Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Project Readiness”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 883 records · Page 49

Science Validation for Dark Energy Research with Optical Imaging Surveys

The Universe has been expanding at an accelerating rate over the past several billion years, as though an unknown form of dark energy permeates all of space. The ultimate scientific goal of the proposed research is to distinguish between different physical mechanisms that could account for this observed accelerated expansion, for example, the zero-point energy of the vacuum, a dynamical form of energy that varies in time and/or space, or a modification to our theory of gravity. Wide- field optical imaging surveys of the night sky can test these competing models by measuring both the cosmic expansion history and the growth of large-scale structure. To this end, the Dark Energy Survey (DES) has cataloged several hundred million galaxies and thousands of supernovae. The Vera C. Rubin Observatory Legacy Survey of Space and Time (LSST), will enlarge the census to billions of galaxies and hundreds of thousands of supernovae. A critical question for these dark energy experiments is whether systematic uncertainties can continue to be controlled at a level to keep pace with the statistical precision offered by such enormous datasets. The immediate research objectives of this project were (1) to prepare and validate input datasets that are the foundation of cosmological analyses with DES, and (2) to prepare for value-added characterization of Rubin Observatory commissioning data to inform early operations and accelerate the realization of dark energy science from LSST data products. For DES, we assembled and curated cosmology-ready data releases that include value-added components such as enhanced photometric and astrometric calibrations, alternative source extraction algorithms, maps of the survey coverage and survey conditions, object classifications, object quality selections, galaxy shapes, and photometric redshifts. We used the galaxy clustering technique to validate the photometric redshift distributions of various galaxy samples to be used as lenses in combined studies of galaxy clustering and weak gravitational lensing. The galaxy clustering redshift analysis was enhanced by use of a larger sample of reference galaxies from the eBOSS spectroscopic survey that extends to higher redshifts. For LSST, we prepared for science validation studies of commissioning data aimed at dark energy science capability that extend beyond the normative system-level tests to be done by the Rubin Observatory Construction Project. We identified a set of proposed survey strategies and candidate target fields that could be observed during the commissioning period to enhance science validation activities related to studies of dark energy.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Hybrid Thermally Efficient Core (HyTEC) HyTEC Phase 1 – Advanced Aerodynamics Final Report

The objective of the Hybrid Thermally Efficient Core (HyTEC) – Advanced High Pressure Turbine (HPT) Aerodynamics project is to develop technology for a compact core that contributes to significant fuel burn reductions of 5-10% over current generation technologies. To accomplish this, the HPT is incorporating a range of aerodynamic features and technologies to improve component efficiency and provide favorable systems level trades. In particular, this project explored low solidity airfoils, advanced tip treatments, platform contouring, and advanced ceramic matrix composite (CMC) Stage 2 Nozzle (S2N) airfoils to eliminate the need for post throat cooling in a compact core environment. The maturation of these technology areas is expected to provide a significant improvement in component efficiencies, and consequently reductions in fuel burn, over the current state of the art (SoA). To mature these technologies to Technology Readiness Level (TRL) 4, a test campaign was performed that consisted of four tests at three facilities. TRL 3 testing was performed in the CW22 linear cascade at NASA Glenn for blade and nozzle technologies, TRL 4 nozzle testing was performed at GE Aerospace (GEA) Test Cell A8, and TRL 4 blade testing was performed at the Notre Dame Turbomachinery Laboratory (NDTL) using the Transonic Research Turbine (TRT) rig. Low solidity was successfully demonstrated to a TRL 4 level. Low solidity nozzles showed benefits in line with pre-project expectations, while low solidity blades were shown to have an aerodynamic penalty. Crucially, this program only considered the aerodynamic losses, and systems trades such as reductions in cooling flows are expected to continue to make low solidity blades a net positive. By successfully quantifying the aerodynamic performance in this project, these trades can be conducted to determine where in the engine architecture low solidity blades will contribute positively to system operation. Platform contouring was demonstrated to a TRL 4 level, with performance in line with the lower end of the pre-project expected range. Advanced tip treatments performance levels were indeterminate, showing the expected improvements to flow physics but with a performance level confounded by several rig issues including whirl mode induced variation in tip clearance. The elimination of post-throat cooling on the S2N was successfully demonstrated to provide a performance benefit, however that benefit was approximately half the level that was expected in pre-project predictions. Overall, the technology maturation plan for HyTEC Phase 1 was successful, bringing the suite of technologies to TRL 4.

