCLE will be used to test other in-line instruments (mass and volumetric flowmeters, spectrophotometers, etc.). UNCLE will be able to test commercially available equipment, such as the Endress+Hauser Promass 83F Coriolis meter that was used in the field test and other equipment that is presently under development. UNCLE is designed to accommodate different pipe sizes, flow rates, solution concentrations, and other variables of interest. Construction is expected to be completed by the end of September 2008 with initial testing beginning later that year. The design and current status of UNCLE will be presented, along with the capabilities of the facility and the proposed test plans.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Status of the LBNE Neutrino Beamline

The Long Baseline Neutrino Experiment (LBNE) will utilize a neutrino beamline facility located at Fermilab to carry out a compelling research program in neutrino physics. The facility will aim a beam of neutrinos toward a detector placed at the Homestake Mine in South Dakota. The neutrinos are produced in a three-step process. First, protons from the Main Injector (60-120 GeV) hit a solid target and produce mesons. Then, the charged mesons are focused by a set of focusing horns into the decay pipe, towards the far detector. Finally, the mesons that enter the decay pipe decay into neutrinos. The parameters of the facility were determined taking into account several factors including the physics goals, the Monte Carlo modeling of the facility, spacial and radiological constraints and the experience gained by operating the NuMI facility at Fermilab. The initial beam power is expected to be {approx}700 kW, however some of the parameters were chosen to be able to deal with a beam power of 2.3 MW. We discuss here the status of the conceptual design and the associated challenges.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

R&D Status for In-Situ Plasma Surface Cleaning of SRF Cavities at Spallation Neutron Source

The SNS SCL is reliably operating at 0.93 GeV output energy with an energy reserve of 10MeV with high availability. Most of the cavities exhibit field emission, which directly or indirectly (through heating of end groups) limits the gradients achievable in the high beta cavities in normal operation with the beam. One of the field emission sources would be surface contaminations during surface processing for which mild surface cleaning, if any, will help in reducing field emission. An R&D effort is in progress to develop in-situ surface processing for the cryomodules in the tunnel without disassembly. As the first attempt, in-situ plasma processing has been applied to the CM12 in the SNS SRF facility after the repair work with a promising result. This paper will report the R&D status of plasma processing in the SNS.

43 PARTICLE ACCELERATORS↗

Status of the ATF2 Lattices

The current status for the ATF2 Nominal and Ultra-low {beta}* lattices are presented in this paper. New lattice designs have been obtained in order to minimise the impact of the last interpretation of multipole measurements that have been included into the model. However, the new ATF2 Ultra-low design is not able to recover the expected vertical beam size at the IP with the current magnet distribution. Therefore, different quadrupole sorting have been studied. A significant gain is evident for the ATF2 Ultra-low lattice when sorting the magnets according to the skew-sextupolar components. The ATF2 Nominal lattice is also expected to benefit from the new sorting. Tuning results of the new ATF2 Ultra-low lattice under realistic imperfections are also reported.

43 PARTICLE ACCELERATORS↗

Status of Studies of Achromat-based 6D Ionization Cooling Rings for Muons

Six dimensional ionization cooling of muons is needed to achieve the necessary luminosity for a muon collider. If that cooling could occur over multiple turns in a closed ring, there would be significant cost savings over a single-pass cooling channel. We report on the status of a cooling ring with achromatic arcs. The achromatic design permits the design to easily switch between a closed ring and a snaking geometry on injection or extraction from the ring. The ring is designed with sufficient space in each superperiod for injection and extraction magnets. We describe the ring's lattice design, performance, and injection/extraction requirements.

43 PARTICLE ACCELERATORS↗

STATUS OF THE ORBIT CODE: RECENT DEVELOPMENTS AND PLANS

We report on recent enhancements to the physics modules of the ORBIT Code and on progress toward a new implementation of ORBIT using python. We have developed the capability to track particles through general three dimensional electromagnetic field configurations. This facility has proved essential in modeling beam transport through the complicated magnetic field regions of the SNS injection chicane and injection dump line, where beam losses are high. We have also enhanced the acceleration module to provide more flexibility for synchrotron calculations and we have developed alternative multiple Coulomb and Rutherford scattering models for the stripper foil and collimation routines. Finally, progress continues on the migration of the ORBIT physics models to a python user environment. We present the status of this work.

