Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “NEWS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 883 records · Page 49

STS-114: Discovery Mission Status Briefing

This STS-114 Discovery Mission Status Briefing begins with Eileen Collins, Commander of the STS-114 Discovery, and crewmembers in orbit talking with mission control after launch of the Space Shuttle Discovery. Collins gives tribute to the crewmembers of the Space Shuttle Columbia and their families. Phil Engelauf, STS-114 Mission Operations Representative presents his mission status briefing and John Shannon, Space Shuttle Flight Operations and Integration Manager talks about the processing of radar data taken of the Space Shuttle Discovery during ascent. A video presentation from the Solid Rocket Booster Camera is shown by John Shannon. The video includes: 1) Piece of orbiter tile and origins of debris; 2) Pictures of debris after SRB separation; 3) TYVEK covers; and 4) Bird impacts external tank nose cone. Questions from the news media about tile shearing, vehicle damage and debris from the external tank are answered.

Source record↗

STS-114: Discovery Post MMT Press Conference

Bruce Buckingham of NASA Public Affairs hosted this press conference. Wayne Hill, Space Shuttle Deputy Program Manager; John Muratore, Shuttle Systems and Integration Manager; Mike Wetmore, Director for Shuttle Processing were present. Wayne started with a video from Shuttle Logistics Depot showing details of a point sensor box commonly named the black box. Work with the trouble shooting continues on a day to day basis, no definite launching date is set. John reports that they are in a mission support mode all over the country until the sensor problem is solved. Mike reports his team will complete scrub and securing tasks through the next day, restore the facility to its normal mode, and will start to a four day process of getting back to launch once trouble shooting is completed. Tanking test, thermal environment, problem identification, engine cut-off sensor problems, sensors, risk, design reviews, test and analysis, correlation of the problem with Columbia, are some of the topics covered with the News media.

Source record↗

STS-114: Discovery Mission Status Briefing

Paul Hill, STS-114 Lead Shuttle Flight Director and Wayne Hale, Space Shuttle Deputy Program Director is shown during this mission status briefing. Hill talks about the first 24 hours of the Space Shuttle Discovery in orbit. He expresses that he has acquired data from the launch through imagery and hand held photographs of the external tank. Hale answers questions from the news media about how the engineers may be managing this data and if there is an overwhelming amount of data. Live downlink television pictures from the end-effectors camera on the Robotic Arm as it has completed its reberthing of the Orbiter Boom Sensor System (OBSS) are shown.

Source record↗

Return to Flight Crew Activities Resource Reel JSC 1988 2 of 2

The crew of the STS-114 Discovery continues to answer questions from the news media about the upcoming mission. Commander Collins thanks NASA for enabling the astronauts to express their thoughts and feelings about procedures during spaceflight and she is also very happy to work for NASA. Pilot James Kelly talks about the pictures that they are now able to take of the external tank. Mission Specialists Wendy Lawrence and Steve Robinson discuss the items that they will be bringing up to the International Space Station. Robinson also talks about mementos of the Space Shuttle Columbia crew that they will be taking to the International Space Station.

Source record↗

STS-114: Discovery Mission Status Briefing (incl. Statement from Cmdr. Collins and Crew)

Commander Eileen Collins and crew briefly thanked everyone who worked hard to get the Shuttle back in space, and dedicated the mission to the Columbia crew as she bids their first "good night" to the Mission Control Room in Houston. Video continues with the Mission Status Briefing by Phil Engelauf, STS-114 Mission Operations Representative, and John Shannon, Manager of the Space Shuttle Operations and Integration. Phil noted that launching and ascent had gone extremely well, the crews and the flight control team performed well and the vehicle performed exceptionally as well. The launch is the beginning of a 12 day mission period. John details the tasks of the Engineering team processing the radar data taken during ascent and checking frame by frame the imagery from both on vehicle imagery and ground imagery. John further detailed the two debris event from ascent video clips of tile loss and an unidentified material falling off from the external tank; the release of TYVEK covers, and bird impact on the external tank nose cone. Tile shearing, tile damage, tile repair, landing gear door seals, repair capabilities, debris assessment, safety, inspections criteria, data acquisitions and data analysis were topics covered with the News media.

