Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Requirements”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 883 records · Page 49

Magnetohydrodynamics (MHD) Engineering Test Facility (ETF) 200 MWe power plant. Design Requirements Document (DRD)

A description and the design requirements for the 200 MWe (nominal) net output MHD Engineering Test Facility (ETF) Conceptual Design, are presented. Performance requirements for the plant are identified and process conditions are indicated at interface stations between the major systems comprising the plant. Also included are the description, functions, interfaces and requirements for each of these major systems. The lastest information (1980-1981) from the MHD technology program are integrated with elements of a conventional steam electric power generating plant.

Rigo, H. S.↗

Development of Integrated Programs for Aerospace-Vehicle Design (IPAD) - IPAD user requirements

Results of a requirements analysis task for Integrated Programs for Aerospace Vehicle Design (IPAD) are presented. User requirements which, in part, will shape the IPAD system design are given. Requirements considered were: generation, modification, storage, retrieval, communication, reporting, and protection of information. Data manipulation and controls on the system and the information were also considered. Specific needs relative to the product design process are also discussed.

Anderton, G. L.↗

A study of flight control requirements for advanced, winged, earth-to-orbit vehicles with far-aft center-of-gravity locations

Control requirements of Controlled Configured Design Approach vehicles with far-aft center of gravity locations are studied. The baseline system investigated is a fully reusable vertical takeoff/horizontal landing single stage-to-orbit vehicle with mission requirements similar to that of the space shuttle vehicle. Evaluations were made to determine dynamic stability boundaries, time responses, trim control, operational center-of-gravity limits, and flight control subsystem design requirements. Study tasks included a baseline vehicle analysis, an aft center of gravity study, a payload size study, and a technology assessment.

Hepler, A. K.↗

San Juan National Forest Land Management Planning Support System (LMPSS) requirements definition

The role of remote sensing data as it relates to a three-component land management planning system (geographic information, data base management, and planning model) can be understood only when user requirements are known. Personnel at the San Juan National Forest in southwestern Colorado were interviewed to determine data needs for managing and monitoring timber, rangelands, wildlife, fisheries, soils, water, geology and recreation facilities. While all the information required for land management planning cannot be obtained using remote sensing techniques, valuable information can be provided for the geographic information system. A wide range of sensors such as small and large format cameras, synthetic aperture radar, and LANDSAT data should be utilized. Because of the detail and accuracy required, high altitude color infrared photography should serve as the baseline data base and be supplemented and updated with data from the other sensors.

Werth, L. F.↗

Generic functional requirements for a NASA general-purpose data base management system

Generic functional requirements for a general-purpose, multi-mission data base management system (DBMS) for application to remotely sensed scientific data bases are detailed. The motivation for utilizing DBMS technology in this environment is explained. The major requirements include: (1) a DBMS for scientific observational data; (2) a multi-mission capability; (3) user-friendly; (4) extensive and integrated information about data; (5) robust languages for defining data structures and formats; (6) scientific data types and structures; (7) flexible physical access mechanisms; (8) ways of representing spatial relationships; (9) a high level nonprocedural interactive query and data manipulation language; (10) data base maintenance utilities; (11) high rate input/output and large data volume storage; and adaptability to a distributed data base and/or data base machine configuration. Detailed functions are specified in a top-down hierarchic fashion. Implementation, performance, and support requirements are also given.

Lohman, G. M.↗

Definition of display/control requirements for assault transport night/adverse weather capability

A Helicopter Night Vision System was developed to improve low-altitude night and/or adverse weather assult transport capabilities. Man-in-the-loop simulation experiments were performed to define the minimum display and control requirements for the assult transport mission and investigate forward looking infrared sensor requirements, along with alternative displays such as panel mounted displays (PMD) helmet mounted displays (HMD), and integrated control display units. Also explored were navigation requirements, pilot/copilot interaction, and overall cockpit arrangement. Pilot use of an HMD and copilot use of a PMD appear as both the preferred and most effective night navigation combination.

