Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Information Sharing”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 883 records · Page 49

Advanced Transmission Technologies –GETs and HPCs Session 3: HPCs and Building Actions Plans to Digital Assurance Risks

The third session of the Idaho National Laboratory’s (INL) Technical Assistance for Digital Assurance (TADA) program, held on November 11, 2025, centered on High Performance Conductors (HPCs) and the formulation of action plans to address digital assurance risks associated with Grid-Enhancing Technologies (GETs). This session convened experts from utilities, vendors, and government agencies to examine the technical, operational, and cybersecurity aspects of HPC deployment. Discussions highlighted the benefits of HPCs, such as their ability to rapidly increase transmission capacity using existing corridors, improve grid resilience, reduce system losses, and align with FERC Orders 2023 and 1920. Participants evaluated supply chain and digital assurance risks, including reliance on imported materials, limited domestic manufacturing capacity, workforce shortages, and traceability issues. The session also emphasized the importance of digital trust, integration-layer cybersecurity, and unified risk frameworks, introducing tools like intrusion detection systems, encryption, zero trust networking, and firmware integrity. Recaps of earlier workshops on Dynamic Line Ratings (DLRs), Advanced Power Flow Control (APFC), and Transmission Topology Optimization (TTO) underscored institutional barriers and integration challenges. Action plans were proposed to mitigate issues such as inconsistent cybersecurity practices, SBOM usage, supply chain visibility, operator trust, and misaligned incentives. Additionally, INL presented its supply chain risk management tools and Cyber-Informed Engineering (CIE) principles to support secure procurement and system design. The session concluded with a commitment to share key takeaways, incorporate cohort feedback into future policy development, and continue collaborative engagement through upcoming pilot activities. Session 3 of 3.

24 - POWER TRANSMISSION AND DISTRIBUTION↗

Advancing Urban Water Resilience: Coproducing Knowledge through Civic–Academic Global Partnerships on Water and Climate

As extreme weather events become more pronounced, the vulnerabilities associated with the urban water supply and wastewater systems in megacities are intensified in multiple interconnected dimensions. These multifaceted water challenges can benefit from enhanced cross-sectoral collaboration and sharing of critical knowledge, which are essential for sustainable and adaptive water governance frameworks. In this context, the Megacity Alliance for Water and Climate (MAWAC)–Europe and North America Region (ENAR) Working Group convened a workshop in March 2023, followed by a subsequent workshop in London, United Kingdom, from 11 to 13 September 2024. These workshops aimed to investigate and devise solutions for the cascading hazards with water systems. The solutions examined various aspects focused on climate adaptation and mitigation, stormwater management, and the governance of water and wastewater systems. Additionally, discussions highlighted the importance of community engagement, economic considerations, equity, and effective communication in addressing these pressing challenges. Over the course of 3 days, experts from academia, government agencies, and industry engaged in meaningful discussions on digital modeling for integrated water management, climate-informed urban planning, and public–private–academic partnerships (Fig. 1). Case studies from cities such as New York, Los Angeles, London, Paris, and Chicago highlighted innovative governance strategies for managing water and wastewater systems, promoting water reuse, planning infrastructure, and fostering stakeholder-driven and stakeholder-informed adaptation. The workshop participants emphasized the need for data-driven decision-making, scalable governance models, and knowledge-sharing networks to enhance urban water governance for sustainability and resilience. This workshop report presents the key takeaways from the 3-day convening, providing a roadmap for integrating scientific research, policy frameworks, and emerging technologies to address water challenges faced by megacities.

