NDA SYSTEM RESPONSE MODELING AND ITS APPLICATION

The Portsmouth gaseous diffusion plant (PORTS) is a uranium enrichment facility that was historically used to enrich uranium to levels that range from 2% to greater than 97%. The feed material for PORTS was obtained from the Paducah Gaseous Diffusion Plant (PGDP) that produced uranium in the form of UF6 that was enriched to about 1 to 2%. The enrichment process involves a multistage process by which gaseous UF{sub 6} passed through a diffusion barrier in each stage. The porous diffusion barrier in each stage retards the rate of the diffusion of the heavier {sup 238}U atoms relative to the diffusion of the lighter {sup 235}U atoms. By this process the product stream is slightly enriched by each stage of the process. Each stage consists of a compressor, converter and a motor. There are more than 4000 stages that are linked together with piping of various diameters to form the PORTS cascade. The cascade spans three interconnected buildings and comprises miles of piping, thousands of seals, converters, valves, motors, and compressors. During operation, PORTS process equipment contained UF{sub 6} gas with uranium enrichment that increased in the process stream from the first to the last stage in a known manner. Gaseous UF{sub 6} moving through the PORTS process equipment had potential to form deposits within the process equipment by several mechanisms, including solidification due to incorrect temperature and pressure conditions during the process, inleakage of atmospheric moisture that chemically reacts with UF{sub 6} to form hydrated uranyl fluoride solids, reduction reactions of UF{sub 6} with cascade metals, and UF{sub 6} condensation on the internal equipment surfaces. As a result, the process equipment of the PORTS contains a variable and unknown quantity of uranium with variable enrichment that has been deposited within the equipment during plant operations. The exact chemical form of this uranium is variable, although it is expected that the bulk of the material is of the form of uranyl fluoride that will become hydrated on exposure to moisture in air when the systems are no longer buffered. The deposit geometry and thickness is uncertain and variable. However, a reasonable assessment of the level of material holdup in this equipment is necessary to support decommissioning efforts. The assessment of nuclear material holdup in process equipment is a complex process that requires integration of process knowledge, nondestructive assay (NDA) measurements, and computer modeling to maximize capabilities and minimize uncertainty. The current report is focused on the use of computer modeling and simulation of NDA measurements.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

ASSESSMENT OF THE POTENTIAL FOR HYDROGEN GENERATION DURING GROUTING OPERATIONS IN THE R AND P REACTOR VESSELS

The R- and P-reactor buildings were retired from service and are now being prepared for deactivation and decommissioning (D and D). D and D activities consist primarily of immobilizing contaminated components and structures in a grout-like formulation. Aluminum corrodes very rapidly when it comes in contact with the alkaline grout materials and as a result produces hydrogen gas. To address this potential deflagration/explosion hazard, the Materials Science and Technology Directorate (MS and T) of the Savannah River National Laboratory (SRNL) has been requested to review and evaluate existing experimental and analytical studies of this issue to determine if any process constraints on the chemistry of the fill material and the fill operation are necessary. Various options exist for the type of grout material that may be used for D and D of the reactor vessels. The grout formulation options include ceramicrete (pH 6-8), low pH portland cement + silica fume grout (pH 10.4), or Portland cement groupt (pH 12.5). The assessment concluded that either ceramicrete or the silica fume grout may be used to safely grout the P-reactor vessel. The risk of accumulation of a flammable mixture of hydrogen between the grout-air interface and the top of the reactor is very low. Portland cement grout, on the other hand, for the same range of process parameters does not provide a margin of safety against the accumulation of flammable gas in the reactor vessel during grouting operations in the P-reactor vessel. It is recommended that this grout not be utilized for this task. The R-reactor vessel cotnains significantly less aluminum based on current facility process knowledge, surface observations, and drawings. Therefore, a Portland cement grout may be considered for grouting operations as well as the other grout formulations. For example, if the grout fill rate is less than 1 inch/min and the grout temperature is maintained at 70 C or less, the risk of hydrogen accumulation during fill operations in the R-reactor vessel is low for the Portland cement. Alternatively, if the grout fill rate is less than 0.5 inch/min and the grout is maintained at a temperature of 80 C, the risk is again low. Although these calculations are conservative, there are some measures that may be taken to further minimize the potential for hydrogen evolution. (1) Minimize the temperature of the grout as much as practical. Lower temperatures will mean lower hydrogen generation rates. For P-reactor, grout temperatures less than 100 C should provide an adequate safety margin for the pH 8 and pH 10.4 grout formulations. For R-reactor, grout temperatures less than 70 C or 80 C will provide an adequate safety margin for the Portland cement. The other grout formulations are also viable options for R-reactor. (2) Minimize the grout fill rate as much as practical. Lowering the fill rate takes advantage of passivation of the aluminum components and hence lower hydrogen generation rates. For P-reactor, fill rates that are less than 2 inches/min for the ceramicrete and the silica fume grouts will reduce the chance of significant hydrogen accumulation. For R-reactor, fill rates less than 1 inch/min will again minimize the risk of hydrogen accumulation. (3) Ventilate the building as much as practical (e.g., leave doors open) to further disperse hydrogen. The volumetric hydrogen generation rates in the P-reactor vessel, however, are low for the pH 8 and pH 10.4 grout, (i.e., less than 0.97 ft{sup 3}/min). If further walk-down inspections of the reactor vessels suggest an increase in the actual areal density of aluminum, the calculations should be re-visited.

