Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Human information processing.”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

867 records · Page 49

Auto calibration of a cone-beam-CT

Purpose: This paper introduces a novel autocalibration method for cone-beam-CTs (CBCT) or flat-panel CTs, assuming a perfect rotation. The method is based on ellipse-fitting. Autocalibration refers to accurate recovery of the geometric alignment of a CBCT device from projection images alone, without any manual measurements. Methods: The authors use test objects containing small arbitrarily positioned radio-opaque markers. No information regarding the relative positions of the markers is used. In practice, the authors use three to eight metal ball bearings (diameter of 1 mm), e.g., positioned roughly in a vertical line such that their projection image curves on the detector preferably form large ellipses over the circular orbit. From this ellipse-to-curve mapping and also from its inversion the authors derive an explicit formula. Nonlinear optimization based on this mapping enables them to determine the six relevant parameters of the system up to the device rotation angle, which is sufficient to define the geometry of a CBCT-machine assuming a perfect rotational movement. These parameters also include out-of-plane rotations. The authors evaluate their method by simulation based on data used in two similar approaches [L. Smekal, M. Kachelriess, S. E, and K. Wa, 'Geometric misalignment and calibration in cone-beam tomography,' Med. Phys. 31(12), 3242-3266 (2004); K. Yang, A. L. C. Kwan, D. F. Miller, and J. M. Boone, 'A geometric calibration method for cone beam CT systems,' Med. Phys. 33(6), 1695-1706 (2006)]. This allows a direct comparison of accuracy. Furthermore, the authors present real-world 3D reconstructions of a dry human spine segment and an electronic device. The reconstructions were computed from projections taken with a commercial dental CBCT device having two different focus-to-detector distances that were both calibrated with their method. The authors compare their reconstruction with a reconstruction computed by the manufacturer of the CBCT device to demonstrate the achievable spatial resolution of their calibration procedure. Results: Compared to the results published in the most closely related work [K. Yang, A. L. C. Kwan, D. F. Miller, and J. M. Boone, 'A geometric calibration method for cone beam CT systems,' Med. Phys. 33(6), 1695-1706 (2006)], the simulation proved the greater accuracy of their method, as well as a lower standard deviation of roughly 1 order of magnitude. When compared to another similar approach [L. Smekal, M. Kachelriess, S. E, and K. Wa, 'Geometric misalignment and calibration in cone-beam tomography,' Med. Phys. 31(12), 3242-3266 (2004)], their results were roughly of the same order of accuracy. Their analysis revealed that the method is capable of sufficiently calibrating out-of-plane angles in cases of larger cone angles when neglecting these angles negatively affects the reconstruction. Fine details in the 3D reconstruction of the spine segment and an electronic device indicate a high geometric calibration accuracy and the capability to produce state-of-the-art reconstructions. Conclusions: The method introduced here makes no requirements on the accuracy of the test object. In contrast to many previous autocalibration methods their approach also includes out-of-plane rotations of the detector. Although assuming a perfect rotation, the method seems to be sufficiently accurate for a commercial CBCT scanner. For devices which require higher dimensional geometry models, the method could be used as a initial calibration procedure.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Tonopah Test Range Air Monitoring: CY2018 Meteorological, Radiological, and Wind Transported Particulate Observations

