Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Space Launch System”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 883 records · Page 49

Analysis of Launch Vehicle Liftoff Debris: Historical Perspective from Space Shuttle and Application to Artemis I

Human exploration-class launch vehicles are inherently prone to debris due to the extreme environments generated during pre-launch operations, liftoff, and flight. The use of cryogenic propellants often requires thermal protection system (TPS) coatings, typically foam, to maintain the propellant conditions in the tank and prevent an accumulation ice on the external surface of the vehicle. Some ice growth is to be expected at umbilical interfaces, vents, flanges, or brackets where it is difficult to apply TPS. This ice may come loose at any time due to wind on the launch pad, structural vibration and acoustics after rocket ignition, or aerodynamic forces during flight. This phenomena is especially apparent on vehicles with no TPS, such as the Saturn V rockets used in the Apollo Program, see Figure 1. During propellant tanking, the thermal contraction of the underlying substrate may generate cracks in the TPS (Figure 1). Chunks of TPS can release due to the expansion of ingested gas from cryopumping or from aerodynamic forces if the crack creates an offset surface. Most foams will also have a certain amount of “popcorning” where small pieces of foam will pop off during flight because of the differential between the static surface pressure and the pressure of the gas trapped in the foam cell structure. There are a number of other coating or closeout materials that may be shed from the vehicle and become debris. During pre-launch operations and liftoff, the vehicle may also be exposed to debris originating from the launch pad or ground support equipment. This debris is separate from foreign object debris, or FOD, which is not intended to be present and is strictly controlled through operations and maintenance procedures. In this case, debris is generated from hardware and materials that are necessary for launch and are subject to the intense vibration, acoustics, and direct plume impingement of the launch environment. Examples include ice from umbilicals, tape and tie wraps that protect cables, and rust or corrosion from the launch platform. While NASA has historically been aware of debris as a potential issue that could cause a failure resulting in loss of mission, loss of vehicle, or loss of crew, the likelihood and severity of that risk was not always well understood or given sufficient weight in program and flight decisions. After the Space Shuttle Columbia accident (STS-107), the investigation found that foam TPS debris shed from the external tank was the proximate cause of the damage to the orbiter wing. Six previous observations of debris released from the foam ramp that covered the bipod connecting the forward end of the orbiter to the external tank resulted in minor changes or were determined to be accepted flight risks. Two occurrences of bipod ramp foam loss were not identified until the STS-107 investigation. Despite the damage inflicted by these debris strikes, the Shuttle Program Requirements Control Board deemed the vehicle safe to fly. During the Return to Flight effort following the Columbia disaster, NASA Engineering developed a process for the assessment of debris transport, impact, and damage tolerance to support independent assessments of risk by NASA Safety and Mission Assurance (S&MA). Under this system, each element (vehicle or ground system) defines a catalog of all expected debris based on launch history, component testing, or analysis. Debris transport analysis (DTA) is conducted using the debris catalog characteristics and potential flow transport mechanisms (e.g., vehicle aerodynamics, gravity, wind, plume-driven). The predicted debris impact locations and velocities are provided to the hardware owners, who use available test data and analysis to determine whether each component can withstand the impacts. In cases where the element hardware may be severely damaged or fail, the options are to mitigate the debris source through some change in design or operation, or to work with S&MA to try to characterize the probability of the impact and damage for program risk acceptance. Because of the differences in debris characteristics and transport, the DTA has been divided between the Liftoff and Ascent regimes. The development and application of Liftoff DTA methodology from the Shuttle Program to the current Artemis Program is the subject of this paper. Liftoff DTA covers the time from the start of pre-launch operations at the launch pad, up until the vehicle clears the launch tower and there is no longer any interaction with ground systems. Debris transport during this period is broadly classified as either gravity, wind, and plume-entrained (GWPE) or plume driven (PD). GWPE debris is generally lower speed, travelling in a forward-to-aft direction. PD transport includes flow features from the rocket ignition transient, as well as plume impingement and recirculation that occur as the vehicle lifts off the launch platform. In these cases, the debris typically moves in an aft-to-forward direction at higher speeds. The applicable transport mechanisms must be considered for each piece of debris depending on the material, and release location and time. For example, rust or metallic debris from the tower could fall (GWPE) and impact the vehicle before landing on the launch platform deck where it could be also be transported by plume impingement (PD). However, falling ice (GWPE) from an umbilical is unlikely to survive impact with the vehicle or launch platform and be available for PD transport. Modeling of debris transport is accomplished using a set of DTA tools which simulate debris trajectories subject to a reference frame acceleration (i.e., gravity) and aerodynamic drag. Where the trajectory encounters a solid surface, the debris is allowed to rebound with a specified coefficient of restitution. The drag is calculated by interpolating the fluid state at each point in the debris trajectory from high-fidelity computational fluid dynamics (CFD) simulations of the launch vehicle and pad. The CFD data may either be static (steady state or time averaged), typically for GWPE transport, or dynamic (time-accurate) for PD flow features like the ignition transient. Examples of the CFD flow field solutions for the Space Launch System (SLS) rocket and launch pad are shown in Figure 2. Typical SLS debris trajectory predictions from DTA are illustrated in Figure 3. The final version of this paper will include a more detailed examination of the Liftoff DTA process developed during the Shuttle Program, and how it has been augmented and applied to the SLS rocket under the Artemis Program. Comparisons with debris observations from the Artemis I launch will demonstrate validation of the tools and methodology.