Source record↗

STS-114: Discovery Flight Day 7 Post MMT Meeting

Wayne Hale Space Shuttle Deputy Program Manager, and Chuck Campbell Subsystem Engineer in Aerothermodynamics are seen in this post mission management teem briefing on this seventh day of space flight. Wayne Hale begins with talking about how the International Space Station has been resupplied with its necessities, and that the Control Moment Gyroscope (CSG) has been replaced. Hale expresses his concern about the health of the Space Shuttle Discovery with the two protruding gap fillers present, and the aerothermodynamics surrounding the gap fillers. These concerns led to the conclusion to have spacewalker Stephen Robinson remove the gap fillers during EVA-3. Campbell shows a video of the protruding gap filler aft of Nose Landing Gear Door (NLGD). Campbell and Hale answer questions from the news media about the risks of performing this spacewalk, boundary layer transitions, flight safety, inspections, and temperature concerns.

Source record↗

STS-114: Discovery Post MMT Press Conference

George Diller, NASA Public Affairs, introduces the panel who consist of: Bill Parsons, Space Shuttle Program Manager; Wayne Hale, Space Shuttle Deputy Program Manager; Ed Mango, Deputy Manager JSC Orbiter Project Office; and Mike Wetmore, Director of Shuttle Processing. Bill Parsons begins by expressing that he is still searching for the problem with the low level fuel sensor inside the external tank. Hale talks about more ambient tests that will be performed to fix this problem. Mango expresses his findings from tests in the aft engine compartment, point sensor box, orbiter wiring, and wire resistance. He also talks about looking in detail into the circuit analysis of the point sensor box. Questions from the news media about tanking tests and extending the launch window are addressed.

Source record↗

STS-114: Discovery Post MMT Press Conference

Bruce Buckingham, NASA Public Affairs hosted this conference. Bill Parsons, Space Shuttle Program Manager; John Muratore, Shuttle System and Integration Manager; Mike Wetmore, Shuttle Processing Director were present. The Panel summarizes that thorough effort of analysis and test techniques and great amount of work is being done to fix the sensor problem and will be ready to call the stations for a launch countdown process after the trouble shooting is fully completed. Launch time, grounding problem, sensor failure, trouble shooting, tanking test, pin swap, and heaters were topics covered with the News media. For clarification, Bruce Buckingham provided information that preferred launch time is at 10:39am on July 26, Eastern Time.

Source record↗

STS-114: Discovery Post Landing Press Briefing

Dean Acosta, NASA Public Affairs Deputy Assistant Administrator hosted this press briefing. Michael Griffin, NASA Administrator; Bill Parsons, Shuttle Program Manager; Michael Leinbach, Shuttle Launch Director; and Bill Ready, Space Operations Associate Administrator were present. The Panel specifically honored the Columbia crew as they praised Commander Eileen Collin's performance in bringing the Discovery and crew safe back to Earth. Re-entry, test flight and next test flight, thermal insulation, heat, vehicle inspection, turn around processing, and ferrying Discovery back to the Kennedy Space Center were topics covered with the News media. Michael Griffin announced the launching of Mars Reconnaissance Orbiter will take place the following morning.

Source record↗

STS-114: Discovery Day 6 Post MMT Meeting

Wane Hill, Deputy Manager of the Space Shuttle Program, and Steve Poulos, Manager, Orbiter Project Office discussed damage assessments caused during ascent. Steve further detailed the damage analysis and assessments with chart presentation of composite tile damage and gap filler sites evaluation, protruding ceramic shim, left wing tile damage, comparisons of ground test results versus FD5 focused inspection, and the window 1 blanket. Gap fillers, the STS-73, thermal protection, temperature range, heating and heating range, aerodynamics, aerothermodynamics, risk, foam damage, tile adhesions, and extravehicular activities are topics covered with the News media.

