When Every Drum is a Win - Tackling a Thirty-Five Thousand Drum Legacy - 20064

Cameco Corporation's (Cameco) Port Hope Conversion Facility (PHCF) was previously owned by the federal Crown Corporation, Eldorado Nuclear, which held a significant inventory of legacy waste material at the time Cameco was formed in 1988. As a result, Cameco was granted an allocation of 150,000 cubic metres of space in the Long-Term Waste Management Facility (LTWMF) located in the Municipality of Port Hope (MPH), which opened to the receipt of Cameco material in June 2018. Cameco is currently undertaking a major site cleanup and renewal of its Port Hope Conversion Facility (PHCF) which is known as the Vision in Motion (VIM) project. Over its operating history, Eldorado accumulated an inventory of over 35,000 drums of accumulated waste that was primarily stored at two offside warehouse locations. In 2017 and 2018, the project focused on repackaging two well characterized legacy wastes (magnesium fluoride slag and depleted uranium titanium oxide) from one of the two offsite locations. At the conclusion of this work, approximately 15,000 drums of these wastes had been repackaged and disposed of at the LTWMF. There remained approximately 1000 drums from this location that either could not be repackaged safely or were different waste types and required further verification and/or processing. The buildings at this location were scheduled for demolition in early 2019, which triggered the development of a process for triaging legacy drums in August 2018, which allowed for preparation and shipment of approximately half of these drums to the LTWMF by March 2019, with the remainder moved to the second offsite warehouse location in February 2019 for further characterization which is ongoing. This paper will discuss key lessons learned as the drummed legacy waste disposal inventory has been reduced to approximately half of the initial inventory. This will include the development of an alternate packaging process; prioritization of characterization activities and selection of techniques where minimal inventory information is available; determination of next step(s) for each drum as it is assessed; key safety considerations; and how to make inroads into an overwhelming task while under public and regulatory scrutiny. In a relatively short period of time, significant progress has been made to organize and gather information about the legacy waste, update the inventory records and determine the most appropriate pathways (i.e. LTWMF disposal, disposal at another appropriate facility, site storage until future processing and/or disposal). Since 2017 the volume of the decades-old legacy waste inventory has decreased significantly. With the majority of the known materials safely disposed of at the LTWMF, every drum removed from the endless rows of 20,000 pyramidally-stacked waste drums with limited history that is safely characterized, prepared and shipped is considered a win. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Optimization of the Post-Operational Phase on Two Belgian Multi-Unit Nuclear Power Plants: the Case of the Non-Fissile Irradiated Core Items - 20156

The current legal framework in Belgium foresees the progressive phase out of nuclear power between October 2022 (Doel 3) and December 2025 (Doel 2). Upon its definitive shutdown, each unit of the Tihange and Doel sites will enter a Post-Operational Phase (POP) and be prepared for its Decontamination and Decommissioning (D and D). Prior to obtaining the D and D license, the Operator Electrabel is legally required to remove any non-fissile irradiated core items stored in the deactivation pools. The non-fissile irradiated core items consist essentially of control rods, poison rods and source thimbles as well as thimble plugs and foreign materials irradiated during operation: - Their significant content in highly radiant radionuclides (up to 6 TBq of Co-60 per kg of irradiated material) renders all existing operational waste management processes inadequate due to insufficient biological shielding; - Their high concentrations in long-lived radionuclides call for their disposal in a geological repository for which no final design nor waste acceptance criteria are expected prior to 2050. Uncertainties in the Belgian energy supply and security, however, require the Operator to be prepared for a partial nuclear phase out, where one or more units would benefit from lifetime extension while the remaining units would undergo decommissioning. The present paper aims at presenting how Electrabel, in partnership with Tractebel, addressed this challenge by maximizing the use of synergies within the respective sites as well as between both sites themselves, all the while accounting for site specificities. The most recent results and state of progress of the project will be detailed and the first lessons learned will be shared. The project has been split in multiple tasks and phased as follows: - An inventory phase aimed at mapping the contents, origin, composition and history of the non-fissile irradiated core items; - A pre-characterization phase based on neutron activation models; - A waste sorting phase aimed at separating waste forms for which an evacuation route exists from those for which such route does not exist; - A feasibility phase aimed at exploring all possible scenarios for the management of non-fissile irradiated core items and identifying the optimal feasible solution for each site; - A preparation phase (currently ongoing), developing further the optimal solution and ensuring that back-up solutions are available for any foreseeable change of context (licensing issue, modification in the nuclear phase-out program, etc.) and initiating early contacts with potential subcontractors for segmentation works and cask manufacturers, as well as the Belgian regulatory body and waste management agency. This phase also foresees the investigation of destructive and non-destructive radiological measurements to support the detailed characterization of the waste forms; - A realization phase (future work). (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