Debris↗

Internal Electrostatic Discharge Testing of Inert Solid Rocket Motor Materials

Jupiter’s moon Europa is believed to have a global liquid-water ocean beneath its icy surface. As such, it is a highly interesting destination for explorers seeking signs of life outside of Earth. This interest has given rise to the Europa Lander Mission [Hand, et al., 2017]. The central goal of the Europa Lander Mission is to place a stationary lander on Europa and make surface and sub-surface measurements, dramatically improving understanding of this Jovian moon, and potentially detecting signs of life.Placing a lander on Europa will require multiple spacecraft elements deployed across a multi-year mission timeline. Some of the key elements include: a large payload capacity rocket, such as the Space Launch System (SLS), capable of providing direct Jupiter orbit insertion; a solar-powered carrier; a de-orbit system; a sky crane landing system; and, of course, the surface lander. A noteworthy fact is that the current design requires a large solid rocket motor to provide the necessary braking thrust for the de-orbit stage. While solid rocket motors have been used extensively by NASA during launch, in-space use has been limited. In addition to the normal challenges associated with a long-distance planetary mission, the Europa Lander Mission must also contend with the high-radiation environment associated with the Jovian system. The size of Jupiter, combined with its magnetic field strength, and rotation speed, result in a harsh radiation environment composed of high energy charged particles (ions and electrons) as well as high-temperature plasmas [de Soria-Santacruz Pich, 2016]. Due to this high-radiation environment, each component of the Europa Lander spacecraft must be evaluated to determine its radiation dose tolerance and its likelihood for experiencing electrostatic charging (and discharging). In general, metal components in a Jovian environment do not pose a concern for radiation degradation; in fact, metal structures and closeouts can act as radiation shielding for the more sensitive components. Charging of a metal component is only an issue if the component is not properly grounded to the spacecraft chassis. However, electrically insulating materials, such as polymers, are subject to radiation degradation as well as surface and internal charging, and therefore require extra scrutiny. The focus of this paper will be on the insulating materials that are commonly used inside solid rocket motors. The special application of a solid rocket motor used in space after a relatively long duration flight, combined with the high energy electron environment in the Jovian system, raises concerns about the possibility of significant charging and discharging leading to reduced performance.

