Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Probabilistic Risk”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 883 records · Page 49

Survey on Failure Modes and Failure Mechanisms in Digital Components and Systems

This paper presents the preliminary results of a survey on the operating experience of a broad range of digital components and systems deployed in various industries. The primary objective of this survey is to identify principal modes and mechanisms of failure in field-deployed digital systems. Earlier works have sought to determine the failure rates of various classes of digital devices with the intent to integrate this information into the risk analysis calculations though still immature for such systems. Failure rates of individual components or systems are not taken into account in this evaluation; only failure modes and their respective probabilistic distribution are considered. Preliminary results from two data sources, SPIDR and FARADIP, are presented.

42 ENGINEERING↗

A Multi-Stage Stochastic Risk Assessment With Markovian Representation of Renewable Power

Probabilistic forecasts provide a distribution of possible outputs and so can capture the uncertainty and variability of Variable Renewable Energy (VRE). However, taking advantage of uncertainty information has practical challenges that make it difficult to integrate probabilistic forecasting into control room decision-making. This paper proposes a novel use-case for probabilistic forecasts by incorporating them into the hour-ahead operations for situational awareness via a risk-averse multi-stage stochastic program. We employ a Markovian representation of the probabilistic forecasts that enables the formulation of the multi-stage problem and avoids a scenario generation phase. We test the model on a realistically sized system to assess risk and showcase the capability of using probabilistic renewable forecast as input to produce probabilistic output forecasts of future system states. The results show that the model can capture time consistency in the reserves and Area Control Error (ACE) forecast. The solution times are adequate for risk profiling in hour-ahead timescales.

forecasting↗

Acute Radiation Risk and BRYNTRN Organ Dose Projection Graphical User Interface

The integration of human space applications risk projection models of organ dose and acute radiation risk has been a key problem. NASA has developed an organ dose projection model using the BRYNTRN with SUM DOSE computer codes, and a probabilistic model of Acute Radiation Risk (ARR). The codes BRYNTRN and SUM DOSE are a Baryon transport code and an output data processing code, respectively. The risk projection models of organ doses and ARR take the output from BRYNTRN as an input to their calculations. With a graphical user interface (GUI) to handle input and output for BRYNTRN, the response models can be connected easily and correctly to BRYNTRN. A GUI for the ARR and BRYNTRN Organ Dose (ARRBOD) projection code provides seamless integration of input and output manipulations, which are required for operations of the ARRBOD modules. The ARRBOD GUI is intended for mission planners, radiation shield designers, space operations in the mission operations directorate (MOD), and space biophysics researchers. BRYNTRN code operation requires extensive input preparation. Only a graphical user interface (GUI) can handle input and output for BRYNTRN to the response models easily and correctly. The purpose of the GUI development for ARRBOD is to provide seamless integration of input and output manipulations for the operations of projection modules (BRYNTRN, SLMDOSE, and the ARR probabilistic response model) in assessing the acute risk and the organ doses of significant Solar Particle Events (SPEs). The assessment of astronauts radiation risk from SPE is in support of mission design and operational planning to manage radiation risks in future space missions. The ARRBOD GUI can identify the proper shielding solutions using the gender-specific organ dose assessments in order to avoid ARR symptoms, and to stay within the current NASA short-term dose limits. The quantified evaluation of ARR severities based on any given shielding configuration and a specified EVA or other mission scenario can be made to guide alternative solutions for attaining determined objectives set by mission planners. The ARRBOD GUI estimates the whole-body effective dose, organ doses, and acute radiation sickness symptoms for astronauts, by which operational strategies and capabilities can be made for the protection of astronauts from SPEs in the planning of future lunar surface scenarios, exploration of near-Earth objects, and missions to Mars.

