Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Mars mission”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 883 records · Page 49

How to Build a Rover: An Overview of the Mars 2020 Mission’s Vehicle System Testbed

While NASA’s Mars rover Perseverance continues to make groundbreaking achievements on the Red Planet, its twin is hard at work here on Earth. The Operational Perseverance Twin for the Integration of Mechanisms and Instruments Sent to Mars, or OPTIMISM, is the Mars 2020 Vehicle System Testbed (VSTB) rover operated by NASA Jet Propulsion Laboratory (JPL) in Pasadena, California. OPTIMISM’s home is the JPL Mars Yard; an outdoor field with red soil that simulates the terrain encountered by Perseverance. The VSTB is a full-scale engineering model of the flight rover, serving a number of functions to ensure mission operations can continue smoothly and on schedule. The VSTB possesses instrumentation, computers, mechanisms, cameras, and a Mobility subsystem that are nearly identical to its extraterrestrial twin. Its high fidelity allows the rover to be a highly effective tool to fully test system functionality and performance prior to commanding the flight rover. The early stages of building OPTIMISM began a few months prior to Perseverance departing JPL for Cape Canaveral, FL in early 2020. Electrical integration of the flight system avionics, and compatibility checkouts of the electrical ground support equipment ensured that the foundation of the electrical system was operational and in place. Next, the internal harnessing was installed and compatibility checks of the rover instrumentation and mechanisms were performed to confirm the system was prepared for full buildup. Finally, mechanical assembly of the rover chassis with its external components completed the integration of the system before it was moved to the Mars Yard for its initial phase of testing to perform verification & validation (V&V) of the Mobility subsystem requirements. By the time Perseverance landed at Jezero Crater in February 2021, the first phase of VSTB operations was underway. Surface guidance, navigation, and control (SGNC) testing for the Mobility subsystem ensured functionality and performance requirements were met for various capabilities such as visual odometry (VO), mapping, and automatic navigation (AutoNav). Subsequent integration of the robotic arm (RA) onto the VSTB enabled the V&V campaign for surface sampling operations (SSO) to commence. As the mission’s engineering operations (EO) have gotten underway, the VSTB has been utilized for an array of purposes including troubleshooting software anomalies, and performing dry-runs for first time activities (FTAs) prior to sending the commands to Perseverance. OPTIMISM will continue to serve mission critical functions as long as Perseverance is roving the Red Planet.

Rojas, Jose Trujillo↗

The Icebreaker Life Mission to Mars: A Search for Biomolecular Evidence of Recent Life

The Icebreaker mission is the first mission to search for life signatures on Mars using biomolecular methods. Icebreaker lands in the ice-rich mid-latitudes of Mars and drills and collects samples down to at least 1 m depth to 1) search for molecular signatures of life and 2) assess the habitability of the icy regolith in the context of recent orbital cycles. Icebreaker is a NASA Discovery-class mission.

Mars Life Detection↗

Mars Surface Mission Workshop

A workshop was held at the Lunar and Planetary Institute on September 4-5, 1997, to address the surface elements of the Mars Reference Mission now being reviewed by NASA. The workshop considered the current reference mission and addressed the types of activities that would be expected for science and resource exploration and facilities operations. A set of activities was defined that can be used to construct "vignettes" of the surface mission. These vignettes can form the basis for describing the importance of the surface mission, for illustrating aspects of the surface mission, and for allowing others to extend and revise these initial ideas. The topic is rich with opportunities for additional conceptualization. It is recommended that NASA consider supporting university design teams to conduct further analysis of the possibilities.

Duke, M. B.↗

Guidance, Navigation and Control for the Entry, Descent, and Landing of the Mars 2020 Mission

This paper presents an overview of the Guidance, Navigation and Control (GNC) system for the Entry, Descent, and Landing (EDL) phases of the Mars 2020 Mission. The EDL GNC system adds Terrain Relative Navigation to the MSL EDL GNC system1 to enable landing on landing sites with landing hazards within the landing ellipse. This paper describes the GNC architecture, including sensors, actuators and algorithms, for the entry, parachute descent, and powered flight phases of the mission.

Brugarolas, Paul↗

Manned mission to Mars with periodic refueling from electrically propelled tankers

In a joint study by students from the Ecole Polytechnique Feminine, France, and the University of California, Los Angeles, a mission concept that had the objective of evaluating the feasibility of a non-nuclear, yet fast, manned mission to Mars was considered. Ion-engine propelled tankers are postulated that would provide mid-coarse refueling of LOX and LH2 to the manned ship. The scenario is therefore one of a 'split mission', yet with the added feature that the cargo ships include tankers for mid-course refueling. The present study is a continuation of one first conducted last year. Emphasis this year was on the design of the tanker fleet.

Gogan, Laura↗

Nuclear Power Concepts for High-Power Electric Propulsion Missions to Mars

Under the Mars Transportation Assessment Study, NASA and DOE are performing analyses and generating concepts for crewed Nuclear Electric Propulsion (NEP) missions to Mars. This paper presents the results of trade studies and concept development for the nuclear electric power system, consisting of the fission reactor, radiation shielding, power conversion, heat rejection and power management & distribution (PMAD). The nuclear power team completed trade studies to evaluate different reactor and power conversion technologies and developed preliminary concepts for the crew shielding, waste heat radiators, and PMAD. The initial results suggest that a modified terrestrial microreactor combined with supercritical CO2 Brayton conversion could be used to perform the crew and cargo missions with satisfactory performance and modest risk.