Milelli, R. J.↗

Software reliability: Application of a reliability model to requirements error analysis

The application of a software reliability model having a well defined correspondence of computer program properties to requirements error analysis is described. Requirements error categories which can be related to program structural elements are identified and their effect on program execution considered. The model is applied to a hypothetical B-5 requirement specification for a program module.

Logan, J.↗

Space Operations Center System Analysis: Requirements for a Space Operations Center, revision A

The system and program requirements for a space operations center as defined by systems analysis studies are presented as a guide for future study and systems definition. Topics covered include general requirements for safety, maintainability, and reliability, service and habitat modules, the health maintenance facility; logistics modules; the docking tunnel; and subsystem requirements (structures, electrical power, environmental control/life support; extravehicular activity; data management; communications and tracking; docking/berthing; flight control/propulsion; and crew support). Facilities for flight support, construction, satellite and mission servicing, and fluid storage are included as well as general purpose support equipment.

Woodcock, G. R.↗

Requirements for high quality X-ray spectroscopy in an Explorer class mission

Through the use of simulated X-ray spectra the question of instrument requirements for a spectrograph that could significantly advance X-ray astronomy is addressed. It it concluded that resolution (lambda/delta lambda) in the range of 200 to 500, and effective collecting area in excess of 200 sq cm are required. One design, based on the objective reflection grating concept, which would meet these stringent requirements in an Explorer class mission is presented.

Cash, W. C., Jr.↗

Satellite services system analysis study. Volume 3: Service equipment requirements

Service equipment mission requirements are discussed. On-orbit operations, satellite classes, and reference missions are included. Service equipment usage and requirements are considered. Equipment identification methodology is discussed. Service equipment usage is analyzed, including initial launch, revisit, Earth return, and orbital storage. A summary of service requirements and equipment is presented, including service equipment status, even interaction, satellite features, and observations.

Source record↗

Concept for advanced satellite communications and required technologies

The advanced communications technology satellite (ACTS) program of NASA is aimed at the development of high risk technologies that will enable exploiting higher frequency bands and techniques for improving frequency reuse. The technologies under development include multiple beam spacecraft antennas, on-board switching and processing, RF devices and components and advanced Earth stations. The program focus is on the Ka-band (30/20 GHz) as the implementing frequency since it has five times the bandwidth of either the C- or Ku-bands. However, the technology being developed is applicable to other frequency bands as well and will support a wide range of future communications systems required by NASA, other Government agencies and the commercial sector. An overview is presented of an operational 30/20 GHz satellite system that may evolve. How the system addresses service requirements is discussed, and the technology required and being developed is considered.

Ramler, J. R.↗

High density bit transition requirements versus the effects on BCH error correcting code

The design to achieve the required bit transition density for the Space Shuttle high rate multiplexes (HRM) data stream of the Space Laboratory Vehicle is reviewed. It contained a recommended circuit approach, specified the pseudo random (PN) sequence to be used and detailed the properties of the sequence. Calculations showing the probability of failing to meet the required transition density were included. A computer simulation of the data stream and PN cover sequence was provided. All worst case situations were simulated and the bit transition density exceeded that required. The Preliminary Design Review and the critical Design Review are documented. The Cover Sequence Generator (CSG) Encoder/Decoder design was constructed and demonstrated. The demonstrations were successful. All HRM and HRDM units incorporate the CSG encoder or CSG decoder as appropriate.

Ingels, F. M.↗

Requirements for company-wide management

Computing system requirements were developed for company-wide management of information and computer programs in an engineering data processing environment. The requirements are essential to the successful implementation of a computer-based engineering data management system; they exceed the capabilities provided by the commercially available data base management systems. These requirements were derived from a study entitled The Design Process, which was prepared by design engineers experienced in development of aerospace products.