43 PARTICLE ACCELERATORS↗

Final Focus Test Facility ATF2 Status

ATF2 is a final-focus test beam line which aims to focus the low emittance beam from the ATF damping ring to a vertical size of about 37 nm and to demonstrate nanometre level beam stability. Several advanced beam diagnostics and feedback tools are used. In December 2008, construction and installation were completed and beam commissioning started, supported by an international team of Asian, European and American scientists. In this paper, the present status and performance of the recently deployed ATF2 systems are briefly described, based on the first experience with beam measurements and tuning during winter, spring and early autumn of 2009. The near and longer term plans are outlined as well. The ATF collaboration has completed the construction of ATF2 and has started its commissioning. Important experience operating the new cavity BPM and BSM instrumentation in real conditions has been gained and first beam measurements have been performed in a magnetic configuration with reduced optical demagnification. Both horizontal and vertical emittances were successfully tuned and measured in the extraction line, with values approaching the design values of 2 nm and 12 pm, respectively. First checks of the first order optics along the beam line and at the IP were also done. Hardware developments for the second ATF2 goal are being pursued in parallel with the present commissioning work for the first goal. The collaboration is also preparing several near and long terms plans for ATF2. In the next few years, information very valuable for any future collider with local chromaticity correction and tuning of very low emittance beams can be expected. In the previous experience at the FFTB, the smallest vertical beam sizes which were achieved were about 70 nanometers. The work described here continues to address this largely unexplored regime in a systematic way.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

LCG Persistency Framework (CORAL, COOL, POOL): Status and Outlook

The Persistency Framework consists of three software packages (CORAL, COOL and POOL) addressing the data access requirements of the LHC experiments in different areas. It is the result of the collaboration between the CERN IT Department and the three experiments (ATLAS, CMS and LHCb) that use this software to access their data. POOL is a hybrid technology store for C++ objects, metadata catalogs and collections. CORAL is a relational database abstraction layer with an SQL-free API. COOL provides specific software tools and components for the handling of conditions data. This paper reports on the status and outlook of the project and reviews in detail the usage of each package in the three experiments.

99 GENERAL AND MISCELLANEOUS↗

IEEE Smart Grid Series of Standards IEEE 2030 (Interoperability) and IEEE 1547 (Interconnection) Status: Preprint

The IEEE American National Standards smart grid publications and standards development projects IEEE 2030, which addresses smart grid interoperability, and IEEE 1547TM, which addresses distributed resources interconnection with the grid, have made substantial progress since 2009. The IEEE 2030TM and 1547 standards series focus on systems-level aspects and cover many of the technical integrationissues involved in a mature smart grid. The status and highlights of these two IEEE series of standards, which are sponsored by IEEE Standards Coordinating Committee 21 (SCC21), are provided in this paper.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Fuel Cell Technology Status - Voltage Degradation (Presentation)

This presentation describes an independent assessment of fuel cell durability status and discusses the project's relevance to the Department of Energy Hydrogen and Fuel Cells Program; NREL's analysis approach; the FY12 technical accomplishments including the fourth annual publication of results; and project collaborations and future work.

08 HYDROGEN↗

Ceramic-based fuel technologies: scope and status

This presentation is an overview of the approach, status and path forward for ongoing tasks under the ceramic fuel development part of the program. Experimental work is focused on fundamental studies employing depleted urania-based compositions and mixed oxide (MOX) and minor actinide-bearing MOX. Contributions are included from researchers at LANL, ORNL and BNL. The audience for this presentation consists of the various participants in the FCRD program. Those participants include representatives from: DOE-NE, other national laboratories, DOE funded university researchers, DOE funded industry teams, FCRD funded advisors, and occasionally NRC.

