Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Relocation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 883 records · Page 49

Corium stratification test using intermediate products of degraded core materials in severe accident of BWR

Two series of corium stratification tests using samples including intermediate products (B{sub 4}C-Fe alloy, Fe-Zr alloy) in BWR severe accidents were performed to investigate the influence of initial chemical composition. Chemical features of intermediate products of degraded core materials in severe accidents are considered to change depend upon oxygen potential in the atmosphere and temperature of the products in accordance with the accident progression and the features are highly important for evaluating the relocation and stratification behavior of fuel debris, especially for boron distribution in fuel debris. The initial compositions of samples were determined based on the results of our previous control blade and channel box degradation tests. The present results indicate that the U concentration in the metallic layer largely depends on the oxygen potential in the atmosphere and the apparent red-ox reaction rate between UO{sub 2} and Zr is mitigated when the typical intermediate product B{sub 4}C-Fe alloy coexists with UO{sub 2} and Zr. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Investigation and modeling of the degradation of Zr-based fuel claddings during corrosion in steam and air-steam mixtures at high temperatures - 6.3 STP-2016-0033

This paper presents the main results of a study conducted to quantify and to model the degradation state of Zr-based fuel claddings submitted to severe accident conditions in a nuclear reactor core: high temperatures and either pure steam or air-steam mixture. Due to the progressive thickening of a dense and protective ZrO{sub 2} layer, the oxidation kinetics of Zr-based claddings in steam at high temperatures typical of nuclear severe accidents, is generally cubic or parabolic. However, for some temperature domains, this oxide layer may crack, becoming porous and non-protective anymore. In these 'breakaway' conditions, the oxidation kinetics change from (sub-)parabolic to linear or even accelerated. Additionally, the temperature increase can lead core materials to melt and to relocate down to the vessel lower head, threatening its integrity. If it fails, and for specific conditions, air ingress may take place into the reactor. Hence, oxygen and nitrogen both react with Zr-based claddings, successively through oxidation of Zr (forming ZrO{sub 2} layer), nitriding of Zr (forming ZrN particles) and oxidation of ZrN (forming ZrO{sub 2} and releasing nitrogen). These self-sustained chemical reactions enhance the deterioration of Zr-based claddings and of their ZrO{sub 2} layers, inducing a rise of their open porosity. To quantify this porosity, a series of two-step experiments was conducted. First, Zirlo{sup TM} cladding samples were isothermally oxidized in various conditions: in pure steam or in 50- 50 mol% air-steam mix, at several temperatures, and for different durations. The main thermal effects on reaction kinetics and the high impact of air on the cladding degradation are all confirmed by experimental results. Second, pioneering porosimetry measurements by Hg intrusion were realized for the first time on such corroded cladding samples. In both atmospheres, it is pointed out that 1200 and 1250 K lead to particularly porous oxide layers, especially due to strong 'breakaway' effects. Moreover, it is confirmed that the presence of air strongly enhances the oxide cracking: cladding samples are more porous when oxidized in the air-steam mixture than under pure steam. Finally, it is observed that in all conditions, the open porous volume fraction of Zirlo{sup TM} claddings continuously rises during their corrosion process. Hence, for each experimental condition, porosity correlations are determined through linear regressions, and porosity increase rates are deduced by derivation versus time and validated against porosimetry results of cladding samples corroded in transient (nonisothermal) conditions. (authors)

36 MATERIALS SCIENCE↗

Burnt Mountain Alaska RTG Extraction, Transport and Disposal Project - 17359

The Air Force Technical Applications Center (AFTAC), headquartered at Patrick Air Force Base (AFB), Florida, removed excess nuclear material from one of the center's seismic arrays on Burnt Mountain, Alaska, after nearly 15 years of un-operability, and transferred it to a the low-level waste disposal facility at the Nevada National Security Site (NNSS). Ten radioisotope thermoelectric generators (RTGs), were used as a power source by AFTAC at its array 97 kilometers (60 miles) north of the Arctic Circle. Originally placed on Burnt Mountain in 1973, the first RTG was installed to power a single seismometer. Twelve years later, due to the increase in communications equipment and demand for additional power, nine more RTGs were placed at the site. For the next 17 years, the RTGs were operated and maintained by AFTAC's Detachment 460 based at Eielson AFB near Fairbanks, Alaska, and were used because of their high reliability and low maintenance requirements to determine if regional seismic activity was caused by nuclear explosions or naturally-occurring events such as earthquakes, volcanic activity, etc. AFTAC's primary mission is to verify compliance with nuclear test ban treaties. In 1992, a tundra fire encroached on the Burnt Mountain site and damaged some of the data cables. Despite the fact the fire did not impact the generators themselves, it raised public concern among nearby inhabitants about the safety of using radioactive material as a power source at the station. The Air Force, in coordination with multiple agencies and mission partners, made the decision to remove the RTGs and relocate them to NNSS for permanent disposal. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Port Hope Area Initiative's Port Granby Project: From Planning to Execution - 17451