Schneider, Todd A.↗

Cold Gas Reaction Control System for the Near Earth Asteroid Scout CubeSat

This paper describes the Attitude Control System (ACS) for the Near Earth Asteroid (NEA) Scout cubesat with particular focus on the Reaction Control System (RCS). NEA Scout is a 6-Unit cubesat with an 86-square-meter solar sail. NEA Scout will launch on Space Launch System (SLS) Exploration Mission 1 (EM-1), currently scheduled to launch in 2019. The spacecraft will rendezvous with an asteroid after a two year journey, and will conduct science imagery. The ACS consists of three major actuating subsystems: a Reaction Wheel (RW) control system, a Reaction Control System (RCS), and an Active Mass Translator (AMT) system. The three subsystems allow for a wide range of spacecraft attitude control capabilities, needed for the different phases of the NEA-Scout mission. The RCS performs a number of critical functions during NEA Scout’s mission. These requirements are described and the performance for achieving these requirements is shown. Moreover, NEA Scout employs a solar sail for long-duration propulsion. Solar sails are large, flexible structures that typically have low bending-mode frequencies. This paper demonstrates a robust performance while avoiding excitation of the sail’s structural modes.

Stiltner, Brandon C.↗

Building the RS-25 Engine for NASA’s Next Generation of Exploration.

NASA is aggressively pursuing a human lunar return to the Moon with the Artemis Program. The Space Launch System (SLS) is critical to the transportation architecture, providing both crew and cargo capability. To accelerate SLS development, NASA settled on space shuttle heritage propulsion technologies. Early missions will use repurposed RS-25 engines from the Shuttle Program adapted to SLS requirements. For future missions, however, NASA and engine contractor Aerojet Rocketdyne are restarting RS-25 production with a goal of using the latest manufacturing technologies to produce an RS-25 variant that will cost at least 30 percent less than the shuttle-era engines developed and flown for almost 30 years. The prospect of restarting the production line on these engines after many years and modifying the engine to reduce cost and better match the needs of the SLS vehicle presented unique challenges and opportunities for NASA and Aerojet Rocketdyne. NASA and AR are now deep into the process of adapting 16 RS-25 engines for the first four SLS Artemis flights and building the first RS-25 “Restart” engines for future Artemis missions. In addition to navigating programmatic, technical, and logistical challenges with the current RS-25 production work, NASA and AR have partnered to pursue new methods of building this engine through advanced manufacturing techniques to further reduce the cost and schedule required to build each RS-25 engine to contribute to the long-term affordability of the SLS vehicle. This presentation will discuss the goals for the restart program, the challenges, and results to date.

Jessica Jean Wood↗

Artemis Innovative Assembly and Integration Operations of the Launch Abort Systemat KSC

This paper describes the Artemis program assembly and integration approach that enables affordable and low risk processing operations for the Launch Abort System at KSC. NASA is currently developing the Artemis 1 spacecraft to meet the test objectives of an uncrewed orbital mission to the moon and return to earth in 2021. The Artemis Orion spacecraft consists of a Crew Module (CM), a Service Module (SM), and a Launch Abort System (LAS) to safely transport a crew of 4 to the moon and return to earth. The LAS enables the CM to have an abort capability for the crew during the launch phase of the mission from the launch pad throughout the ascent phase. The LAS includes motor elements for abort, attitude control, and stage separation is assembled at the Launch Abort System Facility (LASF) adjacent to the CM/SM (CSM) assembly operations in the Neil Armstrong Operations and Checkout Building (O&C) at KSC. The LAS integration to the CSM is completed in the LASF and the completed Artemis spacecraft is integrated to the Space Launch System (SLS) in the Vehicle Assembly Building (VAB) at KSC. A significant LAS development flight test milestone was recently completed in 2019 for the Ascent Abort (AA-2) flight test at Cape Canaveral Air Force Station where a high-altitude abort test was successfully achieved using a Peacekeeper booster stage exercising all of the LAS systems including propulsion, avionics, and pyrotechnics demonstrating he LAS readiness for crewed flight. The first operational flight of the LAS will be for the Artemis 2 mission which is the first crewed mission for the Orion program planned in 2023.

