Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Power Plant”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 883 records · Page 49

High-Temperature Multi-Process Sensor Development for a PC-Fired Unit

The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings. The mMPMS is based on an electrochemical sensor that provides a real-time indication of the risk of damage to key locations in the radiant or convective section of a coal-fired boiler such as metal loss rates, heat flux, metal surface temperature, and deposit thickness. These indications can be utilized to optimize boiler performance as well as improve boiler availability in conjunction with corresponding operating conditions. This monitoring system was developed and tested in the high-temperature regions of coal-fired utility boilers in this project but can be applied to many other industries and applications as well. This project leveraged the existing electrochemical noise-based monitoring system and the new sensor design is small enough to be installed through the webbing of the waterwalls without the need for long shut-downs to bend tubes and to make it feasible to obtain high spatial resolution in the boiler. Data is transferred to the plant distributed control system (DCS) and any other control system. The sensor body that houses the sensor assembly was designed to ensure good conductive contact with boiler tubes to ensure the sensor is held at an identical temperature to the tube surface temperature. The data acquisition and signal conditioning modules were redesigned into a small footprint with optimized cooling of the module. System software was developed specifically for the new signal conditioning module and is compatible with plant PLCs. After the preliminary testing at a pilot-scale facility, the three mMPMS were installed at a full-scale pulverized coal-fired plant, PacifiCorp’s Hunter 3. The systems were demonstrated over 20,000 hours at the plant during regular operation. Also, the sensor data was fed to the plant’s advanced process control system to evaluate the corrosion control by the operation changes and utilized to understand the impacts of load cycling with different ramping up and down speeds. At the end of the project, the systems were converted to the permanent installation at the power plant to be used with the advanced process control system installed at the plant.

Advanced Sensors, Corrosion, Ash Deposition, Optim↗

Real-time sensor measurements to evaluate impacts of load cycling on high-temperature fire-side corrosion in a PC boiler

The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings. The mMPMS is based on an electrochemical sensor that provides a real-time indication of the risk of damage to key locations in the radiant or convective section of a coal-fired boiler such as metal loss rates, heat flux, metal surface temperature, and deposit thickness. These indications can be utilized to optimize boiler performance as well as improve boiler availability in conjunction with corresponding operating conditions. This monitoring system was developed and tested in the high-temperature regions of coal-fired utility boilers in this project but can be applied to many other industries and applications as well. This project leveraged the existing electrochemical noise-based monitoring system and the new sensor design is small enough to be installed through the webbing of the waterwalls without the need for long shut-downs to bend tubes and to make it feasible to obtain high spatial resolution in the boiler. Data is transferred to the plant distributed control system (DCS) and any other control system. The sensor body that houses the sensor assembly was designed to ensure good conductive contact with boiler tubes to ensure the sensor is held at an identical temperature to the tube surface temperature. The data acquisition and signal conditioning modules were redesigned into a small footprint with optimized cooling of the module. System software was developed specifically for the new signal conditioning module and is compatible with plant PLCs. After the preliminary testing at a pilot-scale facility, the three mMPMS were installed at a full-scale pulverized coal-fired plant, PacifiCorp’s Hunter 3. The systems were demonstrated over 20,000 hours at the plant during regular operation. Also, the sensor data was fed to the plant’s advanced process control system to evaluate the corrosion control by the operation changes and utilized to understand the impacts of load cycling with different ramping up and down speeds. At the end of the project, the systems were converted to the permanent installation at the power plant to be used with the advanced process control system installed at the plant.