08 HYDROGEN↗

GROUT TEMPERATURE MEASUREMENTS IN 105-R DISASSEMBLY BASIN D AND E CANAL

The 105-R Reactor Disassembly Basin Grout Placement Strategy Report (SRNL-TR-2009-00157) identifies various portions of the facility that will undergo an in-situ decommissioning process. The estimated residual radioactive contamination in the 105-R facility is shown in Figure 1. Cementitious grout formulations developed by SRNL are being used to immobilize and isolate the radioactive contamination in existing below grade portions of the 105-R building as shown by the gray-hatched area in Figure 2. A Zero Bleed flowable fill was formulated for both dry placement and for underwater placement. The first major area in the 105-R Disassembly Basin to undergo the grouting process was the D&E Canal and an underlying void space known as the Chase. Grout temperature data was needed to ensure that the grout mix design was on the correct grout curing trajectory to meet the material compressive strength requirement of 50 pounds per square inch. Initial grout temperature measurements were needed to confirm and optimize grout mix design fresh property characteristics; i.e. material strength, and set time. Grout curing temperature is an integrating fresh property characteristic that is used to estimate cementitious material strength in accordance with the Standard Practice for Estimating Concrete Strength by the Maturity Method, ASTM C 1074. The Maturity Method is used in the construction industry to estimate in-place strength of concrete to allow the start of critical construction activities; e.g. formwork removal, removal of cold weather protection, opening of roadways to traffic, etc. Applying this methodology provides an expeditious means to estimate in-place grout strength based on compressive strength laboratory results. The Maturity Method results define the relationship between strength-time and age-time that may be utilized in the field for estimating strength after a given time of placement. Maturation curves were developed under the 105-R Reactor Disassembly Basin Cementitious Materials Laboratory Test Plan (SRNL-TR-2009-00175) to establish grout mix maturation indices for this relationship. Temperature data collected from the D&E grout placement will be evaluated against these maturation indices in a subsequent analysis. Grout temperature data outside the maturation indices highlight the opportunity to adjust the grout mix design for future placements. The pre-existing grout placement will not be removed since this material will comply with strength requirements under the normal curing duration. SRNL designed a standalone measurement system to collect grout mass placement temperature data in the D&E Canal. Four vertical poles instrumented with thermocouples were positioned in the canal prior to grout placement. The thermocouples were connected to stand-alone, battery-powered data recorders mounted nearby that were configured to take temperature recordings every 10 minutes for up to 100 days. Unfortunately, after just 2 weeks, data collection was terminated because the thermocouple wires connecting the data loggers to the thermocouple poles were severed during construction activities. This report will highlight the unique challenges in designing a data collection system for the D&E canal, describe the temperature measurement system and its installation, and present calculated as well as measured temperature values.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

RECOMMENDATIONS FOR UO3 PLANT BIOASSAY

Alternative urine bioassay programs are described for application with decontamination and decommissioning activities at the Hanford UO3 Plant. The alternatives are based on quarterly or monthly urine bioassay for recycled uranium, assuming multiple acute inhalation intakes of recycled uranium occurring over a year. The inhalations are assumed to be 5µm AMAD particles of 80% absorption type F and 20% absorption type M. Screening levels, expressed as daily uranium mass excretion rates in urine, and the actions associated with these levels are provided for both quarterly and monthly sampling frequencies.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

