Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Simulation of distributed computing systems”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

869 records · Page 49

Advancing Aerosol Chemical Characterization and Vertical Profiling over the Southern Great Plains Using Uncrewed Aerial Sampling and Offline Aerosol Mass Spectrometry

Recent advancements in uncrewed aerial systems (UASs) and particulate matter (PM) analytical techniques have provided opportunities for atmospheric research. In this study, we deployed the Department of Energy’s fixed-wing ArcticShark UAS to examine PM 2.5 composition at varying altitudes─within and above the planetary boundary layer (PBL)─over the Southern Great Plains atmospheric observatory (SGP). A total of 22 flights were conducted across March, June, and August 2023. Composite filter samples were collected during each flight and analyzed with offline aerosol mass spectrometry (AMS), complemented by on-board real-time sensors and ground-based instrumentation, to provide a comprehensive view of regional aerosol characteristics. Results show clear vertical and seasonal differences in the aerosol composition. Relative to ground-level measurements, aloft samples exhibited shifts in the distribution of organic and inorganic PM, with the organic composition varying distinctly across seasons. Particulate organic nitrogen (ON) was elevated, with bulk compositions similar in March and June but strongly altered in August, likely driven by biomass burning and enhanced photochemical activity. Combined AMS and chemical ionization mass spectrometry analyses detected amines, amides, and amino acids. PM above the planetary boundary layer was enriched in oxidized organic aerosols, while ground-level PM contained higher nitrate and sulfate. Seasonal differences in aqueous-phase processing were also observed, which were strongest in March during persistent cloud cover and weaker in the drier August period, suggesting a shift from aqueous- to gas-phase SOA formation. In conclusion, these findings highlight the value of UAS in advancing PM measurements and vertical profiling of aerosol composition.

54 ENVIRONMENTAL SCIENCES↗

Collaborative Research: Advancing Arctic Climate Projection Capability at Seasonal to Decadal Scales (Final Technical Report)