Advanced Sensors, Corrosion, Ash Deposition, Optim↗

Full-scale Demonstration of Multi-process Sensor at a Cycling PC-fired Boiler

The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings. The mMPMS is based on an electrochemical sensor that provides a real-time indication of the risk of damage to key locations in the radiant or convective section of a coal-fired boiler such as metal loss rates, heat flux, metal surface temperature, and deposit thickness. These indications can be utilized to optimize boiler performance as well as improve boiler availability in conjunction with corresponding operating conditions. This monitoring system was developed and tested in the high-temperature regions of coal-fired utility boilers in this project but can be applied to many other industries and applications as well. This project leveraged the existing electrochemical noise-based monitoring system and the new sensor design is small enough to be installed through the webbing of the waterwalls without the need for long shut-downs to bend tubes and to make it feasible to obtain high spatial resolution in the boiler. Data is transferred to the plant distributed control system (DCS) and any other control system. The sensor body that houses the sensor assembly was designed to ensure good conductive contact with boiler tubes to ensure the sensor is held at an identical temperature to the tube surface temperature. The data acquisition and signal conditioning modules were redesigned into a small footprint with optimized cooling of the module. System software was developed specifically for the new signal conditioning module and is compatible with plant PLCs. After the preliminary testing at a pilot-scale facility, the three mMPMS were installed at a full-scale pulverized coal-fired plant, PacifiCorp’s Hunter 3. The systems were demonstrated over 20,000 hours at the plant during regular operation. Also, the sensor data was fed to the plant’s advanced process control system to evaluate the corrosion control by the operation changes and utilized to understand the impacts of load cycling with different ramping up and down speeds. At the end of the project, the systems were converted to the permanent installation at the power plant to be used with the advanced process control system installed at the plant.

Advanced Sensors, Corrosion, Ash Deposition, Optim↗

High-Temperature Multi-Process Sensor Development and Demonstration at a Full-scale PC Combustion System

The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings. The mMPMS is based on an electrochemical sensor that provides a real-time indication of the risk of damage to key locations in the radiant or convective section of a coal-fired boiler such as metal loss rates, heat flux, metal surface temperature, and deposit thickness. These indications can be utilized to optimize boiler performance as well as improve boiler availability in conjunction with corresponding operating conditions. This monitoring system was developed and tested in the high-temperature regions of coal-fired utility boilers in this project but can be applied to many other industries and applications as well. This project leveraged the existing electrochemical noise-based monitoring system and the new sensor design is small enough to be installed through the webbing of the waterwalls without the need for long shut-downs to bend tubes and to make it feasible to obtain high spatial resolution in the boiler. Data is transferred to the plant distributed control system (DCS) and any other control system. The sensor body that houses the sensor assembly was designed to ensure good conductive contact with boiler tubes to ensure the sensor is held at an identical temperature to the tube surface temperature. The data acquisition and signal conditioning modules were redesigned into a small footprint with optimized cooling of the module. System software was developed specifically for the new signal conditioning module and is compatible with plant PLCs. After the preliminary testing at a pilot-scale facility, the three mMPMS were installed at a full-scale pulverized coal-fired plant, PacifiCorp’s Hunter 3. The systems were demonstrated over 20,000 hours at the plant during regular operation. Also, the sensor data was fed to the plant’s advanced process control system to evaluate the corrosion control by the operation changes and utilized to understand the impacts of load cycling with different ramping up and down speeds. At the end of the project, the systems were converted to the permanent installation at the power plant to be used with the advanced process control system installed at the plant.

Advanced Sensors, Corrosion, Ash Deposition, Optim↗

Site Integration and Regulatory Considerations for an NPP Colocated with a Petroleum Refinery, Methanol Plant, and Wood Pulp Plant