Source record↗

STS-114: Discovery Post MMT Press Conference

Bruce Buckingham from NASA Public Affairs introduces the panel who consists of: Wayne Hale, Space Shuttle Program Deputy Manager; John Muratore, Manager, Space Shuttle Systems and Integration; and Mike Wetmore, Director of Shuttle Processing. Hale begins with a video presentation of the point sensor box (black box) and discusses the troubleshooting plans that are in place to fix the low level fuel sensor inside the External Tank of the Space Shuttle Discovery. Muratore talks about exploring conditions that may be causing the problem and Wetmore discusses completing scrub securing. Questions from the news media pertaining to solutions to the sensor problem, risks involved, and anomalies are addressed.

Source record↗

STS-114: Discovery Launch Readiness Press Conference

Michael Griffin, NASA Administrator; Wayne Hale, Space Shuttle Deputy Program Manager; Mike Wetmore, Director of Shuttle Processing; and 1st Lieutenant Mindy Chavez, Launch Weather Officer-United States Air Force 45th Weather Squadron are in attendance for this STS-114 Discovery launch readiness press conference. The discussion begins with Wayne Hale bringing to the table a low level sensor device for everyone to view. He talks in detail about all of the extensive tests that were performed on these sensors and the completion of these ambient tests. Chavez presents her weather forecast for the launch day of July 26th 2005. Michael Griffin and Wayne Hale answer questions from the news media pertaining to the sensors and launch readiness. The video ends with footage of Pilot Jim Kelly and Commander Eileen Collins conducting test flights in a Shuttle Training Aircraft (STA) that simulates Space Shuttle landing.

Source record↗

STS-114: Discovery Post MMT Briefing

Wayne Hale, Space Shuttle Deputy Program Manager, is presented in this STS-114 Discovery Post Mission Management Team (MMT) briefing. He begins by talking about obtaining clearance from the Reinforced Carbon-Carbon (RCC) material. He then describes the supplies such as eleven water containers and the transfer of 50 additional pounds of Oxygen to the International Space Station. Hale presents a video of a billowed thermal blanket next to the commander's window on the port side of the Space Shuttle Discovery that seems to be of some concern. He answers questions from the news media about the dimensions of this blanket, and the dangers of getting close to this blanket during the Extravehicular Activity (EVA) to repair the gap fillers.

Source record↗

STS-114: Discovery Mission Status Briefing

Phil Engelauf, STS-114 Mission Operations Representative reports: the orbital rendezvous was successful, and today's activities includes initial preparations of the next day's extravehicular activities (EVA); he specifically mentioned tile repair, wiring on the outside of the vehicle to try to recover CMG2 (Control Moment Gyro), and preparation for the external stowage platform. John Shannon, Manager of the Space Shuttle Operations and Integration reports from Engineering standpoint that the composites of the underside of the tile surface seen from pictures taken during the pitch maneuver were extremely clean; the Engineering staff continues to look at the focus inspection data from the orbital boom sensor system (OBSS) and other data to assess the condition of the vehicle. Solid rocket boosters were retrieved and are towed back to the Air Force hangar in Cape Carneval. Six target inspection (nose gear doors, gap fillers, chine area, external tank doors, trailing edge, and ice), and arm operations, foam, conservation measures, shuttle air lock, aerodynamics assessment and re-entry were topics covered with the News media.