The Port Hope Area Initiative's Port Granby Project involves the construction of a new, secure long-term waste management facility (LTWMF) and supporting infrastructure, and the excavation and relocation of some 450,000 m{sup 3} of LLRW and marginally contaminated soil from the former Port Granby Waste Management Facility (PGWMF) to the newly constructed LTWMF. Presented is an overview of the Port Granby Project and a description of the planning needed to execute the project successfully. A comprehensive suite of approximately 40 pre-construction submittals were developed and submitted for review and approval by Canadian Nuclear Laboratories (CNL), the project authority. Importantly, comprehensive training programs were developed and implemented to ensure all project staff fully understood the scope of the planning documents (covering such things as Quality Control, Environmental Monitoring, Radiation Protection, Dust Management, Noise, Radiation Protection etc.) and possess the appropriate competencies for completing the work to which they have been assigned. The effective planning that has been invested in the Port Granby project, from initial design to project planning and implementation, has allowed this complex project to proceed with minimal difficulty. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Legacy of Taiwan Lanyu LLW Interim Storage Site - 17491

The Lanyu (Orchid Island) LLW (Low Level Waste) interim storage facility for the Taiwan LLW is located on Lanyu Island off the coast of Taiwan (Republic of China). It is perhaps the only outdoor LLW interim storage facility in the world. The shipment of LLW to the Lanyu LLW interim storage facility began in May 1982 and ceased in June 1995 after strong opposition from the local aboriginal Yamei tribe people. Since the shipment of LLW to the Lanyu LLW storage facility ceased in 1995, the LLW in Taiwan has been stored temporarily at the indoor facilities at the Taipower (Taiwan Electric Power Company) three operating NPPs (nuclear power plants) and the INER (Institute of Nuclear Energy Research). The current Taiwan government has recently begun to lay out a multi-faceted plan to address the Lanyu LLW interim storage facility and evaluate different options of relocating Lanyu LLW to other possible sites. However, many challenges remain, notably the site selection for the LLW final disposal site. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Deployment of large tank monosodium titanate strike to increase salt processing at the Savannah river site - 15115

The treatment of high level waste (HLW) salt solutions using the Actinide Removal Process (ARP) and Modular Caustic Side Solvent Extraction Unit (MCU) began at Savannah River Site (SRS) in 2008. Since that time, over 6 million gallons of liquid HLW have been treated and the resulting low level waste (LLW) effluent immobilized in cementitious grout at salt-stone. In addition to the continued stabilization of liquid HLW, operating experience from the ARP/MCU facilities has also been valuable in considering the design and construction of the Salt Waste Processing Facility (SWPF) which will utilize similar unit operations on a much larger scale. ARP removes actinides by contacting waste with monosodium titanate (MST) which is a solid adsorbent for soluble strontium and actinides. Once the sorption reaction is complete, the MST solids are separated from salt solution via ultrafiltration through a crossflow filter. The throughput of initial operations of ARP/MCU was limited by the flowrate through the extraction process. However, after the implementation of a new solvent flowsheet, filtration of MST will be the rate limiting step in salt processing. For the entirety of ARP/MCU operation, Savannah River Remediation (SRR) has sought to improve process efficiency and performance through optimization and modification of the original facility design. These efforts have resulted in a best-single-year throughput of 4.9 million liters of decontaminated salt solution. In keeping with these practices, SRR recently initiated a project to improve filtration throughput by relocating the MST strike from small batches immediately upstream of the filtration unit to the underground waste tank used to batch and store salt solution feed for ARP/MCU. This process change will allow the bulk of MST solids to decant in the waste tank prior to filtration which should improve both the nominal operational filter flux as well as the achieved utility of filter operation. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Decommissioning of a facility in a historical reactor at SRS: achieving both historical significance preservation and effective in-situ decommissioning - 15275