High pressure turbine↗

History and Logic Model NASA Goddard Space Flight Center Instrument and Payload Systems Engineering Technical Performance Study

Historically, some NASA missions have exceeded schedule and cost commitments. Studies suggest technical performance is a contributor. The 1980 NASA Project Management Study concluded, "one of the most significant contributors to cost and schedule growth is inadequate definition of technical and management aspects of a program..." (as cited in GAO/NSIAD-93-97, p. 11). The 1991 NASA Roles and Missions Report identified a "need for increased emphasis on technological readiness and requirements on the front end of a program" (as cited in GAO/NSIAD-93-97, p. 11). The 1992 NASA Program Costs Report stated that NASA officials identified, among other things, "insufficient definition studies... [and] program redesigns and technical complexities" as reasons for cost and schedule overruns (GAO/NSAID-93-97, p. 11). The 2002 Task Force on Acquisition of National Security Space Programs found "requirements definition and control issues, unhealthy cost bias in proposal evaluation, widespread lack of budget reserves required to implement high risk programs on schedule, and an overall underappreciation of the importance of appropriately staffed and trained system engineering staff to manage the technologically demanding and unique aspects of space programs" (DoD, 2003, p.i.) In 2007, The NASA Office of the Chief Engineer chartered the NASA Instrument Capability Study (NICS) “to determine whether NASA instrument developers are facing challenges that impact the capability to design and build quality instruments or whether there are flaws in the acquisition strategy evidenced by schedule delays, cost overruns, and increased technical risk via design deficiencies. The... team was also chartered to determine if occurrences [are]... isolated cases or if there are generic issues... If the issues [are] found to be generic, the team [is] to offer solutions to recover such capability" (NICS Report, 2008, p. vi). The 2008 NICS Report, led by Goddard Space Flight Center (GSFC), identified challenges to instrument technical performance consistent with findings from previous reports. In 2017, the Instrument Project Division (IPD) Implementation Study was initiated to determine if there was a change in meeting schedule and cost commitments after implementing certain NICS recommendations. In 2018, the Instrument Technical Performance Study was initiated to determine the current state of Instrument Technical Performance in the GSFC Payload & Instrument Systems Engineering Branch. The purpose of the combined studies is to answer the question, "Is there a relationship between meeting NASA scientific instrument technical success and meeting schedule and cost commitments? If yes, what is the relationship?" References Department of Defense Office of the Under Secretary of Defense for Acquisition, Technology, and Logistics. (2003). The report of the defense science board/ air force scientific advisory board joint task force on acquisition of national security space programs. Washington DC. Government Accounting Office. (1992). NASA program costs: Space missions require substantially more funding than initially estimated. GAO/NSIAD-93-97. Washington DC. National Aeronautics and Space Administration, National Oceanic and Atmospheric Agency, Department of Defense. (2008). The NASA instrument capability study final report. NP-2008-11-058-GSFC. Washington DC.

Robbins, Geraldine↗

Integrated Display and Environmental Awareness System - System Architecture Definition

The Integrated Display and Environmental Awareness System (IDEAS) is an interdisciplinary team project focusing on the development of a wearable computer and Head Mounted Display (HMD) based on Commercial-Off-The-Shelf (COTS) components for the specific application and needs of NASA technicians, engineers and astronauts. Wearable computers are on the verge of utilization trials in daily life as well as industrial environments. The first civil and COTS wearable head mounted display systems were introduced just a few years ago and they probed not only technology readiness in terms of performance, endurance, miniaturization, operability and usefulness but also maturity of practice in perspective of a socio-technical context. Although the main technical hurdles such as mass and power were addressed as improvements on the technical side, the usefulness, practicality and social acceptance were often noted on the side of a broad variety of humans' operations. In other words, although the technology made a giant leap, its use and efficiency still looks for the sweet spot. The first IDEAS project started in January 2015 and was concluded in January 2017. The project identified current COTS systems' capability at minimum cost and maximum applicability and brought about important strategic concepts that will serve further IDEAS-like system development.

