Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “SPACE LOGISTICS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 883 records · Page 49

Management of the Post-Shuttle Extravehicular Mobility Unit (EMU) Water Circuits

The EMU incorporates two separate water circuits for the rejection of metabolic heat from the astronaut and the cooling of electrical components. The first (the Transport Water Loop) circulates in a semi-closed-loop manner and absorbs heat into a Liquid Coolant and Ventilation Garment (LCVG) worn by the astronaut. The second (the Feed-water Loop) provides water to a cooling device (Sublimator) with a porous plate, and that water subsequently sublimates to space vacuum. The cooling effect from the sublimation of this water translates to a cooling of the LCVG water that circulates through the Sublimator. Efforts are underway to streamline the use of a water processing kit (ALCLR) that is being used to periodically clean and disinfect the Transport Loop Water. Those efforts include a fine tuning of the duty cycle based on a review of prior performance data as well as an assessment of a fixed installation of this kit into the EMU backpack, within on-orbit EMU interface hardware or as a stand-alone unit. Furthermore, testing is being conducted to ensure compatibility between the International Space Station (ISS) Water Processor Assembly (WPA) effluent and the EMU Sublimator as a prelude to using the WPA effluent as influent to the EMU Feed Water loop. This work is undertaken to reduce the crewtime and logistics burdens for the EMU, while ensuring the long-term health of the EMU water circuits for a 6-year service life.

Steele, John W.↗

Leveraging Commercial Software Defined Radio for Low Cost Deep Space Testing

In a typical space mission development life cycle, there is a stage where the spacecraft needs to test against the ground station for interface compatibility to ensure that the spacecraft will be properly tracked after launch. This testing normally requires the spacecraft team to bring their flight equipment to the ground station facility. While recognizing that testing with actual flight or engineering module is the most preferred option because of maximum fidelity, there are occasion when the use of actual flight hardware is a logistically challenge because of spacecraft development. Having another test tool that can emulate the spacecraft signal – by recording the signal transmitted by the spacecraft and regenerate an RF signal for ground system testing - would be very useful. It is even more an attractive option if such spacecraft emulator is inexpensive and highly portable. In this paper, we describe a low-cost, light-weight recorder/playback assembly (RPA) that supports deep space missions testing. The equipment leverages on commercially available software defined radios (SDR) and public-domain software. The RPA has been used to support two missions. One effort is to validate that the Uchinoura 34-m tracking station of the Japanese Aerospace Exploration Agency (JAXA) would be able to track the upcoming NASA Exploration Mission 1 (EM-1) spacecraft, scheduled for launch in 2019. The second effort is to help with the testing and certification of the 21-m antenna ground station at the Morehead State University (MSU) in Kentucky, United States, prior to the time when the Lunar IceCube spacecraft is ready for actual compatibility testing. The RPA also enables students/staff training of the new ground station, using the RPA signal as test input into the system. This low-cost test signal allows the MSU team to save money on not having to develop a full-scale self-generated telemetry test signal source.

White, Leslie↗

Space Operations Center System Analysis: Requirements for a Space Operations Center, revision A

The system and program requirements for a space operations center as defined by systems analysis studies are presented as a guide for future study and systems definition. Topics covered include general requirements for safety, maintainability, and reliability, service and habitat modules, the health maintenance facility; logistics modules; the docking tunnel; and subsystem requirements (structures, electrical power, environmental control/life support; extravehicular activity; data management; communications and tracking; docking/berthing; flight control/propulsion; and crew support). Facilities for flight support, construction, satellite and mission servicing, and fluid storage are included as well as general purpose support equipment.

Woodcock, G. R.↗

Single stage to orbit/SDIO

This paper included a discussion of the United States' need for a launch system that demonstrates both high capacity and low cost. Current systems, which typically require two years' lead time to provide on-orbit service to space platforms, are too inflexible for many missions. A system is needed that is able to operate in much the same way as existing commercial aircraft. The SSTO program is focused on satisfying aircraft-like operations and logistics support requirements such as engine-out intact abort capability and seven-day, 350-man-day vehicle turnaround times.

French, James R.↗

On-orbit refueling

The goal of this program is to increase operational availability of space assets by refueling with an expendable launch vehicle (not the Shuttle) in LEO or GEO. Information is drawn from the on-orbit refueling model, COSEMS model, COMA study, and information provided from the San Antonio Air Logistics Center.