The Savannah River Site (SRS) is an 802 square-kilometer United States Department of Energy (US DOE) nuclear facility located along the Savannah River near Aiken, South Carolina, where Management and Operations are performed by Savannah River Nuclear Solutions, LLC (SRNS). In 2004, US DOE recognized SRS as a structure within the Cold War Historic District of national, state and local significance because it is composed of the first generation of facilities constructed and operated from 1950 through 1989 to produce plutonium and tritium for our nation's defense. US DOE agreed to manage the SRS 105-C Reactor Facility as a potentially historic property due to its significance in supporting the U.S. Cold War Mission and for potential for future interpretation. The Disassembly Basin (DB) in C Reactor was evaluated for action under CERCLA. Data indicated there were over 830 curies of radioactivity associated with the basin sediments and approximately 9.1 million (M) liters (L) of contaminated water, not including a large quantity of activated reactor equipment, scrap metal, and debris on the basin floor. The release of DB water could potentially migrate to the aquifer and contaminate groundwater. The need for an action was identified to reduce risks to personnel in the facility and to eliminate the possible release of contaminants into the environment. In-situ decommissioning was selected as the remedy. The remedial action proceeded in stages: -Above-grade modifications to the interior of DB building -Relocation of irradiated scrap and reactor components to the deepest segments of the DB - Construction of a metal building to house evaporators - Forced evaporation of the DB's radiologically contaminated water - Grouting with special hybrid grouts - Removal of the evaporators and temporary building. Since the building itself was not demolished and will remain unchanged in appearance with the exception of filling the DB with grout, this ISD removal action/methodology did not adversely impact the historical significance of the 105-C Reactor Building, in accordance with the National Historic Preservation Act, nor did it adversely affect the ability to determine the full extent and details of preservation at some later date. Both special hybrid grout materials met all requirements. Overall average 7-day compressive strength for the dry area mix was 1.54 MPa (223 psi) and for the underwater mix 2.94 MPa (427 psi).Overall 28-day compressive strength for the dry area mix was 2.88 MPa (417 psi) and for the underwater mix 4.99 MPa (724 psi). A limited amount of testing was also performed at 91 days, where the overall compressive strength for the dry area mix was found to be 9.40 MPa (1363 psi) and for the underwater mix 13.98 MPa (2028 psi). All compressive strength values far exceeded the 0.34 MPa (50 psi) minimum requirements. The special, flowable-fill grouts designed and used for P- and R-Reactor ISD and used again for this 105-C ISD removal action resulted in considerable labor, cost, and schedule savings versus conventional materials. As an added bonus/benefit, the CO{sub 2} footprint of the SRS C-Reactor DB ISD was minimized by using a small amount of cement and byproduct material to produce the structural fill materials. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Progress toward cleanup of operable unit 1 groundwater at the US DOE0 Mound, Ohio, site: success of a phased-combined remedy - 15310