Wearables↗

Power Management and Distribution Trades Studies for a Deep-Space Mission Scientific Spacecraft

As part of NASA's Project Prometheus, the Nuclear Systems Program, NASA GRC performed trade studies on the various Power Management and Distribution (PMAD) options for a deep-space scientific spacecraft which would have a nominal electrical power requirement of 100 kWe. These options included AC (1000Hz and 1500Hz and DC primary distribution at various voltages. The distribution system efficiency, reliability, mass, thermal, corona, space radiation levels and technology readiness of devices and components were considered. The final proposed system consisted of two independent power distribution channels, sourced by two 3-phase, 110 kVA alternators nominally operating at half-rated power. Each alternator nominally supplies 50kWe to one half of the ion thrusters and science modules but is capable of supplying the total power re3quirements in the event of loss of one alternator. This paper is an introduction to the methodology for the trades done to arrive at the proposed PMAD architecture. Any opinions expressed are those of the author(s) and do not necessarily reflect the views of Project Prometheus.

Kimnach, Greg L.↗

De-Inventory Plan for Transuranic Waste Stored at Area G

This report describes the strategy and detailed work plan developed by Los Alamos National Laboratory (LANL) to disposition transuranic (TRU) waste stored at its Area G radioactive waste storage site. The focus at this time is on disposition of 3,706 m 3 of TRU waste stored above grade by June 30, 2014, which is one of the commitments within the Framework Agreement: Realignment of Environmental Priorities between the Department of Energy (DOE) National Nuclear Security Administration (NNSA) and the State of New Mexico Environment Department (NMED), Reference 1. A detailed project management schedule has been developed to manage this work and better ensure that all required activities are aligned and integrated. The schedule was developed in conjunction with personnel from the NNSA Los Alamos Site Office (LASO), the DOE Carlsbad Field Office (CBFO), the Central Characterization Project (CCP), and Los Alamos National Security, LLC (LANS). A detailed project management schedule for the remainder of the above grade inventory and the below grade inventory will be developed and incorporated into the De-Inventory Plan by December 31, 2012. This schedule will also include all newly-generated TRU waste received at Area G in FYs 2012 and 2013, which must be removed by no later than December 31, 2014, under the Framework Agreement. The TRU waste stored above grade at Area G is considered to be one of the highest nuclear safety risks at LANL, and the Defense Nuclear Facility Safety Board has expressed concern for the radioactive material at risk (MAR) contained within the above grade TRU waste inventory and has formally requested that DOE reduce the MAR. A large wildfire called the Las Conchas Fire burned extensive areas west of LANL in late June and July 2011. Although there was minimal to no impact by the fire to LANL, the fire heightened public concern and news media attention on TRU waste storage at Area G. After the fire, New Mexico Governor Susana Martinez also requested that LANL accelerate disposition of TRU waste stored above grade at Area G. The 3,706 m 3 volume of TRU waste stored above grade consists of 4,495 containers that include all above grade non-cemented waste as well as above grade cemented waste that was ready for characterization on October 1, 2011. This volume includes all newly-generated TRU waste currently stored at Area G as of October 1, 2011. This volume does not include the Bolas Grandes spheres, mixed low level waste (MLLW) containers, empty containers, cemented waste that requires remediation, projected newly generated TRU waste from FY 2012 and later, or TRU waste stored below grade. The 3,706 m 3 volume represents about 86 per cent of the total volume of TRU waste stored above grade on October 1, 2011. The De-Inventory Plan supports the DOE Office of Environmental Management (EM) goal to disposition 90% of the Legacy TRU waste within the DOE complex by the end of 2015 as stated in its Roadmap for EM’s Journey to Excellence (Reference 2). The plan also addresses precursor actions for disposition of TRU waste that are necessary for compliance with the Compliance Order on Consent issued by the NMED in 2005 (Reference 3).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Christmas Valley Renewable Energy Assessment

