Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “PILOT”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 883 records · Page 49

Technical Details on Beyond Design Basis Event Pilot Evaluations

The primary focus of the BDBE pilot project was the review of BDBE analysis and mitigation features at four DOE nuclear facilities representing a range of DOE sites, nuclear facility types/activities, and responsible program offices. The pilots looked at (1) how beyond design basis accidents were evaluated and documented in the facility Documented Safety Analysis, (2) potential BDBE vulnerabilities and margins to failure of facility safety features as obtained from general area and specific system walkdowns and design documents reviews, and (3) preparations made in facility and site emergency management programs to respond to severe accidents. It also evaluated whether draft BDBE guidance on safety analysis and emergency management could be used to improve the analysis of and preparations for mitigating severe and beyond design basis accidents. The details of these activities are organized in this report as described below.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Large Pilot-Scale Carbon Dioxide (CO2) Capture Project Using Aminosilicone Solvent.Final Scientific/Technical Report

GE Global Research has developed, over the last 8 years, a platform of cost effective CO2 capture technologies based on a non-aqueous aminosilicone solvent (GAP-1m). As demonstrated in previous funded DOE projects (DE-FE0007502 and DEFE0013755), the GAP-1m solvent has increased CO2 working capacity, lower volatility and corrosivity than the benchmark aqueous amine technology. Performance of the GAP-1m solvent was recently demonstrated in a 0.5 MWe pilot at National Carbon Capture Center, AL with real flue gas for over 500 hours of operation using a Steam Stripper Column (SSC). The pilot-scale PSTU engineering data were used to (i) update the techno-economic analysis, and EH&S assessment, (ii) perform technology gap analysis, and (iii) conduct the solvent manufacturability and scale-up study.

01 COAL, LIGNITE, AND PEAT↗

Department of Energy Operational Readiness Review for the Waste Isolation Pilot Plant

The U.S. Department of Energy (DOE) has completed an Operational Readiness Review (ORR) for the restart of Contact Handled (CH) waste emplacement at the Waste Isolation Pilot Plant (WIPP) located near Carlsbad, New Mexico. The ORR team assessed the readiness of Nuclear Waste Partnership, LLC (NWP) to manage and perform receipt through CH waste emplacement, and associated waste handling and management activities, including the ability of the National TRU Program (NTP) to evaluate the waste currently stored at the WIPP site against the revised and enhanced Waste Acceptance Criteria (WAC). Field work for this review began on November 14, 2015 and was completed on November 30, 2016. The DOE ORR was conducted in accordance with the Department of Energy Operational Readiness Review Implementation Plan for the Waste Isolation Pilot Plant, dated November 8, 2016, and DOE Order 425.1D, Verification of Readiness to Start Up or Restart Nuclear Facilities. The review activities included personnel interviews, record reviews, direct observation of operations and maintenance demonstrations, and observation of multiple operational and emergency drills/exercises. The DOE ORR also evaluated the adequacy of the contractor’s ORR (CORR) and the readiness of the DOE Carlsbad field Office (CBFO) to oversee the startup and execution of CH waste emplacement activities at the WIPP facility. The WIPP facility is categorized as a Hazard Category 2 DOE Nonreactor Nuclear Facility for all surface and Underground (UG) operations per DOE-STD-1027-92, Hazard Categorization and Accident Analysis Techniques for Compliance with DOE Order 5480.23, Nuclear Safety Analysis Reports. In addition, the WIPP experienced two events in February, 2014 that resulted in Accident Investigations being performed in accordance with the requirements of DOE Order 225.1B, Accident Investigations. Based upon the results of the accident investigations and hazard categorization of the facility, the team placed significant emphasis on the following areas: fire protection, emergency preparedness, radiological protection, nuclear safety, and operations. The identification of specific focus areas was not intended to diminish the importance of other areas of the review, but to ensure that these areas received a particularly thorough and in-depth evaluation due to their significance with respect to the safe operation of the facility.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Q and A with the grandson of the Little Boy’s pilot: Brigadier General (retired) Paul Tibbets IV reflects on his family’s legacy military service