Hydrologic models↗

The genome of jojoba ( Simmondsia chinensis ): A taxonomically isolated species that directs wax ester accumulation in its seeds

Seeds of the desert shrub, jojoba ( Simmondsia chinensis ), are an abundant, renewable source of liquid wax esters, which are valued additives in cosmetic products and industrial lubricants. Jojoba is relegated to its own taxonomic family, and there is little genetic information available to elucidate its phylogeny. Here, we report the high-quality, 887-Mb genome of jojoba assembled into 26 chromosomes with 23,490 protein-coding genes. The jojoba genome has only the whole-genome triplication (γ) shared among eudicots and no recent duplications. These genomic resources coupled with extensive transcriptome, proteome, and lipidome data helped to define heterogeneous pathways and machinery for lipid synthesis and storage, provided missing evolutionary history information for this taxonomically segregated dioecious plant species, and will support efforts to improve the agronomic properties of jojoba.

Sturtevant, Drew↗

Aligning Standards Communities for Omics Biodiversity Data: Sustainable Darwin Core-MIxS Interoperability

The standardization of data, encompassing both primary and contextual information (metadata), plays a pivotal role in facilitating data (re-)use, integration, and knowledge generation. However, the biodiversity and omics communities, converging on omics biodiversity data, have historically developed and adopted their own distinct standards, hindering effective (meta)data integration and collaboration. In response to this challenge, the Task Group (TG) for Sustainable DwC-MIxS Interoperability was established. Convening experts from the Biodiversity Information Standards (TDWG) and the Genomic Standards Consortium (GSC) alongside external stakeholders, the TG aimed to promote sustainable interoperability between the Minimum Information about any (x) Sequence (MIxS) and Darwin Core (DwC) specifications. To achieve this goal, the TG utilized the Simple Standard for Sharing Ontology Mappings (SSSOM) to create a comprehensive mapping of DwC keys to MIxS keys. This mapping, combined with the development of the MIxS-DwC extension, enables the incorporation of MIxS core terms into DwC-compliant metadata records, facilitating seamless data exchange between MIxS and DwC user communities. Through the implementation of this translation layer, data produced in either MIxS- or DwC-compliant formats can now be efficiently brokered, breaking down silos and fostering closer collaboration between the biodiversity and omics communities. To ensure its sustainability and lasting impact, TDWG and GSC have both signed a Memorandum of Understanding (MoU) on creating a continuous model to synchronize their standards. These achievements mark a significant step forward in enhancing data sharing and utilization across domains, thereby unlocking new opportunities for scientific discovery and advancement.

59 BASIC BIOLOGICAL SCIENCES↗

Multilateral Biomedical Data Sharing in the One-year Joint US-Russian Mission on the International Space Station

The One Year Mission (1YM) by two astronauts on the International Space Station (ISS), starting in March 2015, offers a unique opportunity to expand multilateral collaboration by sharing data and resources among the partner agencies in preparation for planned space exploration missions beyond low Earth orbit. Agreements and protocols will be established for the collection, distribution, analysis and reporting of both research and clinical data. Data will be shared between the agencies sponsoring the investigators, and between the research and clinical medicine communities where common interests are identified. The assignment of only two astronauts, one Russian and the other American, to the 1YM necessitated creativity in bilateral efforts to maximize the biomedical return from the opportunity. Addition of Canadian, European and Japanese investigations make the effort even more integrative. There will be three types of investigations: joint, cross‐participation and data‐exchange. The joint investigations have US and Russian coprincipal investigators, and the data acquired will be their common responsibility. The other two types must develop data sharing agreements and processes specific to their needs. A multilateral panel of ISS partner space agencies will develop policies for international exchange of scientific information to meet their science objectives and priorities. They will promote archiving of space flight data and will inform each other and the scientific community at large about the results obtained from space life sciences studies. Integration tasks for the 1YM are based on current experience from the ISS and previous efforts on the Russian space station Mir. Closer coordination between international partners requires more common approaches to remove barriers to multilateral resource utilization on the ISS. Greater integration in implementation should increase utilization efficiency to benefit all participants in spaceflight human research. This presentation will describe the overarching principles for multilateral data collection, analysis and sharing and for data security for medical and research data shared between ISS partners prior to release in public forums.