In partnership with the Oregon Military Department, the Department of Energy used the award to assess and evaluate renewable resources in a 2,622-acre location in Lake County, central Oregon, leading to future development of up to 200 MW of solar electricity. In partnership with the Oregon Military Department, the Department of Energy used the award to assess and evaluate renewable resources in a 2,622-acre location in Lake County, central Oregon, leading to future development of up to 200 MW of solar electricity. The Oregon Military Department (Military) acquired a large parcel of land located in south central Oregon. The land was previously owned by the US Air Force and developed for an Over-the-Horizon Backscatter Radar Transmitter Facility, located about 10 miles east of the town of Christmas Valley. The Military is investigating a number of uses for the site, including Research and Development (R&D) laboratory, emergency response, military operations, developing renewable energy and related educational programs. One of the key potential uses would be for a large scale solar photovoltaic power plant. This is an attractive use because the site has excellent solar exposure; an existing strong electrical interconnection to the power grid; and a secure location at a moderate cost per acre. The project objectives include: 1. Site evaluation 2. Research and Development (R&D) facility analysis 3. Utility interconnection studies and agreements 4. Additional on-site renewable energy resources analysis 5. Community education, outreach and mitigation 6. Renewable energy and emergency readiness training program for veterans

14 SOLAR ENERGY↗

Experimentation for the Maturation of Deep Space Cryogenic Refueling Technologies

This report describes the results of the "Experimentation for the Maturation of Deep Space Cryogenic Refueling Technology" study. This study identifies cryogenic fluid management technologies that require low-gravity flight experiments bring technology readiness levels to 5 to 6; examines many possible flight experiment options; and develops near-term low-cost flight experiment concepts to mature the core technologies. A total of 25 white papers were prepared by members of the project team in the course of this study. The full text of each white paper is included and 89 relevant references are cited. The team reviewed the white papers that provided information on new or active concepts of experiments to pursue and assessed them on the basis of technical need, cost, return on investment, and flight platform. Based on on this assessment the "Centaur Test Bed for Cryogenic Fluid Management" was rated the highest. "Computational Opportunities for Cryogenics for Cryogenic and Low-g Fluid Systems" was ranked second, based on its high scores in state of the art and return on investment, even though scores in cost and time were second to last. "Flight Development Test Objective Approach for In-space Propulsion Elements" was ranked third.

Chato, David J.↗

Dust Solution Testing Initiative (DuSTI) Executive Summary

Mitigating dust is critical for the success of all future lunar surface systems as nearly all hardware that encounters the surface of the Moon will interact with lunar dust. The Dust Solution Testing Initiative (DuSTI) project was a series of component and subsystem tests in dusty environments to test existing technologies with high potential for lunar dust mitigation. The tested technologies included coatings for softgoods, coatings for hardgoods, and pliable cleaners. The DuSTI project included several adhesion and abrasion tests on various substrates, in addition to mechanical strength tests for candidate materials. The testing results provided data recommendations on coatings to use for adhesion and abrasion mitigation for lunar dust and increased Technology Readiness Levels (TRL) for commercial off the shelf (COTS) technologies. A NASA Technical Publication will be published in 2022 with information on the testing process, detailed results, recommendations, and future work.