Paul Tibbets Jr., the pilot of the Enola Gay who released the Little Boy atomic bomb above Hiroshima, is part of a family with a legacy of military service. He was father to Paul Tibbets III, who served in the military as an Army reservist pharmacist and hospital administrator and eventually retired as a colonel. His son— grandson of Tibbets Jr.—is also Paul Tibbets. Paul Tibbets IV is a retired Air Force brigadier general and decorated bomber pilot. This legacy is not lost on his fellow airmen. They gave Tibbets IV the callsign “Nuke” early in his flying career. Tibbets IV flew the B-1 bomber and then the B-2 stealth bomber, a nuclear-capable, longrange strike aircraft. His 29 years of military service include combat missions in the Middle East, Afghanistan, and the Balkans—and a flight in a restored B-29 with his grandfather. In commemoration of the 75th anniversary of the atomic bombs and his grandfather’s historic role, Tibbets IV spoke with Los Alamos National Laboratory.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Nuclear Criticality Safety Assessment of Criticality Control Containers without Moderation Control at the Waste Isolation Pilot Plant

The Waste Isolation Pilot Plant (WIPP) provides for safe, permanent disposal of government-owned transuranic (TRU) and TRU mixed wastes. Receipt and disposal of waste at the WIPP site began in March 1999. The Sandia report, Consideration of Nuclear Criticality When Disposing of Transuranic Waste at the Waste Isolation Pilot Plant, addressed potential nuclear criticality safety issues based on the projected inventory characteristics known at the time [1]. As designs for inventory, waste forms, and disposal packages have changed, new analyses have been performed, and updates have been made to address any potential effects to the WIPP safety basis. New analyses performed include Saylor 2017 [2] and Brickner 2019 [3], which address certain waste containers with specified loadings under post-closure conditions. Both examined several hypothetical scenarios and included analyses to bound (from a criticality potential standpoint) credible configurations that could occur at WIPP during the repository regulatory post-closure disposal time period for feature, event, and process (FEP) considerations—10,000 years. During this post-closure period at WIPP, the screening of FEPs is governed by the risk-based standards and implementing regulations of the US Environmental Protection Agency (EPA) (i.e., 40 CFR 191 and 40 CFR 194, respectively) [4,5]. An FEP screening can be based on either a low-consequence or low-probability rationale. A low-probability rationale includes either (a) a qualitative rationale that the FEP is not credible or (b) a quantitative demonstration that the probability is less than 10-4 in 104 years. In this evaluation, a qualitative lowprobability rationale of not credible is used by demonstrating that bounding configurations of the waste are not critical. The demonstration of subcriticality is through quantitative calculations, but a probability of criticality is not evaluated. Rather, the rationale for this evaluation is that bounding configurations with an effective neutron multiplication factor (keff) well below the upper subcriticality limit (USL) make criticality incredible. Reference [2] documented a nuclear criticality assessment of the WIPP repository for disposal of dilute surplus plutonium materials using the Dilute and Dispose Approach and packaging in criticality control overpacks (CCOs). The CCO is the waste disposal container recently designed to allow for up to 380 fissile gram equivalent (FGE) 239 Pu per drum, which is a higher fissile loading than typical waste containers. The CCO consists of a criticality control container (CCC) positioned by upper and lower plywood spacers within a standard 55 gal drum. The CCC is used to establish a geometry control for fissile materials during transportation and WIPP emplacement operations. The current WIPP waste acceptance criteria for CCO payloads limit beryllium to less than or equal to 1% by weight of the waste contents and require the waste form to be non-machine compacted. Reference [2] considered two scenario progressions—room closure from salt creep, hereafter referred to as the reconfigured dry scenario, and flooding with brine, hereafter referred to as the reconfigured wet scenario. The subsequent drying out of the reconfigured wet scenarios was also considered. For all scenarios, subcriticality was maintained when 50 g of B 4 C (acting as a neutron absorber) per CCC was intermixed within the plutonium disposition waste form. The analysis used a waste form description that limits the amount of moderation that could be present within the waste form (i.e., it limits the amount of water and polyethylene that could be present based on planned processing conditions). This analysis to evaluate increased limits on the amount of moderation that could be present was performed as a companion to Reference [2] to address concerns associated with verifying moisture and/or plastic contents of waste materials following packaging of dilute surplus plutonium in the CCO. To that end, this analysis used the models and methods from Reference [2] to evaluate a more generic base waste form consisting of water and polyethylene that is more similar (and nearly identical) to the generic waste forms utilized in other models/analyses supporting the TRU Package Transporter Model II (TRUPACTII) safety analysis [6] (all are without moderation controls). The waste form in this analysis uses a base mixture of 75% water and 25% polyethylene, the total amount of which is varied to determine the optimum moderation to fissile material (H/Pu) ratio. The fissile loading is maintained at up to 380 FGE 239 Pu (modeled as PuO 2 ) per CCO with an additional 545 g of beryllium (to bound the 1% by weight contents restriction) and 50 g of B 4 C intermixed per CCO. The beryllium content (1% by weight) is based on the total allowed waste weight (this does not include packaging and container weights). Figures ES-1 and ES-2 display summary results, showing that with this model including 50 g of B 4 C per CCO, the system keff remains under 0.85 for all moderator amounts and provides a significant margin against post-closure criticality under postulated bounding conditions for compaction. Figure ES-1 compares an infinite model with a room model at the initial emplacement spacing and under full radial compaction. Full radial compaction places each CCC in direct contact and does not credit any anticipated spacing associated with current post-closure geomechanical modeling of the repository [7]. The effects of variations in the H/Pu ratio were evaluated by varying the amount of the water/polyethylene component of the waste model, with fissile loading maintained at 380 239 Pu FGE. Similarly, Figure ES-2 illustrates how various amounts of B 4 C per CCO influence k eff at different radial compactions, all at the H/Pu ratio of 200 (in the room array model). Therefore, while the results from Saylor 2017 [2] modeled more realistic process limits associated with packaging of dilute surplus plutonium, this analysis demonstrates that limits on moderation (plastic and water content) are not necessary to ensure subcriticality in the WIPP repository, provided the requisite B 4 C absorber is present.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