Industrial solvents (primarily trichloroethene) and other volatile organic compounds (VOCs) that originated from the former solid waste landfill contaminated the groundwater in the Buried Valley Aquifer beneath the Mound, Ohio, Site. The landfill was used from 1948 to 1974 for the disposal of trash, debris, and liquid waste. In 1977, much of the waste was relocated and encapsulated onsite. The landfill site and surrounding area (Operable Unit 1 [OU-1]) occupy approximately 1.6 hectares (4 acres) in the southwestern portion of the site. The historical pathway of concern consisted of leaching of contaminants from site soils or disposed wastes down into the groundwater, entrainment in the flowing groundwater, and migration toward former Mound site water-production wells. A groundwater pump-and-treat (P and T) system was initiated in 1996 to interdict the plume and a soil vapor extraction system was installed and operated from 1997 to 2003 to remove the bulk of the VOC sources from the vadose zone. Physical removal of the landfill waste and contaminated soil was performed between 2006 and 2010. Approximately 76,000 cubic meters (99,400 cubic yards) of material were removed from the OU-1 landfill area; the remaining soils in the OU-1 area meet the site cleanup objectives for future industrial or commercial use. Operation of the groundwater P and T system continued throughout this period. During the remediation time frame, groundwater monitoring and a number of innovative characterization campaigns were completed to assess the contaminant and biogeochemical conditions in the subsurface at OU-1. For example, in 2013 an integral pumping test was performed to characterize the amount (mass) of the low-level VOCs in groundwater. Soil and groundwater were also collected to obtain site-specific data to identify if geochemical conditions support natural attenuation reactions. Contaminant and hydrogeologic data collected from this test, as well as historical data, were evaluated to identify the distribution and potential sources of VOCs, refine the hydrogeologic description, update the conceptual model of VOC fate and transport, and determine if monitored natural attenuation remains a viable option to address VOCs in groundwater. To date, the performance of the phased-combined remedy has resulted in significant reductions in the concentrations of VOCs in the groundwater. For example, in 2013 the trichloroethene in all wells was less than 40 micrograms per liter, with a plurality of the wells near or below maximum contaminant levels. The generally observed declining concentration trends and the low concentrations for 2013 represent the net impact of source removal actions, P and T operation, and natural attenuation. In accordance with the current conditions, the joint US DOE and regulator Core Team is proceeding with a field demonstration of enhanced attenuation-an engineering and regulatory strategy that was recently developed by the Interstate Technology and Regulatory Council. Enhanced attenuation strategies focus on altering a target site in such a way that it can transition to natural attenuation. The combination of technologies to be deployed includes neat (pure) vegetable oil deployment in the deep vadose zone of the former landfill area and emulsified vegetable oil deployment within the footprint of the groundwater plume. In the first part of the deployment, neat oil spreads laterally and forms a thin layer on the water table beneath residual soil sources to intercept and reduce future VOC loading and to reduce oxygen inputs to the local groundwater. In the second part of the deployment, emulsified oil forms active bioremediation treatment zones within the plume footprint to degrade existing groundwater contaminants (via reductive dechlorination, co-metabolism, or both) and stimulates long-term attenuation capacity in the down-gradient plume (via co-metabolism). If the proposed activities are successful, they will accelerate the progress of the Mound OU-1 toward remedial goals and convert the current active P and T remedy into a passive attenuation-based remedy that represents a cost-effective final step in a phased remediation. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Success in commissioning a key U.S. radioactive waste burial site through the technical support of Dufrane Nuclear Shielding Incorporated (DNSI) - 15476

With the -phase out- of the South Carolina based Barnwell Radioactive Waste Burial Site, and the stockpile and storage of radioactive waste and irradiated components throughout the U.S. Nuclear Industry for decades, the opening of the Texas Low-Level Radioactive Waste Disposal Compact Facility by Waste Control Specialists (WCS), is a game changer in solving this industry-wide issue. For the first time in decades, generators now have the opportunity to send their waste to a site specifically designed to permanently sequester the waste in a licensed facility that will protect public health and the environment, better than any built to date. As history has shown through the many decades of the U.S. Commercial and Federal Nuclear Industry, site operators and management have relied heavily on contractors and vendors with exceptional expertise and decades of experience to achieve success and meet their goals. The commissioning of WCS was no exception as DNSI was contracted to design, develop, build and deploy a major component required for the opening and successful operation of the WCS site. This component, being the Modular Concrete Canister (MCC), is the -work horse- of the site. With its enormous size, weight and strength, it provides many functions that meet and comply with the site performance assessment (PA) under 10 CFR Part 61, the site WAC, and Texas Low-Level Radioactive Waste Disposal Authority. Offsite contracting the production and delivery of this critical component was a major step toward success in meeting schedule and cost for the much needed opening of the Texas Compact and Federal site. In selecting a shielding vendor, WCS partnered with a U.S. Nuclear Service company with over 30 years of experience which spans the entire U.S. Commercial, Federal, and Nuclear Industry. The task given DNSI was not a simple one, it involved every aspect from start to finish of the design, production and delivery of rectangular, cylindrical and -irradiated hardware- (IH) MCCs, that could accept waste up to 100 Sv /Hr contact dose rates. The enormity of this project was quite clear and required extensive quality control, construction of batch plants, purchase of huge quantities of raw materials, setting up a production site in a neighboring city, relocation of personnel from company headquarters, and safely transporting 8,000 Tons of MCC components 75 miles one-way on West Texas highways daily. Most important of all, this was accomplished safely with no incidents, no component failures or rejects, and on schedule. The start of receipt, of -in-compact waste- and -out-of-compact waste- was conducted virtually in a 3 month period time span. To help guarantee success and quality of product, all forms had surfaces machined, heavy duty elastomer coatings were applied to concrete surfaces, only galvanized anchors were used, and the batch plant was run to strict ASME standards thus testing every 50 cubic yards of concrete poured. With significant teamwork and success from Vendors such as DNSI, WCS and the Texas Compact has evolved as one of the leading radioactive waste sites in the U.S. and the world, providing safe, secure and compliant permanent waste disposal services by using technical expertise and innovation of the highest standards. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Design and Construction of the Paddys Run Streambank Stabilization Project at the Fernald Preserve, Harrison, Ohio - 16165