dust mitigation↗

X-57 Flight Systems Integration Path

The foundation for a safe and successful flight test of the National Aeronautics and Space Administration (NASA) X-57 Maxwell all-electric experimental airplane, or any X-Plane, is comprehensive system testing on the ground. This test campaign includes verification and validation (V&V) that the integrated system operates as designed and expected, as well as understanding how the system reacts and responds to failures that can occur during flight by performing failure modes and effects testing (FMET). The aircraft should be in the final flight configuration for these test activities because any modifications, even those that appear insignificant, could affect test outcomes. Although the plan was to perform V&V and FMET testing once the airplane was in the flight configuration, due to multiple component redesigns, concurrent software development, and other problems with on-aircraft testing, the X-57 Maxwell never made it into a full-flight configuration. As a result, a build-up approach was followed to test software and hardware as they became ready in order to continue making progress wherever possible. Using this approach revealed problems with the hardware and software faster than waiting for a full-flight configuration, allowing solutions to be found more quickly and in parallel with other project tasks. Other than unloaded motor testing in a lab setting, the only other test setup was on the airplane itself. On-aircraft testing was preferrable in order to test things as close to a flight configuration as possible but was time consuming due to the requirements for testing on the airplane. To overcome some of the on-aircraft barriers, off-aircraft test configurations, such as the Systems Integration Laboratory (SIL) and hardware-in-the-loop (HIL) setups, were used, but each of these setups had limitations to be considered. As a result, solutions found in the SIL or HIL configurations did not always work as expected on the airplane, resulting in an iterative process between on- and off-aircraft testing to find the final solution. Having a dedicated test platform such as an iron bird that closely represents the aircraft - without flight hardware - would have been the most effective off-aircraft test setup, which could have allowed the project to save time and money and potentially reach flight. This paper will highlight the V&V and FMET considerations and testing prerequisites, the build-up approaches to both software and system testing, the benefits and drawbacks to different test configurations, as well as battery testing and operations.

Kassidy M. Mclaughlin↗

X-57 Flight Systems Integration Path

The foundation for a safe and successful flight test of the National Aeronautics and Space Administration (NASA) X-57 Maxwell all-electric experimental airplane, or any X-Plane, is comprehensive system testing on the ground. This test campaign includes verification and validation (V&V) that the integrated system operates as designed and expected, as well as understanding how the system reacts and responds to failures that can occur during flight by performing failure modes and effects testing (FMET). The aircraft should be in the final flight configuration for these test activities because any modifications, even those that appear insignificant, could affect test outcomes. Although the plan was to perform V&V and FMET testing once the airplane was in the flight configuration, due to multiple component redesigns, concurrent software development, and other problems with on-aircraft testing, the X-57 Maxwell never made it into a full-flight configuration. As a result, a build-up approach was followed to test software and hardware as they became ready in order to continue making progress wherever possible. Using this approach revealed problems with the hardware and software faster than waiting for a full-flight configuration, allowing solutions to be found more quickly and in parallel with other project tasks. Other than unloaded motor testing in a lab setting, the only other test setup was on the airplane itself. On-aircraft testing was preferrable in order to test things as close to a flight configuration as possible but was time consuming due to the requirements for testing on the airplane. To overcome some of the on-aircraft barriers, off-aircraft test configurations, such as the Systems Integration Laboratory (SIL) and hardware-in-the-loop (HIL) setups, were used, but each of these setups had limitations to be considered. As a result, solutions found in the SIL or HIL configurations did not always work as expected on the airplane, resulting in an iterative process between on- and off-aircraft testing to find the final solution. Having a dedicated test platform such as an iron bird that closely represents the aircraft - without flight hardware - would have been the most effective off-aircraft test setup, which could have allowed the project to save time and money and potentially reach flight. This paper will highlight the V&V and FMET considerations and testing prerequisites, the build-up approaches to both software and system testing, the benefits and drawbacks to different test configurations, as well as battery testing and operations.

Kassidy McLaughlin↗

Moving K-12 Zero Energy Schools to the Mainstream: Establishing Design Guidelines and Energy Targets: Preprint