William J Koenig↗

Aerocapture Trajectory Design for Uranus Orbiter

Introduction: The recently released National Academies Planetary Science and Astrobiology Decadal Survey 2023-2032 [1] identified the Ice Giants as the top priority science destination. While the survey acknowledged the potential for either a Uranus Orbiter and Probe (UOP) mission or a Neptune-Triton Odyssey mission, it ultimately identified the former as the highest priority new flagship mission. UOP missions calls for a launch window of opportunity between 2031-2038 with 12-15 year interplanetary cruise time along with a fully-propulsive Uranus Orbit Insertion burn on the order of a few km/s. However, a mission to Uranus with the same science payload could utilize aerocapture for orbit insertion to achieve both a significant reduction in the interplanetary cruise time and reduction in propulsive burn costs. Why Aerocapture: Aerocapture is a promising propellant and time-saving orbital insertion technique for planetary destinations with an atmosphere. Although not flight-proven, previous aerocapture systems studies in the literature have demonstrated both the validity and robustness of the technique at various planetary destinations. With respect to the Ice Giant planets, Neptune has seen more of the analysis in the literature. For science missions at Neptune, aerocapture can enable 1.4 times more delivered mass to orbit than an all-propulsive mission for the same launch vehicle while reducing interplanetary cruise times by more than 3 years [2] Additionally with modern guidance and control, Neptune aerocapture with blunt-body aeroshells is realizable [3][4]. There are limited papers in the literature investigating Uranus aerocapture with those available providing a preliminary feasibility assessment [5]. Consequently, the two-year funded NASA Space Technology Mission Directorate (STMD)-funded project, titled Aerocapture System as an Enabling Technology for Ice Giants Missions, aims to mature the analysis and technology state of Uranus aerocapture. Trajectory Design: This paper presents the current state of the trajectory design in support of the new aerocapture project. The project design philosophy is inspired from recent Neptune aerocapture studies, which employed modern guidance and control, in the sense that blunt-body aeroshells are analyzed. An assessment of the theoretical flight path angle corridor width is conducted for a range of ballistic coefficients and lift-to-drag ratios for both Space Launch System and Falcon Heavy Launch Vehicle interplanetary trajectory solutions. The results from the corridor width assessment provide an assessment of the aerocapture design-space and qualitative metrics on trajectory design considerations. The Program to Optimize Simulated Trajectories II (POST2) is utilized to run Monte Carlo simulations of Uranus aerocapture three-degree-of-freedom bank angle modulated trajectories using a closed-loop numerical-predictor corrector guidance algorithm. UranusGRAM 2021 is utilized as the atmospheric model [6]. A Uranus-developed aerodatabase, originally derived from Mars Science Laboratory (MSL), is utilized to provide vehicle aerodynamics over a wide range of hypersonic flow regimes. A MSL-derived 70 deg 4.5m diameter sphere-cone aeroshell that houses the UOP payload mass is assumed. Robustness testing and performance analysis is conducted, including the assessment of entry state errors, atmosphere density variations, and aerodynamic dispersions. Post-aerocapture Delta-V and aerothermal statistics are formulated into propellant mass and TPS requirements. The results presented in the paper will demonstrate the trajectory viability of Uranus aerocapture. Preliminary Results: Preliminary trajectory design results indicates successful Uranus aerocapture with a blunt-body aeroshell housing the same payload mass as the UOP mission from an Earth-to-Uranus interplanetary trajectory arriving in less than 7 years. From this interplanetary trajectory, aerocapture provides an orbit insertion Delta-V capability of 6.9 km/s requiring less than 300 m/s for post-aerocapture correction burns (15% of wet mass allocated to propellant). To put this into perspective, the UOP study utilized an Earth-to-Uranus trajectory that arrives in 13 years and requires more than 1000 m/s for fully-propulsive orbit insertion (40% of wet mass allocated to propellant). Achieving the same 6.9 km/s Delta-V capability fully-propulsively is mass prohibitive (97% of wet mass allocated to propellant). Nevertheless, aerocapture has the potential to reduce interplanetary transit times to Uranus by half while delivering the same payload mass to orbit in a reduced propellant mass footprint.

