A Plutonium Finishing Plant Model for the Cercla Removal Action and Decommissioning Construction Final Report

The joint policy between the U.S. Environmental Protection Agency (EPA) and the U.S. Department of Energy (DOE) for decommissioning buildings at DOE facilities documents an agreement between the agencies to perform decommissioning activities including demolition under the Comprehensive Environmental Response Compensation and Liability Act (CERCLA). The use of removal actions for decommissioning integrates EPA oversight authority, DOE lead agency responsibility, and state authority for decommissioning activities. Once removal actions have been performed under CERCLA, a construction completion report is required to document the completion of the required action. Additionally, a decommissioning report is required under DOE guidance. No direct guidance was found for documenting completion of decommissioning activities and preparing a final report that satisfies the CERCLA requirements and the DOE requirements for decommissioning. Additional guidance was needed for the documentation of construction completion under CERCLA for D and D projects undertaken under the joint policy that addresses the requirements of both agencies. A model for the construction completion report was developed to document construction completion for CERCLA D and D activities performed under the joint EPA/DOE policy at the Plutonium Finishing Plant (PFP). The model documentation report developed at PFP integrates the DOE requirements for establishing decommissioning end-points, documenting end-point completion and preparing a final decommissioning report with the CERCLA requirements to document completion of the action identified in the Action Memorandum (AM). The model includes the required information on health and safety, data management, cost and schedule and end-points completion. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Chemical Sludge Heel Removal At The Savannah River Site F-Tank Farm Closure Project

Chemical Sludge Removal (CSR) is the final waste removal activity planned for some of the oldest nuclear waste tanks located at the Savannah River Site (SRS) in Aiken, SC. In 2008, CSR will be used to empty two of these waste tanks in preparation for final closure. The two waste tanks chosen to undergo this process have previously leaked small amounts of nuclear waste from the primary tank into an underground secondary containment pan. CSR involves adding aqueous oxalic acid to the waste tank in order to dissolve the remaining sludge heel. The resultant acidic waste solution is then pumped to another waste tank where it will be neutralized and then stored awaiting further processing. The waste tanks to be cleaned have a storage capacity of 2.84 E+06 liters (750,000 gallons) and a target sludge heel volume of 1.89 E+04 liters (5,000 gallons) or less for the initiation of CSR. The purpose of this paper is to describe the CSR process and to discuss the most significant technical issues associated with the development of CSR. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Alternative cooling resource for removing the residual heat of reactor

The Recirculated Cooling Water (RCW) system of a Candu reactor is a closed cooling system which delivers demineralized water to coolers and components in the Service Building, the Reactor Building, and the Turbine Building and the recirculated cooling water is designed to be cooled by the Raw Service Water (RSW). During the period of scheduled outage, the RCW system provides cooling water to the heat exchangers of the Shutdown Cooling System (SDCS) in order to remove the residual heat of the reactor, so the RCW heat exchangers have to operate at all times. This makes it very hard to replace the inlet and outlet valves of the RCW heat exchangers because the replacement work requires the isolation of the RCW. A task force was formed to prepare a plan to substitute the recirculated water with the chilled water system in order to cool the SDCS heat exchangers. A verification test conducted in 2007 proved that alternative cooling was possible for the removal of the residual heat of the reactor and in 2008 the replacement of inlet and outlet valves of the RCW heat exchangers for both Wolsong unit 3 and 4 were successfully completed. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Vertical Extraction Process Implemented at the 118-K-1 Burial Ground for Removal of Irradiated Reactor Debris from Silo Structures - 12431