Charles, John B.↗

Foreword to special issue: Papers from the 63rd annual meeting of the APS Division of Plasma Physics, November 8–12, 2021

The 63rd annual meeting of the APS Division of Plasma Physics (DPP) was held on November 8–12, 2021 in Pittsburgh at the David Lawrence Convention Center with both a live (in person) component and a virtual component. Following guidance from an APS COVID task force, all in-person attendees were fully vaccinated and masked. More than 800 physicists attended, safely, in-person. With both virtual and on-site participants, discussions were lively, and the research presentations showed unmatched mastery in the modern observation, theory, simulation, and manipulation of plasma. The presentations included four invited review talks, 97 invited talks, four tutorials, and four presentations from this year's prize and award recipients. There were more than 1200 contributed poster presentations and 725 contributed oral presentations. Including both in-person and remote attendees, DPP 2021 had a record of 2232 participants. As a hybrid meeting, in-person presentations of all invited presentations were broadcast live and were accompanied by a Q&A discussion. Contributed oral and poster presentations were prerecorded along with options to schedule in-person discussions on demand. Five mini-conferences were held: “Gatekeeper Workshop: Creating a Diverse, Equitable, and Inclusive Pipeline,” “Collisionless Shocks in Laboratory and Space Plasmas,” “The High Repetition Rate Frontier in High-Energy-Density Physics,” “Measuring and Modeling Plasma Surface Interactions,” and “The Second Mini-Conference on Machine Learning, Data Science and Artificial Intelligence in Plasma Research.” Finally, on the day before the official start of the meeting, an afternoon “for students, by students” included lightning talks, plasma trivia, and an informal occasion to connect with other students, learn how to get the most from the DPP Annual Meeting, and share successful ways to connect with colleagues and advance their professional careers.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Hybridized kagome bands and induced Ti magnetism in RTi3Bi4 (R = Nd, Sm, Gd) kagome metals studied using angle-resolved photoemission spectroscopy and x-ray magnetic circular dichroism

Kagome materials are known for hosting emergent quantum phenomena driven by the interaction between different lattice, charge and spin orders. Here, we present a detailed angle resolved photoemission (ARPES), density functional theory (DFT) and x-ray magnetic circular dichroism (XMCD) study of the electronic and magnetic structure of RTi3Bi4 (R = Nd, Sm, Gd). ARPES and DFT demonstrate that the bulk electronic band structure is dominated by the hybridization of the Ti bands, and the weak electron-like pocket at Γ is identified as a surface state. The isotropic XAS profile of the M 4,5-edge of the rare earth is consistent with the presence of R 3+ oxidation state. Using the XMCD sum rules, backed by the atomic multiplet theory calculations, we obtain the spin and orbital magnetic moments. The Ti L2,3-edge XMCD reveals the presence of a small magnetic moment in GdTi3Bi4, presumably driven by the proximity of the Ti kagome layers to the zigzag chains of Gd, while the total magnetic moment of Gd is shared by the f and d electrons. Our combined XMCD, ARPES and DFT study brings an important piece of information to understand the spin flip transitions and anomalous Hall effect observed in the RTi3Bi4 kagome metals.

Lim, C.↗

Evaluating a Commercial Dynamic Line Rating Software with the National PMU Dataset