Rohan Deshmukh↗

Near-Field Separation Analysis of SLS Block-1 and Block-1B Secondary Payloads

The NASA Space Launch System (SLS) Program Block-1 and Block-1B missions are expected to carry a number of CubeSat secondary payloads (SPL) to space, where they will be ejected from internal SLS structures to begin their own missions. This near-field ejection process must be closely evaluated to ensure that no SPL contacts the SLS structures, as contacts could result in SPL component damage, mission loss, or aberrant SPL trajectories. To this end, multiple SPL ejection events were analyzed for both Block-1 and Block-1B mission configurations using CLVTOPS, a NASA Marshall Space Flight Center (MSFC) developed multi-body dynamics, proximity analysis, and visualization toolchain. This paper details the SPL-to-SLS clearance assessment process, with a focus on simulation setup and results as well as SPL design requirement analysis. Relevant CLVTOPS, statistics, and mission backgrounds are covered; important constraints, difficulties, and assumptions are also documented. Furthermore, the importance of SPL housing geometry on near-field vehicle clearance is highlighted, and examples are shown.

Jared Rucker↗

Evolvable Mars Campaign Long Duration Habitation Strategies: Architectural Approaches to Enable Human Exploration Missions

The Evolvable Mars Campaign (EMC) is the current NASA Mars mission planning effort which seeks to establish sustainable, realistic strategies to enable crewed Mars missions in the mid-2030s timeframe. The primary outcome of the Evolvable Mars Campaign is not to produce "The Plan" for sending humans to Mars, but instead its intent is to inform the Human Exploration and Operations Mission Directorate near-term key decisions and investment priorities to prepare for those types of missions. The FY'15 EMC effort focused upon analysis of integrated mission architectures to identify technically appealing transportation strategies, logistics build-up strategies, and vehicle designs for reaching and exploring Mars moons and Mars surface. As part of the development of this campaign, long duration habitats are required which are capable of supporting crew with limited resupply and crew abort during the Mars transit, Mars moons, and Mars surface segments of EMC missions. In particular, the EMC design team sought to design a single, affordable habitation system whose manufactured units could be outfitted uniquely for each of these missions and reused for multiple crewed missions. This habitat system must provide all of the functionality to safely support 4 crew for long durations while meeting mass and volume constraints for each of the mission segments set by the chosen transportation architecture and propulsion technologies. This paper describes several proposed long-duration habitation strategies to enable the Evolvable Mars Campaign through improvements in mass, cost, and reusability, and presents results of analysis to compare the options and identify promising solutions. The concepts investigated include several monolithic concepts: monolithic clean sheet designs, and concepts which leverage the co-manifested payload capability of NASA's Space Launch System (SLS) to deliver habitable elements within the Universal Payload Adaptor between the SLS upper stage and the Orion/Service module on the top of the vehicle. Multiple modular habitat options for Mars surface and in-space missions are also considered with various functionality and volume splits between modules to find the best balance of reducing the single largest mass which must be delivered to a destination and reducing the number of separate elements which must be launched. Analysis results presented for each of these concepts in this paper include mass/volume/power sizing using parametric sizing tools, identification of unique operational constraints, and limited comments on the additional impacts of reusability/dormancy on system design. Finally, recommendations will be made for promising solutions which will be carried forward for consideration in the Evolvable Mars Campaign work.

Simon, Matthew A.↗

Our Human Journey to Mars - The Next Steps

The United States National Aeronautics and Space Administration (NASA) will be launching the super-heavy-lift Space Launch System (SLS) by the end of the decade. This launch marks the next steps of human exploration of Mars and continues the journey that began over 50 years ago with Mariner and most recently ExoMars. SLS is the only rocket with the power capable of sending humans to deep space and the large systems necessary for human exploration all the way to Mars. Exploration Mission (EM)-1 will be the first integrated flight of the SLS rocket and Orion spacecraft - journeying farther into space than Apollo. NASA will also expand the science and exploration capability of SLS by deploying thirteen small satellites into deep space for the first time. These small satellites, created through partnerships with small businesses, Universities and international partners, will carry out various scientific missions to better understand our universe and the challenges of living and working in deep space. SLS EM-1 will provide the framework and serve as a test flight, not only for vehicle systems, but also for payload accommodations, ground processing and on-orbit operations. The results of this mission will validate capabilities for sending explorers to Mars and create the opportunity to pioneer solutions to challenges to deep space exploration. SLS's versatile design will evolve for future exploration needs and accommodate bigger payloads, such as large aperture telescopes for scientific research or manned human deep space exploration missions to Mars. The achievement of EM-1 will demonstrate NASA's commitment and capability to extend human existence to deep space and inspire the world to pursue greatness in the exploration of our universe.