The Fernald Preserve is a former uranium-processing plant that underwent extensive remediation pursuant to CERCLA and is now managed by the US DOE Office of Legacy Management. While remediation of buildings and soil contamination was completed in 2006, aquifer remediation is ongoing. Paddys Run is a second-order stream that runs to the south along the western side of the Fernald Preserve. The Paddys Run watershed encompasses nearly 41 km{sup 2} (16 mi{sup 2}), including most of the Fernald site. Field personnel conducting routine site inspections in March 2014 observed that Paddys Run was migrating east via bank erosion into the 'Pit 3 Swale', an area of known surface-water contamination. The soil there was certified pursuant to site regulatory agreements and meets all final remediation levels. However, weekly surface-water monitoring is conducted from two puddles within the swale area, when water that exceeds the final remediation levels is present. Paddys Run had migrated east approximately 4 m (13 ft) in 2 years and was approximately 29 m (95 ft) from the sample location. This rapid migration threatened existing conditions that allowed for continued monitoring of the swale area and also threatened Paddys Run water quality. Therefore, DOE and regulators determined that the east bank of Paddys Run required stabilization. This was accomplished with a design that included the following components: relocation of approximately 145 m (475 ft) of streambed 9 m (30 ft) west, installation of a rock toe along the east bank, installation of two cross-vane in-stream grade-control structures, stabilization of a portion of the east bank using soil encapsulated lifts, and regrading, seeding, and planting within remaining disturbed areas. In an effort to take advantage of low-flow conditions in Paddys Run, construction was initiated in September 2014. Weather delays and subsurface flow within the Paddys Run streambed resulted in an interim shutdown of the project area in December 2014. Construction activities resumed in April 2015, with completion in November 2015. To date, this stabilization project has been successful. The regraded bank and streambed have remained stable, and no compromise to installed cross-vanes, the rock toe, or the soil encapsulated lifts has been observed. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Little Engine That Could: No Project is too Small for Sustainable Remediation Moab Uranium Mill Tailings Removal Project - 16427

Executive Order 13693, 'Planning for Federal Sustainability in the Next Decade', mandates the reduction of energy use and cost and greenhouse gas emissions, and the search for renewable or alternative energy solutions. DOE EM manages the Moab Uranium Mill Tailings Remedial Action Project in Utah that involves relocating a 16-million-ton uranium mill tailings pile and associated contaminated materials at the former Atlas mill site to a permanent disposal cell constructed near Crescent Junction, Utah, predominantly by rail. Project personnel strive to support the Executive Order in making preparations for the impacts of climate change. Meeting the goals of the Executive Order in light of the remote location and limited resources of the Project sites often requires an innovative approach and perseverance. The Moab Project is a 'Small Site' within EM and has a comparatively short-term completion date. As a result, large-scale sustainability projects, such as retrofits or remodels, do not offer a cost benefit over this period. Instead, less dramatic process changes are achievable. The Project purchases renewable wind energy through the local power provider to reduce Scope 2 (purchased electricity) greenhouse gas emissions. Toward its ambitious goal of achieving zero landfill waste, the Project has diverted over 50 percent of its nonhazardous solid waste from the local landfill through composting and recycling efforts. In particular, electronics must meet various sustainable criteria prior to purchase, and be recycled through donations and certified recyclers, diverting it from the waste stream. The Project has received multiple Green Buy Awards from DOE by reaching leadership goals for purchasing energy-efficient, water-efficient, bio-based, and recycled-content products. In fiscal year 2014, in response to President Obama's June 2014 memorandum, 'Sustainable Practices for Designed Landscapes and Supporting Pollinators on Federal Landscapes', the Project decided to take a proactive approach and work with a local pollinator group, hosting two beehives in a revegetation area on the Moab site. An increase in plant growth and blossoming plants in the revegetation area has been observed and is believed to be related to the added pollinators. The Project has previously seeded disturbed areas mainly with native drought-resistant species to reduce water usage. Storm water collected in sediment basins at the Crescent Junction site is used for dust control and compaction of mill tailings in the disposal cell. The Project worked with the U.S. Army Corps of Engineers and the U.S. Fish and Wildlife Service to gain support for re-contouring a remediated area adjacent to the Colorado River, which borders the Moab site on the east, to allow the area to flood at a lower river stage. This re-contouring promotes more varied vegetation growth and river water that tops the west bank brings soil nutrients to inundated areas of the site. Ponded floodwater has been pumped into revegetation plots for irrigation, reducing freshwater usage. Innovation in sustainable practices comes in many different fashions. The Moab Project demonstrates that no project is too small to implement sustainable practices. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Port Hope Area Initiative - Community Based Concepts Become Reality - 16538