This research explores the colocation of nuclear power plants (NPPs) with industrial applications. Three existing industrial sites were considered to demonstrate the siting process and illuminate technological gaps for future work. The three applications demonstrated for colocation here are a petroleum refinery, a methanol production plant, and a pulp and paper plant. This study uses a modified version of the EPRI siting criteria to explore the geological and demographic characteristics of the location of the current industrial site, as well as exploring external hazards from the industrial plant and its surrounding land use. Data was collected from public databases to estimate site characteristics. We then discuss how the site characteristics may impact the ability to colocate an NPP with an industrial application. The application site and 5 additional sites were explored for each application to give a general indication of the siting implications for an NPP in each area. The hazards for each industrial application was also explored to determine how colocation may impact reactor safety. The following gaps have been identified and should be explored in future research on colocation of NPPs with petroleum refineries, methanol plants, and pulp and paper plants: - There is a variety of industrial use, hazards, and pipelines in the surrounding area. A more thorough review of these hazards should be considered for colocation. - In general, the whole region around some applications seems to have softer soil, with implications for large site preparation costs. Further site investigations should prioritize looking into the geotechnical conditions. - Applications along coastlines are susceptible to flooding and hurricanes. The benefits of colocation should be weighed against the potential design implications. - The benefits of natural gas pipeline infrastructure in place should be explored further. If heat supply from the NPP is not required or not feasible due to the distance between the NPP and the application, there may be an opportunity to supply hydrogen to the plant through an existing pipeline. - Because there are several collocated industrial plants in the regions for the refinery and methanol plant, the benefits of sharing resources from the NPP should be explored further. This may open up additional sites for colocation. The following knowledge gaps were identified for the colocation of NPPs with these three industries, and industrial applications in general. These gaps are: - While the STAND tool contains many important characteristics for the reactor siting process, it is not calibrated for the colocation of NPPs with industrial facilities. - There are aspects of both the NPP and industrial application that need to be quantified for a siting analysis. Particularly, we need to understand the water intake requirements for NPPs and each application. - Further work may focus on adapting the STAND site comparison methodology to comparison of sites for co-location. This will involve using the data documented in this report as a starting point and performing a comprehensive and quantitative comparison. - Without spending significant resources, it would be impossible to gather data for each site to evaluate all aspects of siting. One approach to finding data and understanding its implications to siting is looking at FSARs for existing plants. For example, most sites considered in this study have small Vs30 values, indicating soft soil. However, there are NPPs located in the vicinity of most of the sites (e.g., Waterford Steam Electric Station near New Orleans) and reviewing available site characteristics and geotechnical data for these NPPs, might provide further information for siting. - The siting analysis in this study indicates that colocation of the NPP with the industrial site could be difficult based on external hazards, cooling requirements, weather, or population. We need to determine the impact of distance between the two facilities on cost and quality of energy transport. - This study did not touch on socioeconomic impacts for NPP colocation with industrial facilities. The input-output analysis methodology could be applied to the communities referenced in this study to determine the socioeconomic impact of these projects. - Similarly, the impacts of colocation on emergency planning was not explored in this study. The impacts on emergency planning infrastructure are somewhat related to the socioeconomic impacts, and could be explored using a similar methodology. - This study also did not address physical and cybersecurity, which will be important aspects of co-location [ref] . Cybersecurity will be important, regardless of the distance, but physical security will be important if the facilities are located very closely. Physical security might also be important for the steam lines between the plants, unless they are determined to be non-safety significant. - In many site l

08 - HYDROGEN↗

Durable Low-Cost Pressure Vessels for Bulk Hydrogen Storage

Long-duration energy storage (LDES) in the form of gaseous hydrogen is vital for fossil fuel power plants to reduce frequent shutdowns and rapid start-ups. It's also crucial in renewable energy power plants for grid stabilization. WireTough Cylinders (WTC) has developed a Type II-S pressure vessel that uses steel liners that are hoop-wrapped with multiple layers of high-strength, cost-effective, and readily available steel wires. This design enables the vessel to withstand significantly higher pressures. It addresses hydrogen embrittlement issues and cyclic loading from repeated pressurization and depressurization during service. The WireTough design is cost-efficient, robust, and fatigue-resistant (with a 30-year design life) and is ASME certified for ground storage of hydrogen at a maximum operating pressure (MOP) of 350 bar and a design pressure of 500 bar. The cylinder has a 645 mm outside diameter and a water capacity of 1,715 liters, capable of storing 40.7 KG of hydrogen at MOP. Two prototypes were successfully produced to showcase the manufacturing technologies, with one being certified under ASME Section VIII Division 3 rules. Preliminary design work for a similar Type II-S vessel with a 500 bar MOP was also completed. The 350 bar and 500 bar Type II-S vessels were shown respectively to be 47.5% to 60% more cost-effective and 55% and 62.5% lighter based on per KG of hydrogen stored, when compared with their Type 1 counterparts.

08 HYDROGEN↗

From Data to Knowledge: A Graph-Based Reliability Approach to Assess System Health

With the goal of maximizing plant reliability and availability, complex systems such as nuclear power plants continuously monitor and record the performance and the health status of many components, assets, and systems. Such data may take the form of online monitoring data, condition reports, and maintenance reports and it carries the potential to provide system engineers with insights into anomalous behaviors or degradation trends as well as the possible causes behind them and to predict their direct consequences. The analysis of such data poses however few challenges. While some of these challenges are technical in nature (i.e., data are often distributed over several physical servers or databases), others are conceptual in nature (i.e., data elements come in different formats, numeric or textual), and measured values have different scales (e.g., vibration spectra and oil temperature). This paper directly tackles these challenges, and it focuses on the integration of all these data elements in order to assist plant system engineers in analyzing component, assets, and systems performances and optimize maintenance activities. This is performed by 1) extracting knowledge from textual data via technical language processing methods, and 2) quantifying system, asset, and component health from numeric condition-based data. We rely on model-based system engineering (MBSE) models of systems and assets to identify their architecture and functional (i.e., cause and effect) relations. Numeric and textual data elements are then associated with an MBSE graph element, based on their nature. This bonding of MBSE models and data elements constitutes a first-of-its-kind knowledge graph of a nuclear power plants system, with data elements being organized in a structured manner that enables system engineers to identify cause-effect trends in data elements and carry out appropriate actions in response.