POSPISIL↗

Wake Vortex Advisory System (WakeVAS) Evaluation of Impacts on the National Airspace System

This report is one of a series that describes an ongoing effort in high-fidelity modeling/simulation, evaluation and analysis of the benefits and performance metrics of the Wake Vortex Advisory System (WakeVAS) Concept of Operations being developed as part of the Virtual Airspace Modeling and Simulation (VAMS) project. A previous study, determined the overall increases in runway arrival rates that could be achieved at 12 selected airports due to WakeVAS reduced aircraft spacing under Instrument Meteorological Conditions. This study builds on the previous work to evaluate the NAS wide impacts of equipping various numbers of airports with WakeVAS. A queuing network model of the National Airspace System, built by the Logistics Management Institute, Mclean, VA, for NASA (LMINET) was used to estimate the reduction in delay that could be achieved by using WakeVAS under non-visual meteorological conditions for the projected air traffic demand in 2010. The results from LMINET were used to estimate the total annual delay reduction that could be achieved and from this, an estimate of the air carrier variable operating cost saving was made.

Smith, Jeremy C.↗

Space Shuttle Program Tin Whisker Mitigation

The discovery of tin whiskers (TW) on space shuttle hardware led to a program to investigate and removal and mitigation of the source of the tin whiskers. A Flight Control System (FCS) avionics box failed during vehicle testing, and was routed to the NASA Shuttle Logistics Depot for testing and disassembly. The internal inspection of the box revealed TW growth visible without magnification. The results of the Tiger Team that was assembled to investigate and develop recommendations are reviewed in this viewgraph presentation.

Nishimi, Keith↗

An Approach for Hydrogen Recycling in a Closed-loop Life Support Architecture to Increase Oxygen Recovery Beyond State-of-the-Art

State‐of‐the‐art atmosphere revitalization life support technology on the International Space Station is theoretically capable of recovering 50% of the oxygen from metabolic carbon dioxide via the Carbon Dioxide Reduction Assembly (CRA). When coupled with a Plasma Pyrolysis Assembly (PPA), oxygen recovery increases dramatically, thus drastically reducing the logistical challenges associated with oxygen resupply. The PPA decomposes methane to predominantly form hydrogen and acetylene. Because of the unstable nature of acetylene, a down‐stream separation system is required to remove acetylene from the hydrogen stream before it is recycled to the CRA. A new closed‐loop architecture that includes a PPA and downstream Hydrogen Purification Assembly (HyPA) is proposed and discussed. Additionally, initial results of separation material testing are reported.

Abney, Morgan B.↗

International Space Station Operational Experience and Its Impacts on Future Mission Supportability

Operational experience gained on the International Space Station (ISS) has enabled significant improvements in failure rate estimates for various Orbital Replacement Units (ORUs). These improved estimates, in turn, allow more efficient and accurate spare parts allocations for future missions, enabling significant reductions in both logistics mass and risk. This paper examines the value of ISS experience to date in terms of its impact on supportability for future missions. A supportability model is presented that assesses the spares required as a function of mission endurance and risk, taking into account uncertainty in failure rate estimates. Changes in ISS Environmental Control and Life Support (ECLSS) ORU failure rate estimates are described and discussed, both in terms of the overall population of ORUs and the evolution of failure rate estimates over time for a particular item. The value of those updated failure rate estimates is assessed by calculating the estimated spares mass requirements for two cases, using the initial, pre-ISS estimates and using the estimates informed by on-orbit experience. Hidden risk resulting from underestimated failure rates is also assessed. These results indicate that, for a 1,200-day Mars mission, ISS experience has enabled a 3.9 t to 6.0 t reduction in ECLSS spares mass required and uncovered failure rate underestimates that would have resulted in an order of magnitude increase in risk had they not been discovered and corrected. The implications of these results for system development and mission planning are discussed, including approaches to accelerate the rate of failure rate refinement and the risks associated with making changes or introducing new systems. Overall, test time is a critical factor that must be carefully considered in system development, and new systems must budget appropriate time for testing in a relevant environment or accept higher risk and logistics requirements on future missions.

Owens, Andrew C.↗

Standardized Modular Power Interfaces for Future Space Explorations Missions

Earlier studies show that future human explorations missions are composed of multi-vehicle assemblies with interconnected electric power systems. Some vehicles are often intended to serve as flexible multi-purpose or multi-mission platforms. This drives the need for power architectures that can be reconfigured to support this level of flexibility. Power system developmental costs can be reduced, program wide, by utilizing a common set of modular building blocks. Further, there are mission operational and logistics cost benefits of using a common set of modular spares. These benefits are the goals of the Advanced Exploration Systems (AES) Modular Power System (AMPS) project. A common set of modular blocks requires a substantial level of standardization in terms of the Electrical, Data System, and Mechanical interfaces. The AMPS project is developing a set of proposed interface standards that will provide useful guidance for modular hardware developers but not needlessly constrain technology options, or limit future growth in capability. In 2015 the AMPS project focused on standardizing the interfaces between the elements of spacecraft power distribution and energy storage. The development of the modular power standard starts with establishing mission assumptions and ground rules to define design application space. The standards are defined in terms of AMPS objectives including Commonality, Reliability-Availability, Flexibility-Configurability and Supportability-Reusability. The proposed standards are aimed at assembly and sub-assembly level building blocks. AMPS plans to adopt existing standards for spacecraft command and data, software, network interfaces, and electrical power interfaces where applicable. Other standards including structural encapsulation, heat transfer, and fluid transfer, are governed by launch and spacecraft environments and bound by practical limitations of weight and volume. Developing these mechanical interface standards is more difficult but an essential part of defining physical building blocks of modular power. This presentation describes the AMPS projects progress towards standardized modular power interfaces.