The Port Hope Area Initiative (PHAI) involves the cleanup of historic low-level radioactive waste (LLRW) resulting from radium and uranium processing by the former Crown Corporation, Eldorado Nuclear Limited, and its predecessor companies, during the period between 1932 and 1988. The PHAI, which is based on a legal agreement between the Government of Canada and the adjacent municipalities of Port Hope and Clarington in Ontario, Canada, comprises two separate community-initiated projects for the long-term management of the historic LLRW located in each of these municipalities. The Port Hope Project involves the cleanup of approximately 1.2 million cubic metres of historic LLRW from various sites within the urban area of Port Hope, the construction and operation of an engineered aboveground mound where the waste will be safely contained, and the long-term maintenance and monitoring of the new waste management facility. The waste is currently located in 13 large-scale sites and an estimated 375 small-scale sites within the community. In contrast, the Port Granby Project involves the relocation of approximately 450,000 cubic metres of historic LLRW from the existing waste site on the north shore of Lake Ontario in rural Clarington, to a new engineered aboveground mound to be built 700 metres north of the shoreline. The work also involves the restoration of the existing site and long-term maintenance and monitoring the new facility. The PHAI entered Phase 2 (construction) of a three-phase program in early 2012, when $1.28 billion (Canadian) in federal funding was announced by the Minister of Natural Resources Canada. The funding, together with regulatory approval from the Canadian Nuclear Safety Commission (CNSC), which granted 10-year waste management licences to both projects, have permitted the PHAI to move forward with construction and remediation. Waste water treatment plants based on best-available technologies have been constructed for each project to remove a wide range of contaminants from groundwater, surface water and leachate collected during construction and operation of the aboveground mounds. Each treatment process has been designed to ensure the quality of treated water being discharged into Lake Ontario meets or exceeds stringent regulatory requirements, resulting in the enhanced protection of the Great Lakes Basin ecosystem. In 2015, the contract to build the Port Granby long-term waste management facility and remediate the existing waste site was awarded, and the long-awaited facility development will soon begin. The use of a dedicated internal waste transportation route along, which the LLRW will be trucked from the existing site to the new facility, is a key component of the design to minimize the impact on the local, rural community. In Port Hope, the removal of contaminated soil within the site for the new long-term management facility commenced in the fall of 2015. Over the next several years, multiple contracts will be awarded for construction and operation of the new waste management facility and remediation of the large and small-scale sites. In short, the Port Hope and Port Granby community-based concepts have matured into tangible projects with appropriate regulatory approvals and federal funding in place. Ongoing communications with the two communities have resulted in a well-informed public that understands the work to be done and is eager to see their projects take shape and become reality. As Canada's largest environmental remediation and restoration undertaking, the PHAI has never been closer to fulfilling its vision - working with the local communities to fulfil Canada's commitment for the cleanup of historic waste in Port Hope and Port Granby to leave an honourable legacy for future generations. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Protecting the Columbia River through Removal and Packaging of Radioactive Sludge in Hanford's K Area - 16572