97 MATHEMATICS AND COMPUTING↗

Explaining System-Level Prognostics with Established Machine Learning Methods

System-level prognostics is crucial for ensuring reliability and enabling predictive maintenance in complex systems with interconnected components. This study presents a framework that integrates data-driven methods to predict the remaining useful life (RUL) of a subsystem under multiple and concurrent faults within a nuclear power plant system with explainable artificial intelligence (XAI). A nuclear power plant (NPP) operation was simulated to model the degradation behavior of NPP components, and four machine learning models—Gradient Boosting Regressor (GBR), Support Vector Regressor (SVR), Fully Connected Neural Network (FCNN), and Long Short-Term Memory (LSTM)—were evaluated for prognostics with a novel system RUL parameter. The LSTM model demonstrated potential superior repeatability, while SHAP (SHapley Additive exPlanations) for explainability provided consistent and trustworthy global explanations. In contrast, LIME (Local Interpretable Model-agnostic Explanations) offered localized interpretability but showed reduced stability for sequential data. Key findings include the interplay between component-level degradation and system-wide performance, with LSTM effectively capturing these dynamics through sequence-level predictions. The XAI techniques enhanced transparency by identifying critical features influencing model predictions and aligning with domain knowledge. Furthermore, this framework has significant implications for improving trust and understanding in predictive maintenance, particularly in safety-critical industries like nuclear energy.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Price response of waste resources under demand shocks: four case studies

To quantify potential price changes of waste feedstocks that may be caused by increased demand, this study explored four case studies: 1) recyclable materials at local waste collection and recycling facilities in seven US states, 2) recyclable materials on internationally traded markets, 3) a wood-powered plant in Reading, PA, and 4) an MSW-powered plant in Tulsa, OK. The four case studies provided a total of ninety-one waste material price observations yielding twenty-seven price-supply relationships expressed as price elasticity of supply (PES) and unit price change with change in demand. For the two case studies related to recyclable materials with a global market shock, price changes vary widely from $0.08-$7.84 per ton with each percent change in demand. For the two case studies related to local market shocks in biomass used for energy, observed price changes range from $0.08-$0.23 per ton per percent change in demand. Based on these results, a base range of $0.10-$0.20 per ton per percent change in demand is recommended for local market shocks. I.e., for a facility that collects organic wastes on the order of 200,000-400,000 tons per year at price near zero, a doubling of demand could increase procurement prices by about $10.00-$20.00 per ton. Actual price changes with respect to change in demand may be non-linear. Shocks with broader geographic extent may increase price response due to a reduced opportunity for surrounding markets to mitigate localized market changes.

09 BIOMASS FUELS↗

Phase 1 NuScale SMR FOAK Nuclear Demonstration Readiness Project (Final Scientific/Technical Report)

The overarching objective of the Phase 1 NuScale SMR First-of-a-Kind (FOAK) Nuclear Demonstration Readiness Project was to enhance competitiveness of the U.S. nuclear industry by enabling timely deployment of the NuScale small modular reactor (SMR). The scope of this Phase 1 project continued to advance the licensing and design maturity, particularly in those areas related to supporting customer readiness, supply chain integration, cost competitiveness, and cost confidence. This investment provided by the Government has accelerated development of these designs and technologies so that the existing domestic fleet of nuclear power plants remains viable and the most mature in the nuclear industry. The intent is to have the new, advanced U.S. designs be deployed as early 2026, and be globally competitive. As a part of the First-of-a-Kind Nuclear Demonstration Readiness Project, NuScale has been developing an advanced reactor design, leading the path for other development projects or complex technology advancements for existing plants that have significant technical and licensing risk. The NuScale Power team (NuScale) is advancing licensing, engineering, supply chain development, testing, and other required activities to enhance the innovation and competitiveness of the U.S. nuclear industry by enabling timely deployment of the NuScale SMR. Specifically, NuScale is performing the following activities in Phase 1. Fully supporting the NRC review of the NuScale DCA to ensure approval of a final safety evaluation report by the end of 2020. Improving plant cost confidence and cost competitiveness through design and supply chain advancement, incorporation of constructability best practices, and margin recovery to increase plant power output. Accelerating design maturity, technology development, and operational program readiness to support a customer commitment for plant deployment. The Department of Energy (DOE) Office of Scientific and Technical Information (OSTI), a unit of the Office of Science, fulfills agency-wide responsibilities to collect, preserve, and disseminate both unclassified and classified scientific and technical information (STI) emanating from DOE-funded research and development (R&D) activities at DOE national laboratories and facilities and at universities and other institutions nationwide. This scientific and technical report provides summaries of the analyses and research that was performed by NuScale under this project that achieves the objective of disseminating information to the nuclear industry to ensure the innovations realized are shared for the benefit of the industry at large.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Quantitative Ceilometer-Radar Studies of Clouds Field Campaign Report