The Regional Arctic System Model (RASM) at process resolving configurations has been used to (i) advance understanding of physical processes and feedbacks involved in Arctic amplification and (ii) understand and potentially reduce uncertainty in prediction of arctic climate change at seasonal to decadal scales. RASM consists the atmosphere (Weather and Research Forecasting model, WRF), ocean (Parallel Ocean Program, POP), sea ice (CICE), land hydrology (Variable Infiltration Capacity model, VIC), river routing scheme (RVIC), marine biogeochemistry components and the coupling framework (CPL7). Its domain is pan-Arctic, with the atmosphere and land components configured on a 50-km or 25-km grid and four configurations of the ocean and sea ice components: 1/12°(~9.3km) or 1/48°(~2.4km) and 45 or 60 vertical layers. These RASM configurations have been motivated by the emerging exascale capability for high performance computing to improve model fidelity. The dynamical downscaling of reanalysis allows comparison of RASM results with observations in place and time to: (i) advance system level understanding of physical processes and coupling involved in an event, (ii) optimize model parameter space, (iii) diagnose and reduce model biases and (iv) produce realistic and consistent across all the components initial conditions for predictions and predictability studies, which are all unique capabilities not available in global Earth System Models (ESMs). An evaluation of RASM 1.0 (Cassano et al. 2017) revealed that it had a cold bias over the oceans and a warm bias over land areas due largely to cloud and radiation biases in the model, with too little cloud cover simulated over land and too much cloud cover simulated over sub-polar oceans. This study has motivated an upgrade to WRF version 3.7.1 in RASM and allowed for the inclusion of the radiative impact of convective clouds. A variety of atmospheric physics parameterizations were evaluated against observations (e.g. data from the Arctic Clouds in Summer Experiment (ACSE); Sedlar et al. 2020) to identify an optimal suite of WRF physics options in RASM. The RASM with the optimized WRF physics were used to study the impact of strong mesoscale winds over the ocean around the southern tip of Greenland (DuVivier and Cassano 2016) and their impact on oceanic convection (DuVivier et al. 2017a). Data from the PolarWinds field campaign were used to evaluate WRF boundary layer physics and resolution impacts on the simulation of a Greenland barrier wind event (DuVivier et al. 2017b). The RVIC streamflow routing model has been implemented in RASM to realistically represent high-resolution streamflow processes (Hamman et al. 2017) and to couple the land buoyancy fluxes to the ocean. The RASM-RVIC high-resolution data set of all coastal freshwater fluxes for the Arctic drainage basin and surrounding areas for 1979-2014 was published as a separate product (https://doi.org/10.5281/zenodo.293037). The fidelity of atmospheric momentum transfer to and the response of polar marine Ekman layer in RASM and Community Earth System Model (CESM) was investigated by Roberts et al. (2015). The increased frequency of oceanic flux exchange in CESM, following the RASM guidance, caused a considerable increase in the median inertial ice speed across the Southern Ocean and parts of the Arctic. A comprehensive evaluation of the RASM1.0 atmosphere-ocean-sea ice-land interface was completed by Brunke et al. (2018). RASM was also demonstrated for its capability to simulate extreme events in agreement with observations in space and time (Lee et al. submitted). In particular, the development of three open water events, known as polynyas, have been simulated north of Greenland in February of 2011, 2017 and 2018, in agreement with satellite observations for the past four decades. The optimized RASM sea ice results have been favorably evaluated against satellite observations and a subset of eleven CMIP6 models (Watts et al. submitted). In a complementary project, Jin et al. (2018) have shown that RASM with higher-resolution and new sea-ice processes contributed to lower model errors in sea-ice conditions, concentrations of nutrients and ice algae, in comparison to results from the coarse-resolution (1°) CESM. In two other complementary studies, RASM results were used (i) to explain areas of concentrated use by bowhead whales, the seasonal progression in the use, and the physical environment within those areas (Citta et al. 2015) and (ii) for a synthesis of fall bowhead whales distribution and migration in the Bering-Chukchi-Beaufort (BCB) Sea to investigate whale movements and feeding to the local ocean hydrography and currents (Citta et al. 2018). However, the multi-decadal output from the CESM Large Ensemble yielded unrealistic forcing. Instead, the shorter NCEP CFSv2 9-month forecasts were successfully tested and afforded an increased ensemble size (~30) to demonstrate gains of dynamical downscaling at sub-seasonal to intra-annual time scales. The improved model physics and coupling among RASM model components have yielded more realistic representation of the sea ice cover and consistent across all model components initial conditions. Consequently, RASM demonstrates significant gains compared to simulation of sea ice in the NCEP reanalysis. In addition, RASM 6-month ensemble forecasts yield very realistic sea ice distribution, which demonstrates both significant gains of dynamical downscaling and the continued impact of the initial conditions on forecasts out to 6 months (https://nps.edu/web/rasm/predictions). A follow up study using RASM for dynamical downscaling of the more realistic CESM initialized Decadal Prediction Large Ensemble output is currently ongoing as part of the DOE RGMA HiLAT-RASM project.

54 ENVIRONMENTAL SCIENCES↗

Evaluating Variable-Impedance Magnetically-Insulated Transmission Lines as a Risk-Mitigation Measure for Next-Generation Pulsed Power