The Columbia River once provided power and cooling water to operations on the Hanford Site; today, more than a million people downstream from Hanford rely on the river for agriculture, fishing and recreation. The Department of Energy and contractor CH2M HILL Plateau Remediation Company (CH2M) is making significant progress in protecting that vital resource. Eight of nine reactors along the river have been cocooned and soil and groundwater remediation is successfully reducing the concentration of contaminants in groundwater. The 100-K area is the last area where significant work remains to protect the river. CH2M has accomplished much in the past ten years, including demolishing the K East reactor fuel storage basin in 2009. Prior to demolition of the basin, highly radioactive sludge from that basin was transferred into containers located in the nearby K West reactor fuel storage basin. Today, the K East reactor is in interim surveillance mode, and work is underway in the K West basin to remove the sludge, which is a mixture of tiny fuel corrosion particles, fuel rod and metal fragments and soil and sand less than 1/4-inch in diameter. CH2M has designed a sludge removal system that will safely and efficiently remove the sludge from the K West basin and deposit it into specially designed containers which will be relocated to a storage facility on Hanford's Central Plateau. Procurement, fabrication and delivery of the sludge removal system is underway, with extensive testing and training planned for 2016 and 2017 ahead of the goal of removing sludge from the river by September 30, 2018. This project must account for many technical and safety considerations that render the project very challenging. Several safety measures have been incorporated as a result of safety evaluations. This paper will describe the issues facing the project team in developing the safety basis requirements and incorporating them into the design of the process equipment and construction of the facility to house the repackaging operations. This paper will allow CH2M and DOE-RL to share lessons learned and progress to date with other complex and hazardous projects across the DOE complex. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Portable positional scanning lane

A positional lane scanner and method therefor includes a positional lane cargo scanning structure having a first frame portion, a second frame portion, and a top frame portion connected to define a passage lane for a cargo vessel. The first and second frame portions are located on opposite sides and cargo vessels pass therebetween. The first and second frame portions, or both, include a first housing portion and a scanning device mounted within the first housing portion. A lifting member is provided on the top frame portion facing outward, or if the lifting means is on a transport vehicle, such as a reach spreader, a pair of lifting beams may be arranged on the transport vehicle. The lift member removably connects with a boom portion of the transport vehicle for positioning and relocating the scanning structure to be disposed adjacent a cargo vessel lane.

Stihel, Gregory C.↗

How Successful Site Preparation Work at a Large, Commercial, Hazardous and Toxic Waste Site Can Benefit DOE Cleanup Projects - 18111

Jacobs recently completed site preparation work supporting the private commercial development of a world-scale petrochemical complex (an 'ethylene cracker' to produce the primary building block for many forms of plastic) in Monaca, Pennsylvania - the first major U.S. project of its kind outside the Gulf Coast region in 20 years and one of the largest (multi-billion dollar) construction projects in the eastern U.S. Prior to beginning construction on the petrochemical complex, the site's previous large, industrial zinc smelter operations had to be decommissioned and the facilities had to be removed. During the previous 80 years, the smelting operations at the site were used to produce zinc, lead, mercury, and sulfuric acid (a by-product of smelting). The smelting operations left landfills and industrial soil over a large area that had to be removed or closed under regulatory review to allow development across the 81,000 m{sup 2} (200-acre) industrial site located near a major river and local populations. In order to meet Pennsylvania's site-specific Land Recycling Program (commonly referred to as 'Act 2') legislative requirements, the direct contact pathway for landfill soil and slag was removed or mitigated. The site preparation work, or 'Early Works', started in January 2015. As the selected Early Works overall Engineering, Procurement, and Construction Management (EPCM) contractor, Jacobs performed the front end engineering and design. Subsequently, Jacobs had overall responsibility for procurement, construction management, health and safety, quality, security, and environmental services for the entire site and all contractors. The Early Works project included eight separate work scope packages: 1) Site Preparation, 2) Site Development, 3) Marine Works, 4) Rail Works, 5) Road Works and Offsite Utilities, 6) Site Security, 7) Construction Facilities, and 8) High Voltage Line Relocation. The Early Works scope was successfully completed in 2017. The challenges faced by this privately funded commercial project have much in common with large DOE and government construction projects. This paper explores lessons learned from the project and compares how project challenges were addressed on this private commercial project with those anticipated at large DOE/government construction and remediation sites, particularly those in the areas of Safety, Logistics, Infrastructure, and Stakeholder Involvement. The identification of best practices demonstrated on this successful project are shared for the purpose of bringing outside, commercial perspectives to ongoing or planned DOE/government construction projects. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Mercury Cleanup at the Y-12 Nuclear Security Complex - 18304