The Long Island Solar Farm (LISF) is a 32-megawatt solar photovoltaic power plant built through a collaboration including BP Solar, the Long Island Power Authority (LIPA), and the U.S. Department of Energy (DOE). The LISF, located on the Brookhaven National Laboratory site, began delivering power to the LIPA grid in November 2011, and is currently one of the largest solar photovoltaic power plants in the eastern United States. It is generating enough renewable energy to power approximately 4,500 homes and is helping New York State meet its clean energy and carbon reduction goals. Brookhaven National Laboratory (BN)L has the LISF instrumented and is capturing solar insolation and power data that can be used for research purposes. Additional information on LISF is available here: https://www.bnl.gov/lisf/. A network of nine high-definition (HD cameras) and 32 pyranometers are deployed within the LISF for the purpose of monitoring the location and characteristics of clouds and available global horizontal irradiance at the surface across the region. Information collected by this network every 30 s is currently used in BNL’s solar NowCasting algorithm, which forecasts near-term solar energy availability accounting for the behavior of clouds. The most important parameters for forecasting the near-term solar energy availability are accurate estimations of their horizontal extend, horizontal motion, and cloud base height. Currently, images from nearly located cameras are used to estimate the cloud base height. In order to evaluate the potential of this method for estimating the cloud base height, we decided to deploy a Vaisala ceilometer at the LISF.

14 SOLAR ENERGY↗

A data-driven model for thermodynamic properties of a steam generator under cycling operation

The varying electricity demand from coal power plants due to the intermittent nature of renewable sources leads to load-follow and on/off operations referred to as cycling. Cycling causes transients of properties such as pressure and temperature within various components of the steam generation system.These transients cause increased damage because of fatigue and creep-fatigue interactions shortening the life of components. An algorithm is developed to identify cycling operations from the gross power data. The data-driven model based on artificial neural networks (ANN) is developed using 10 years data from Coal Creek Station power plant located in North Dakota, USA to estimate properties of the steam generator components during cycling operations. Furthermore, the uniqueness of this model is the ability to predict component properties for the cycling as well as base-load operations and is reported for the first time. The ANN model estimates the component properties, for a given gross power profile and initial conditions, as they vary during cycling operations. As a representative example, the ANN estimates are presented for the superheater outlet pressure, reheater inlet temperature, and flue gas temperature at the air heater inlet. The changes in these variables as a function of the gross power over the time duration are compared with measurements to assess the predictive capability of the model. Mean square errors of 4.49E-04 for superheater outlet pressure, 1.62E-03 for reheater inlet temperature, and 4.14E-04 for flue gas temperature at the air heater inlet were observed.

01 COAL, LIGNITE, AND PEAT↗

Hazards and Probabilistic Risk Assessments of Advanced Nuclear Reactors Coupled with Industrial Facilities