This project has produced the first detailed characterizations of power flow resulting from applying the “variable-impedance MITL” concept to real-life systems in Sandia’s pulsed power program (Z and next-generation pulsed power (NGPP)). We present simulation results and analyses for constant-impedance versions of both Z and NGPP and survey the operational viability of several variable-impedance re-designs in the parameter space of linear tapers. Circuit modeling (SCREAMER/Bertha) was used to pinpoint promising candidate designs, and EM-PIC (Empire) simulations were used to evaluate these candidates more rigorously. This approach was particularly successful in the Z regime which resulted in the identification of several viable variable-impedance MITL designs for each level. The approach was more challenged in the operating space NGPP occupies, producing data points that speak to a more restrictive design space due to anode plasma turn-on. In the end, we were able to converge on one viable variable-impedance design for the highest inductance line (level “F”) and one for the highest current line (level “A”). Altogether, the body of simulation evidence presented in this report suggest there does exist flexibility in operating space for magnetically-insulated transmission lines (MITLs) having variable geometric impedance to be a potential enabling technology for safely increasing current delivery (and potentially lowering stack voltage) in pulsed-power drivers by manipulating electron losses; however, operating points for a particular design must be carefully screened. Circuit and EM-PIC modeling provided consistent verdicts in safe operating regimes for operational viability, but additional physics such as anode plasma turn-on which is included in Empire but not in SCREAMER/Bertha was found to be a critical factor affecting power flow that lead to different assessments between the codes. It is not always the case that the occurrence of anode plasma caused a design to fail (some designs turned on anode plasma yet still delivered load currents meeting design targets); the details matter such as how early in the pulse anode surfaces break down (and how large a region). However, in every case that it did fail it was found that the feedback from anode plasma was the cause (i.e., turning off the anode plasma model in Empire restored agreement with the circuit model prediction). As circuit simulations represent an efficient and practical means of surveying design space compared to more computationally-expensive approaches such as EM-PIC, it could be prudent to invest in the research and development of models to include the effects of anode plasma such as ion emission in circuit codes. The variable-impedance MITL design is a new concept that enables controlled manipulation of the initial electron losses in the outer MITL and can be tested on Z today. We encourage follow-on work to explore further optimization (including alternative variable-impedance profiles, e.g., having constant dZ/dR), and to confirm the major findings presented in this report by fielding test hardware on actual Z shots.

24 POWER TRANSMISSION AND DISTRIBUTION↗

The UV Photoinduced Ring-Closing Reaction of Cyclopentadiene Probed with Ultrafast Electron Diffraction

Conjugated cyclic organic molecules are common across many fields such as pharmaceuticals, are naturally occurring in biological systems, and are used in synthetic materials. One particular area of interest from a photochemical point of view is the formation of highly strained cyclic organics. We investigate the photoinduced reaction of cyclopentadiene, a five-membered organic ring molecule which can form strained three and four carbon rings after photoexcitation with UV light, with the gas-phase ultrafast electron diffraction instrument at the SLAC MeV-UED facility. Electron diffraction offers a direct probe sensitive to the nuclear geometry during the reaction, allowing for the determination of the distribution of products formed following photoexcitation. We observe the simultaneous formation of the highly strained ring- closed bicyclo[2.1.0]pentene and vibrationally hot cyclopentadiene within the temporal resolution of the experiment, and determine the relative yield of all reaction products. Furthermore, the experimental results are in good agreement with the predictions of trajectory simulations.