To accelerate the development of data-driven applications for power systems, the Department of Energy (DOE) supported the collection and curation of a synchrophasor dataset spanning two years of observations from transmission utilities across the US. This National PMU Dataset (NPDS) was anonymized and distributed to awardees of a DOE research grant under nondisclosure agreements (NDAs) but has also been retained at PNNL to enable further research. Agreements with data contributors prevent the data from being shared outside the organization. However, establishing a blind research validation methodology is envisioned to maximize the value proposition of the NPDS. In this validation strategy, researchers may share algorithms/software (potentially as executables to protect intellectual property) with PNNL, and PNNL will share feedback about the software’s performance on subsets of the NPDS. Such a blind methodology ensures that sensitive information about critical infrastructure remains protected, but the value of the NPDS can be extended to research beyond PNNL. Through iterative feedback, the algorithms may be tweaked to address real-world artifacts. As the NPDS data is temporally and geographically diverse, it may capture features absent in smaller datasets used during the development of the algorithm under test. This report presents lessons learned from applying the blind validation methodology to LineID™, a synchrophasor-based dynamic line rating software developed by Topolonet Corporation. Improvements made to the software through iterative feedback, limitations of the validation methodology, as well as how the limitations of the NPDS affected the evaluation process are discussed. Observations indicate that the proposed validation methodology can be valuable for evaluating other tools in the future.

97 MATHEMATICS AND COMPUTING↗

County Level Annual Population Projections for SSP3 and SSP5

This dataset consist of annual (2020-2100) county-level population projections for the United States (U.S.) for Shared Socioeconomic Pathways (SSPs) 3 and 5. The original decadal state-level data is used as an input to the gridded population data model to downscale the state-level projections for each SSP to a 1 km grid. The 1 km data is then aggregated to the county-level using the 2020 TIGER/Line county shapefiles from the U.S. Census Bureau. The two data files are shared as .csv files with the following structure: Rows = Data for individual counties which are identified using their Federal Information Processing Standard (FIPS) code. The FIPS code is stored in the first column. Columns = Each year from 2020-2100 is an individual column. For easier reference, the state name associated with each row is stored in the last column. Values in each cell are the downscaled estimated population for that county-year combination. Values are fractional due to the weighting scheme used in the downscaling. The paper and model source code cited in the "Related Works" section describes the initial source of the population projections.

FIPS↗

The UARS and open data system concept and analysis study. Executive summary

Alternative concepts for a common design for the UARS and OPEN Central Data Handling Facility (CDHF) are offered. The designs are consistent with requirements shared by UARS and OPEN and the data storage and data processing demands of these missions. Because more detailed information is available for UARS, the design approach was to size the system and to select components for a UARS CDHF, but in a manner that does not optimize the CDHF at the expense of OPEN. Costs for alternative implementations of the UARS designs are presented showing that the system design does not restrict the implementation to a single manufacturer. Processing demands on the alternative UARS CDHF implementations are discussed. With this information at hand together with estimates for OPEN processing demands, it is shown that any shortfall in system capability for OPEN support can be remedied by either component upgrades or array processing attachments rather than a system redesign.

Mittal, M.↗

Aerospace Industries Association (AIA) work practices report for composites

In an effort to gain a better understanding of effective safety and health work practice controls for composite manufacturing operations, the Aerospace Industries Association (AIA) Occupational Safety and Health Committee established a Composites Task Group. The group's task was to provide AIA members with recommendations for minimizing occupational exposure risk and to determine research needs and information gaps. The strategy included a review of toxicological information on composites, a review of member company experience and control methods, and interaction with other professional organizations who share an interest in composite work practices.

Luca, Jackie↗

STS-81 Flight Day 4

On this fourth day of the STS-81 mission, the flight crew, Cmdr. Michael A. Baker, Pilot Brent W. Jett, Mission Specialists, John M. Grunsfeld, Marsha S. Ivins, Peter J.K. Wisoff, and Jerry M. Linenger, prepare for the fifth linkup of the Space Shuttle and the Mir Space Station. The Atlantis docks with Mir at a point 210 nautical miles above the Earth southeast of Moscow, culminating a three-day rendezvous. Two hours after docking, the hatches between Atlantis and Mir are opened and Baker and Mir 22 Commander Valery Korzun share a hug to mark the start of five days of joint operations between the two crews. After an informal welcoming ceremony in the Mir's core module, the STS-81 crewmembers receive a station safety briefing. Linenger becomes the fourth American to occupy a position on the Russian Space Station following the docking of Atlantis to the outpost. During the docked phase of the mission, the two crews transfer nearly three tons of food, water and supplies to Mir.