14 Steps to Creating Value in Cost and Schedule Resources for Nuclear Waste Management - 20188

While Waste Management budgets are shrinking, DOE required cost and schedule controls are becoming increasingly stringent. At the same time, there is a scarcity of adept, qualified, and competent projects controls staff who both understand nuclear waste management and are capable of addressing today's cost and schedule challenges. In response, we have developed a systematic approach to training and mentoring project controls staff. The approach is based on the observations and lessons learned on projects, both successful and unsuccessful, over the past 20 years. During that time, we evaluated staff development and used that experience to design a program that progresses the maturity, knowledge and experience of the individual. The program is based on the unique needs of cost and schedule specialists while incorporating the best leadership and managerial applications. The system is not limited to developing individual software skills, which is a primary focus of many project controls training programs. Instead, our system develops an individual's soft and hard skill sets. The system develops the user's skill, talent, attitude, and drive to do the best job possible. It focuses on all aspects of becoming a more productive technical team while accepting responsibility for individual growth. It also enhances the project controls team by setting up checks and balances that everyone is aware of and participates in. The system is based on 14 steps of increasing complexity in knowledge and application. The system clarifies roles, responsibilities and expectations. It helps eliminate uncertainty and reduces stress on staff and managers. It contains everyday routine actions and is simple to implement. It allows the development of a consistent rhythm to staff growth and development. Mastering the steps will allow the user to achieve excellence in cost and schedule control. The 14 steps are: 1 - Key Performance Objectives, 2 - Check Lists, 3 - Desktop Guides, 4 - System Description, 5 - Procedures, 6 - Software and On the Job Training (OTJ), 7 - Traceability Checks, 8 - Surveillances, 9 - 32 Criteria, 10 - The Contract, 11 - Customer/Government Guidance, 12 - Training and Mentoring Others, 13 - Master your weekly and daily schedules, 14 - Improving your interpersonal skills. Application and mastery of this system will produce better cost and schedule control results. Your project controls staff will write better reports, analyze data better, make better use of their time, and be more valuable to decision makers. If followed rigorously, our system will produce a great project controls team, which is invaluable to the success of each project. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Using Digital and Web-Based Platforms to Enhance Nuclear Power Plant Knowledge Transfer - 20203