The primary objective of a remediation project is the safe extraction and disposition of diverse waste forms and materials. Remediation of a solid waste burial ground containing reactor hardware and irradiated debris involves handling waste with the potential to expose workers to significantly elevated dose rates. Therefore, a major challenge confronted by any remediation project is developing work processes that facilitate compliant waste management practices while at the same time implementing controls to protect personnel. Traditional burial ground remediation is accomplished using standard excavators to remove materials from trenches and other excavation configurations often times with minimal knowledge of waste that will be encountered at a specific location. In the case of the 118-K-1 burial ground the isotopic activity postulated in historic documents to be contained in vertical cylindrical silos was sufficient to create the potential for a significant radiation hazard to project personnel. Additionally, certain reported waste forms posed an unacceptably high potential to contaminate the surrounding environment and/or workers. Based on process knowledge, waste management requirements, historic document review, and a lack of characterization data it was determined that traditional excavation techniques applied to remediation of vertical silos would expose workers to unacceptable risk. The challenging task for the 118-K-1 burial ground remediation project team then became defining an acceptable replacement technology or modification of an existing technology to complete the silo remediation. Early characterization data provided a good tool for evaluating the location of potential high exposure rate items in the silos. Quantitative characterization was a different case and proved difficult because of the large diameter of the silos and the potential for variable density of attenuating soils and waste forms in the silo. Consequently, the most relevant information supporting job planning and understanding of the conditions was the data obtained from the gross gamma meter that was inserted into each casing to provide a rough estimate of dose rates in the tubes. No added value was realized in attempting to quantify the source term and/or associate the isotopic activity with a particular actual waste form (e.g., sludge). Implementing the WRM system allowed monitoring of worker and boundary exposure rates from a distance, maintaining compliance with ALARA principles. This system also provided the project team early knowledge of items being removed that had high exposure rates associated with them, thus creating an efficient method of acknowledging an issue and arriving at a solution prior to having an upset condition. An electronic dosimeter with telemetry capability replaced the excavator mounted AMP-100 system approximately half way through remediation of the silos. Much higher connectivity efficiency was derived from this configuration. Increasing the data feed efficiency additionally led to less interruption of the remediation effort. Early in system testing process a process handicap on the excavator operator was acknowledged. A loss of depth perception resulted when maneuvering the excavator and bucket using the camera feed to an in-cab monitor. Considerable practice and mock-up testing allowed this handicap to be overcome. The most significant equipment failures involved the cable connection to the camera mounted between the clamshell bucket jaws and the video splitter in the excavator cab. Rotation of the clamshell bucket was identified as the cause of cable connection failures because of the cyclic twisting motion and continuous mechanical jarring of the connection. In-cab vibration was identified as the culprit in causing connection failures of the video splitter. While these failures were repaired, substantial production time was lost. Ultimately, the decision was made to purchase a second cable and higher quality video splitter eliminate the down time. An engineering improvement for future operations would be inserting cable pig tails at more stressed cable connection points to facilitate rapid change out of the cable should that be required. Overall, the system performed better than expected in a safe and efficient manner. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Complex Challenges of Remotely Removing Redundant Pipework and Cleaning/Remediation of Aging Civil Structures at Sellafield - 12446

This paper identifies how a joint Sellafield Ltd/Nuclear Management Partners Tactical Review Team and main contractor, SA Robotics, developed and successfully deployed a solution to clean and coat the wall surface of an aging structure on the Sellafield Site. This involved removal of redundant pipework from the wall, cleaning and coating of the surface using a bespoke designed robotic manipulator with various end effectors. This system was able to safely and in a controlled manner remove the pipework, clean down the wall and prime and coat it within the required programme duration which was 5 months earlier than a previous shielding only option. This was done in a high radiation field and in the challenging conditions of winter in Northern England. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Removal of radium by ion-exchange from mine water

This paper presents a method on removal of radium from uranium mine water. Resin IR-001 is used to absorb radium from mine water, eluted by saturated NaCl solution. Radium enriched in the eluate is then precipitated by BaCl{sub 2} solution, thereby removed effectively. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Pilot Plant Test of Removal of Co-60 and Cs-137 from the Evaporator Concentrates of Forsmark unit 3 - 17158