Cucinotta, Francis A.↗

Assembling Multiple Models Within the RAVEN Framework

RAVEN (Risk Analysis Virtual Environment) is an INL-developed software tool that can be used to identify and increase the safety margin in complex systems. As a generic software framework, RAVEN is designed to perform parametric and probabilistic analysis based on the response of complex system codes. RAVEN is capable of investigating the system response as well as the input space using Monte Carlo, Grid, or Latin Hyper Cube sampling schemes, but its strength is focused toward system feature discovery, such as limit surfaces, separating regions of the input space leading to system failure, using dynamic supervised learning techniques. RAVEN is currently able to construct multi-targets Reduced Order Models (ROMs), which are aimed to represent the response of a system (in a fixed configuration) for multiple Figures of Merits (FOMs) and time-dependent ROMs. These capabilities represent the initial steps for a larger implementation about the interaction of multiple models. In fact, in several cases, multiple models need to interface with each other since the initial conditions of one are dependent on the outcomes of another. To better understand the problem that here is solved, it is useful to consider a simple example: The following problem is considered: a weather forecast simulation code 'a' is used to compute the external (i.e. ambient) temperature in a certain location. A second model 'b' is inquired to compute the average temperature in a room having as boundary condition, among several others, the external ambient temperature. The response of the model 'b' depends on the outcome of the model 'a'. The reported example is only aimed to illustrate the reason why the creation of a framework to make interact different models is a key development for the advancement of RAVEN as a comprehensive calculation flow driver. Before reporting how the ensemble-models have been implemented, it is necessary to briefly describe the representative Model 'entities' that are available in RAVEN.

42 ENGINEERING↗

Importance Of Quality Control in Reducing System Risk, a Lesson Learned From The Shuttle and a Recommendation for Future Launch Vehicles

This paper presents lessons learned from the Space Shuttle return to flight experience and the importance of these lessons learned in the development of new the NASA Crew Launch Vehicle (CLV). Specifically, the paper discusses the relationship between process control and system risk, and the importance of process control in improving space vehicle flight safety. It uses the External Tank (ET) Thermal Protection System (TPS) experience and lessons learned from the redesign and process enhancement activities performed in preparation for Return to Flight after the Columbia accident. The paper also, discusses in some details, the Probabilistic engineering physics based risk assessment performed by the Shuttle program to evaluate the impact of TPS failure on system risk and the application of the methodology to the CLV.

Safie, Fayssal M.↗

Insights from the WGRISK workshop on the PSA of advanced and new reactors

Probabilistic Safety Assessment /Probabilistic Risk Assessment for new and advanced reactors is recognized as an essential complement of the deterministic approaches to achieve improved safety and performances of new nuclear power plants, comparing to the operating plants. However, the development of PSA to these reactors is encountered to concurrent challenges, mainly due to the limited available design information, as well as due to potentially new initiating events, accident sequences and phenomena. The use of PSA in the decision making process is also challenging since the resulting PSA may not sufficiently reflect the future as-built, as-operated plant information. In order to address these aspects, the OECD/NEA/WGRISK initiated two coordinated tasks on 'PSA for Advanced Reactors' and 'PSA in the frame of Design and Commissioning of New NPPs'. In this context, a joint workshop was organized by OECD, during which related subjects were presented and discussed, including PSA for generation IV reactors, PSA for evolutionary reactors, PSA for small modular reactors, severe accidents and Level 2 PSA, Level 3 PSA and consequences analysis, digital I and C modeling, passive systems reliability, safety-security interface, as well as the results of the surveys performed in the frame of theses WGRISK tasks. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Probability of failure and risk assessment of propulsion structural components

The probabilistic structural analysis method (PSAM) was developed to analyze the effects of fluctuating loads, variable material properties, and uncertain analytical models especially for high performance structures such as the Space Shuttle Main Engine turbopump blades. Risk is calculated after expensive service experience. However, probabilistic structural analysis provides a rational alternative method to quantify uncertainties in the structural performance and durability. NESSUS (Numerical Evaluation of Stochastic Structures Under Stress) was developed as a probabilistic structural analysis computer code which integrates finite element methods and reliability algorithms, capable to predicting the probability distributions of structural response variables such as stress, displacement, natural frequencies, and buckling loads. This computer code is detailed.