Singer, Jody↗

Scale Model Acoustic Test Overview

Launch environments, such as liftoff acoustic (LOA) and ignition overpressure (IOP), are important design factors for any vehicle and are dependent upon the design of both the vehicle and the ground systems. LOA environments are used directly in the development of vehicle vibro-acoustic environments and IOP is used in the loads assessment. The Scale Model Acoustic Test (SMAT) program was implemented to verify the Space Launch Systems LOA and IOP environments for the vehicle and ground systems including the Mobile Launcher (ML) and tower. The SMAT is currently in the design and fabrication phase. The SMAT program is described in this presentation.

Counter, Douglas D.↗

A Combined Solar Electric and Storable Chemical Propulsion Vehicle for Piloted Mars Missions

The Mars Design Reference Architecture (DRA) 5.0 explored a piloted Mars mission in the 2030 timeframe, focusing on architecture and technology choices. The DRA 5.0 focused on nuclear thermal and cryogenic chemical propulsion system options for the mission. Follow-on work explored both nuclear and solar electric options. One enticing option that was found in a NASA Collaborative Modeling for Parametric Assessment of Space Systems (COMPASS) design study used a combination of a 1-MW-class solar electric propulsion (SEP) system combined with storable chemical systems derived from the planned Orion crew vehicle. It was found that by using each propulsion system at the appropriate phase of the mission, the entire SEP stage and habitat could be placed into orbit with just two planned Space Launch System (SLS) heavy lift launch vehicles assuming the crew would meet up at the Earth-Moon (E-M) L2 point on a separate heavy-lift launch. These appropriate phases use high-thrust chemical propulsion only in gravity wells when the vehicle is piloted and solar electric propulsion for every other phase. Thus the SEP system performs the spiral of the unmanned vehicle from low Earth orbit (LEO) to E-M L2 where the vehicle meets up with the multi-purpose crew vehicle. From here SEP is used to place the vehicle on a trajectory to Mars. With SEP providing a large portion of the required capture and departure changes in velocity (delta V) at Mars, the delta V provided by the chemical propulsion is reduced by a factor of five from what would be needed with chemical propulsion alone at Mars. This trajectory also allows the SEP and habitat vehicle to arrive in the highly elliptic 1-sol parking orbit compatible with envisioned Mars landing concepts. This paper explores mission options using between SEP and chemical propulsion, the design of the SEP system including the solar array and electric propulsion systems, and packaging in the SLS shroud. Design trades of stay time, power level, specific impulse and propellant type are discussed.

Mercer, Carolyn R.↗

A Combined Solar Electric and Storable Chemical Propulsion Vehicle for Piloted Mars Missions