UNITED STATES DEPARTMENT OF ENERGY OFFICE OF ENVIRONMENTAL MANAGEMENT TECHNOLOGY DEVELOPMENT REPORT FISCAL YEAR 2010

The mission of the Department of Energy's (DOE's) Office of Environmental Management (EM) is to clean up the environmental legacy of nuclear weapons research and production during the Cold War. That mission includes cleaning up nuclear waste, contaminated groundwater and soil, nuclear materials, and contaminated facilities covering two million acres of land in thirty-five states. EM's principal program goals include timely completion of tank waste treatment facilities, reduction of the life-cycle costs and acceleration of the cleanup of the Cold War legacy, and reduction of the EM footprint. The mission of the EM Technology Innovation and Development program is to transform science and innovation into practical solutions to achieve the EM mission. During fiscal year 2010 (October 2009-September 2010), EM focused upon accelerating environmental cleanup by expeditiously filling identified gaps in available knowledge and technology in the EM program areas. This report describes some of the approaches and transformational technologies in tank waste processing, groundwater and soil remediation, nuclear materials disposition, and facility deactivation and decommissioning developed during fiscal year 2010 that will enable EM to meet its most pressing program goals.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Greenhouse Gas Emissions from the Nuclear Fuel Cycle

Since greenhouse gases are a global concern, rather than a local concern as are some kinds of effluents, one must compare the entire lifecycle of nuclear power to alternative technologies for generating electricity. A recent critical analysis by Sovacool (2008) gives a clearer picture. "It should be noted that nuclear power is not directly emitting greenhouse gas emissions, but rather that lifecycle emissions occur through plant construction, operation, uranium mining and milling, and plant decommissioning." "[N]uclear energy is in no way 'carbon free' or 'emissions free,' even though it is much better (from purely a carbon-equivalent emissions standpoint) than coal, oil, and natural gas electricity generators, but worse than renewable and small scale distributed generators" (Sovacool 2008). According to Sovacool, at an estimated 66 g CO2 equivalent per kilowatt-hour (gCO2e/kWh), nuclear power emits 15 times less CO2 per unit electricity generated than unscrubbed coal generation (at 1050 gCO2e/kWh), but 7 times more than the best renewable, wind (at 9 gCO2e/kWh). The U.S. Nuclear Regulatory Commission (2009) has long recognized CO2 emissions in its regulations concerning the environmental impact of the nuclear fuel cycle. In Table S-3 of 10 CFR 51.51(b), NRC lists a 1000-MW(electric) nuclear plant as releasing as much CO2 as a 45-MW(e) coal plant. A large share of the carbon emissions from the nuclear fuel cycle is due to the energy consumption to enrich uranium by the gaseous diffusion process. A switch to either gas centrifugation or laser isotope separation would dramatically reduce the carbon emissions from the nuclear fuel cycle.

01 COAL, LIGNITE, AND PEAT↗

ESTABLISHING FINAL END STATE FOR A RETIRED NUCLEAR WEAPONS PRODUCTION REACTOR; COLLABORATION BETWEEN STAKEHOLDERS, REGULATORS, AND THE FEDERAL GOVERNMENT - 11052

The Savannah River Site (SRS) is a 310-square-mile United States Department of Energy nuclear facility located along the Savannah River (SRS) near Aiken, South Carolina. Nuclear weapons material production began in the early 1950s, utilizing five production reactors. In the early 1990s all SRS production reactor operations were terminated. The first reactor closure end state declaration was recently institutionalized in a Comprehensive Environmental Response and Compensation and Liability Act (CERCLA) Early Action Record of Decision. The decision for the final closure of the 318,000 square foot 105-P Reactor was determined to be in situ decommissioning (ISD). ISD is an acceptable and cost effective alternative to off-site disposal for the reactor building, which will allow for consolidation of remedial action wastes generated from other cleanup activities within the P Area. ISD is considered protective by the regulators, U. S. Environmental Protection Agency (US EPA) and the South Carolina Department of Health and Environmental Control (SCDHEC), public and stakeholders as waste materials are stabilized/immobilized, and radioactivity is allowed to naturally decay, thus preventing future exposure to the environment. Stakeholder buy-in was critical in the upfront planning in order to achieve this monumental final decision. Numerous public meetings and workshops were held in two different states (covering a 200 mile radius) with stakeholder and SRS Citizens Advisory Board participation. These meetings were conducted over an eight month period as the end state decision making progressed. Information provided to the public evolved from workshop to workshop as data became available and public input from the public meetings were gathered. ISD is being considered for the balance of the four SRS reactors and other hardened facilities such as the chemical Separation Facilities (canyons).