This report provides a roadmap and tool kit for site specific risk assessments across a broad range of industrial customers co-located with advanced nuclear power plants (ANPP) that are not currently built and operating in the U.S. This report builds upon the body of work sponsored by the Department of Energy (DOE) Integrated Energy Systems Pathway that has produced industrial requirements studies and techno-economic assessments on the topics of feasibility of ANPP supported industrial processes. This report also leverages the DOE Light Water Reactor Sustainability (LWRS) program that has presented hazards assessment and generic probabilistic risk assessments (PRAs) for the addition of a heat extraction system (HES) to light-water reactors (LWRs) co-located with hydrogen production facilities. Many of the hazard assessments and risk assessments performed for the LWRS report are agnostic to whether the nuclear reactor is an ANPP or were adapted to the ANPP focus. The report performs hazards assessments to include industrial facilities: an oil refinery, a methanol plant, a synthetic fuel (synfuel) plant, the production of synthetic gas (syngas) as part of the methanol and synfuel plants, wood pulp and paper mills, and hydrogen production. Hydrogen production facilities are assessed in depth through prior reports in the LWRS program and the results are leveraged in this report. All these facilities are specified through industrial process and requirements research performed by national laboratories, universities, and interaction with industry. Many of the processes used in this report are pre-conceptual designs to use for decarbonization of the current technology facilities. A process of failure modes and effects analysis (what can go wrong) and accidentology (what has historically gone wrong) was used to determine the hazards presented to the nuclear power plant by the addition of the HES and the industrial customer. Chemical properties of feedstocks and products are summarized as part of the hazards assessment. Example analysis procedures are provided for each of the hazard types identified. These deterministic analyses can be used to assess adherence to licensing criteria. They can also be used to meet other safety goals like protection of the public, workers, or industrial facility equipment. A modular high temperature gas-cooled reactor (MHTGR) PRA only existing on paper was modeled and verified in modern PRA software. This will provide a tool for representative ANPP probabilistic analyses for future research.

10 SYNTHETIC FUELS↗

Predictive Assessment of the Chemical Composition of Coal Ash in Reserve at U.S. Disposal Sites

In the United States, more than 2 Gt of coal combustion residuals (i.e., coal ash) are stored in hundreds of disposal units. Recent federal regulations mandate the closure or retrofitting of most coal ash impoundments, presenting significant challenges for waste management. These regulatory pressures also present opportunities to reuse coal ash. However, the quality and quantity of discarded coal ash across the U.S. are not well known, even though this information is crucial for spurring its reuse for conventional and new material applications. This study describes a predictive model for the major element composition of coal ash in reserve at disposal sites of major U.S. coal-fired power plants. This model was constructed from coal purchase records of 705 power stations from 1973 to 2022 and was trained on coal ash composition data, showing that coal ash elemental composition is strongly associated with the source of feedstock coal. The model showed regional shifts in the major element contents of ash produced by power plants in the last 50 years, particularly for calcium and iron (expressed as %CaO and %Fe2O3), as power stations changed their source of coal over this time frame. Our approach enables an estimation of chemical composition for ash stored in waste impoundments at individual power stations. Such information can help to delineate the regional market resource potential of supplementary cements for concrete and other material innovations that would utilize coal ash harvested from disposal sites across the U.S.

01 COAL, LIGNITE, AND PEAT↗

The value of wake steering wind farm flow control in US energy markets

Abstract. Wind farm flow control represents a category of control strategies for achieving wind-plant-level objectives, such as increasing wind plant power production and/or reducing structural loads, by mitigating the impact of wake interactions between wind turbines. Wake steering is a wind farm flow control technology in which specific turbines are misaligned with the wind to deflect their wakes away from downstream turbines, thus increasing overall wind plant power production. In addition to promising results from simulation studies, wake steering has been shown to successfully increase energy production through several recent field trials. However, to better understand the benefits of wind farm flow control strategies such as wake steering, the value of the additional energy to the electrical grid should be evaluated – for example, by considering the price of electricity when the additional energy is produced. In this study, we investigate the potential for wake steering to increase the value of wind plant energy production by combining model predictions of power gains using the FLOw Redirection and Induction in Steady State (FLORIS) engineering wind farm flow control tool with historical electricity price data for 15 existing US wind plants in four different electricity market regions. Specifically, for each wind plant, we use FLORIS to estimate power gains from wake steering for a time series of hourly wind speeds and wind directions spanning the years 2018–2020, obtained from the ERA5 reanalysis dataset. The modeled power gains are then correlated with hourly electricity prices for the nearest transmission node. Through this process we find that wake steering increases annual energy production (AEP) between 0.4 % and 1.7 %, depending on the wind plant, with average increases in potential annual revenue (i.e., annual revenue of production, ARP) 4 % higher than the AEP gains. For most wind plants, ARP gain was found to exceed AEP gain. But the ratio between ARP gain and AEP gain is greater for wind plants in regions with high wind penetration because electricity prices tend to be relatively higher during periods with below-rated wind plant power production, when wake losses occur and wake steering is active; for wind plants in the Southwest Power Pool – the region with the highest wind penetration analyzed (31 %) – the increase in ARP from wake steering is 11 % higher than the AEP gain. Consequently, we expect the value of wake steering, and other types of wind farm flow control, to increase as wind penetration continues to grow.