A pilot plant test has been conducted to treat evaporator concentrates at Forsmark BWR NPP unit 3 in Sweden using Fortum's selective ion exchanger technology. The concentrate contains an array of radionuclides of which C-60 and Cs-137 are radiologically the most important ones. Concentrate also contained a high salt content ∼ 20 g/l and high organic carbon loading ∼ 1 g/l The pilot system consisted of pre-treatment (mechanical filters, activated carbon, UV oxidation) and Cs and Co selective ion exchangers. CsTreat ion exchanger was very effective in removing Cs from the evaporator concentrate: {sup 137}Cs activity was lowered from the initial value 280 MBq/m{sup 3} to below detection limit 550 Bq/m{sup 3}. Removing Co was more complicated: results suggest that Co is bound to organic chelating compounds, thus fairly compete oxidation of organic carbon was required in order to achieve good ion exchange results. Finally, after total organic carbon (TOC) was treated to below 50 ppm, {sup 60}Co activity was lowered from the initial value of 57 MBq/m{sup 3} to 2.7 kBq/m{sup 3}. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Overcoming Waste Removal Challenges at Savannah River Site: A Case Study of Tank 15 - 16198

Tank 15 is a High Level Waste Tank at the Savannah River Site containing sludge waste that had been allowed to dry due to several flaws in the primary tank wall. In order to remove the tank waste, the sludge had to first be re-hydrated. Due to the age of Tank 15 and the thirty years of 'dry sludge tank' status, there were numerous technical challenges and risks that had to be addressed to demonstrate operational readiness to add liquid to a tank with known flaws. Liquid management was a key to readiness since Tank 15 did not have the infrastructure to mitigate waste accumulating in the annulus or to transfer waste out of the primary tank as a means to control a large leak. The project team's fundamental expectation was that some amount of liquid would migrate to the annulus through identified flaws as the sludge waste was re-hydrated. Communication was crucial to ensuring this expectation was propagated to management, the customer, and the regulators. Equipment upgrades, provisions for annulus liquid management (monitoring and removal), and readiness for outgoing transfers mitigated waste migration. Liquid addition methodology and facility modifications were developed to safely re-hydrate the sludge while monitoring the integrity of the primary tank. These efforts culminated in successfully adding 697 m{sup 3} (184,000 gal) of liquid to Tank 15, re-hydrating the sludge waste. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Performance Analysis of the Passive Residual Heat Removal System of an Integral Reactor

A demand for small modular reactors (SMRs) is gradually emerging worldwide, especially in Middle East Asia and Africa. SMART (System-integrated Modular Advanced ReacTor) developed by KAERI (Korea Atomic Energy Research Institute) is the first mover among several SMRs. It is designed to produce 100 MW of electricity, or 90 MW of electricity and 40,000 tons of desalinated water concurrently, which is sufficient for 100,000 residents. SMART is currently holding the initiative as the first licensed integral reactor in the world since 4 July 2012, when the standard design approval (SDA) was officially issued by the Nuclear safety and security commission (NSSC). After that, the SMART safety enhancement project was successfully conducted with intense support of the Government, resulting in an in-depth development of the most advanced safety features including the passive residual heat removal system (PRHRS). Recently, an agreement between KAERI and King Abdullah city for atomic and renewable energy (K.A. CARE) was officially signed for the pre-project engineering (PPE) in pursuit of the construction of SMART and developing human resources capability. Both parties are currently conducting a three-year preliminary study to review the feasibility of building SMART and to prepare for its commercialization. KAERI also takes responsibility to train R and D personnel chosen from Kingdom of Saudi Arabia. Sooner or later, SMART will open the global market of SMR and be the best competitive pioneer. Since the Fukushima accident, the passive cooling system of a nuclear reactor has received a great amount of attention. SMART is designed with passive systems in order to ensure the safety of the reactor. The PRHRS is one of the passive safety systems, which is activated after an accident to remove the residual heat from the core and the sensible heat of the reactor coolant system (RCS) through the steam generators (SGs) until the condition of the RCS reaches a safe shutdown condition. In the present study, the thermal performance of the PRHRS is predicted by using in-house code. Temperature of the RCS and the cooling rate of the RCS are traced with time to see if it is satisfactorily designed to meet the design requirements of the PRHRS. The dependency of the mass flow rate of the natural circulation on the filling ratio (FR) is also discussed. The FR is arbitrarily chosen from 0.22 to 0.50 and further parametric study is needed in the future.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