36 MATERIALS SCIENCE↗

US/UK Loan Account Project Status PMOD477

The viewgraphs describe the status of PMOD477 for LANL. The meeting will occur at DOE-HQ with NA-11 and Military Applications personnel in attendance. Serves to repatriate material with a balance to zero by December 2012. Phase 1 -- Establish formality of operations for War Reserve (WR): Complete surrogate taskings to A90 through a Materials Channel and perform US/UK lessons learned; Complete the US/UK agreed Quality Acceptance Plan, Materials Plan, Shipping procedure, and establish the formal UK/US point of contacts. Phase 2 -- Metal Manufacture (WR): Process material and store material as electrorefined metal (ER) rings, with initial assay and isotopic analysis, prior to manufacturing. Material is cast into accepted configuration and appropriate acceptance document for each aliquot will be generated. Phase 3 -- Intermediate Material Manufacture, Packaging and Shipping (WR): Continue processing of the material in accepted configuration with appropriate acceptance documentation for each aliquot. Provide an initial tasking of the material owed to UK including appropriate quality acceptance documentation. Phase 4 -- Complete Tasking (WR). Phase 5 -- Residue Processing (Non-WR): Complete processing of residue material and waste into accepted configuration with appropriate acceptance document for disposal.

CONFIGURATION↗

Status of the Short-Pulse X-ray Project at the Advanced Photon Source

The Advanced Photon Source Upgrade (APS-U) Project at Argonne will include generation of short-pulse x-rays based on Zholents deflecting cavity scheme. We have chosen superconducting (SC) cavities in order to have a continuous train of crabbed bunches and flexibility of operating modes. In collaboration with Jefferson Laboratory, we are prototyping and testing a number of single-cell deflecting cavities and associated auxiliary systems with promising initial results. In collaboration with Lawrence Berkeley National Laboratory, we are working to develop state-of-the-art timing, synchronization, and differential rf phase stability systems that are required for SPX. Collaboration with Advanced Computations Department at Stanford Linear Accelerator Center is looking into simulations of complex, multi-cavity geometries with lower- and higher-order modes waveguide dampers using ACE3P. This contribution provides the current R&D status of the SPX project.

43 PARTICLE ACCELERATORS↗

Status of Proof-of-principle Experiment for Coherent Electron Cooling

Coherent electron cooling (CEC) has a potential to significantly boost luminosity of high-energy, high-intensity hadron colliders. To verify the concept we conduct proof-of-the-principle experiment at RHIC. In this paper, we describe the current experimental setup to be installed into 2 o&#x27;clock RHIC interaction regions. We present current design, status of equipment acquisition and estimates for the expected beam parameters.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Status of proof-of-principle experiment for coherent electron cooling

Coherent electron cooling (CEC) has a potential to significantly boost luminosity of high-energy, high-intensity hadron colliders. To verify the concept we conduct proof-of-the-principle experiment at RHIC. In this paper, we describe the current experimental setup to be installed into 2 o'clock RHIC interaction regions. We present current design, status of equipment acquisition and estimates for the expected beam parameters. We use a dogleg to merge the electron and ion beams. The ions 'imprint' their distribution into the electron beam via a space charge density modulation. The modulation is amplified in an FEL comprised of a 7-m long helical wiggler. The ions are co-propagating with electron beam through the FEL. The ion's average velocity is matched to the group velocity of the wave-packet of e-beam density modulation in the FEL. A three-pole wiggler at the exit of the FEL tune the phase of the wave-packet so the ion with the central energy experience the maximum of the e-beam density modulation, where electric field is zero. The time-of-flight dependence on ion's provides for the electrical field caused by the density modulation to reduce energy spread of the ion beam. The used electron beam is bent off the ion path and damped.

43 PARTICLE ACCELERATORS↗

Status of the Design of the LBNE Neutrino Beamline

The Long Baseline Neutrino Experiment (LBNE) will utilize a neutrino beamline facility located at Fermilab to carry out a compelling research program in neutrino physics. The facility will aim a beam of neutrinos toward a detector placed at the Homestake Mine in South Dakota, about 1300 km away. The neutrinos are produced as follows: First, protons extracted from the MI-10 section of the Main Injector (60-120 GeV) hit a solid target above grade and produce mesons. Then, the charged mesons are focused by a set of focusing horns into a 200 m long decay pipe, towards the far detector. Finally, the mesons that enter the decay pipe decay into neutrinos. The parameters of the facility were determined taking into account several factors including the physics goals, the modelling of the facility, spacial and radiological constraints and the experience gained by operating the NuMI facility at Fermilab. The initial beam power is expected to be {approx}700 kW, however some of the parameters were chosen to be able to deal with a beam power of 2.3 MW in order to enable the facility to run with an upgraded accelerator complex. We discuss here the status of the design and the associated challenges.

43 PARTICLE ACCELERATORS↗