In 1963, the U.S. Department of Energy (DOE) (formerly the Atomic Energy Commission [AEC]), implemented Operation Roller Coaster on the Tonopah Test Range (TTR) and an adjacent area of the Nevada Test and Training Range (NTTR) (formerly the Nellis Air Force Range). This operation resulted in radionuclide-contaminated soils at the Double Tracks site and Clean Slate I, II, and III sites. This report documents observations made during ongoing monitoring of radiological, meteorological, and dust conditions at stations installed adjacent to the Clean Slate sites and at the TTR Sandia National Laboratories (SNL) Range Operations Center (ROC). The primary objective of the monitoring effort is to support the DOE Environmental Management Nevada Program (EM NV) in the safe remediation of the environmental legacy of nuclear device development and testing by determining if wind blowing across the Clean Slate sites is transporting particles of radionuclide-contaminated soil beyond the physical and administrative boundaries of the sites, and to provide information for designing long-term monitoring of the sites. The monitoring program in 2018 included five stations. Station 400, located within TTR Area 3 and near the ROC, monitors conditions near the local workforce center. Stations 401 and 403 are located on the northern and southeastern perimeter fence lines, respectively, of the Clean Slate III site. Stations 404 and 405 are along the northern and eastern boundary fence, respectively, at Clean Slate II. The stations are generally downwind of the contaminated areas during either northwesterly or southerly winds, which are the predominant wind directions. The stations—which are similar in design to the Community Environmental Monitoring Program (CEMP) stations operating at locations surrounding the Nevada National Security Site and TTR—include meteorological instruments and continuous-flow, low-volume air samplers. Three pressurized ionization chambers for measuring gamma energy are in use at Stations 400, 401, and 403. Saltation sensors and saltation traps are deployed at the stations adjacent to the Clean Slate sites. Detailed meteorological data are recorded on data loggers, with periodic uploads via a satellite system to the Western Regional Climate Center (WRCC) at Desert Research Institute (DRI), to monitor instrument and site conditions. Air filter samples are collected every two weeks and the deposits in the saltation traps are collected when a sufficient sample mass for analysis has accumulated (generally a six- to eight-month interval). Monitoring at TTR in calendar year (CY) 2018 provided surveillance of both ambient conditions, and ground disturbance associated with remediation activities at Clean Slate II and III. The first half of CY2018 data from Stations 404 and 405 at Clean Slate II were collected during remediation activities at that site, and data collected during the final third of the year at Stations 401 and 403 at Clean Slate III coincided with remediation work at the site. Ambient conditions prevailed at Station 400 throughout the year. Dust transport by suspension and saltation is strongly dependent on wind speed. Concentrations of PM 10 (particulate matter of aerodynamic diameter ≤10 micrometers [μm], a size fraction of small particles that are suspended in the air and can be easily inhaled) remain low until winds exceed approximately 32 kilometers per hour (km/hr) (20 miles per hour [mph]). Saltation particle counts also increase above the same general threshold wind speed. Wind speeds in excess of 32 km/hr (20 mph) occur less than three percent of the time at the sites. Ground disturbing remediation activities were carried out at Clean Slate II from October 31, 2017, until July 26, 2018. Station 404 is located closest to the remediation area and is downwind of the area when winds are from the south. By late November, analysis of dust from the air sampler at Station 404 registered increases in plutonium-239+240 ( 239+240 Pu) concentrations. Peak plutonium concentrations, accompanied by elevated gross alpha concentrations and the detection of americium-241 ( 241 Am) by gamma spectroscopy, occurred between March and May 2018. During spring and early summer of 2018, elevated radionuclide concentrations were also measured in dust collected from the air sampler at Station 405, which is more than twice the distance from the remediation activity as Station 404. A minor but sustained increase in gross alpha concentration of suspended dust collected at Stations 400, 401, and 403 was also observed starting in May 2018 and continuing into August. Stations 401 and 403 are approximately 4.8 to 6.4 km (three to four miles) from Clean Slate II and Station 400 is approximately 13 km (eight miles) from that site. The radionuclide content of material that saltated into the passive Big Spring Number Eight (BSNE) traps during the Clean Slate II remediation period increased in both the traps facing toward and away from the fenced contamination area at Station 404, with the largest increases in concentration (almost five times the previous 239+240 Pu concentration) observed in the traps facing the fenced area. The radionuclide concentration in material in the trap facing away from the fence more than doubled from that measured in 2017. A similar increase was observed for the saltation trap facing away from the fenced area at Station 405, although no increase was observed for material captured in the trap facing the fenced area. Particles ranging in size from 50 to 500 µm generally