GT Flex: A Coordinated Multi-Building Pilot Study

Buildings are a significant and untapped resource for providing utility electric grid services. Recent studies have estimated that buildings could reduce the peak demand on the electric grid in the U.S. by almost 25% through effective combinations of energy efficiency (EE) measures and load flexibility strategies (Langevin et al. 2021). The U.S. Department of Energy (DOE) has established a goal to triple energy efficiency and demand flexibility in both residential and commercial sections by 2030 compared to 2020 levels (Satchwell et al. 2021). Such findings place buildings alongside electric vehicles, photovoltaics, electric batteries, and other distributed energy resources (DERs) as primary technologies needed for supporting high renewable energy generation grids. Coordinating and optimizing multiple buildings and other DERs is more beneficial and valuable when compared with individual buildings and DERs operating as siloed resources, uncoordinated with others (Olgyay et al. 2020). A pilot study at the Georgia Institute of Technology (GIT) was conducted to evaluate value propositions of a multi-building scale project seeking carbon reduction, energy efficiency and grid-interactive capabilities, by demonstrating the means by which stakeholders can determine the technical and financial merits of grid-interactivity and energy efficiency technologies coordinated across multiple assets. The study focused on analyzing technical feasibility of deploying thermal load flexibility strategies at the multi-building scale, coordinated to not exceed existing infrastructure constraints at the pilot site. Results show that campus can provide 3-3.5 MW of potential load shed over a 4-hour event window through coordinated dispatch of thermal cooling load flexibility without exceeding existing infrastructure capacities. Under future high renewable scenarios, this thermal flexibility resource is also valuable when coordinated to reduce curtailment of intermittent renewables. Economic analyses were performed to effectively communicate various value propositions of grid-interactive and efficient building (GEB) thermal flexibility strategies. Load flexibility presents a financial value proposition to the campus today. By conducting rationalized, coordinated dispatch in response to real time price (RTP) fluctuations, the campus can benefit materially from daily price arbitrage. The RTP signal acts as an aggregating mechanism between the utility and customer to call on demand flexibility resources, with a large portion of the benefit deriving from a relatively small number of days. Realizing and maximizing this benefit with thermal load flexibility requires careful attention to the timing of pricing signals and parameterization of dispatch to overcome efficiency penalties. Grid value and signals are expected to evolve over time, and thermal load flexibility shows potential to adapt dispatch logic to support intermittent renewable generation.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Using Pilot Jobs and CernVM File System for Simplified Use of Containers and Software Distribution