As the workforce ages, the loss of experienced personnel can result in a loss of important knowledge. Updating Electric Power Research Institute (EPRI) research and guidance with the latest technology developments and operating experience is an important method to transfer knowledge between the retiring and incoming workforce. Studies suggest that the incoming workforce is accustomed to using digital and/or internet-based platforms to find information and may have a higher comfort with these types of platforms than they have with static, written reports. Additionally, the ease and speed of updating and delivering content through digital formats may offer an effective method for knowledge transfer and combining information from multiple reports into a single access point. EPRI has recently produced an online Decommissioning Hub available to members and is working on replicating the effort in the area of radioactive waste management called the Radwaste Web References. EPRI has extensive guidance in both disciplines. The Decommissioning Hub uses a wiki format to provide a platform that allows for both the updating of that guidance resulting from new research and new operating experiences, and combining related topical information from multiple reports. It also allows users to access the information based on key words and topical searches, and can be a tool for users to input experience to share with others. The Decommissioning Hub is accessed via a web-based portal and includes topical pages; experience summaries; a question and answer capability; and a smart search function of all EPRI decommissioning reports. Use of a wiki format allows users to input new experiences or modify existing experience summaries to add additional detail. EPRI moderates all content. The experience data base has been initially populated with information available in published EPRI reports and unpublished information currently available within EPRI. Moving forward, population of the database will continue with information available within the open literature, new information developed from current decommissioning projects, and user inputs. The web site became active in late 2017, and a major update will be issued in early 2020. Larger scale updates are planned biannually, and smaller-scale updates will occur continuously. Capturing and applying lessons learned from industry experiences is a hallmark of the global nuclear industry. This is even more important in the decommissioning technology area since very few plant staff have relevant experience and thus there is a steep learning curve. Moreover, decommissioning involves a number of complex, non-routine and specialized tasks. The web-accessible and searchable experience database provides an easy-to-use resource for capturing and disseminating practical experiences from completed and ongoing decommissioning projects. The EPRI Radwaste Web References will build upon the philosophy and objectives of the Radwaste Desk References that were published in the 1990's. The purpose of the original Radwaste Desk References was to provide nuclear power plant professionals with a how-to manual for managing radioactive waste. The Radwaste Web References will adopt this original purpose and will be a wiki type web site that provide fundamental practical and theoretical information, operating experience (OE), and information about advanced technologies and methods. As much as practicable, features that allow for interaction between users to share OE, best practices, and benchmarking will be added. Where they exist and are appropriate, the various EPRI Guidelines documents on radwaste topics will be updated and incorporated into the Radwaste Web References. The first Radwaste Web Reference will be on Low Level Waste Characterization and will build upon the EPRI Low Level Waste Characterization Guidelines (EPRI Report TR-107201, 1996) and will be available in 2020. The next Radwaste Web Reference will be on the topic of liquid radioactive waste processing and management, tentatively set for unveiling in 2021. This paper summarizes the EPRI's previous experiences with web-based platforms and future plans in this area. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Contaminant Migration Modeling to Support the In Situ Decommissioning of Hardened Nuclear Facilities - 20215

The decommissioning of hardened nuclear facilities provides a unique challenge in balancing current worker dose with exposure to future receptors and media. In situ decommissioning (ISD) is a cost-effective and safe option for the closure of such facilities but requires a detailed understanding of the threat that radioactive and hazardous constituents remaining in the facilities pose to groundwater and surrounding surface water. The Savannah River Site (SRS) extensively employs contaminant migration models within the decommissioning process to develop site-specific removal, grouting, and monitoring strategies in support of safe and effective final end states of nuclear facilities. This work discusses the use of contaminant migration modeling in the ISD process at SRS, including specific examples from the closure of P-Reactor and R-Reactor, Building 235-F, F-Canyon and F/H Laboratory Complex. Migration models developed during the closure of P-Reactor and R-Reactor were divided into four source areas: the reactor vessel, the process area, the disassembly basin, and the purification wing. Each source area was assigned a specific inventory and migration pathway and was then subject to varying hypothetical removal, capping, and grouting schemes. Modeling indicated that groundwater Maximum Concentration Limits (MCLs) might be exceeded if no action was taken for eleven and ten constituents of concern (COCs) at P-Reactor and R-Reactor, respectively. These exceedances could occur in as few as 200 to 500 years. Alternatively, the migration modeling demonstrated that the selected ISD actions reduced contaminant mobility which allowed for significant radioactive decay and resulted in fewer predicted exceedances of groundwater MCLs (five COCs for P-Reactor; eight COCs for R-Reactor). In response to the modeling results for P-Reactor and R-Reactor, effectiveness monitoring programs were developed to target contaminants, specific to each reactor, that may migrate to groundwater. Contaminant migration modeling also revealed that roof collapse was a large factor in the release of COCs to the environment, giving rise to roof improvements, and an inspection and vegetation control program to ensure roof stability over time. Contaminant migration modeling is also aiding in the closure planning for hardened facilities in F Area. Building 235-F housed the Actinide Billet Line, which produced Np-237 billets for irradiation in SRS reactors, and the Plutonium Fuel Form (PuFF) facility that produced Pu-238 heat sources for the space program. As a result of these missions, areas within Building 235-F contain considerable residual amounts of both Pu-238 and Np-237. Contaminant migration modeling of Building 235-F was originally performed in 2012 to identify the feasibility of ISD and the amount of radioactive material removal required to prevent the exceedance of groundwater MCLs. The original model indicated that a 60% reduction in the PuFF facility Pu-238 inventory could keep groundwater concentrations below standards, while Np-237 did not pose a threat to groundwater. However, updates to the model with an emphasis on source impact pathways revealed that, due to the orientation of the source areas relative to groundwater flow, no amount of reasonable removal of Pu-238 would keep groundwater concentrations below MCLs and that Np-237 could be a large contributor to localized MCL exceedances. With this insight, the refined 2019 model is being used to assist in the development of grouting plans specific to each facility source area, where bentonite may be utilized to slow the migration of Pu-238 and its daughter products from the PuFF facility and a reducing grout may decrease Np-237 transport by ensuring the nuclide remains in the less mobile +IV oxidation state. The beginning phases of contaminant migration modeling are underway for F-Canyon and associated facilities using lessons learned from the Reactors and Building 235-F. A contaminant migration pathway, similar to the pathway used for the reactor vessels, is being developed for the hot and warm canyons. The F-Canyon inventories are being spatially refined to identify specific and localized source zones, comparable to Building 235-F, that may impact groundwater. Contaminant migration modeling provides vital input within the ISD process, from facility investigation to post closure effectiveness monitoring, making it a valuable tool in the development of safe and effective end states for hardened nuclear facilities at SRS. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Use of Historical EM Practices and Policies for Management of Cleanup Program and Address GAO Concerns - 20222