move by saltation processes and are not expected to significantly contribute to dose for someone breathing in the standard respiratory zone for adult humans (1.5 to 1.7 m [4.9 to 5.6 ft] above ground level) because they are too large to be entrained in the air as suspended dust. Remediation activities at Clean Slate III began on September 5, 2018, and continued until a brief hiatus started on December 20, 2018. Although Station 401 is much closer to the remediation area than Station 403, the first increase in gross alpha and 239+240 Pu concentrations was noted in dust from filters collected at Station 403 in early November 2018. The highest radionuclide concentrations of 2018 at the Clean Slate III stations were recorded in air samples taken from Stations 401 and 403 in late December 2018 and these concentrations were comparable between the two station locations. Gamma rate data measured by the PICs was slightly higher than the annual average at Stations 401 and 403 after remediation activities began, but no single measurement was outside of the range observed in 2018 prior to remediation activities. No increase in radionuclide concentration was observed for the Clean Slate III remediation time period on air filters collected from the other stations. Radiological monitoring at Station 400—which is located at the ROC, and therefore the closest regularly staffed work location to the Clean Slate sites—recorded a higher mean gross alpha activity from dust collected on air sampler filters than in previous years. The individual biweekly air filters yielded measurements of gross alpha that were at or below the mean plus one standard deviation measured in CY2017, except for the period from April 25, 2018, through September 12, 2018. Nonetheless, gamma spectroscopy of all air filters from Station 400 identified only naturally occurring radionuclides, with no detection of americium-241 ( 241 Am) (which is used as an indicator of plutonium-241[ 241 Pu]). Alpha spectroscopy of selected air filters collected at Station 400 did not detect plutonium-238 ( 238 Pu) or 239+240 Pu above the analytical detection limit. Gross beta and gamma exposure rate data were comparable to data from regional CEMP stations. No saltation traps are deployed at Station 400. Considering the ambient monitoring periods during CY2018, the monitoring stations adjacent to the Clean Slate sites recorded above-background 238 Pu and 239+240 Pu concentrations (SNL, 1998; Turner et al., 2003) in samples collected by passive saltation traps and on selected air filters. These observations were consistent with previous years and indicated that radionuclide movement occurred under ambient conditions by processes of both saltation and suspension. The presence of radionuclides in all saltation traps, both upwind and downwind of the fenced contamination areas, was consistent with previous radiological survey results (EG&G, 1979) that show lower concentration radiologically contaminated material dispersed outside the fenced area. Although 239+240 Pu concentrations in the air filter samples were sometimes orders of magnitude higher than background, the concentrations were below risk-based action levels defined for an industrial area worker scenario (U.S. DOE, 2014). The interception of airborne dust with above-background radionuclide concentrations demonstrates that dispersal processes are continuing. Strong winds are the driver for both suspension and saltation of dust and soil. The recorded wind speed and PM10 during remediation activities at Clean Slate II and III identified discrete wind events lasting approximately five to eight hours each, which accounted for the greatest PM 10 concentrations at the monitoring stations. These events captured the effect of winds from the northwest and from the south. The observed differences in dust loading and radionuclide concentrations for the monitoring stations when they were either upwind or downwind of the contamination area identify the remediation area as a source of plutonium contaminated dust. The increase in concentration of radionuclides in airborne dust during the remediation activities, compared with measurements under previous ambient conditions (mean 239+240 Pu concentrations during remediation activities are approximately nine to 40 times higher compared to pre-remediation concentrations, depending on monitoring station), highlights the impact of land disturbance on wind-borne contaminant transport from the Clean Slate test areas. The meteorological and particulate matter monitoring indicated that conditions for wind-borne contaminant movement exist at the Clean Slate sites, and that transport of radionuclide-contaminated soil by both suspension and saltation occurred under ambient conditions and accelerated when the sites were disturbed. The 239+240 Pu alpha spectroscopy results indicated that airborne concentrations during remediation activities ranged from 2 × 10-16 to 380 × 10-16 µCi/ml. These results can be compared to the derived air concentration limit for 239 Pu of 6 × 10-11 µCi/ml for occupational workers contained in Code of Federal Regulations 10 CFR 835, Occupational Radiation Protection. Even though the air sampling results document an increase in concentration during remediation activities, the observed concentrations are less than 0.06 percent of the occupational limit. The Corrective Action Unit (CAU) closure strategy uses a risk-based approach, whereby acceptable contaminant concentrations are determined as a function of anticipated human exposure.