Computational Chemistry↗

Findings on Subtask 3.1 - Bakken Rich Gas Enhanced Oil Recovery Project

Total in-place oil for the Bakken petroleum system (BPS) (which includes the Bakken and Three Forks Formations) has been estimated to be 600 billion barrels (bbl). However, BPS wells have decline rates as high as 85% over the first 3 years of their lives, and primary recovery factors typically range from 3% to 10% of original oil in place. Given the low initial recovery rates, even small incremental productivity improvements could dramatically increase technically recoverable oil in the BPS. One potential solution is enhanced oil recovery (EOR) using gas injection, such as carbon dioxide (CO2) or hydrocarbon (HC) gases. While commonly used in conventional reservoirs, CO2 EOR in unconventional tight oil reservoirs has been limited to pilot tests. EOR using rich gas (mixture of methane, ethane, and propane) has also been employed in numerous pilots in several unconventional plays and has recently been successfully applied in the Eagle Ford play. If successful, large-scale gas-based EOR in the BPS could dramatically increase oil productivity and recovery factors and extend the life of the play for decades. While CO2 may be a technically suitable working fluid for EOR in the BPS, supplies are limited and costs for using CO2 in EOR pilots are prohibitively high. Meanwhile, produced gas flaring has presented challenges for BPS operators in North Dakota. Analysis conducted by the North Dakota Pipeline Authority indicates that the current gas-gathering infrastructure in North Dakota is insufficient to accommodate all of the associated gas that is produced from the BPS. The geographically isolated location of North Dakota relative to large natural gas markets, combined with suppressed natural gas prices, has made it economically challenging for industry to invest capital in expanding gas-gathering infrastructure in the state. These circumstances led to a research program conducted by the Energy & Environmental Research Center (EERC) in partnership with Liberty Resources Management Company LLC (LR) to examine the potential to use rich gas injection for EOR and mitigate flaring. A rich gas EOR pilot test was designed and executed by LR at its Stomping Horse development area in Williams County, North Dakota. From July 2018 through May 2019, a total of 160 million standard cubic feet (MMscf) of rich produced gas was injected into the BPS using five different wells in a sequential injection strategy. LR’s Leon–Gohrick drill spacing unit (DSU) was used as the test site. Regulatory oversight was provided by the North Dakota Industrial Commission (NDIC). Technical support was provided by the EERC through a series of laboratory, modeling, and field-based activities, and additional post-pilot research activities incorporated learnings from the test, developed new laboratory data, improved fracture modeling methods, and developed machine learning and big data analytics. The results from the Stomping Horse rich gas EOR pilot activities indicate that developing an effective, economical EOR approach for the BPS will require more field tests. Another key lesson learned from the Stomping Horse tests is that detailed pre- and posttest data on reservoir conditions and fluids production are essential. Robust reservoir characterization provides information that is crucial to creating realistic geomodels and conducting valid dynamic simulations of potential EOR scenarios. A detailed understanding of the completions and production history of offset wells is also necessary for valid test result interpretations. This knowledge is essential to designing the operational parameters of injectivity tests and interpreting the results. A conformance control strategy is also essential to success. Laboratory-based examinations of rich gas interactions with reservoir fluids and rocks were conducted, with an emphasis on determining the ability to mobilize oil in the tight reservoir rocks and shales of the BPS. Injection fluid composition was shown to have a positive impact on reducing reservoir oil minimum miscibility pressure (MMP), reducing interfacial tension (IFT), and altering wettability. IFT and contact angle measurements demonstrated that wettability can be altered in the presence of rich gas, suggesting the potential to improve oil recovery. Iterative modeling of surface infrastructure and reservoir performance using data generated by the various project activities was conducted. A geologic model of the Stomping Horse area was built; history-matched oil, gas, and water production was used in simulations of various EOR scenarios. Early programmatic modeling results were used to support LR’s design and operation of the EOR pilot and to provide insight regarding optimization of future commercial-scale BPS EOR design and operations. Post-pilot modeling focused on alternative methods of understanding complex fracture networks and accelerating simulation time. These led to improved simulation run times and provide excellent history-matching results. Several of these iterative models were used as the bases for developing algorithms into machine learning and big data analytics. History matching in reservoir simulation is time-consuming and computer processing-intensive. Machine learning algorithms were created, and an automated history-matching tool was developed. A large set of synthetic reservoir simulations were created to generate well responses (oil, gas, and water production, well bottomhole pressure [BHP], and tracer or propane breakthrough) for a set of EOR operating parameters that included offset well status (open or closed), injectate (rich gas or propane), injection rate, and injection well BHP. A user interface was developed to provide real-time visualization. Machine learning-based models were developed to provide rapid forecasting of well performance given a set of user-defined EOR operating parameters. These predictive models allow the user to modify the offset well status, injection rate, and injection well BHP and rapidly forecast future production performance. The combination of real-time visualization tools with real-time forecasting tools provides a framework for real-time control—operational changes that the EOR site operator can enact (e.g., changing gas injection rates) to affect the observed performance and potentially improve the EOR outcome. There is great reason to be optimistic about the future of EOR in the Bakken. The results of the laboratory studies suggest significant potential for high rates of oil mobilization using produced field gas injection under the right conditions. The results of the lab studies, combined with rigorous statistical analysis of well production data and associated modeling efforts, confirm the notion that fluid mobility within the reservoir is controlled by fractures. As more knowledge is gained about the nature and distribution of fracture networks in the Bakken, the industry will be in a better position to predict and, ultimately, influence fluid mobility. New field tests are necessary to develop a more complete understanding of those conditions. Thoughtful and creatively engineered field tests within a well-characterized geologic setting will yield the fundamental knowledge needed to take Bakken oil production to the next level. This subtask was cofunded through the EERC–U.S. Department of Energy Joint Program on Research and Development for Fossil Energy-Related Resources Cooperative Agreement No. DE-FE0024233. Nonfederal funding was provided by the North Dakota Industrial Commission’s Oil and Gas Research Program and Computer Modelling Group.

04 OIL SHALES AND TAR SANDS↗