As Department of Energy (DOE) Environmental Management (EM) program policies and management practices are revised over time, it might be useful to periodically reflect on the DOE EM program's past to identify practices that have worked and those that might be appropriate for possible reuse in the future. An added impetus to examine alternative approaches is the recent Government Accountability Office (GAO) report entitled 'Nuclear Waste Cleanup - DOE Could Improve Program and Project Management by Better Classifying Work and Following Leading Practices.' The February 2019 GAO report states that EM categorizes most of its work in a way that does not adequately involve independent experts and DOE senior leadership. It also noted that EM has not followed leading practices for program and project management that could help keep the cleanup efforts on schedule and control costs. The GAO report recommended that EM, working with DOE Office of Project Management (PM): - Establish requirements and then assess EM's ongoing operations activities to determine if some activities should be reclassified as capital asset projects based on these newly established requirements. - Review and revise EM's 2017 cleanup policy to include program management leading practices related to scope, cost, schedule performance, and independent reviews. - Update the cleanup policy to require that earned value management (EVM) systems be maintained and used in a way that follows EVM best practices. - Develop a policy to ensure that work is categorized as level of effort (LOE) only in appropriate, specified circumstances, such as when work is not measurable or when measurement is impractical. - Integrate EVM data into EM's performance metrics for operations activities. To assist with improving program performance and implementing audit recommendations, this paper reviewed past successful cleanups such as Weldon Springs, Rocky Flats, Fernald, Ashtabula, Battelle Columbus (abs, and other historical resources and people with experience during the early years of EM program. As such, there are several past practices which may well be suited for reuse today. Some of these practices include: - In 1990's, as the DOE EM cleanup program, known as Environmental Restoration came into effect, the known cleanup scope at each geographic location or site was organized into four levels ranging from overall site-wide cleanup effort to the individual 'release sites', providing high granularity to the program. - The cleanup program was organized by geography (Northwest, Southwest, Eastern Area Programs, etc.). These 'sub-program' managers provided a degree of Headquarters oversight and management allowing upper management (EM-1, 2, and 3) to focus on major decisions and issues. - Budget levels at selected cleanup sites were funded above 'minimum-safety' levels to accelerate actual cleanup work. - Past practice utilized EVM techniques and uniform EM oversight over all discrete project-like activities, providing for a coordinated cleanup effort. - EM managed LOE activities using benchmarking and best in class management practice techniques to help manage costs. - EM managed and reviewed entire site cleanup baselines, not only individual projects, focusing on a successful overall outcome. - Sites had a 'Road map' or 'Management Action Plan' that provided the overall strategy or plan for that site's cleanup - this helped with understanding and coordination of efforts. - EM had a robust lessons-learned program and database to capture and transmit worthy ideas. - EM had well-structured cleanup baseline change control policies to control cost and schedule changes, at the contractor and higher Headquarters levels. Finally, some of the GAO observations may be valid, however it is not clear as to their extent. For example, for some operation types of work, the use of the Level of Effort (LOE) earned value method to track progress may be appropriate. Also, to ensure independence of thought, and to obtain useful insight on past practices, it may be suitable to have former EM employees to assist with understanding past practices or to verify that activities have been properly identified. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Canonsburg, Pennsylvania, UMTRCA Title I Disposal Site 35 Years Postclosure (1985-2020) - 20288