K-12 school buildings are ideal candidates to lead the market shift from buildings that consume energy to buildings that produce as much renewable energy as they use, and there are now resources available to guide owners and project teams as they make that shift. Chief among them is the Advanced Energy Design Guide for K-12 School Buildings: Achieving Zero Energy (K-12 ZE AEDG). Starting with a feasibility study to prove that zero energy schools were possible, a committee of industry experts used extensive energy modeling to create a set of energy use intensity allowances for school buildings such that on-site renewable energy could meet the buildings' energy loads . These energy targets were compared with the energy use intensities of a limited number of schools that have achieved very high levels of energy performance. The allowances represent a 'zero energy ready' (rather than zero energy) school, because in many situations the ability to use on-site renewable sources is limited by utilities, policies, or economics. From these targets, the guidance for achieving a zero energy school was created and developed into the K-12 ZE AEDG, which covers the process of designing and building zero energy schools from the perspective of an owner and a project team. The K-12 ZE AEDG advocates setting an absolute energy target before design begins. The K-12 ZE AEDG also contains practical, cost-effective strategies for achieving the energy target and outreach approaches and disseminating these market-friendly strategies to design and school owner communities.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Moving K-12 Zero Energy Schools to the Mainstream: Establishing Design Guidelines and Energy Targets

K-12 school buildings are ideal candidates to lead the market shift from buildings that consume energy to buildings that produce as much renewable energy as they use, and there are now resources available to guide owners and project teams as they make that shift. Chief among them is the Advanced Energy Design Guide for K-12 School Buildings: Achieving Zero Energy (K-12 ZE AEDG). Starting with a feasibility study to prove that zero energy schools were possible, a committee of industry experts used extensive energy modeling to create a set of energy use intensity allowances for school buildings such that on-site renewable energy could meet the buildings' energy loads . These energy targets were compared with the energy use intensities of a limited number of schools that have achieved very high levels of energy performance. The allowances represent a 'zero energy ready' (rather than zero energy) school, because in many situations the ability to use on-site renewable sources is limited by utilities, policies, or economics. From these targets, the guidance for achieving a zero energy school was created and developed into the K-12 ZE AEDG, which covers the process of designing and building zero energy schools from the perspective of an owner and a project team. The K-12 ZE AEDG advocates setting an absolute energy target before design begins. The K-12 ZE AEDG also contains practical, cost-effective strategies for achieving the energy target and outreach approaches and disseminating these market-friendly strategies to design and school owner communities.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Techno Economic Analysis of an LGFCS MWE Class SOFCT System (Final Scientific/Technical Report)

The objective of this project is to perform a range of technical, cost and economic analyses of a MWscale natural gas fired Solid Oxide Fuel Cell (SOFC) distributed power generation system design. The information generated will provide evidence of the tracking of technology and manufacturing readiness supportive of Technology Readiness Level 7 (TRL7) system testing in the 2022 timeframe that meets the Department of Energy’s (DOE) targets for cost (<$6000/kW) and durability (<0.5% power degradation/1000 hours).

20 FOSSIL-FUELED POWER PLANTS↗

Building a CO 2 Economy in the Four Corners Region [Script plus Slides]

This project will assess options in the Four Corners region relative to developing a CO₂-based economy, considering both CO₂ supply (via capture) and CO₂ demand (utilization and storage). The assessment will consider a spectrum of opportunities at various stages of technology readiness, including their magnitude and regional distribution. An additional component (via a collaboration TBD) will evaluate the regional implications relative to economy and job growth.

54 ENVIRONMENTAL SCIENCES↗

Pressurizing Hagan and SAVY containers to 30-psig (air) to measure the release of analytical cerium oxide test powder