Source record↗

Underestimation of Project Costs

Large projects almost always exceed their budgets. Estimating cost is difficult and estimated costs are usually too low. Three different reasons are suggested: bad luck, overoptimism, and deliberate underestimation. Project management can usually point to project difficulty and complexity, technical uncertainty, stakeholder conflicts, scope changes, unforeseen events, and other not really unpredictable bad luck. Project planning is usually over-optimistic, so the likelihood and impact of bad luck is systematically underestimated. Project plans reflect optimism and hope for success in a supposedly unique new effort rather than rational expectations based on historical data. Past project problems are claimed to be irrelevant because "This time it's different." Some bad luck is inevitable and reasonable optimism is understandable, but deliberate deception must be condemned. In a competitive environment, project planners and advocates often deliberately underestimate costs to help gain project approval and funding. Project benefits, cost savings, and probability of success are exaggerated and key risks ignored. Project advocates have incentives to distort information and conceal difficulties from project approvers. One naively suggested cure is more openness, honesty, and group adherence to shared overall goals. A more realistic alternative is threatening overrun projects with cancellation. Neither approach seems to solve the problem. A better method to avoid the delusions of over-optimism and the deceptions of biased advocacy is to base the project cost estimate on the actual costs of a large group of similar projects. Over optimism and deception can continue beyond the planning phase and into project execution. Hard milestones based on verified tests and demonstrations can provide a reality check.

Cost estimation↗

Propulsion-Airframe Integration Technical Interchange Meeting

The 1st Propulsion-Airframe Integration Technical Interchange Meeting (PAI–TIM) was held in Cleveland, Ohio, at the Ohio Aerospace Institute from May 30 to 31, 2018. The meeting was organized by representatives from the National Aeronautics and Space Administration (NASA) aeronautics research centers (i.e., Ames Research Center, Armstrong Flight Research Center, Glenn Research Center, and Langley Research Center) and the Air Force Research Laboratory and was sponsored by NASA’s Advanced Air Vehicle Technology project. The purpose of the PAI-TIM was to exchange information and ideas amongst this community of researchers in a workshop-type setting. At this meeting, results were shared in the form of presentations only (i.e., no papers were required) regarding ongoing research efforts in both the experimental and modeling areas associated with propulsion-airframe integration for advanced subsonic and supersonic vehicles. During the 2-day meeting, a total of 22 presentations were made and were organized into three sessions: (1) Vision and PAI Challenges of Future Air Vehicles, (2) PAI Modeling and Simulation: State-of-the-Art and Challenges/Needs, and (3) PAI Testing: Test Techniques, Results and Challenges/Needs. All but two of the presentations made at the PAI-TIM are included in this publicly available conference proceedings document.