CHEMICAL SLUDGE HEEL REMOVAL AT THE SAVANNAH RIVER SITE F TANK FARM CLOSURE PROJECT 8183

Chemical Sludge Removal (CSR) is the final waste removal activity planned for some of the oldest nuclear waste tanks located at the Savannah River Site (SRS) in Aiken, SC. In 2008, CSR will be used to empty two of these waste tanks in preparation for final closure. The two waste tanks chosen to undergo this process have previously leaked small amounts of nuclear waste from the primary tank into an underground secondary containment pan. CSR involves adding aqueous oxalic acid to the waste tank in order to dissolve the remaining sludge heel. The resultant acidic waste solution is then pumped to another waste tank where it will be neutralized and then stored awaiting further processing. The waste tanks to be cleaned have a storage capacity of 2.84E+06 liters (750,000 gallons) and a target sludge heel volume of 1.89E+04 liters (5,000 gallons) or less for the initiation of CSR. The purpose of this paper is to describe the CSR process and to discuss the most significant technical issues associated with the development of CSR.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

MODELING AN ION EXCHANGE PROCESS FOR CESIUM REMOVAL FROM ALKALINE RADIOACTIVE WASTE SOLUTIONS

The performance of spherical Resorcinol-Formaldehyde ion-exchange resin for the removal of cesium from alkaline radioactive waste solutions has been investigated through computer modeling. Cesium adsorption isotherms were obtained by fitting experimental data using a thermodynamic framework. Results show that ion-exchange is an efficient method for cesium removal from highly alkaline radioactive waste solutions. On average, two 1300 liter columns operating in series are able to treat 690,000 liters of waste with an initial cesium concentration of 0.09 mM in 11 days achieving a decontamination factor of over 50,000. The study also tested the sensitivity of ion-exchange column performance to variations in flow rate, temperature and column dimensions. Modeling results can be used to optimize design of the ion exchange system.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

IMPACT OF ELIMINATING MERCURY REMOVAL PRETREATMENT ON THE PERFORMANCE OF A HIGH LEVEL RADIOACTIVE WASTE MELTER OFFGAS SYSTEM

The Defense Waste Processing Facility at the Savannah River Site processes high-level radioactive waste from the processing of nuclear materials that contains dissolved and precipitated metals and radionuclides. Vitrification of this waste into borosilicate glass for ultimate disposal at a geologic repository involves chemically modifying the waste to make it compatible with the glass melter system. Pretreatment steps include removal of excess aluminum by dissolution and washing, and processing with formic and nitric acids to: (1) adjust the reduction-oxidation (redox) potential in the glass melter to reduce radionuclide volatility and improve melt rate; (2) adjust feed rheology; and (3) reduce by steam stripping the amount of mercury that must be processed in the melter. Elimination of formic acid pretreatment has been proposed to eliminate the production of hydrogen in the pretreatment systems; alternative reductants would be used to control redox. However, elimination of formic acid would result in significantly more mercury in the melter feed; the current specification is no more than 0.45 wt%, while the maximum expected prior to pretreatment is about 2.5 wt%. An engineering study has been undertaken to estimate the effects of eliminating mercury removal on the melter offgas system performance. A homogeneous gas-phase oxidation model and an aqueous phase model were developed to study the speciation of mercury in the DWPF melter offgas system. The model was calibrated against available experimental data and then applied to DWPF conditions. The gas-phase model predicted the Hg{sub 2}{sup 2-}/Hg{sup 2+} ratio accurately, but some un-oxidized Hg{sup 0} remained. The aqueous model, with the addition of less than 1 mM Cl{sub 2} showed that this remaining Hg{sup 0} would be oxidized such that the final Hg{sub 2}{sup 2+}/Hg{sup 2+} ratios matched the experimental data. The results of applying the model to DWPF show that due to excessive shortage of chloride, only 6% of the mercury fed is expected to be chlorinated, mostly as Hg{sub 2}Cl{sub 2}, while the remaining mercury would exist either as elemental mercury (90%) or HgO (4%).