Shiao, Michael C.↗

Mining Behavior Based Safety Data to Predict Safety Performance

The Idaho National Laboratory (INL) operates a behavior based safety program called Safety Observations Achieve Results (SOAR). This peer-to-peer observation program encourages employees to perform in-field observations of each other's work practices and habits (i.e., behaviors). The underlying premise of conducting these observations is that more serious accidents are prevented from occurring because lower level “at risk” behaviors are identified and corrected before they can propagate into culturally accepted “unsafe” behaviors that result in injuries or fatalities. Although the approach increases employee involvement in safety, the premise of the program has not been subject to sufficient empirical evaluation. The INL now has a significant amount of SOAR data on these lower level “at risk” behaviors. This paper describes the use of data mining techniques to analyze these data to determine whether they can predict if and when a more serious accident will occur.

99 GENERAL AND MISCELLANEOUS↗

Reliability and risk assessment of structures

Development of reliability and risk assessment of structural components and structures is a major activity at Lewis Research Center. It consists of five program elements: (1) probabilistic loads; (2) probabilistic finite element analysis; (3) probabilistic material behavior; (4) assessment of reliability and risk; and (5) probabilistic structural performance evaluation. Recent progress includes: (1) the evaluation of the various uncertainties in terms of cumulative distribution functions for various structural response variables based on known or assumed uncertainties in primitive structural variables; (2) evaluation of the failure probability; (3) reliability and risk-cost assessment; and (4) an outline of an emerging approach for eventual certification of man-rated structures by computational methods. Collectively, the results demonstrate that the structural durability/reliability of man-rated structural components and structures can be effectively evaluated by using formal probabilistic methods.

Chamis, C. C.↗

Developing high-resolution spatial data of migration corridors for avian species of concern in regions of high potential wind development

The future of the US economy, our national security, and our environmental quality all depend on decreasing our reliance on foreign oil and on fossil fuels. An essential component of decreasing this reliance is the development of alternative energy sources. Wind power is among the most important alternative energy sources currently available, and the mid-Atlantic region is a primary focus for wind power development. In addition to being important to the development of wind power, the mid-Atlantic region holds a special responsibility for the conservation of the eastern North America's golden eagles (Aquila chrysaetos). This small population breeds in northeastern Canada, winters in the southern Appalachians, and nearly all of these birds pass through the mid-Atlantic region twice each year. Movement of these birds is not random and, particularly during spring and autumn, migrating golden eagles concentrate in a narrow 30-50 mile wide corridor in central Pennsylvania. Thus, because the fate of these rare birds may depend on responsible management of the habitat they use it is critical to use research to identify ways to mitigate prospective impacts on this and similar raptor species. The goal of this project was to develop high-resolution spatial risk maps showing migration corridors of and habitat use by eastern golden eagles in regions of high potential for wind development. To accomplish this, we first expanded existing models of raptor migration for the eastern USA to identify broad-scale migration patterns. We then used data from novel high-resolution tracking devices to discover routes of passage and detailed flight behavior of individual golden eagles throughout the eastern USA. Finally, we integrated these data and models to predict population-level migration patterns and individual eagle flight behavior on migration. We then used this information to build spatially explicit, probabilistic maps showing relative risk to birds from wind development. This project has numerous benefits to people and to wildlife, primarily because it will provide a framework for safer and less controversial development of wind power. Because golden eagles are an important "umbrella" for other raptors, this project benefits a suite of species that may be impacted by wind turbines. Finally this work is a recognized priority for central Appalachian states and it is explicitly called for in, and meets the goals of, numerous state wildlife conservation plans. The final product we created, a region-wide map of relative risk to eagles of development of wind power, has allowed us to make specific recommendations regarding siting and operation of and mitigation at wind facilities. This approach also serves as a model for other projects to protect eagles in other places and to conserve suites of species beyond raptors.

17 WIND ENERGY↗

PROBABALISTIC RISK ANALYSIS AND THERMAL MARGIN PROCESS FOR AN INFLATABLE AEROSHELL

Atmospheric entry vehicle thermal protection systems (TPS) are margined due to the uncertainties that exist in entry aeroheating environments and the thermal response of the materials and structures. Traditional approaches typically over-margin TPS and offer very little insight into the risk of over-temperature during flight. A probabilistic margin process can be used to apply thermal margin to an aeroshell based on a rigorously calculated risk of failure. This probabilistic margin process allows engineers to make informed aeroshell design, entry-trajectory modifications, and risk trades while preventing excessive margin from being applied. This methodology can also be applied to other TPS applications, hot structures, and other engineering disciplines.