Long-Davis, Mary Jo↗

Uncrewed Lunar Surface Operations and Support Activities

Sustained human presence on the surface of the Moon and future missions to Mars require increased independence from surface crews and Earth-based mission control to operate efficiently, safely, and reliably. The time for surface crews to perform tasks will be limited. Extravehicular activities by surface personnel are burdensome and time-consuming, even when a continuous human presence on the surface occurs. Identifying and balancing human/automation roles and tasks and infusing automation and autonomy practices early in a system’s lifecycle will be essential to achieve mission objectives. Among these objectives are attaining a sustained human presence, improving performance and mission effectiveness, reducing operations and maintenance (O&M) costs, and ensuring operations that are robust to communication delays. To achieve these objectives, an operational shift toward increased automation and autonomy with less reliance on humans is needed. Uncrewed lunar surface operations and support activities occur when surface crews are not present or are independent of surface crew timeline activities requiring no surface crew oversight or intervention. These uncrewed surface opportunities can also be planned to minimize crew workload that avoids routine maintenance and support tasks, thus maximizing crew exploration time. Uncrewed preparations such as staging and prepositioning equipment and materials before the crew arrives could improve crew task efficiency. Additional opportunities exist to conduct uncrewed science, exploration, and utilization. Uncrewed surface architecture functions can include science and exploration; habitation; launch and landing support; surface communication and navigation; surface power generation and distribution; human surface mobility; lifting, handling, manipulating; excavation, construction, and site preparation; logistics management; maintenance and repair; surface resource utilization; integrated site operations and shared support services (e.g., site scheduling/prioritization, dust mitigation/contamination control, and surface safety). Early robotic lunar surface campaigns will provide information on the availability of resources, such as oxygen and water, and demonstrate surface-based technologies. After the Artemis III human lunar return mission, a series of landers will deliver surface systems, cargo, supplies, science packages, spare parts, and commodities. A balance of crewed and uncrewed surface operations will enable a sustained lunar surface presence at the South Pole of the Moon at a site that will be known as the Artemis Base Camp (ABC). It is envisioned that base camp operations on and around the Moon will then help prepare for the mission durations and activities needed to support the first human mission to Mars. Before long-duration crew missions to the base camp can occur, the necessary surface infrastructure will be pre-deployed and verified operational. Surface assets will be teleoperated and remotely managed from Earth. Additionally, robotic and short-duration crewed missions to the ABC will ensure the site’s merit to achieve long-term science objectives, availability of usable resources, and that terrain, seasonal variations, and illumination conditions are acceptable. ABC will consist of different areas where specific functions and services are rendered, including: • Launch and Landing Area • Habitation Area • Power Production Area • Resource Areas Launch and Landing Area—The launch and landing area will support associated functions for the arrival and departure of vehicles, such as crewed landing and ascent and uncrewed cargo deliveries and offloading. It will evolve from an unimproved site at the beginning of the exploration campaign to a more sustainable landing and launch area that can support repeated arrivals and departures. Initial uncrewed Lunar Terrain Vehicle (LTV) surface operations may include emplacement of navigation beacons and communication equipment, real-time video and photography of landing/liftoff events, and element repositioning, such as portable utility power (PUP) (applicable for other landed assets at other areas). Site preparations, such as surface leveling, soil compaction, and berm/path construction, may be needed for a more sustainable launch and landing area capable of accommodating vehicles that are increasingly more reusable and reduce the effects of plume surface interactions and ejecta impacts on nearby surface assets. During the ABC missions, cargo and logistics will be delivered to the lunar surface via robotic cargo landers before the crew arrives. These shipments, which can arrive in pressurized logistics carriers, will deliver the logistics necessary to support a crewed mission and include items such as food, water, equipment spares, etc. Providing the capability to retrieve, offload, and transport the logistics closer to the ABC site before the arrival of the crew will increase the overall efficiency of crew operations once they arrive. In the sustained phase of exploration, other supporting services may be needed, such as lander propellant servicing, surface power services, commodity refreshes, and additional inspection, maintenance, and repair capabilities, to sustain a cadence of extended personnel stays and cargo arrivals and departures. Habitation Area—Uncrewed support to surface habitation could involve supporting activation and pre-entry operations of the habitat while the crew is in orbit at the Gateway outpost preparing for a surface landing. Surface Habitat (SH) uncrewed operations may include bringing the cabin environment to a habitable temperature and air mix and activating other critical crew support systems. Potential crop production uncrewed tasks in the SH could also include autonomous watering and tending. Additionally, when the crew departs, the SH enters dormancy for the long period of uncrewed operation. A logistical staging area could also be collocated near the SH. If so, staging operations for crew supplies, waste re-location, and recycling operations may be opportunities for uncrewed operations. Power Production Area—The Fission Surface Power (FSP) element and its supporting distribution equipment provide power to surface elements as needed across the ABC to supplement day-to-day operations and survive lunar nights. Uncrewed support of this power system includes any initial LTV-assisted deployments of cables and other distributed equipment, associated electrical connections, and system testing and activation operations. Robotically performing some inspections, maintenance, or repair tasks on the power distribution equipment could reduce the surface crew workload. Resource Area— Uncrewed resource prospecting, mapping, and characterizing possible resource sites is likely to be time-consuming and represents an opportunity for uncrewed operations between crewed missions. Uncrewed mobile equipment operations will be needed in the extreme environments of permanently shadowed locations where resource extractions occur. As In-Situ Resource Utilization (ISRU) pilot plant operations begin, uncrewed surface support activities with available mobile and portable assets (LTV, PUP, etc.) will better support these operations. Any produced commodities can be stored at a centralized storage location for future use. Also associated with these operations is the use of mobile robotic excavators for resource acquisition and robotic/autonomous regolith processing. The waste tailings generated during excavation and regolith processing would also need to be transported and deposited at a dedicated location. Surface assets will continue operating between crew visits to maintain surface capabilities, conduct lunar surface science, technology demonstrations, and public outreach opportunities. Additionally, certain sustaining tasks that would consume valuable crew time could be performed before crew arrival, or after their departure. This capability may offer more affordable options to construct, activate, test, and maintain a broad set of surface assets. Telerobotically operated human surface mobility systems, such as the LTV and Pressurized Rover (PR), can be utilized for various tasks. Surface environmental conditions pose a distinct challenge for all these activities. Surface illumination and localized shadows are one such factor. Night-survival operations could consist of thermal management, battery pre-charging, and load shedding. Some surface systems may hibernate through the night and then awake and continue nominal operations. Uncrewed mobile assets may use a more adaptive approach to optimize their power and operations; one method is to follow the sunlight. Night-survival operations may be initiated remotely by teleoperation, automated, or accomplished by supervised autonomous operation. The ability to pre-deploy and control remote assets in orbit or on Mars before the arrival of the mission crew is a key capability that can be simulated on the moon. The base camp provides a venue where these advanced operational concepts, technologies, and autonomous methods and techniques, including the incorporation of time delays to simulate Earth-Mars latency can be replicated to help buy down future Mars mission risks. This paper will examine the evolution of uncrewed lunar surface operations and support activities. It will also discuss the lunar surface environmental conditions (thermal, lighting, terrain, topography, communications) along with the challenges they pose on uncrewed surface operations, and the performance of these activities with limited to minimal human interaction and/or teleoperation. Since lunar missions include Mars mission analogs, such investigation provides the framework for future uncrewed Mars mission support.