Spacecraft Power↗

Space Test and Operations Port for Exploration Missions

The International Space Station (ISS) has from its inception included plans to support the testing of exploration vehicle/systems technology, the assembly of space transport vehicles, and a variety of operations support (communications, crew transfer, cargo handling, etc). Despite the fact that the ISS has gone through several re-designs and reductions in size and capabilities over the past 20 years, it still has the key capabilities, truss structure, docking nodes, etc required to support these exploration mission activities. ISS is much like a frontier outpost in the Old West, which may not have been in optimum location (orbit) for assisting travelers on their way to California (the Moon and Mars), but nevertheless because it had supplies and other support services (regular logistics from Earth, crewmembers, robotics, and technology test and assembly support capabilities) was regularly used as a stopover and next trip phase preparation site by all kinds of travelers. This paper will describe some of the ISS capabilities which are being used currently, and are being planned for use, by various payload sponsors, developers and Principal Investigators, sponsored by the NASA Office of Space Flight (Code M ISS Research Program Office - Department of Defense (DoD), NASA Hqs Office of Space Communications, Italian Space Agency, etc.). Initial ideas and concepts for payloads and technology testing which are being planned, or which are being investigated, for use in support of advanced space technology development and verification and exploration mission activities will be summarized. Some of the future ISS payloads and test activities already identified include materials and system component space environment testing, laser space communication system demonstrations (leading to the possible development of an ISS deep space communication node), and an advanced space propulsion testbed and ISS based, free-flying platform.

Holt, Alan C.↗

Office of Nuclear Verification FY 2023 Quarterly Report TSVT Q1

This project encompasses the continued development and training of a U.S. operational team, the Test Site Verification Team (TSVT), supporting verification of nuclear testing activities. TSVT builds on decades of U.S. nuclear testing history and nuclear explosion monitoring experience. The Team maintains readiness to deploy internationally on short notice to provide field-based support of verification of declared or undeclared nuclear testing and associated activities, as well as follow-on activities including monitoring and capability disablement and dismantlement, as established by negotiated agreement or treaty. The roles and structure of the TSVT are integrated with other NA-243 deployable verification teams and the interagency. FY23 TSVT activities focus on continued capability buildup within the team, including Team trainings and exercises with a focus on missions in confined spaces (e.g., tunnels, mines, other underground facilities), increased familiarity with foreign nuclear weapons testing programs, demonstration of Team capacity to deploy, train, and practice sustained OPSEC in non-western locations, establishment of sustainable storage and maintenance of equipment, specification and procurement of additional equipment to support field observations, further evolution of concepts of operation documents (CONOPs), and mission coordination with Headquarters and associated Stakeholders. Activities will culminate with a full-scale domestic team exercise at the end of FY23 focusing on underground activities signatures/observations and safety including advanced outdoor safety and familiarity in working around explosive test environments. In addition, we will be further articulating approaches and capacity relevant to the identification of nuclear tests, as well as monitoring of nuclear testing activities and/or dismantlement of nuclear test sites and anticipate developing additional equipment requests in support of this evolution. The TSVT Team Leads will also coordinate with its Senior Advisor, the TSVT Logistics and Readiness (L&R) Training Lead, and NNSA Headquarters to draft a five-year TSVT training and exercise plan, that strategically and incrementally builds capacity and expertise in key areas of significance for the continuum of nuclear and nuclear-related testing activities that fall within the team’s mission space.

42 ENGINEERING↗

Space shuttle food system study. Volume 1: System design report

Data were assembled which define the optimum food system to support the space shuttle program, and which provide sufficient engineering data to support necessary requests for proposals towards final development and installment of the system. The study approach used is outlined, along with technical data and sketches for each functional area. Logistic support analysis, system assurance, and recommendations and conclusions based on the study results are also presented.