High Energy Physics (HEP) experiments entail an abundance of computing resources, i.e. sites, to run simulations and analyses by processing data. This requirement is fulfilled by local batch farms, grid sites, private/commercial clouds, and supercomputing centers via High Throughput Computing (HTC). The growing needs of such experiments and resources being prone to trends of heterogeneity make it difficult for physicists to handle these resources directly. Additionally, HEP collaborations heavily rely on data and software releases, typically in the order of tens of gigabytes, while conducting simulations and analyses. Hence, aspects of scalability, reliability, and maintenance become crucial with regards to the distribution of the necessary data and software stack. The GlideinWMS [4] framework helps with the resource management problem by using pilot jobs, aka Glideins, to provision reliable elastic virtual clusters. Glideins are submitted to unreliable heterogeneous resources which are validated and customized by the Glideins to make the worker nodes available for end-user job execution. On the other hand, the CernVM File System (CernVM-FS or CVMFS) [1] helps with data distribution. It is a write-once, read-everywhere filesystem used to deploy scientific software to thousands of nodes on a worldwide distributed computing infrastructure. CVMFS is based on the Hyper Text Transfer Protocol and has been widely used within the particle physics community for (1) distributing experiment software and data such as calibrations, and (2) facilitating containerization by efficiently hosting container images along with providing containerization software, especially Singularity [3] GlideinWMS relies on CVMFS installed locally on the computing resources to satisfy the experiments' software needs. This requires system administrators' effort to install and maintain CVMFS at the sites and limits the use of sites, especially HPC resources, that do not have CVMFS installed. This poster presents a solution, taking advantage of Glideins to provide CVMFS at most sites without the need for a local installation. Doing so expands the pool of resources available for HEP experiments and reduces the effort of system administrators for current resources. Additionally, the proposed solution allows GlideinWMS to also start Singularity [3], a containerization software that can run unprivileged, on sites where neither CVMFS nor Singularity are available, including HPC sites. The benefits provided by this solution are: (1) lower overhead for site administrators in that they have less software to install, (2) an expanded pool of resources that run user jobs with easy access to software and data provided by CVMFS, thus making life easier for the scientists, and (3) improved flexibility to use HPC resources by enabling GlideinWMS pilot jobs to support HPC sites.

Urs, Namratha↗

Gen 3 Particle Pilot Plant (G3P3) -- High-Temperature Particle System for Concentrating Solar Power (Phases 1 and 2)