The Mars Design Reference Architecture (DRA) 5.0 explored a piloted Mars mission in the 2030 timeframe, focusing on architecture and technology choices. The DRA 5.0 focused on nuclear thermal and cryogenic chemical propulsion system options for the mission. Follow-on work explored both nuclear and solar electric options. One enticing option that was found in a NASA Collaborative Modeling for Parametric Assessment of Space Systems (COMPASS) design study used a combination of a 1-MW-class solar electric propulsion (SEP) system combined with storable chemical systems derived from the planned Orion crew vehicle. It was found that by using each propulsion system at the appropriate phase of the mission, the entire SEP stage and habitat could be placed into orbit with just two planned Space Launch System (SLS) heavy lift launch vehicles assuming the crew would meet up at the Earth-Moon (E-M) L2 point on a separate heavy-lift launch. These appropriate phases use high-thrust chemical propulsion only in gravity wells when the vehicle is piloted and solar electric propulsion for every other phase. Thus the SEP system performs the spiral of the unmanned vehicle from low Earth orbit (LEO) to E-M L2 where the vehicle meets up with the multi-purpose crew vehicle. From here SEP is used to place the vehicle on a trajectory to Mars. With SEP providing a large portion of the required capture and departure changes in velocity (delta V) at Mars, the delta V provided by the chemical propulsion is reduced by a factor of five from what would be needed with chemical propulsion alone at Mars. This trajectory also allows the SEP and habitat vehicle to arrive in the highly elliptic 1-sol parking orbit compatible with envisioned Mars landing concepts. This paper explores mission options using between SEP and chemical propulsion, the design of the SEP system including the solar array and electric propulsion systems, and packaging in the SLS shroud. Design trades of stay time, power level, specific impulse and propellant type are discussed.

Mercer, Carolyn R.↗

Environmental Control Systems for Exploration Missions One and Two

In preparing for Exploration Missions One and Two (EM-1 & EM-2), the Ground Systems Development and Operations Program has significant updates to be made to nearly all facilities. This is all being done to accommodate the Space Launch System, which will be the world’s largest rocket in history upon fruition. Facilitating the launch of such a rocket requires an updated Vehicle Assembly Building, an upgraded Launchpad, Payload Processing Facility, and more. In this project, Environmental Control Systems across several facilities were involved, though there is a focus around the Mobile Launcher and Launchpad. Parts were ordered, analysis models were updated, design drawings were updated, and more.

EM-2↗

NEA Scout Thermal Control

The Near-Earth Asteroid Scout (NEA Scout) is a 6U CubeSat that will fly to a near earth asteroid using a solar sail. The mission is a joint project between NASA’s Marshall Space Flight Center and the Jet Propulsion Laboratory. The CubeSat will be deployed as a secondary payload during the Space Launch System (SLS) Exploration Mission 1 (EM-1). The CubeSat will use an 85 sq m (915 sq ft) aluminized polyimide solar sail for deep space propulsion. A multispectral camera will be used to characterize a small asteroid (<300 feet in diameter). The primary thermal architecture is a passive design with heaters to keep temperatures above the minimum allowable. Thermal vacuum testing was done on subsystems where possible. However for some long lead subsystems thermal vacuum testing will not be done until the final assembly.

Stewart, Elijah↗

Telecommunication System Design for Interplanetary CubeSat Missions: LunaH-Map

The Lunar Hydrogen Mapper (Luna H-Map) will be one of 13 CubeSats to launch on the first integrated flight of NASA’s Space Launch System and Orion spacecraft in 2018. The goal of the LunaH-Map mission is to map the hydrogen content of the entire South Pole of the moon, including permanently shadowed regions at high resolution. The spacecraft is a 6 U CubeSat and the main instrument is a neutron spectrometer which will be used to perform the measurements required to accomplish the primary science objective. Once LunaH-Map reaches the Moon, the spacecraft will perform a 60 - day science mission, consisting of 141 science orbits during which the measurements will be taken. In the design of the LunaH-Map spacecraft, one of the main challenges is the elecommunication system as the spacecraft needs the ability to relay data during the long cruise phase and during the science phase. In addition, the telecommunication system needs to support the main navigation functions required to reach the Moon and to insert in the highly elliptical orbit required for the science phase. This paper covers the main aspects of the telecommunication design for the mission including: link and coverage analysis, waveform selection and spectral constraints, hardware selection and ground station coordination.