Source record↗

Management of the Post-Shuttle Extravehicular Mobility Unit (EMU) Water Circuits

The EMU incorporates two separate water circuits for the rejection of metabolic heat from the astronaut and the cooling of electrical components. The first (the Transport Water Loop) circulates in a semi-closed-loop manner and absorbs heat into a Liquid Coolant and Ventilation Garment (LCVG) warn by the astronaut. The second (the Feed Water Loop) provides water to a cooling device (Sublimator) with a porous plate, and that water subsequently sublimates to space vacuum. The cooling effect from the sublimation of this water translates to a cooling of the LCVG water that circulates through the Sublimator. Efforts are underway to streamline the use of a water processing kit (ALCLR) that is being used to periodically clean and disinfect the Transport Loop Water. Those efforts include a fine tuning of the duty cycle based on a review of prior performance data as well as an assessment of a fixed installation of this kit into the EMU backpack or within on-orbit EMU interface hardware. Furthermore, testing is being conducted to ensure compatibility between the International Space Station (ISS) Water Processor Assembly (WPA) effluent and the EMU Sublimator as a prelude to using the WPA effluent as influent to the EMU Feed Water loop. This work is undertaken to reduce the crew-time and logistics burdens for the EMU, while ensuring the long-term health of the EMU water circuits for a post-Shuttle 6-year service life.

Steele, John W.↗

Space Launch System Payload Stage Capability for Ultra-High Characteristic Energy Missions

The Space Launch System (SLS) vehicle is NASA’s cornerstone capability for a new era of human and robotic exploration of deep space. The unrivalled performance of SLS provides the capability to launch the first woman and next man to walk on the lunar surface and to support development of a sustained human presence in cislunar space, and ultimately human missions to Mars. As an evolvable capability with unique launch performance, the opportunities enabled by SLS also include game-changing benefits for science missions, including probes to the outer solar system and beyond. For the last two years, the SLS Program has worked with the Interstellar Probe team at the Johns Hopkins University Applied Physics Laboratory(APL) to provide data that describe how SLS could support a mission that would break through the boundary of the heliosphere and into pristine interstellar space only a decade after launch, enabling earlier science return and greatly increasing spacecraft life in the interstellar medium. In record-breaking time, the ISP as launched on SLS may answer questions raised by the extended mission of NASA’s Voyager spacecraft. While SLS and its efficient Exploration Upper Stage (EUS) offer benefits for exploration of the outer planets, adding one or more additional stages to this architecture makes it even more capable for missions beyond our solar system, offering more realistically appealing flight times that would allow the mission scientists to reap the rewards of exploration. During the time the SLS Program has been working with the Interstellar Probe team, it has identified an expedited path to the Block 2 capability planned for the Interstellar Probe mission, and further matured performance numbers for diverse multi-stage configurations using a combination of commercially available liquid hydrogen (LH2)/liquid oxygen (LOX) upper stages and solid motor kick stages. That work has demonstrated the SLS payload stage capability provides significant benefits and opens trade space for multiple missions in consideration during planning for the next Planetary Science and Astrobiology Decadal Survey. This presentation details the significant benefits SLS can provides for very high characteristic (C3) energy missions by coupling the capabilities of SLS to current commercial rocket propulsion stage systems. These capabilities are explored specifically in the context of an Interstellar Probe architecture in which a small, capable science probe, coupled with carefully tailored mission design trajectories, could be used to explore the outer solar system and the interstellar medium. The presentation will also address the operational logistics of integrating such a mission, explaining the options available for “non-standard” SLS payloads, including processing those with radioisotope power generators or additional propulsion stages. An SLS system overview and capabilities will be presented, along with vehicle configuration and orbit performance capability studies, explaining how SLS is enabling for a variety of high-energy science mission profiles, including launching an exploratory probe bound for interstellar space only a decade after launch.

Rob Stough↗

Study of solid rocket motor for space shuttle booster, volume 2, book 3, appendix A

A systems requirements analysis for the solid propellant rocket engine to be used with the space shuttle was conducted. The systems analysis was developed to define the physical and functional requirements for the systems and subsystems. The operations analysis was performed to identify the requirements of the various launch operations, mission operations, ground operations, and logistic and flight support concepts.

Source record↗

A Study of a Lifting Body as a Space Station Crew Exigency Return Vehicle (CERV)

A lifting body is described for use as a return vehicle for crews from a space station. Reentry trajectories, subsystem weights and performance, and costs are included. The baseline vehicle is sized for a crew of eight. An alternate configuration is shown in which only four crew are carried with the extra volume reserved for logistics cargo. A water parachute recovery system is shown as an emergency alternative to a runway landing. Primary reaction control thrusters from the Shuttle program are used for orbital maneuvering while the Shuttle verniers are used for all attitude control maneuvers.

MacConochie, Ian O.↗