The U.S. Department of Energy Solar Energy Technologies Office initiated the Generation 3 Concentrating Solar Power (CSP) program to achieve higher operating temperatures (>700 °C) to enable next-generation CSP high-temperature power cycles such as the supercritical CO 2 (sCO2) Brayton Cycle. Three teams were selected to pursue high-temperature gas, liquid, and solid pathways for the heat-transfer media. Phases 1 and 2, which lasted from 2018 – 2020, consisted of design, modeling, and testing activities to further de-risk each of the technologies and develop a design for construction, commissioning, and operation of a pilot-scale facility in Phase 3 (2021 – 2024). This report summarizes the activities in Phases 1 and 2 for the solid-particle pathway led by Sandia National Laboratories. In Phases 1 and 2, Sandia successfully de-risked key elements of the proposed Gen 3 Particle Pilot Plant (G3P3) by improving the design, operation, and performance of key particle component technologies including the receiver, storage bins, particle-to-sCO2 heat exchanger, particle lift, and data acquisition and controls. Modeling and testing of critical components have led to optimized designs that meet desired performance metrics. Detailed drawings, piping and instrumentation diagrams, and process flow diagrams were generated for the integrated system, and structural analyses of the assembled tower structure were performed to demonstrate compliance with relevant codes and standards. Instrumentation and control systems of key subsystems were also demonstrated. Together with Bridgers & Paxton, Bohannan Huston, and Sandia Facilities, we have completed a 100% G3P3 tower design package with stamped engineering drawings suitable for construction bid in Phase 3.

14 SOLAR ENERGY↗

Post-closure Nuclear Criticality Safety Evaluations for Disposition of Criticality Control Overpacks at the Waste Isolation Pilot Plant

The Waste Isolation Pilot Plant (WIPP) is a geological repository in southern New Mexico that provides for disposal of transuranic (TRU) wastes from atomic energy defense activities. The Sandia National Laboratories (Sandia) Report, Consideration of Nuclear Criticality When Disposing of Transuranic Waste at the Waste Isolation Pilot Plant, addresses nuclear criticality safety based on the projected inventory characteristics for the initial compliance certification application of WIPP in 1996. As the inventory, waste forms, and disposal package designs change, revised or new analyses are necessary to demonstrate acceptability for these configurations within the WIPP safety basis and compliance with 10,000-year post-closure standards of the US Environmental Protection Agency (EPA). Saylor and Scaglione evaluated criticality control overpacks (CCOs) in 2017 based on conservative assumptions for post-closure repository structural conditions with resulting effects on containers and container spacing, The Saylor and Scaglione evaluation of CCOs addressed a single waste configuration that represents the Surplus Plutonium Disposition Program’s dilute and dispose waste form and composition. This initial CCO study demonstrated that 50 grams of boron carbide (B 4 C) per CCO is sufficient to ensure post-closure criticality safety based on a well-mixed waste composition, and Oak Ridge National Laboratory (ORNL) subsequently determined that this amount of B 4 C does not require constraints on moisture or plastic present as moderator. The Saylor and Scaglione analysis conservatively assumes repository room closure that eliminates all space between fissile gram equivalent (FGE) 239 Pu masses. The close-packed array was selected based on limited availability of repository salt creep modeling results at that time. In 2019, Brickner provided additional evaluations for pipe overpack containers (POCs), building on the conservative basis provided by Saylor and Scaglione. Brickner’s 2019 analysis made use of new geomechanical data for post-closure spacing that rely on advances in repository modeling as documented in the work by Reedlunn and Bean. This current CCO evaluation for generic waste materials expands on earlier work performed at ORNL and includes evaluation of CCOs across a much broader range of possible waste compositions and geometries. This evaluation is intended to provide input for the required feature, event and process (FEP) screening to determine if post-closure criticality must be included as an event in the 10,000-year regulatory evaluation. As such, the approach to modeling post-closure criticality presented in this report has been coordinated with the Sandia team responsible for FEP screening. The resulting analysis supports disposition of fissile materials in the CCO containing up to 380 FGE 239 Pu and expands conditions acceptable for disposal of fissile material in CCOs. This evaluation builds on the methodology of Saylor and Scaglione and Brickner, using the most recently available geomechanical data for CCO spacing under salt creep compaction scenarios provided by Reedlunn and Bean. The broad range of fissile material configurations analyzed in this report are intended to account for configurations that may occur during the post-closure disposal time period, and it also includes waste configurations that are not physically possible to support analysis of conditions that influence neutron fluence.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Exploratory Analysis of Offshore CO 2 Storage Pilot Project in the Gulf of Mexico: Geologic, Infrastructure, and Cost Considerations