54 ENVIRONMENTAL SCIENCES↗

GIS-Based Modeling of Contaminated Soil Volumes at Multiple Sites in the Formerly Utilized Sites Remedial Action Program - 20149

The remediation of hazardous, toxic, and radioactive waste (HTRW) sites produces cost-related risks associated with the estimation of contaminated soil or debris volumes. Historical risk-management techniques include cost contingencies to cover volume uncertainties that affect project budgeting and decision-making. The Buffalo District teamed with project partners to lessen volume uncertainty and reduce project risks at multiple HTRW sites managed under the Formerly Utilized Sites Remedial Action Program (FUSRAP). Historical remedial investigations under FUSRAP commonly identified the presence of radiological material in site media, the associated human health risk, and then areas of remediation. To manage remedial execution and reduce risk, pre-design or remediation-phase sampling essentially 'chased' contamination, which was not conducive to efficient predictive budgeting derived from Feasibility Study (FS) cost analyses. The Buffalo District first optimized their approach to better understand volume uncertainty by utilizing the Argonne National Laboratory's Bayesian Approaches for Adaptive Spatial Sampling (BAASS) software [1]. BAASS processed soft data (e.g., gamma walk-over data) and spatial sampling data to estimate the lateral extent of contaminated soil irrespective of depth (i.e., gross contamination extent) and define areas of contaminant uncertainty. The software performed a binary transformation of contaminant concentrations at all sampling points based upon remedial action goals or a sum of ratios approach (i.e., clean, impacted, or range of impacts in soil). The model produced two-dimensional (horizontal) contaminant probability contours and statistical uncertainty in the sampling coverage and resulting contaminant extents. This method was translated vertically by partitioning the sampling data into depth brackets that produced a stacked representation of contaminant extents and uncertainty in the subsurface (i.e., similar to construction lifts). The results commonly led to a better understanding of project uncertainty and the need for sampling strategies that produce high-confidence soil volumes, which control costs. The BAASS-based delineations were eventually replaced by Empirical Bayesian Kriging (EBK) methods available in ArcGIS Spatial or 3D Analysts [2]. The EBK method calculates contaminant probability zones derived from user-controlled semivariograms of the spatial datasets. The resulting probability zones (e.g., 50% or 80% of contaminant probability) represent the two-dimensional surface delineation of the overall horizontal remedial area, similarly to BAASS. However, unlike BAASS, the vertical sampling data within these probability zones became vertical control points to contour a subterranean surface that connects subsurface points to the land-surface delineations of contamination. The resulting representation of horizontal and vertical impacts within an enclosed envelop (volume) of soil included uncertainty distributions that are used to plan uncertainty-reduction sampling. These data-driven and math-based models of three-dimensional sampling results produced well-bounded remedial volumes for project planning and better uncertainty predictions during project budgeting. The EBK method was applied to several FUSRAP sites managed by the Buffalo District and compared to less rigorously modeled sites previously remediated by the District. The comparison of modeled to actual remediated volumes provide a basis for validating the volume-estimation method. This comparison is important to ensure modeled volumes match physical boundaries of site remediation. FUSRAP sites with denser investigative sampling and lesser volume uncertainty proved useful in remedial planning and contracting. The Buffalo District noted that historical sites with sparser sampling arrays had greater disparity between estimated volumes and final remedial volumes. The benefit achieved over the cost of detailed soil sampling appears positive for FUSRAP projects, especially where impacts vary widely and appear unbounded by investigation-phase sampling. The subsequent Empirical Bayesian Kriging of contamination coupled with vertical contouring for soil estimations reduces uncertainty in soil volumes or indicates where sampling is required to reduce uncertainty, which together optimize remedial planning and budgeting. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