Babuscia, Alessandra↗

Insulation Reformulation Development

The current Space Launch System (SLS) internal solid rocket motor insulation, polybenzimidazole acrylonitrile butadiene rubber (PBI-NBR), is a new insulation that replaced asbestos-based insulations found in Space Shuttle heritage solid rocket boosters. PBI-NBR has some outstanding characteristics such as an excellent thermal erosion resistance, low thermal conductivity, and low density. PBI-NBR also has some significant challenges associated with its use: Air entrainment/entrapment during manufacture and lay-up/cure and low mechanical properties such as tensile strength, modulus, and fracture toughness. This technology development attempted to overcome these challenges by testing various reformulated versions of booster insulation. The results suggest the SLS program should continue to investigate material alternatives for potential block upgrades or use an entirely new, more advanced booster. The experimental design was composed of a logic path that performs iterative formulation and testing in order to maximize the effort. A lab mixing baseline was developed and documented for the Rubber Laboratory in Bldg. 4602/Room 1178.

Chapman, Cynthia↗

Application of Fault Management Theory to the Quantitative Selection of a Launch Vehicle Abort Trigger Suite

The theory of System Health Management (SHM) and of its operational subset Fault Management (FM) states that FM is implemented as a "meta" control loop, known as an FM Control Loop (FMCL). The FMCL detects that all or part of a system is now failed, or in the future will fail (that is, cannot be controlled within acceptable limits to achieve its objectives), and takes a control action (a response) to return the system to a controllable state. In terms of control theory, the effectiveness of each FMCL is estimated based on its ability to correctly estimate the system state, and on the speed of its response to the current or impending failure effects. This paper describes how this theory has been successfully applied on the National Aeronautics and Space Administration's (NASA) Space Launch System (SLS) Program to quantitatively estimate the effectiveness of proposed abort triggers so as to select the most effective suite to protect the astronauts from catastrophic failure of the SLS. The premise behind this process is to be able to quantitatively provide the value versus risk trade‐off for any given abort trigger, allowing decision makers to make more informed decisions. All current and planned crewed launch vehicles have some form of vehicle health management system integrated with an emergency launch abort system to ensure crew safety. While the design can vary, the underlying principle is the same: detect imminent catastrophic vehicle failure, initiate launch abort, and extract the crew to safety. Abort triggers are the detection mechanisms that identify that a catastrophic launch vehicle failure is occurring or is imminent and cause the initiation of a notification to the crew vehicle that the escape system must be activated. While ensuring that the abort triggers provide this function, designers must also ensure that the abort triggers do not signal that a catastrophic failure is imminent when in fact the launch vehicle can successfully achieve orbit. That is, the abort triggers must have low false negative rates to be sure that real crew‐threatening failures are detected, and also low false positive rates to ensure that the crew does not abort from non‐crew‐threatening launch vehicle behaviors. The analysis process described in this paper is a compilation of over six years of lessons learned and refinements from experiences developing abort triggers for NASA's Constellation Program (Ares I Project) and the SLS Program, as well as the simultaneous development of SHM/FM theory. The paper will describe the abort analysis concepts and process, developed in conjunction with SLS Safety and Mission Assurance (S&MA) to define a common set of mission phase, failure scenario, and Loss of Mission Environment (LOME) combinations upon which the SLS Loss of Mission (LOM) Probabilistic Risk Assessment (PRA) models are built. This abort analysis also requires strong coordination with the Multi‐Purpose Crew Vehicle (MPCV) and SLS Structures and Environments (STE) to formulate a series of abortability tables that encapsulate explosion dynamics over the ascent mission phase. The design and assessment of abort conditions and triggers to estimate their Loss of Crew (LOC) Benefits also requires in‐depth integration with other groups, including Avionics, Guidance, Navigation and Control(GN&C), the Crew Office, Mission Operations, and Ground Systems. The outputs of this analysis are a critical input to SLS S&MA's LOC PRA models. The process described here may well be the first full quantitative application of SHM/FM theory to the selection of a sensor suite for any aerospace system.

Lo, Yunnhon↗

SLS Evolution: Comparing Configurations Using System Exergy

A human mission to the moon and Mars is the stated space exploration goal of the United States and the international community. To achieve these goals, NASA is developing the Space Launch System (SLS) and the Orion crew capsule as key elements in the architecture for missions to the moon and Mars. SLS will continue to evolve, adding capability that will further aid the missions to the moon and Mars. This paper examines the various configurations of SLS using energy analysis.

Terry Hawes↗