This analysis employs a high-level exploratory analytical approach to quantify various considerations needed for a potential CCS pilot project in the GOM, most notably the cost magnitude to develop an offshore pilot project. The scope of this analysis focuses on CO 2 storage in saline formations presented in two specific scenarios: parts of GOM Outer Continental Shelf (OCS) federal waters and Texas state waters.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Key Goals and Innovations Needed for a U.S. Compact Fusion Pilot (Final Technical Report)

Fusion energy offers the prospect of addressing the nation's energy needs and contributing to the transition to a low-carbon emission electrical generation infrastructure. Technology and research results from U.S. investments in the major fusion burning plasma experiment known as ITER, coupled with a strong foundation of research funded by the Department of Energy (DOE), position the United States to begin planning for its first fusion pilot plant. Strong interest from the private sector is an additional motivating factor, as the process of decarbonizing and modernizing the nation's electric infrastructure accelerates and companies seek to lead the way. At the request of DOE, Bringing Fusion to the U.S. Grid builds upon the work of the 2019 report Final Report of the Committee on a Strategic Plan for U.S. Burning Plasma Research to identify the key goals and innovations - independent of confinement concept - that are needed to support the development of a U.S. fusion pilot plant that can serve as a model for producing electricity at the lowest possible capital cost.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Pilot Unit Testing at NCCC of Sorbent based CO2 Capture

TDA Research, Inc. is developing a new CO2 sorbent (alkalized alumina) technology for post-combustion CO2 capture. In this DOE sponsored project (DE-FE0012870), TDA constructed a pilot-scale skid, which was installed and tested at National Carbon Capture Center (NCCC). It was designed to process coal derived flue gas equivalent to 0.5 MWe of power generation. The pilot test data shows that TDA’s process can achieve 90% capture rate and 95% CO2 purity (the performance target) for both coal and natural gas (NG) flue gases. The techno-economic analysis (TEA) for a 550-MWe supercritical coal fired power plant with CO2 capture shows that the capture cost for TDA’s process is $34.9/tonne CO2 captured, which meets DOE’s goal of $40/tonne and is 17.1% less than the DOE baseline Case 12 (an amine solvent technology).

20 FOSSIL-FUELED POWER PLANTS↗

Carbonated Brine Injection Pilot Plan

This is a three-year effort to develop a plan for carbonated brine injection, with an end goal of a path for pilot scale implementation. Carbonated brine injection (CBI) strategy was planned for a potential pilot site through simulation study. Methods include geology model, reservoir modeling, wellbore materials compatibility and corrosion modeling, reactive transport modeling.

Xiong, Wei↗

Carbonated Brine Injection for a Pilot Site as a Low-Risk Geologic Carbon Storage Strategy: A Simulation Study

This technical report presents a preliminary study for CBI implementation in the Pena Creek pilot site in Dimmit County, Texas, targeting the Edwards Limestone Formation for SWD, in collaboration with NGL Energy Partners. The objective of this study is to find the conservative CO 2 molality for safe storage and potential risks for CBI at this pilot site. Geomodel was performed to get site-specific reservoir geology information. Reservoir modeling was performed to investigate dissolved CO 2 molality and pressure changes at relevant injection conditions. Wellbore corrosion and compatibility was discussed with corrosion modeling. Dissolved CO 2 long-term fate in the reservoir was examined with reactive transport modeling. This plan would set the scientific foundation as the initial step for future implementation in the field.

