Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “DSN”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 883 records · Page 49

Automated radio astronomy operations

The improvements in using a computer to drive a DSN 64-meter antenna are described. The development is used to simplify operation, improve antenna safety, reduce antenna wear, present the abuse of antenna by misoperation, increase quantity and quality of data gathered, and give users a greater choice of automatic operations.

Livermore, R. W.↗

Pioneer Venus mission support

Activities within the Deep Space Network (DSN) to prepare for the Pioneer Venus Multiprobe Venusian Encounter are reported.

Bouck, A. C.↗

Helios mission support

Activities of the DSN Network Operations Organization in support of the Helios Project from 15 August 1978 through 15 October 1978 are reported.

Goodwin, P. S.↗

Preliminary model for high-power-waveguide arcing and arc protection

The arc protection subsystems that are implemented in the DSN high power transmitters are discussed. The status of present knowledge about waveguide arcs is reviewed in terms of a simple engineering model. A fairly general arc detection scheme is also discussed. Areas where further studies are needed are pointed out along with proposed approaches to the solutions of these problems.

Yen, H. C.↗

Helios missile support

This article reports on activities of the DSN Network Operations Organization in support of the Helios Project from 15 October through 15 December 1978.

Jensen, W. N.↗

Orbiting Deep Space Relay Station (ODSRS). Volume 1: Requirement determination

The deep space communications requirements of the post-1985 time frame are described and the orbiting deep space relay station (ODSRS) is presented as an option for meeting these requirements. Under current conditions, the ODSRS is not yet cost competitive with Earth based stations to increase DSN telemetry performance, but has significant advantages over a ground station, and these are sufficient to maintain it as a future option. These advantages include: the ability to track a spacecraft 24 hours per day with ground stations located only in the USA; the ability to operate at higher frequencies that would be attenuated by Earth's atmosphere; and the potential for building very large structures without the constraints of Earth's gravity.

Hunter, J. A.↗

Preliminary maintenance experience for DSS 13 unattended operations demonstration

The maintenance data base collected for 15 weeks of recent unattended and automated operation of DSS 13 is summarized. During this period, DSS 13 was receiving spacecraft telemetry while being controlled remotely from JPL in Pasadena. Corrective and preventive maintenance manhours are reported by subsystem for DSS 13 including the equipment added for the automation demonstration. The corrective and preventive maintenance weekly manhours at DSS 13 averaged 22 and 40, respectively. The antenna hydraulic and electronic systems accounted for about half of the preventive and corrective maintenance manhours for a comparable attended DSN station, DSS 11.

Remer, D. S.↗

Assessment of 20 kW S-band transmitter

The performance history of the 20-kW S-band transmitter, installed at three 64-meter antennas and six 26-meter antennas in the DSN, is reviewed. A number of failures and discrepancy reports are characteristic of the wearout phase of a failure curve. The type of failures are reviewed and four options toward reducing the number and cost of failures are reviewed. These are: existing (no change), refurbish, redesign and replacement. The options are compared on a ten year life cycle cost basis using FY77 expenditures for existing equipment as a base. It was concluded that benefits, in terms of reduction of outrage time, increase with an increase of expenditure toward improvement.

Dickinson, R.↗

RFI receiver

An S-band radio frequency interference (RFI) receiver to analyze and identify sources of RFI problems in the Deep Space Network DSN tracking stations is described. The RFI receiver is a constant gain, double conversion, open loop receiver with dual sine/cosine channel outputs, providing a total of 20 MHZ monitoring capability. This receiver is computer controlled using a MODCOMP II miniprocessor. The RFI receiver has been designed to operate at a 150 Kelvin system noise temperature accomplished by cascading two low noise field effect transistor (FET) amplifiers for the receiver front-end. The first stage low noise FET amplifier is mounted at the feed horn to minimize any cable losses to achieve a lower system noise temperature. The receiver is tunable over the frequency range of 2150 to 2450 MHz in both sine/cosine output channels with a resolution of 100 kHz.

Lay, R.↗

Traveling clock verification of VLBI synchronization

Four experiments are described which involved measurements of clock offsets at two DSN stations. Both VLBI and traveling clock measurements were performed and the agreement between the two methods was within about 6 ns for all four comparisons.