Southall, J. W.↗

Requirements for a mobile communications satellite system. Volume 3: Large space structures measurements study

This study report defines a set of tests and measurements required to characterize the performance of a Large Space System (LSS), and to scale this data to other LSS satellites. Requirements from the Mobile Communication Satellite (MSAT) configurations derived in the parent study were used. MSAT utilizes a large, mesh deployable antenna, and encompasses a significant range of LSS technology issues in the areas of structural/dynamics, control, and performance predictability. In this study, performance requirements were developed for the antenna. Special emphasis was placed on antenna surface accuracy, and pointing stability. Instrumentation and measurement systems, applicable to LSS, were selected from existing or on-going technology developments. Laser ranging and angulation systems, presently in breadboard status, form the backbone of the measurements. Following this, a set of ground, STS, and GEO-operational were investigated. A third scale (15 meter) antenna system as selected for ground characterization followed by STS flight technology development. This selection ensures analytical scaling from ground-to-orbit, and size scaling. Other benefits are cost and ability to perform reasonable ground tests. Detail costing of the various tests and measurement systems were derived and are included in the report.

Akle, W.↗

Requirements for a mobile communications satellite system. Volume 1: Executive summary

Three types of satellite-aided mobile communications are considered for users in areas not served by (terrestrial) cellular radio systems. In System 1, mobile units are provided a direct satellite link to a gateway station, which serves as the interface to the terrestrial toll network. In System 2, a terrestrial radio link similar to those in cellular systems connects the mobile unit to a translator station; each translator relays the traffic from mobile units in its vicinity, via satellite, to the regional gateway. It is not feasible for System 2 to provide ubiquitous coverage. Therefore, System 3 is introduced, in which the small percentage of users not within range of a translator are provided a direct satellite link as in System 1. While System 2 can operate with leased satellite capacity, Systems 1 and 3 require a dedicated satellite. A major portion of this study is concerned with the design of a satellite for System 1. A weight limit of 10,000 lbs, corresponding to the projected 1990 STS capability, is imposed on the design. Frequency re-use of the allocated spectrum, through multiple satellite beams, is employed to generate the specified system capacity. Both offset-fed and center-fed reflectors are considered. For an assumed 10-MHz allocation and a population of 350,000 subscribers, a two-satellite system is required. The reflector diameters corresponding to offset-fed and center-fed geometries are 46 m and 62 m, respectively. Thus, large-space-structure technology is inherent to the implementation of System 1. In addition to establishing the technical requirements for the three types of satellite systems, the monthly service charge needed to provide a specified return on invested capital is computed. A net present value analysis is used for this purpose.

Source record↗

Large space systems auxiliary propulsion requirements

To meet the needs of a variety of civilian and military missions objectives large space systems (LSS) will become a greater percentage of our orbiting hardware. These LSS's will be transported to low Earth orbit (LEO) by the space transportation system (STS Shuttle). Concurrently, for LSS missions to orbit higher than LEO, the predominant mission scenario is that the LSS will be deployed or assembled in LEO and then transferred to a higher orbit. In support of the LSS concepts, the Office of Aeronautics and Space Technology (OAST) has sponsored studies to determine LSS mission propulsion requirements. Since the fall of 1979, the Boeing Aerospace Company, under contract to NASA and Lewis Research Center, has been studying the disturbance forces and torques that will be experienced by LSS, and they have identified some of the associated auxiliary propulsion systems (APS) requirements. This presentation provides an insight into the results of some of the APS studies, focusing primarily on the APS requirements of single Shuttle launchable LSS's.

Maloy, J. E.↗

Space station needs, attributes, and architectural options study. Volume 1: Missions and requirements

Science and applications, NOAA environmental observation, commercial resource observations, commercial space processing, commercial communications, national security, technology development, and GEO servicing are addressed. Approach to time phasing of mission requirements, system sizing summary, time-phased user mission payload support, space station facility requirements, and integrated time-phased system requirements are also addressed.

Source record↗