The DOE Office of Legacy Management (LM) Canonsburg, Pennsylvania, Disposal Site is a former uranium ore-processing site located in the borough of Canonsburg and an important part of US history. For 46 years (1911-1957), the site processed ore, for vanadium, radium and then uranium. Soils and groundwater beneath the site were contaminated by the milling operations. The 15-hectare (37-acre) site is owned by the US government and managed by LM, which serves as the federal land manager and steward of cultural, historical, and natural resources at Cold War legacy sites that have been successfully cleaned up to remedial standards. In 1978 Congress directed DOE to remediate 22 inactive uranium-ore processing sites under the Uranium Mill Tailings Radiation Control Act (UMTRCA), in accordance with standards promulgated by the US Environmental Protection Agency in Title 40 CFR Part 192 (40 (CFR 192). Subpart B of 40 CFR 192 regulates the cleanup of contaminated groundwater at the processing sites. The radioactive materials were encapsulated in US Nuclear Regulatory Commission (NRC)-approved disposal cells, and the NRC general license for UMTRCA Title I sites is established in 10 CFR 40.27. Canonsburg was the first site to be remediated under UMTRCA. From 1983 to 1985, the Canonsburg site underwent cleanup under this US law that provides for the safe and environmentally sound disposal, long-term stabilization, and control of uranium mill tailings in a manner that minimizes or eliminates radiation health hazards to the public. The site is unique in that it is one of only two UMTRCA Title I sites in the eastern half of the United States, the other site being the Burrell, Pennsylvania, Title I Disposal Site, a vicinity property to the Canonsburg site. It has been 35 years since the disposal cell at the Canonsburg site was completed. This paper discusses the many efforts that have been taken to maintain the site and presents some of the lessons learned concerning the long-term care of the site. The discussion includes but is not limited to the following: (1) Preserving site history so the community can better appreciate and understand the site. (2) Community outreach efforts, and the importance of maintaining transparency of environmental monitoring results with the community. (3) Pursuing reuse opportunities that offer the potential for improving the community. (4) Remaining engaged with the local community. (5) Remaining proactive in the long-term care of the site. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Remediation of Temporary Storage Sites in Support of the Port Hope Area Initiative - 20295

The Port Hope Area Initiative is a community-based solution for the long-term management of historic low level radioactive waste (LLRW) resulting from 60 years of uranium and radium processing operations in the Town of Port Hope which is located in Ontario, Canada. The Eldorado refinery, on the north shore of Lake Ontario, began refining radium-226 from pitchblende ore, later transitioning to the refining of uranium. Through the history of the operation, LLRW was deposited throughout the town of Port Hope as a result of fugitive emissions from the plant and/or through the re-use of process residues as building material and backfill. Historical clean-up activities conducted in the late 1970's involved the remediation of approximately 400 properties and the relocation of 100,000 cubic metres of contaminated soil to a disposal facility in Chalk River operated by Atomic Energy of Canada Limited (AECL). Owing to space limitations at that disposal facility, any LLRW identified through construction monitoring since that time has been stored in the community at three temporary storage sites located throughout the town. These include: the Centre Pier mound that contained approximately of 19,800 m{sup 3} of LLRW-impacted soil that originated from the construction of a new water treatment plant; two mounds located at a licensed storage facility containing LLRW obtained from residential clean-up activities (11,000 m{sup 3}); and a small pad adjacent to the municipal sewage treatment plant containing 2200 m{sup 3} of LLRW-containing sludge. With the construction of a new long-term waste management facility (LTWMF) that has been designed to house all of the LLRW identified within Port Hope, the three sites were early candidates for remediation. The clean-up of the three temporary storage sites was a significant milestone for the Port Hope Area Initiative. After a decade of planning and consultation, this work represents the first sites in the municipality to be remediated with the waste being safety removed and transferred to the newly constructed LTWMF. This paper discusses the challenges associated with the clean-up activities for these three sites and the strategies employed to address those challenges. These included weather-related challenges, owing to the seasons over which the work was conducted as well as those associated with working within a closely-knit community. Canadian Nuclear Laboratories (CNL), working on behalf of the federal government, has worked diligently to develop a positive and trusting relationship with the community. Consequently, the successful execution of this project needed to be sensitive to, and respectful of the needs of the community. In addition to the usual Health, Safety and Environment training, project staff received community awareness training that spoke to the history of this community-based initiative and the expected behavior when working within the community. Transportation routes were defined based on safety and the need to minimize disruption to local traffic while haul-times where scheduled around school bus hours to enhance public safety. The successful completion of this first of many remediation projects to be completed under the Port Hope Area Initiative reflected years of careful planning. Nevertheless, there were a number of 'lessons learned' that have been applied on other ongoing projects be completed under the Port Hope Area Initiative. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Port Hope Areas Initiative's Port Granby Project: The Decontamination of Site Equipment from a Low Level Waste Facility - 20330