Young, L. E.↗

VLBI system for weekly measurement of UT1 and polar motion: Preliminary results

The DSN implementation of a system for measuring UT1 and polar motion using very long baseline interferometry (VLBI) is currently being tested. The VLBI experiments are being conducted on a weekly basis on each of two intercontinental baselines. During a 17 day period in September 1979, data were obtained for seven consecutive experiments using an early version of that system. Those experiments were used to refine the estimation procedure to be used in the operational system and to provide a preliminary assessment of the performance of the system.

Roth, M.↗

Progress report on the Block 1 VLBI correlator implementation

The Block 1 VLBI Processor Subsystem (VPS) of the Very Long Baseline Interferometry (VLBI) System for the determination of station clock-sync parameters, UT1 and polar motion, and station platform parameters and for use in spacecraft tracking is discussed. The Block 1 VPS performs three basic functions: it receives the 500 kbit/sec video data over the GCF wideband data lines from each of the three DSN 64 m antennas; it cross correlates data; and it performs several postcorrelation data reduction operations on the correlated data including calibration, editing, and parameter estimation.

Peterson, J. C.↗

The SETI instrument development plan

The architecture of the instrument system for the SETI (Search for Extraterrestrial Intelligence) program is briefly described and the development approach used to implement the operational instruments is discussed. The two versions of the instrument system include a target survey instrument to observe at a very high sensitivity a selected set of interesting stars that have particular a priori promise, and a sky survey instrument to observe the entire celestial sphere at a lower sensitivity. The targeted survey utilizes the 305 meter antenna at Arecibo, Puerto Rico, a 64 meter DSN antenna, and other large radio telescopes. The Arecibo instrument provides the highest sensitivity by virtue of the antenna gain. The antenna line feeds cover an instantaneous frequency range of 50 MHz (tunable over 100 MHz), while the multichannel spectrum analyzer/signal detector is capable of analyzing a frequency segment 16 MHz wide with a maximum resolution of 1 Hz. The sky survey employs a listen-only, 34 meter antenna. The SETI breadboard development is also described.

Crow, R. B.↗

Experimental optical fiber communications link

An optical fiber communications link 1.5 kilometers in length was installed between the Interim Frequency Standard Test Facility and the Timing and Frequency Systems Research Laboratory at JPL. It is being used to develop optical fiber technology for use in the DSN and particularly for precise time and frequency distribution.

Lutes, G. F.↗

Ramp time synchronization

A new method of intercontinental clock synchronization has been developed and proposed for possible use by NASA's Deep Space Network (DSN), using a two-way/three-way radio link with a spacecraft. Analysis of preliminary data indicates that the real-time method has an uncertainty of 0.6 microsec, and it is very likely that further work will decrease the uncertainty. Also, the method is compatible with a variety of nonreal-time analysis techniques, which may reduce the uncertainty down to the tens of nanosecond range.

Hietzke, W.↗

Development and analysis of a twelfth degree and order gravity model for Mars

Satellite geodesy techniques previously applied to artificial earth satellites have been extended to obtain a high-resolution gravity field for Mars. Two-way Doppler data collected by 10 Deep Space Network (DSN) stations during Mariner 9 and Viking 1 and 2 missions have been processed to obtain a twelfth degree and order spherical harmonic model for the martian gravitational potential. The quality of this model was evaluated by examining the rms residuals within the fit and the ability of the model to predict the spacecraft state beyond the fit. Both indicators show that more data and higher degree and order harmonics will be required to further refine our knowledge of the martian gravity field. The model presented shows much promise, since it resolves local gravity features which correlate highly with the martian topography. An isostatic analysis based on this model, as well as an error analysis, shows rather complete compensation on a global (long wavelength) scale. Though further model refinements are necessary to be certain, local (short wavelength) features such as the shield volcanos in Tharsis appear to be uncompensated. These are interpreted to place some bounds on the internal structure of Mars.

Christensen, E. J.↗

An analysis of network deployment for a dedicated navigation tracking system

Stringent navigation accuracy requirements for future deep space missions are expected to be met by conventional two way radio metric data supplemented with Very Long Baseline Interferometric (VLBI) data provided by a dedicated tracking network. The performance of several proposed VLBI network configurations have been evaluated by comparing navigation capability for the probe delivery and post flight probe trajectory phases of the Galileo mission. Candidate configurations include stations located at the current intercontinental DSN sites, a network with sites in Hawaii, Florida and Washington, Regional (300 km) and a Micro (30 km) baseline systems. Sensitivity to systematic error sources, network deployment, viewing period and sampling strategy are investigated. The dominant factor in performance is shown to be the baseline length.

Ellis, J.↗