08 HYDROGEN↗

Treated bottom ash medium and method of arsenic removal from drinking water

A method for low-cost arsenic removal from drinking water using chemically prepared bottom ash pre-treated with ferrous sulfate and then sodium hydroxide. Deposits on the surface of particles of bottom ash form of activated iron adsorbent with a high affinity for arsenic. In laboratory tests, a miniscule 5 grams of pre-treated bottom ash was sufficient to remove the arsenic from 2 liters of 2400 ppb (parts per billion) arsenic-laden water to a level below 50 ppb (the present United States Environmental Protection Agency limit). By increasing the amount of pre-treated bottom ash, even lower levels of post-treatment arsenic are expected. It is further expected that this invention supplies a very low-cost solution to arsenic poisoning for large population segments.

54 ENVIRONMENTAL SCIENCES↗

Multimodel Surface Temperature Responses to Removal of U.S. Sulfur Dioxide Emissions

Abstract Three Earth System models are used to derive surface temperature responses to removal of U.S. anthropogenic SO 2 emissions. Using multicentury perturbation runs with and without U.S. anthropogenic SO 2 emissions, the local and remote surface temperature changes are estimated. In spite of a temperature drift in the control and large internal variability, 200 year simulations yield statistically significant regional surface temperature responses to the removal of U.S. SO 2 emissions. Both local and remote surface temperature changes occur in all models, and the patterns of changes are similar between models for northern hemisphere land regions. We find a global average temperature sensitivity to U.S. SO 2 emissions of 0.0055 K per Tg(SO 2 ) per year with a range of (0.0036, 0.0078). We examine global and regional responses in SO 4 burdens, aerosol optical depths (AODs), and effective radiative forcing (ERF). While changes in AOD and ERF are concentrated near the source region (United States), the temperature response is spread over the northern hemisphere with amplification of the temperature increase toward the Arctic. In all models, we find a significant response of dust concentrations, which affects the AOD but has no obvious effect on surface temperature. Temperature sensitivity to the ERF of U.S. SO 2 emissions is found to differ from the models' sensitivity to radiative forcing of doubled CO 2 .

Conley, A. J.↗

Science–based maize stover removal can be sustainable

Maize (Zea mays L.) stover can be harvested for multiple uses or left in the field to sustain soil organic carbon (SOC), cycle essential plant nutrients, and protect soil health. This 13-yr field study quantified effects of no (0 Mg ha –1 yr –1 ), low (1.0–1.4 Mg ha –1 yr –1 ), moderate (3.5–4.0 Mg ha –1 yr –1 ), or high rates (4.7–5.4 Mg ha –1 yr –1 ) of stover harvest from either continuous maize or maize–soybean [Glycine max (L.) Merr.] rotation on grain yield, plant nutrient concentrations, and multiple soil properties at two sites in Iowa. Stover harvest increased plant macro- and micro-nutrient removal, but did not affect average grain yields of either crops. Soil inorganic carbon (IC), SOC, bulk density, pH, and cation exchange capacity (CEC) showed no significant differences due to stover harvest. Plant tissue and soil-test nutrient concentration effects were also minor and site-specific. Stover harvest significantly (p < .05) decreased exchangeable K and Ca concentrations by 8.3–23.8% and 0.3–22.5% but overall soil health indicator effects were minimal. Overall, based on crop yields, plant nutrient and soil-test concentrations, soil health indicators, and carbon sequestration estimates, maize stover harvest can be sustainable provided: (a) grain yields consistently exceed 11 Mg ha –1 , (b) stover removal does not exceed 40% of the aboveground biomass (i.e., 3.5–4.0 Mg ha –1 yr –1 ), and (c) plant nutrients (especially K) are closely monitored.