Source record↗

STS-114: Discovery Day 3 Mission Status Briefing

Paul Hill, STS-114 Lead Shuttle Flight Director and John Shannon, Space Shuttle Flight Operations and Integration Manager are seen in this STS-114 flight day three Mission Status Briefing. Hill expresses that the Discovery Orbiter is performing beautifully and that STS-114 crew performed a picture perfect rendezvous. He also shows a video of the Rendezvous Pitch Maneuver (RPM) where Commander Eileen Collins slowly flips Discovery in a circle to give the Expedition 11 crew a view of Discovery's heat resistant tiles. He talks about the removal of the Multi-Purpose Logistics Module (MPLM) from Discovery's payload bay using the ISS Robotic Arm. Shannon discusses two objectives that his team is fulfilling on this mission. They include: 1) Understanding the health of Space Shuttle Discovery; and 2) Assessing the performance of the External Tank. Questions from the news media pertaining to the life expectancy of the Space Shuttle Discovery, battery lifetime on the wing leading edge impact sensors, foam loss, PAL ramps, and the safety of the Space Shuttle Discovery are addressed.

Source record↗

A Global Rapid Integrated Monitoring System for Water Cycle and Water Resource Assessment (Global-RIMS)

The main focus of our work was to solidify underlying data sets, the data processing tools and the modeling environment needed to perform a series of long-term global and regional hydrological simulations leading eventually to routine hydrometeorological predictions. A water and energy budget synthesis was developed for the Mississippi River Basin (Roads et al. 2003), in order to understand better what kinds of errors exist in current hydrometeorological data sets. This study is now being extended globally with a larger number of observations and model based data sets under the new NASA NEWS program. A global comparison of a number of precipitation data sets was subsequently carried out (Fekete et al. 2004) in which it was further shown that reanalysis precipitation has substantial problems, which subsequently led us to the development of a precipitation assimilation effort (Nunes and Roads 2005). We believe that with current levels of model skill in predicting precipitation that precipitation assimilation is necessary to get the appropriate land surface forcing.

Roads, John↗

STS-114: Discovery Day 5 Post MMT Briefing

Wayne Hill, Space Shuttle Deputy Program Manager, and Chair of the Mission Management Team, reports the following: the testing of the thermal protection system in space, on orbit was successful; the MMT meeting formally approved the mission extension for one day; image analysis from the launch phase has been completed; tile and blankets had been formally cleared by the Engineering team; additional inspection of the reinforced carbon-carbon (RCC); gap filler, heat shield and small black spot phenomenon are carefully inspected and evaluated to prepare the safe return of the Discovery. Bill Gerstenmaier, ISS Program Manager reports on the extra vehicular activities (EVA): replaced the GPS antenna; prepared the airlock to attach the ESP2; re-powered CMG2; transfer of CWCs; and the MISSE packages were wrapped around thru at the end of the air lock. He mentioned the high currents problem seen on CMG3, which they will have to take off line to check and understand the problem. Consumables, engineering performance of the three sensors (LCS, LDRI, ITVC), CMG removal and replacement, EVA2 and EVA3, gap fillers, RCC, hydrogen tank pre-press cycles, thermal protection system, inspection, ISS supply maintenance, and projection of next flight are topics covered with the News Media.

Source record↗

STS-121: Discovery End of Mission Crew Briefing

The crew of the STS-121 Discovery mission is shown during this end of mission briefing. The crewmembers consist of: Stephanie Wilson, mission specialist; Steve Lindsey, commander; Lisa Nowak, mission specialist; Piers Sellers, mission specialist; Mike Fossum, mission specialist; and Mark Kelly, pilot. The briefing opens with Commander Lindsey describing the two major objectives of this mission, which are to accomplish the rest of the return to flight objectives started by STS-114, and to increase the ISS crew to three. He expresses that these objectives were fulfilled. A question and answer period from the news media follows. Lisa Nowak talks about robotics and her experiences during her first flight. Stephanie Wilson also discusses robotics and gives her thoughts about spaceflight. Steve Lindsey discusses the flying qualities of STS-121, spacecraft landing, and weather conditions while in space. Mark Kelly was responsible for the undocking of the Shuttle from the International Space Station, and he elaborates on this process. Spacewalkers Piers Sellers and Mike Fossum discuss testing of the Orbiter Boom Sensor System (OBSS). This system will be used as a platform to make repairs to the Space Shuttle.

Source record↗