17 WIND ENERGY↗

A Nonstationary and Non-Gaussian Moving Average Model for Solar Irradiance

Historically, power has flowed from large power plants to customers. Increasing penetration of distributed energy resources such as solar power from rooftop photovoltaic has made the distribution network a two-way-street with power being generated at the customer level. The incorporation of renewables introduces additional uncertainty and variability into the power grid. Distribution network operation studies are being adapted to include renewables; however, such studies require high quality solar irradiance data that adequately reflect realistic meteorological variability. Data from satellite-based products are spatially complete, but temporally coarse, whereas solar irradiances exhibit high frequency variation at very fine timescales. We propose a new stochastic method for temporally downscaling global horizontal irradiance (GHI) to 1 min resolution, but we do not consider the spatial aspect due to limited availability of the in situ irradiance measurements. Solar irradiance's first and second-order structures vary diurnally and seasonally, and our model adapts to such nonstationarity. Empirical irradiance data exhibits highly non-Gaussian behavior; we develop a nonstationary and non-Gaussian moving average model that is shown to capture realistic solar variability at multiple timescales. We also propose a new estimation scheme based on Cholesky factors of empirical autocovariance matrices, bypassing difficult and inaccessible likelihood-based approaches. The model is demonstrated for a case study of three locations that are located in diverse climates through the United States. The model is compared against competitors from the literature and is shown to provide better uncertainty and variability quantification on testing data.

Cholesky factor↗

Machine Learning-Based PV Reserve Determination Strategy for Frequency Control on the WECC System

Frequency control from photovoltaic (PV) power plants has great potential to address the frequency response challenge of the power system with high penetrations of renewable generation. Using model-based approaches to determine the optimal PV headroom reserve, however, requires significant online computation and is intractable for an interconnection level system. This paper proposes a machine learning based strategy, that is suitable for real-time operation, to determine the optimal PV reserve for frequency control. The proposed machine learning algorithm is trained and tested on 1,987 offline simulations of a 60% renewable penetration Western Electricity Coordinating Council (WECC) system. Furthermore, the proposed reserve determination strategy is applied on a realistic 1-day operation profile of the WECC system and demonstrates a savings of more than 40% PV headroom compared to a conservative approach. It is evident that the proposed strategy can efficiently and effectively determine the optimal PV frequency control reserve for realistic interconnection systems.

frequency control↗

Tools and Methods for Optimization of Nuclear Plant Outages

Refueling outages are one of the most challenging phases in a nuclear power plants (NPP) operating cycle. Refueling outages are extremely costly for a NPP due to the large amount of required resources and because of lost revenue due to plant being off the grid. Outage durations have steadily decreased across the industry over that last few decades primarily due to improved planning and coordination, but there are still many plants that struggle to meet the performance metrics accomplished by other utilities. Schedule resilience is one of the issues. NPP outages require scheduling thousands of activities in a duration of around 30 days on average. Outage staff begin working on the schedule more than a year ahead of the outage start and make every effort to build a robust schedule. Despite the robust and detailed planning, once the outage starts, numerous emergent issues typically appear along with schedule delays requiring continuous replanning and adjusting. When schedule disruption occurs during an outage, plant staff make urgent efforts to recover but often not able to maintain the planned outage duration. These outage delays can cost a utility several million dollars per day. Tools that could help outage schedulers create a more resilient schedule and allow them to optimally reschedule emergent work could significantly reduce outage delays. One key aspect of creating a resilient schedule is to have accurate estimates for activity duration. Another important outage scheduling capability is the ability to schedule emergent work with minimal disruption. The Optimization of Outage Activities project under the Risk-Informed Systems Analysis Pathway (RISA) sponsored by Department of Energy (DOE) Light Water Reactor Sustainability (LWRS) program focuses on developing tools and methods to support nuclear power plants with optimization of outage schedules. The goal of the outage optimization is the completion of all planned and emergent outage activities as fast as possible while maintaining highest level of safety. This report describes the initial development of tools to support outage management that leverage computational and machine learning methods developed in other RISA and LWRS projects.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