54 ENVIRONMENTAL SCIENCES↗

Hierarchical Porous Activated Carbon from Wheat Bran Agro-Waste: Applications in Carbon Dioxide Capture, Dye Removal, Oxygen and Hydrogen Evolution Reactions

Here this work reports an efficient method for facile synthesis of hierarchically porous carbon (WB-AC) utilizing wheat bran waste. Obtained carbon showed 2.47 mmol g -1 CO 2 capture capacity with good CO 2 /N 2 selectivity and 27.35 to 29.90 kJ mol -1 isosteric heat of adsorption. Rapid removal of MO dye was observed with a capacity of ~555 mg g -1 . Moreover, WB-AC demonstrated a good OER activity with 0.35 V low overpotential at 5 mA cm -2 and a Tafel slope of 115 mV dec -1 . It also exhibited high electrocatalytic HER activity with 57 mV overpotential at 10 mA cm -2 and a Tafel slope of 82.6 mV dec -1 . The large SSA (757 m 2 g -1 ) and total pore volume (0.3696 cm 3 g -1 ) result from N 2 activation contributing to selective CO 2 uptake, high and rapid dye removal capacity and superior electrochemical activity (OER/HER), suggesting the use of WB-AC as cost effective adsorbent and metal free electrocatalyst.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Enhanced prediction of Cs removal by CST from Hanford tank waste with K accountability

Abstract The treatment of Hanford tank waste is one of the most challenging environmental cleanup activities to date. To expedite the processing of liquid waste stored in underground tanks in Washington State it is necessary to remove the significant dose contributor, 137 Cs. Crystalline silicotitanate ion exchanger is currently used to remove 137 Cs from the aqueous phase of Hanford tank wastes in preparation for vitrification at the Waste Treatment and Immobilization Plant (WTP). Improving the understanding of potassium impacts on ion exchange behavior of Cs will help in the operation of a critical component of one of the most complex treatment processes in the world today. Optimization of this process can result in significant cost savings and less waste production. Toward this effort, a series of batch contact tests varied in potassium concentration were conducted to look at the impact of potassium concentration on Cs distribution. Experimental distribution ratios ( K d ) were compared to the distribution ratios predicted using the ZAM model. A significant underprediction of Cs capacity in the presence of potassium was seen with the existing model. A revision of the equilibrium constants was determined and provided a statistically better fit for determining the Cs K d values in tank waste matrices.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Natural history of percutaneous drainage of postoperative collection following colorectal surgery: in which patients can follow-up imaging be dispensed with before drain removal?

Introduction: Colorectal surgery is complicated by postoperative collections in up to 25% of cases depending on local conditions. The aim of this study was to identify predictive factors of success of percutaneous drainage of collections in order to avoid follow-up imaging. Patients and methods: All consecutive patients between January 2009 and December 2016, who had undergone elective or emergency colorectal surgery (colorectal surgery and appendectomy) complicated by a postoperative collection treated by percutaneous drainage with follow-up imaging prior to drain removal, were included in this single-center and retrospective study. The primary objective was to assess predictive factors of success of the first attempt of percutaneous drainage of collections. Secondary objectives were to describe the natural history of percutaneous drainage of postoperative collections after colorectal surgery and the overall success rate of percutaneous drainage. Results: Fifty-three patients underwent percutaneous drainage of a postoperative collection during the study period and were included in this study. Complete resolution of the collection was observed on the first follow-up radiological examination in 36 patients (58%). In multivariate analysis, post-appendectomy collections (OR = 3.19 (1.14–9.27), p = 0.002) and reduction of the leukocyte count (OR = 3.22 (1.28–8.1), p = 0.013) were significantly associated with success of percutaneous drainage. Conclusion: This is the first study to address that follow-up imaging prior to drain removal might not be necessary in patients undergoing drainage of post-appendectomy collections and/or with more than 30% reduction of the leukocyte count at the first follow-up examination.

62 RADIOLOGY AND NUCLEAR MEDICINE↗