Steven A Tobin↗

Probabilistic Groundwater Modeling of the RDX Plume at Los Alamos National Laboratory to Support Risk Assessment - 20359

A plume of the contaminant hexahydro-1,3,5-trinitro-1,3,5-triazine (RDX) with concentrations greater than the New Mexico tap water drinking standard (9.66 ppb) is present in the regional aquifer near the southwestern boundary of Los Alamos National Laboratory (LANL). A risk assessment is performed for exposure to regional aquifer groundwater, with long-term predictions of RDX concentrations provided by a calibrated, probabilistic, numerical fate and transport model. The structure of the model is hierarchical, with the RDX Regional Aquifer (RA) groundwater model acting as the primary tool for analysis of downgradient RDX concentrations. The RA model is deeply informed by the conceptual site model (CSM) and is calibrated using site RDX concentration data and hydraulic head measurements, along with other analyses. The model is calibrated using data through December 2019. Where data are scarce other lines of evidence are used to inform inputs, including the multiphase RDX Vadose Zone (VZ) model and Pipe and Disk analytical screening tool. Model inputs are described with informative prior distributions using a robust approach to development that incorporates all available lines of evidence for every parameter used as an input to the RA model. Calibration is performed using a classical nonlinear optimization routine, which is then used to initialize a Bayesian calibration. The Bayesian calibration constrains the uncertainty in the classical calibration, ultimately providing posterior distributions for all model parameters. The challenges of the calibration include high-dimensional parameter space, including spatially heterogeneous hydraulic conductivities, comparatively sparse data, and low RDX concentrations. Posterior parameter distributions developed in the calibration process are then used for stochastic predictive model runs into the future. The result of the forward runs is spatially and temporally explicit estimates of head and concentration with uncertainty at all points in space and time. The probabilistic modeling approach presented here includes innovative computational and statistical methods that leverage high-performance computing (HPC) resources. It makes use of prior modeling work performed at the chromium plume site in the central LANL area, with extensive updates. The risk assessment will ultimately be used to support decision-making at the site, using multiple appropriately weighted sources of information, as well as uncertainty, sensitivity, and value-of-information analyses. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Software risk estimation and management techniques at JPL

In this talk we will discuss how uncertainty has been incorporated into the JPL software model, probabilistic-based estimates, and how risk is addressed, how cost risk is currently being explored via a variety of approaches, from traditional risk lists, to detailed WBS-based risk estimates to the Defect Detection and Prevention (DDP) tool.

software risk↗

GRACE Final Technical Report

The GRACE project (Grid that is Risk-Aware for Clean Electricity) was a five-year research initiative funded by the U.S. Department of Energy's Advanced Research Projects Agency- Energy (ARPA-E) under the PERFORM program. Led by Duke University's Nicholas School of the Environment, with contributions from The Ohio State University, North Carolina State University, Dartmouth College, and Pacific Northwest National Laboratory, the project addressed a fundamental challenge in grid management: conventional software plans for a single most-likely outcome and relies on reserves as a buffer, leaving utilities poorly equipped for the growing variability introduced by renewable energy. GRACE demonstrated a better approach: explicitly representing thousands of plausible future scenarios and choosing operating schedules that perform well across all of them.

14 SOLAR ENERGY↗

Wildfire Risk Evaluation Framework for Grid Operations and Planning

The United States (US) environmental protection agency's (EPA's) climate change indicators for wildfires show a long-term trend of increased annual wildfire activity, larger wildfire size, and more variable dynamics in wildfire behavior. This has caused more frequent preemptive public safety power shutoff (PSPS) events in the regions with recognized high wildfire risk. These preemptive power shutoffs attempt to prevent the ignition of a wildfire but it nonetheless renders the transmission line non-operational, which often sheds load of downstream communities. As wildfires and PSPS events become more frequent, it is crucial to find the communities most at risk of load shedding. To that end, this paper proposes the wildfire risk evaluation of the system (WiRES) framework, which is a performance-based framework that translates extreme weather-related and PSPS event probabilities into a cumulative probability of a non-operational transmission line. This study also provides a geospatial visualization tool that breaks down the entire western electrical coordinating council (WECC) region into 50 km grid cells which can be used to 1) filter out transmission lines with higher than a threshold outage probability, and 2) graphically discover the affected regions and their biophysical and socioeconomic metrics. %such as the social vulnerability index, population density, gross domestic product, etc. Lastly, an impact assessment study is conducted which connects the results of the proposed framework to python and powerworld-based contingency analysis to highlight the applicability of the framework.