The Y-12 National Security Complex (Y-12) is one of the nation's most important national security assets. The facility played a key role in producing the world's first atomic bomb during the Manhattan Project and since World War II has been a vital contributor to America's nuclear deterrent capability. Historically, mercury was used extensively in operations at Y-12 in connection with production of components for nuclear weapons. During peak usage - from 1950 to 1963 - approximately 11 million kilograms of mercury were used. Over the years, large quantities of mercury - as much as 330,000 kilograms -- were lost within buildings and to soil and surface water. Today, mercury is considered the greatest environmental risk on the Oak Ridge Reservation and mercury cleanup is a high priority for the Department of Energy's Oak Ridge Office of Environmental Management (OREM). Remediation of Y-12 and East Fork Poplar Creek (EFPC) to mitigate the mercury risk is based on a phased, adaptive management approach. The approach to address surface water includes treatment actions in the short term and research and technology development to evaluate longer-term solutions in the downstream environment. A number of formidable challenges must be addressed in order to assure safe, effective cleanup of mercury contamination at Y-12 and in EFPC. In the long term, understanding how mercury moves in the EFPC system is essential to the development of new technologies and remedial options and strategies for mercury contamination in the creek. OREM has developed and is currently executing a Mercury Technology Development Plan to address these long term needs. As a major component of the short term actions, UCOR has completed the design of the Outfall 200 Mercury Treatment Facility. Outfall 200 is the point at which the west end Y-12 storm drain system discharges to Upper East Fork Poplar Creek (UEFPC). Outfall 200 is consistently the largest single source of mercury to UEFPC. Construction and operation of this facility is critical to reduce mercury in UEFPC, and operation of this facility will be required before demolition of mercury contaminated facilities can begin. Once operational, the Mercury Treatment Facility will have a treatment capacity of 3,000 gallons per minute (gpm), a storm water capture rate of 40,000 gpm, and two million gallons of storm water storage capacity. The headworks with transfer pipeline is designed to capture flow from Outfall 200 and move it to the treatment facility. A contract for construction of the Outfall 200 Mercury Treatment Facility is expected to be awarded in 2018. Early site preparation began in 2017. The early site preparation scope includes utilities relocation, small structure demolition and creek bank secant wall installation. Initial operation of the Mercury Treatment Facility is planned for 2022. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Achieving the Vision: An Update on Cleanup, Closure, and Reindustrialization of the East Tennessee Technology Park - 18401

URS-CH2M Oak Ridge LLC (UCOR) is responsible for cleanup of the U.S. Department of Energy's (DOE) East Tennessee Technology Park (ETTP) in Oak Ridge, Tennessee. Formerly known as the K-25 site, the facility enriched uranium for major defense nd energy programs for more than 40 years. The site's industrial processes - largely the gaseous diffusion method used for enriching uranium - left behind radioactive, chemical and industrial contaminants in soils and structures. Cleanup of the environmental legacies enables DOE's goal for converting ETTP into a private sector industrial park. Return of the restored site to the community will attract new industries to the region, creating jobs and growing the economy. The central elements to achieve DOE's vision for the site are 1) Cleanup, 2) Closure, and 3) Reindustrialization. Cleanup entails completion of all demolition activities and remedial actions consistent with the Comprehensive Environmental Response, Compensation and Liability Act of 1980 (CERCLA) agreements. Closure leaves facilities and infrastructure in a condition that enables transfer of the site to non-federal entities and reduces DOE's long-term stewardship costs. Closure activities include: - Infrastructure stabilization (site utilities, roads, stormwater, etc.); - Disposal or transfer of government property; - Relocation of most DOE contractors and support functions offsite; - Transfer of the majority of the site property to non-federal entities for redevelopment. Reindustrialization enables DOE's vision for the site as a multi-use private sector industrial park, reducing DOE's costs and enhancing the local economy. Transfer to the private sector will be accomplished through the Community Reuse Organization of East Tennessee (CROET), which will serve as the Park Manager. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Risk-Informed Maritime Spent Fuel Transportation

South Korea is facing a shortage of Spent Nuclear Fuel (SNF) storage space. The country generates approximately 760 metric tons of SNF annually out of its 23 Nuclear Power Plants (NPPs). Until any terminal solutions of the back-end fuel cycle is decided, there exists the need to relocate these SNF assemblies from relatively packed storage pools to the more vacant ones. Since NPPs in South Korea are situated at coastal sites, the maritime mode of transportation is more practical for this purpose in comparison to land and air ones. The primary risk factors in this transportation mode, based on the data collected by the Korea Maritime Institute from 1981 until 2013, are ship collision and engine damage. However, because ship collision may initiate other accident types such as sinking, fire or engine damage, it may be considered as the most hazardous event. It is therefore a significant interest to calculate the likelihood of this event. This paper proposes a risk assessment methodology on the maritime SNF transportation in the form of the quantification of ship collision probability. To demonstrate the applicability of the methodology, a transportation case study in South Korea is presented. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