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

ACCELERATED PILOT PROJECT FOR U CANYON DEMOLITION

At the U.S. Department of Energy's Hanford Site in southeast Washington State, CH2M HILL Plateau Remediation Company (CH2M HILL) is underway on a first-of-a-kind project with the decommissioning and demolition of the U Canyon. Following the U.S. Environmental Protection Agency's Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) Record of Decision for the final remediation of the canyon, CH2M HILL is combining old and new technology and techniques to prepare U Canyon for demolition. The selected remedial action called first for consolidating and grouting equipment currently in the canyon into lower levels of the plant (openings called cells), after which the cell galleries, hot pipe trench, ventilation tunnel, drains and other voids below the operating deck and crane-way deck levels will be filled with approximately 20,000 cubic yards of grout and the canyon roof and walls demolished down to the approximate level of the canyon deck. The remaining canyon structure will then be buried beneath an engineered barrier designed to control potential contaminant migration for a 500-year life. Methods and lessons learned from this project will set the stage for the future demolition of Hanford's four other canyon-type processing facilities.

54 ENVIRONMENTAL SCIENCES↗

MANAGING ENGINEERING ACTIVITIES FOR THE PLATEAU REMEDIATION CONTRACT - HANFORD

In 2008, the primary Hanford clean-up contract transitioned to the CH2MHill Plateau Remediation Company (CHPRC). Prior to transition, Engineering resources assigned to remediation/Decontamination and Decommissioning (D&D) activities were a part of a centralized engineering organization and matrixed to the performing projects. Following transition, these resources were reassigned directly to the performing project, with a loose matrix through a smaller Central Engineering (CE) organization. The smaller (10 FTE) central organization has retained responsibility for the overall technical quality of engineering for the CHPRC, but no longer performs staffing and personnel functions. As the organization has matured, there are lessons learned that can be shared with other organizations going through or contemplating performing a similar change. Benefits that have been seen from the CHPRC CE organization structure include the following: (1) Staff are closely aligned with the 'Project/facility' that they are assigned to support; (2) Engineering priorities are managed to be consistent with the 'Project/facility' priorities; (3) Individual Engineering managers are accountable for identifying staffing needs and the filling of staffing positions; (4) Budget priorities are managed within the local organization structure; (5) Rather than being considered a 'functional' organization, engineering is considered a part of a line, direct funded organization; (6) The central engineering organization is able to provide 'overview' activities and maintain independence from the engineering organizations in the field; and (7) The central engineering organization is able to maintain a stable of specialized experts that are able to provide independent reviews of field projects and day-to-day activities.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Initiating the D&D Project for the EBR-II

A novel decommissioning project is underway to close the Experimental Breeder Reactor-II (EBR-II) “fast” reactor at the Idaho National Laboratory (INL), Materials and Fuels Complex (MFC) facility near Idaho Falls, ID. The facility was placed in cold shutdown in 1994 and work began on the removal of the metallic sodium coolant. The bulk of the sodium was drained and treated beginning in 2001. The residual sodium heel was chemically passivated to render it less reactive in 2005 using a novel carbon dioxide treatment. Approximately 700 kg of metallic sodium and 3500 kg of sodium bicarbonate remain in the facility. A RCRA Waste Treatment Permit, issued in 2002 by the State of Idaho Department of Environmental Quality, requires annual progress toward closure of the facility, and that all regulated materials be removed or deactivated, and the waste products removed by 2022. The baseline sodium removal technology would result in about 100,000 gallons of low-level waste solution requiring treatment along with separate handling of the large components (intermediate heat exchanger, rotating plug, etc) outside of the primary tank.