Lee Mason↗

Learning from the Mars Rover Mission: Scientific Discovery, Learning and Memory

Purpose: Knowledge management for space exploration is part of a multi-generational effort. Each mission builds on knowledge from prior missions, and learning is the first step in knowledge production. This paper uses the Mars Exploration Rover mission as a site to explore this process. Approach: Observational study and analysis of the work of the MER science and engineering team during rover operations, to investigate how learning occurs, how it is recorded, and how these representations might be made available for subsequent missions. Findings: Learning occurred in many areas: planning science strategy, using instrumen?s within the constraints of the martian environment, the Deep Space Network, and the mission requirements; using software tools effectively; and running two teams on Mars time for three months. This learning is preserved in many ways. Primarily it resides in individual s memories. It is also encoded in stories, procedures, programming sequences, published reports, and lessons learned databases. Research implications: Shows the earliest stages of knowledge creation in a scientific mission, and demonstrates that knowledge management must begin with an understanding of knowledge creation. Practical implications: Shows that studying learning and knowledge creation suggests proactive ways to capture and use knowledge across multiple missions and generations. Value: This paper provides a unique analysis of the learning process of a scientific space mission, relevant for knowledge management researchers and designers, as well as demonstrating in detail how new learning occurs in a learning organization.

Linde, Charlotte↗

2018 Mars Insight Mission Design and Navigation Overview

Originally scheduled for a launch in the 2016 Earth to Mars opportunity, NASA’s Interior Exploration using Seismic Investigations, Geodesy, and Heat Transport (InSight) mission will launch the next lander to Mars in May-June 2018 arriving to the Red Planet in November 2018. Derived from the Phoenix mission which successfully landed on Mars in May 2008, the InSight Entry, Descent, and Landing system will place a lander in the Elysium Planitia region. This paper specifies the mission and navigation requirements set by the Project and how the final mission and navigation design satisfies those requirements.

Abilleira, Fernando↗

Monte Carlo analysis of the Titan III/Transfer Orbit Stage guidance system for the Mars Observer mission

An important part of space launch vehicle mission planning for a planetary mission is the integrated analysis of guidance and performance dispersions for both booster and upper stage vehicles. For the Mars Observer mission, an integrated trajectory analysis was used to maximize the scientific payload and to minimize injection errors by optimizing the energy management of both vehicles. This was accomplished by designing the Titan III booster vehicle to inject into a hyperbolic departure plane, and the Transfer Orbit Stage (TOS) to correct any booster dispersions. An integrated Monte Carlo analysis of the performance and guidance dispersions of both vehicles provided sensitivities, an evaluation of their guidance schemes and an injection error covariance matrix. The polynomial guidance schemes used for the Titan III variable flight azimuth computations and the TOS solid rocket motor ignition time and burn direction derivations accounted for a wide variation of launch times, performance dispersions, and target conditions. The Mars Observer spacecraft was launched on 25 September 1992 on the Titan III/TOS vehicle. The post flight analysis indicated that a near perfect park orbit injection was achieved, followed by a trans-Mars injection with less than 2sigma errors.

Bell, Stephen C.↗

Mission to Mars

Experiments to be accomplished by Mariner 9 mission

Source record↗

Telecommunications and data acquisition systems support for the Viking 1975 mission to Mars

The background for the Viking Lander Monitor Mission (VLMM) is given, and the technical and operational aspects of the tracking and data acquisition support that the Network was called upon to provide are described. An overview of the science results obtained from the imaging, meteorological, and radio science data is also given. The intensive efforts that were made to recover the mission are described.

Mudgway, D. J.↗

Mars Observer mission status and orbit insertion phase planning

The Mars Observer spacecraft will reach Mars on August 24, 1993. Launch and cruise phase operations have gone smoothly, with few spacecraft anomalies. The orbit insertion phase, which spans a three month period and involves a series of seven maneuvers, has been redesigned postlaunch making use of excess spacecraft velocity change (Delta V) capability to advance the mapping phase, now planned to begin November 24, 1993. This is highly desirable since it moves the start of the mapping phase away from solar conjunction and the expected dust storm disturbances. The redesign process involved making tradeoffs between science, operations, and maneuver requirements. At Mars, the spacecraft will continuously record data with a single daily playback through the Deep Space Network's 34-meter high-efficiency antennas for one Martian year.

Dodd, Suzanne R.↗

COSPAR Workshop Series on Refining Planetary Protection Requirements for Human Missions to Mars

COSPAR and its space agency partners are supporting a multi-year stepwise process devel-oping needed approaches to address planetary protection requirements for human missions beyond Earth orbit. The objective is to support incremental development from the current qualitative COSPAR planetary protection “Principles and Guidelines for Human Missions to Mars” to quantitative implementable planetary protection requirements for such future mis-sions. The workshops and meetings in this series have involved participants from NASA, ESA, JAXA and other national space agencies, as well as the scientific/technical community, and commercial/private enterprise stakeholders, based around three main topic areas: Microbial and Human Health Monitoring; Spacecraft Technology and Operations, and; Natural Trans-port of Contamination at Mars. This presentation provides a status update on the findings of the COSPAR Meetings on this topic to date. First, the identification and prioritization of knowledge gaps will be summarized. Next, where a knowledge gap is to be addressed by new measurements, example descriptions of measurements needed to close the knowledge gaps (and instruments necessary to make those measurements) will be discussed. Where the knowledge gaps closure is based on Agency policy decisions, the scope of the decision-making parameters and process will be described. Lastly, the presentation will consider how the findings of the study series can be integrated into current and future space agency and COSPAR activities.

J. Andy Spry↗