The Port Hope Area Initiative (PHAI) is the Government of Canada's response to the community recommended solutions for the remediation and safe, long-term management of historic low-level radioactive waste (LLRW) that was the result of uranium and radium processing operations in the Municipality of Port Hope, Ontario from the 1930's to the 1980's. The Eldorado refinery, on the shores of Lake Ontario, began refining radium-226 from pitchblende ore, later transitioning to the refining of uranium ore. Process residues were deposited at the Welcome Waste Management Facility in Port Hope until the mid-1950's switching to the Port Granby Waste Management Facility (PGWMF), which continued to accept waste until the late 1980's. The Port Granby Project involves the construction of a new, secure long-term waste management facility (LTWMF) and supporting infrastructure, and the excavation and relocation of approximately 1,200,000 m{sup 3} of historic low-level radioactive waste and marginally contaminated soil from the PGWMF to the newly constructed LTWMF. Since the project's inception in 2016, the bulk of the material has since been moved to the final long term storage cell. This has taken over 500,000 person-hours and a large amount of one site heavy equipment to accomplish including excavators, bulldozers, rock trucks, baker tanks and vacuum trucks. While many of the pieces of heavy equipment and water management equipment has further work to do on site, several of the sites larger items have already undergone the decontamination process prior to release from the site. This process has posed a serious challenge as the waste has a caustic nature to it and over the last few years it has had time to work its way into the metallic structures and framework of the equipment. Coupled with the tight work spaces and in some cases confined work areas there have been many issues that needed to be addressed to successfully reach a state where items can be free released to the unrestricted limits of the sites license. This ongoing process has led to a more refined decontamination program at the Port Granby Facility and has had a rather high success rate considering the length of time the equipment has been exposed to the waste materials on site. This paper discusses the varied challenges of decontamination faced at a low-level radioactive waste facility with a focus on the following aspects: - Challenges faced regarding different equipment types and the solutions implemented by Wood to address these challenges; - An examination of various decontamination methods employed throughout the project; and - Lessons learned over three years of remediation work and how they impact the decontamination process. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Modular, Mobile Systems for the Treatment of Contaminated Water at Three Magnox Sites in the United Kingdom - 20421