Wildfire, Resilience, Extreme Events, Grid Reslien↗

NRAP-Open-IAM: NRAP Open Source Integrated Assessment Model

Note: This is the last version (a2.6.1) of NRAP-Open-IAM released during NRAP Phase II in 2022. The latest version of NRAP-Open-IAM is available here: https://edx.netl.doe.gov/dataset/phase-iii-nrap-open-iam NRAP-Open-IAM is an open-source software product that enables quantification of containment effectiveness and leakage risk at storage sites in the context of system uncertainties and variability. NRAP-Open-IAM represents the next-generation in a line of systems-based computational models developed for quantitative geological carbon storage (GCS) risk assessment. The model comprises a set of reduced-order and analytical models of various components of the GCS system, potential leakage pathways, receptors of concern including impact to groundwater resources and the atmosphere, a framework to support stochastic simulation, time stepping, uncertainty quantification, other analytical functionality for scenario and risk-performance evaluation, and a basic graphical user interface to support scenario development, data input simulation definition, and basic post-processing and results display. As the NRAP Open-IAM functionality continues to evolve, we continue to add to its capability to develop quantitative, probabilistic, and time-dependent profiles of the evolution of risk at a GCS site and evaluate the influence of uncertain parameters on uncertainty in predicted risk. It can be used to quantify the dynamics of reservoir saturation plume and pressure-affected area, for evaluation of the area of potential groundwater impact (i.e., Area of Review) and monitoring requirements to support cost and regulatory analysis, and for consideration of different post-injection site care and closure scenarios. This submission contains the current version of NRAP-Open-IAM available for evaluation and testing. To use the NRAP-Open-IAM, download the source code (https://edx.netl.doe.gov/dataset/08f396c8-bc5f-44ad-a028-6e98a6ea6d70/resource/4c24a3da-3b40-4ffe-9892-c807ae9f8760) then open the NRAP-Open-IAM user's guide (https://edx.netl.doe.gov/dataset/08f396c8-bc5f-44ad-a028-6e98a6ea6d70/resource/8b27335a-343c-4836-b8a3-3ad0bdc9e669) to read more about the tool. Installation instructions for Windows, Mac, and Linux can be found in the "installers" folder of the extracted NRAP-Open-IAM folder and describe setup of environment (e.g., Python libraries) needed for proper work of the tool. Test of installation can be done by running "python openiam_setup_tests.py" in the "setup" folder. The installation test also runs a test suite to see if the NRAP-Open-IAM has been installed correctly. To run the test suite separately, run "python iam_test.py" in the "test" folder. User's guide: https://edx.netl.doe.gov/dataset/08f396c8-bc5f-44ad-a028-6e98a6ea6d70/resource/8b27335a-343c-4836-b8a3-3ad0bdc9e669 Developer's guide: https://edx.netl.doe.gov/dataset/08f396c8-bc5f-44ad-a028-6e98a6ea6d70/resource/3bc6ee7d-609d-4eb6-80ba-fa6130ee0313 Reservoir simulation data used in some examples distributed with NRAP-Open-IAM: - Kimberlina: https://edx.netl.doe.gov/dataset/08f396c8-bc5f-44ad-a028-6e98a6ea6d70/resource/eb62cece-61b2-4037-9b6d-32407dde2ab8 - Kimberlina (compartmentalized): https://edx.netl.doe.gov/dataset/08f396c8-bc5f-44ad-a028-6e98a6ea6d70/resource/366f9530-3b32-4b84-affe-ab2df1d9a8b5 - FutureGen 2.0: https://edx.netl.doe.gov/dataset/futuregen-2-0-1008-simulation-reservoir-lookup-table NRAP-Open-IAM GitLab repository: https://gitlab.com/NRAP/OpenIAM Related publications: - Bacon, D., Yonkofski, C., Brown, C., Demirkanli, D. and Whiting, J., 2019. Risk-based post injection site care and monitoring for commercial-scale carbon storage: Reevaluation of the FutureGen 2.0 site using NRAP-Open-IAM and DREAM. International Journal of Greenhouse Gas Control 90: 102784. - Bacon, D. Demirkanli, D., and White, S., 2020. Probabilistic risk-based Area of Review (AoR) determination for a deep-saline carbon storage site. International Journal of Greenhouse Gas Control 102: 103153. - Harp, D., Oldenburg, C., and Pawar, R., 2019. A metric for evaluating conformance robustness during geologic CO2 sequestration operations. International Journal of Greenhouse Gas Control 85: 100-108. - Lackey, G., Vasylkivska, V., Huerta, N., King, S., and Dilmore, R., 2019. Managing well leakage risks at a geologic carbon storage site with many wells, International Journal of Greenhouse Gas Control, 88 :182-194. - Vasylkivska, V., Dilmore, R., Lackey, G., Zhang, Y., King, S., Bacon, D., Chen, B., Mansoor, K., and Harp, D., 2021. NRAP-Open-IAM: A flexible open-source integrated assessment model for geologic carbon storage risk assessment and management, Environmental Modelling & Software, 143: 105114. Presentations: - Chen, B., Harp, D., and Pawar, R., A data assimilation approach (ES-MDA) coupling with NRAP-Open-IAM for quantifying uncertainty reduction in geological CO2 sequestration. AGUFM 2019: T44A-02. - Chen, B., and Harp, D., Improving risk analysis precision for geologic CO2 sequestration by quantifying the uncertainty reduction before and after acquiring monitoring data. 14th Greenhouse Gas Control Technologies Conference, Melbourne, Australia, 2018, pp. 21-26. - Harp, D., National Risk Assessment Partnership Task 2: Containment Assurance. No. LA-UR-19-28654, Los Alamos National Laboratory (LANL), Los Alamos, NM (United States), 2019. - Vasylkivska, V., King, S., Bacon, D., Harp, D., Chen, B., Mansoor, K., Onishi, T., Yang, Y., Zhang, Y., and Keating, E., NRAP-Open-IAM: An open-source integrated assessment model, poster, Mastering the Subsurface Through Technology Innovation, Partnerships and Collaboration: Carbon Storage and Oil and Natural Gas Technologies Review Meeting, Pittsburgh, PA, August 13-16, 2018. - Vasylkivska, V., Lackey, G., King, S., Wentworth, A., Huerta, N., Creason, C., DiGiulio, J., Yang, Y., and Dilmore, R., Long-term risk analysis of a geologic CO2 storage project during the post-injection period, SIAM Conference on Computational Science and Engineering, Spokane, WA, February 25-March 1, 2019. - Vasylkivska, V., Overview of the NRAP-Open-IAM tool for carbon storage (beta release), 2019 Annual NRAP Tool Users Meeting, Pittsburgh, PA, August 27, 2019. - Vasylkivska, V., Bacon, D., Chen, B., Dilmore, R., Harp, D., King, S., Lackey, G., Lindner, E., Liu, G., Mansoor, K. and Zhang, Y., NRAP-Open-IAM: A new, open-source code for integrated assessment of geologic carbon storage containment effectiveness and leakage risk, poster, American Geophysical Union Fall Meeting 2020 (virtual meeting), December 2020. - Vasylkivska, V., NRAP open-source integrated assessment model and relevant application, oral presentation, NRAP workshop "NRAP Tools for Geologic Carbon Storage Risk-Based Decision Making" held in conjunction with Groundwater Protection Council (GWPC) 2021 Annual Forum (virtual meeting), Salt Lake City, UT, September 2021. - Vasylkivska, V., NRAP-Open-IAM: open-source integrated assessment model, digital poster/demonstration, software demonstration session, 2022 Carbon Management Project Review Meeting, August 16, 2022

AoR↗