Mark E Lewis↗

Fundamental Research to Enable In-Situ Resource Utilization for NASA’s Artemis Program and Beyond Taking Place at The Glenn Research Center

In Situ Resource Utilization (ISRU) is regarded by many to be the key to future sustainability in space. The National Aeronautics & Space Administration’s (NASA) Space Technology Mission Directorate (STMD) recently published a list of ranked technology shortfalls. ISRU specific capabilities of ‘Extraction and separation of water from extraterrestrial surface material’, ‘Extraction and separation of oxygen from extraterrestrial surface material’, and ‘Produce propellants and mission consumables from extracted in-situ resources’ are within the top 80 shortfalls identified. A team of researchers and engineers at NASA’s Glenn Research Center (GRC) in Cleveland, Ohio, are performing fundamental research and technology maturation to ensure concepts and technologies are ready to support when the mission architecture is primed for ISRU to activate. Through analytical modeling and initial lab-scale testing, researchers are establishing concepts that mature to more sophisticated tests in relevant environments. Numerous studies are underway assessing fundamental behaviors of regolith during various steps of a conceptual ISRU production plant. This paper shares some of GRC’s recent advancements in ISRU research and technology development, in the hopes of providing valuable information to the ISRU community at large, spark ideas for future collaborative endeavors, as well as spur interest in utilizing some of the world-class expertise and facilities GRC has to offer.

ISRU↗