Veolia Nuclear Solutions (VNS), and its mitigated entity, Veolia Nuclear Solutions Federal Services (VNSFS), are designing, overseeing the fabrication and installation, and supporting the commissioning of highly mobile and modular skid-based water treatment systems to assist in the decommissioning of three Magnox reactor sites based in the U.K. These Modular Active Effluent Treatment Plants (MAETP) will be deployed at the Chapelcross, Hinkley Point A, and Dungeness A sites to process contaminated water through the use of ion exchange systems and/or filtration units. At the time of writing, two systems have been installed and inactively commissioned, and the third system is expected to be delivered in 2020. Veolia has utilized a multi-national team of engineers, based in the UK and the US, to effectively leverage the best of Veolia expertise in the design and delivery of mobile, modular systems. The VNS team continues to refine the modular, mobile, and scalable approach to water processing system delivery, and has successfully patented the evolving technology for proprietary protection. The intent of this technology investment is to improve the functionality, mobility, and modularity, resulting in a system which can be adapted to a broad range of throughput and isotope removal requirements to achieve the most cost effective, flexible system possible for customers. Designing, fabricating, and factory-testing the modules off site followed by onsite installation, testing, start-up, and commissioning ensures expedited delivery and setup, as well as cost savings for nuclear applications. For the MAETP systems, VNS's previous nuclear site experience and ongoing Research and Development (R and D), combined with the resulting mobile/modular water processing systems developed and successfully deployed by VNS, have proven to be important inputs for the successful end-design of the systems, materials selection, system testing and commissioning. The lessons learned in the development and continued enhancement of the patented systems described in this paper will prove useful in advancing and deploying future systems for other nuclear sites, where rapid customizing and cost-effective implementation are critical factors. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A Database for Radwaste Management in Germany-30 Years of Experience by TUV NORD - 20461

From the very beginning in the late 1980's TUV NORD EnSys is involved as an independent expert in quality assurance processes concerning interim storage facilities and the disposal for radioactive waste with negligible heat generation in Germany. A database has been developed since these times by TUV NORD EnSys. The development of this database over a long time will be discussed as well as the lessons learned within this process. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Cartera de Investigacion y Desarrollo Sobre Desalinizacion de Energia Marina del NREL: Preprint (Spanish Translation)

The National Renewable Energy Laboratory (NREL), in collaboration with the U.S. Department of Energy's (DOE's) Water Power Technologies Office (WPTO), has developed a unique R&D approach to advance marine energy desalination. Desalination is a foundational investment within WPTO's Powering the Blue EconomyTM portfolio [1], and was the first investment within this portfolio. NREL's marine energy desalination spans techno-economic feasibility studies, numerical modeling, and laboratory testing at the component and subsystem level, as well as development of the Hydraulic and Electric Reverse Osmosis Wave Energy Converter (HERO WEC). This multilayered approach enables an innovative feedback loop where the data and lessons learned from laboratory and field experiments are used to refine modeling tools and analysis techniques, prioritize out-year activities, and refine strategic directions within NREL and across the WPTO portfolio. The primary objective of the NREL-led research is to identify key barriers associated with the commercialization of wave-powered desalination and develop solutions that can be adopted by the marine energy industry. In parallel, these R&D activities can help inform technical assistance and support of industry and academic technologies. These two tracks help build a common solver community approach, while also identifying key stakeholders, government agencies, and other organizations outside of the marine sector that will be necessary for developing a robust industry. For the English version of this report, see NREL/CP-5700-86724 (https://www.nrel.gov/docs/fy24osti/86724.pdf).

analysis↗

NREL Marine Energy Desalination R&D Portfolio

The National Renewable Energy Laboratory (NREL), in collaboration with the U.S. Department of Energy's (DOE's) Water Power Technologies Office (WPTO), has developed a unique R&D approach to advance marine energy desalination. Desalination is a foundational investment within WPTO's Powering the Blue EconomyTM portfolio [1], and was the first investment within this portfolio. NREL's marine energy desalination spans techno-economic feasibility studies, numerical modeling, and laboratory testing at the component and subsystem level, as well as development of the Hydraulic and Electric Reverse Osmosis Wave Energy Converter (HERO WEC). This multilayered approach enables an innovative feedback loop where the data and lessons learned from laboratory and field experiments are used to refine modeling tools and analysis techniques, prioritize out-year activities, and refine strategic directions within NREL and across the WPTO portfolio. The primary objective of the NREL-led research is to identify key barriers associated with the commercialization of wave-powered desalination and develop solutions that can be adopted by the marine energy industry. It should be noted, while WPTO's marine energy portfolio includes wave, tidal, ocean current, thermal gradients, and pressure gradients the bulk of the marine energy desalination work has been focused on wave powered desalination. In parallel, these R&D activities can help inform technical assistance and support of industry and academic technologies. These two tracks help build a common solver community approach, while also identifying key stakeholders, government agencies, and other organizations outside of the marine sector that will be necessary for developing a robust industry.