In response to an ESS surrounding the storage of sealed sources at TA-55, personnel from RP-SVS (Radiation Protection Services) and ORI-2 (Operational Readiness & Execution) were approached by ES-55 (Facility System Engineering) to provide technical testing of known nuclear material storage containers. Testing criteria were determined by SB-PF (Safety Basis for Plutonium Facilities). Tests were conducted in conjunction with multiple related projects at the Aerosol Sciences Laboratory (TA-03-0130-0103). An experimental system was quickly developed to deliver a pressure pulse (30-psig) that mimics a sealed source burst scenario. A series of twelve tests was conducted. Six tests were done with two different 5QT SAVY-4000 containers, where each SAVY filter-lid combination was subjected to three successive test insults. Three tests were done with a (0.375" diameter filter) 8Q.T Hagan container, and three tests with a (0.625" diameter filter) 8QT Hagan container. An unused, fresh container filter was used for each tested Hagan container, each receiving only one test insult per filter. Cerium oxide (CeO 2 ) powder was loaded (100 grams per test) into a nozzle in the tested Hagan and SAVY containers, and the nozzle was hard-plumbed to a ball valve and a pressure source. This system was installed into the Los Alamos RRFMC (Respirable Release Measurement Chamber), which is an integrated multipurpose aerosol wind tunnel that satisfies NQA-1 subpart 2.4 for R&D work. The ball valve was fitted with a mechanical linkage for operation from outside the wind tunnel. An aerodynamic particle sizer counted the particle concentrations and size distributions of released aerosol. Respirable aerosol released during the tests was measured and a correction factor for wind tunnel flowrate and internal duct deposition was applied.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Office of Nuclear Verification FY 2023 Quarterly Report TSVT Q1

This project encompasses the continued development and training of a U.S. operational team, the Test Site Verification Team (TSVT), supporting verification of nuclear testing activities. TSVT builds on decades of U.S. nuclear testing history and nuclear explosion monitoring experience. The Team maintains readiness to deploy internationally on short notice to provide field-based support of verification of declared or undeclared nuclear testing and associated activities, as well as follow-on activities including monitoring and capability disablement and dismantlement, as established by negotiated agreement or treaty. The roles and structure of the TSVT are integrated with other NA-243 deployable verification teams and the interagency. FY23 TSVT activities focus on continued capability buildup within the team, including Team trainings and exercises with a focus on missions in confined spaces (e.g., tunnels, mines, other underground facilities), increased familiarity with foreign nuclear weapons testing programs, demonstration of Team capacity to deploy, train, and practice sustained OPSEC in non-western locations, establishment of sustainable storage and maintenance of equipment, specification and procurement of additional equipment to support field observations, further evolution of concepts of operation documents (CONOPs), and mission coordination with Headquarters and associated Stakeholders. Activities will culminate with a full-scale domestic team exercise at the end of FY23 focusing on underground activities signatures/observations and safety including advanced outdoor safety and familiarity in working around explosive test environments. In addition, we will be further articulating approaches and capacity relevant to the identification of nuclear tests, as well as monitoring of nuclear testing activities and/or dismantlement of nuclear test sites and anticipate developing additional equipment requests in support of this evolution. The TSVT Team Leads will also coordinate with its Senior Advisor, the TSVT Logistics and Readiness (L&R) Training Lead, and NNSA Headquarters to draft a five-year TSVT training and exercise plan, that strategically and incrementally builds capacity and expertise in key areas of significance for the continuum of nuclear and nuclear-related testing activities that fall within the team’s mission space.

42 ENGINEERING↗

Prefabricated Standard Modular Hydropower Installations for Low-cost Small Hydropower

The goal of the present project was to investigate the potential savings in greenfield hydropower project costs across sites having vastly different characteristics. Littoral Power Systems, Inc. (LPS) undertook the project described herein to explore the promise of Standard Modular Hydropower (SMH) to transform the processes of site identification, conceptual design, detailed design, and construction planning to support low- cost, environmentally attractive development of small hydropower facilities at new stream- reaches. This report includes descriptions of the work to develop these processes, the resulting facility designs achieved using these processes and the projected economics. Installation cost estimates for the resulting conceptual greenfield facility design at two different locations come in at $\$3,419$/kW for Balcony Falls and $\$2,124$/kW for LPS 566. The installation time from site preparation to commissioning-ready is estimated to be 58 weeks for the conceptual facility at Balcony Falls and 42 weeks for the conceptual facility at LPS 566. A real challenge to any hydropower facility – not only the two cases studied here – is that environmental and social conditions can change, and as such, the facility may be required to change. The h-Modulor modules connect uniquely and are structurally independent, enabling site configurations to be changed on the fly, as needed. These results show that LPS's h-Modulor SMH approach delivers an attractive balance between efficiency, economics, and environmental sustainability for small hydro greenfield sites.

13 HYDRO ENERGY↗