58 GEOSCIENCES↗

Compositional Variation Tests on DuraMelter 100 with LAW Sub-Envelope B1 Feed in Support of the LAW Pilot Melter, VSL-02R62N0-5, Rev. 0 (May 2003)

The principal objective of the DM100 tests was to demonstrate the robustness of the vitrification process with respect to feed and glass compositional changes resulting from variations in the simulant-to-additive ratio. The DM100-WV unit was selected for these tests; this melter was used for all of the Part B 1 tests on LAW Envelopes A, B, and C sulfate incorporation that were used to support the subsequent tests on the Pilot Melter as well as for the more recent LAW Sub-Envelope Al, A2, A3 and Cl tests. The same melter was selected for the present tests in order to maintain comparisons between the data sets. In addition, the somewhat smaller glass volume for the same melt surface area as compared to the DM100-BL melter means that more glass turnovers are achieved for a given test duration. The DM100 tests used nominal feed and feed with a 15% surplus in waste simulant. Previous Pilot Melter tests on Envelope A with 10% variations (but with sulfate removal) showed significant impacts on glass production rates that were ultimately corrected by adjustments in the sugar additions. Consequently, robustness with respect to throughput as well as sulfate tolerance are important motivations for these tests.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Pilot-Scale Validation of Distributed Optical Fiber Sensors for Underground Pipeline Monitoring

Monitoring parameters such as hoop strain, pressure, and acoustic vibrations is key to detecting potential leaks, intrusions, or structural issues. Distributed optical fiber sensor (DOFS) systems provide a compelling solution for continuous, real-time monitoring over long distances. This paper details the development and pilot-scale implementation of DOFS systems for underground pipeline monitoring, evolving from a proof-of-concept stage. Multiple custom-designed DOFS interrogator units—such as optical frequency-domain reflectometry (OFDR), Brillouin optical time-domain analysis (BOTDA), and multimodal interferometer-based fiber acoustic sensor systems were tested to measure the key parameters, such as hoop strain, pipe pressure, surrounding soil temperature, and acoustic vibrations. The underground product pipeline’s outer diameter is 30 inches, the wall thickness is 1.28 inches, and 3 feet deep from the surface. The fiber deployment strategies and sensing data acquisition methods for these systems are discussed. The results demonstrate the effectiveness of DOFS in detecting hoop strain, temperature changes, and acoustic vibrations, showcasing their potential for real-time monitoring and enhancing pipeline safety. These findings from pilot-scale testing offer valuable insights into advancing pipeline monitoring technologies and improving the reliability of underground pipeline systems.

fiber optic sensors↗

Flexible Pilot Jobs Framework for Distributed High Throughput Computing

Experimental particle physics has been at the forefront of analyzing the world’s largest datasets for decades. The high-energy physics (HEP) community was among the first to develop suitable software and computing tools for this purpose. GlideinWMS is a Glidein-based workload management system whose purpose is to provide experiments like CMS at CERN, DUNE at Fermilab, and others, a way to access and efficiently use vast amounts of computing resources. This system wants to provide a simple way to submit jobs to a set of computing resources, that will be provided to users behind the scenes. Glideins are the pilot jobs executed on the worker nodes at the grid sites, performing operations such as hardware detection, environment setup, and error handling. After all these operations, they will launch the actual user job. Many grid sites are supported, such as shared clusters, Google CE, and AWS. My internship aimed to design and code a flexible pilot jobs framework that will replace the one used by GlideinWMS, developing a modular and flexible skeleton of the Glidein and adding further functionalities. My project also focused on the application of machine learning techniques as support to this management system.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Pilot Testing of Amine-Based Solvent at Low-Rank Coal Fired Power System

Conference presentation for the 2023 International Freiberg Conference on Circular Carbon Technologies, Rotterdam, Netherlands, September 24–29, 2023. This presentation describes pilot testing of an amine-based CO₂ capture system at Coal Creek Station, examining solvent performance, system design, and operating conditions for a low-rank coal-fired power plant. The Mitsubishi Heavy Industries KM CDR (KS-1) process is assessed using pilot-scale data to inform capture efficiency, solvent condition, and integration considerations.

01 COAL, LIGNITE, AND PEAT↗