desalination↗

Increasing Diversity in the Field of Radiological Security

This paper will report on a diversity initiative undertaken by the NNSA Office of Radiological Security (ORS), Brookhaven National Laboratory and the Institute of Nuclear Materials Management. This paper will report on the planning associated with inclusion of radiological and nuclear security in the annual meeting program, the process of identifying and selecting individuals who will receive grants to attend the meeting, the expected impact of the INMM/ORS diversity initiative on the nuclear security community, and lessons learned.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

Strategies and Good Practices to Support Robust Stakeholder Engagement in Multi-Sector Energy Transition Planning

This document discusses strategies and good practices to facilitate diverse stakeholder engagement and inclusive decision-making within the context of complex energy system modernization studies and multi-sector energy transition planning, drawing upon the knowledge and expertise of numerous USAID, NREL, and other DOE laboratory practitioners with international and domestic energy planning experience. Examples of multi-sector energy transition analyses from the United States are included in this document to draw out relevant lessons learned and experience for the USAID-NREL Partnership - strategies and good practices will be updated over time as new insights emerge through collaboration with international partners and stakeholders. Considerations included within this document can also be used to support stakeholder engagement at the sector level (e.g., for power, transport, buildings), in addition to integrated approaches.

ENERGY PLANNING, POLICY, AND ECONOMY↗

Robotics for Systems Integration in Buildings - Pilot Study of Viable Approaches to Install Hygrothermal and Rigid Electrical Systems: Preprint

The Industrialized Construction Innovation (ICI) team at the National Renewable Energy Laboratory (NREL) has been exploring the use of robotics to integrate hygrothermal, mechanical, electrical, and plumbing systems in prefabricated building assemblies (offsite construction) and 3D Printed buildings (onsite construction). Such multi-system integration tasks often require specialized robots and custom end-effectors for handling a range of rigid and non-rigid building components. This paper begins with a brief overview of the current state of robotics in construction, followed by a pilot study exploring the use of robotics to integrate a simple prototype multi-trade wall assembly composed of structural studs, hygrothermal layer, wall finishing, and electrical fixtures. The study was funded by the Department of Energy's (DOE) Advanced Materials and Manufacturing Technologies Office (AMMTO). Insights about the implementation of design for manufacturing and assembly (DfMA) principles in designing the prototype wall for robotic assembly, and selection of appropriate robotic end effector hardware for handling these components are included. Detailed comparison of computational toolpath simulations of the robotic assembly process and real-life demonstration of the same is presented. Finally, limitations and lessons learned from this study along with future research recommendations for robotic assembly of more complex multi-trade assemblies, including potential scenarios such as robotic outfitting of facilities in extra-terrestrial environments is included.

advanced manufacturing↗

MRP: Qualification of Powder Metallurgy Hot Isostatic Pressed (PM HIP) Materials for Elevated-Temperature Nuclear Construction

PM HIP is a mature technology that offers many advantages that are attractive to the microreactor industry. The elevated-temperature creep-fatigue properties of the PM HIP 316H SS bar that has been characterized are reduced compared to the wrought material. Work will be carried out in fiscal year 2022 to identify the mechanisms responsible for the reduced creep-fatigue properties. Confirmatory testing of optimized material will be conducted to demonstrate long-term PM HIP properties comparable to the wrought-product form. The lessons learned for PM HIP 316H SS will be applied to the procurement and confirmatory testing of PM HIP Alloy 800H.

316H stainless steel↗

Utility Programs Supporting Customer-Sited Battery Storage: Program Design to Ensure Mutual Benefits

Behind-the-meter (BTM) battery storage, when paired with solar, can benefit customers, utilities, and the electric grid. Some utility-sponsored programs have been implemented offset the cost of customer-owned batteries and recognize the value of batteries to the utility and the grid. This factsheet summarizes existing utility-sponsored battery programs and the value to the stakeholders. It then highlights Wattsmart, the customer-owned battery program offered by Rocky Mountain Power in Utah, and provides lessons-learned from a close look at the impact of the program design on commercial customer participation.

battery↗