38 RADIATION CHEMISTRY, RADIOCHEMISTRY, AND NUCLEA↗

Nuclear Safety [Vol. 36, No. 1, January-June 1995]

Nuclear Safety is a journal that covers significant issues in the field of nuclear safety. Its primary scope is safety in the design, construction, operation, and decommissioning of nuclear power reactors worldwide and the research and analysis activities that promote this goal, but it also encompasses the safety aspects of the entire nuclear fuel cycle, including fuel fabrication, spent-fuel processing and handling, and nuclear waste disposal, the handling of fissionable materials and radioisotopes, and the environmental effects of all these activities. Table of Contents for this issue follows. THE CHORNOBYL ACCIDENT: 1 The Chornobyl Accident Revisited, Part II: The State of the Nuclear Fuel Located Within the Chornobyl Sarcophagus, A A. Borovoi and A. R. Sich; GENERAL SAFETY CONSIDERATIONS: 33 Nuclear Power Safety in Central and Eastern Europe, R. Wilson; 46 Safety of Nuclear Power Reactors in the Former Eastern European Countries, S. Chakraborty; 53 Technical Note: On the Definition of Common-Cause Failures, H. Paula; ACCIDENT ANALYSIS: 58 Modeling and Analysis of Core-Debris Recriticality During Hypothetical Severe Accidents in the Advanced Neutron Source Reactor, S.-H. Kim, V. Georgevich, D. B. Simpson, C. O. Slater, and R. P. Taleyarkhan; 68 Ignitability of Hydrogen/Oxygen/Diluent Mixtures in the Presence of Hot Surfaces, R. K. Kumar and G. W. Koroll; 94 Coupled RELAP5 and CONTAIN Accident Analysis Using PVM, K. A. Smith, A. J. Baratta, and G. E. Robinson; CONTROL AND INSTRUMENTATION: 109 Application of Fuzzy Logic in Nuclear Reactor Control Part I: An Assessment of State-of-the-Art, A. S. Heger, N. K. Alang-Rashid, and M. Jamshidi; DESIGN FEATURES: 122 Twenty-Third DOE/NRC Nuclear Air-Cleaning and Treatment Conference, R. R. Bellamy, J. J. Hayes, and M. W. First; ENVIRONMENTAL EFFECTS: 135 Atmospheric Dispersion and the Radiological Consequences of Normal Airborne Effluents from a Nuclear Power Plant, D. Fang, C. Z. Sun, and L. Yang; 142 Calculation of Distribution Coefficients for Radionuclides in Soils and Sediments, I. Puigdomenech and U. Bergstrom: OPERATING EXPERIENCES: 155 Reactor Shutdown Experience, Compiled by J. W. Cletcher; U.S. NUCLEAR REGULATORY COMMISSION INFORMATION AND ANALYSES: 158 Operating Experience Feedback Report—Reliability of Safety-Related Steam Turbine-Driven Standby Pumps Used in U.S. Commercial Nuclear Power Plants, J. R. Boardman; 166 Turbine Building Hazards, H. L Ornstein; RECENT DEVELOPMENTS: 169 Reports, Standards, and Safety Guides, D. S. Queener; 175 Proposed Rule Changes as of Dec. 31,1994; ANNOUNCEMENTS: 32 Harvard School of Public Health In-Place Filter Testing Workshop; 134 International Conference on Advances in the Operational Safety of Nuclear Power Plants; 193 30th Tennessee Industries Week; 193 DOE Technical Standards Program 1995 Workshop; 194 Multiphase Flow Experiments and Instrumentation; 180 The Authors; 185 Indexes to Nuclear Safety, Volumes 34 and 35.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

FOUR PI CALIBRATION AND MODELING OF A BARE GERMANIUM DETECTOR IN A CYLINDRICAL FIELD SOURCE

In reference 1 the authors described {gamma}-ray holdup assay of a Mossbauer spectroscopy instrument where they utilized two axial symmetric cylindrical shell acquisitions and two disk source acquisitions to determine Am-241 and Np-237 contamination. The measured contents of the two species were determined using a general detector efficiency calibration taken from a 12-inch point source.2 The authors corrected the raw spectra for container absorption as well as for geometry corrections to transform the calibration curve to the applicable axial symmetric cylindrical source - and disk source - of contamination. The authors derived the geometry corrections with exact calculus that are shown in equations (1) and (2) of our Experimental section. A cylindrical shell (oven source) acquisition configuration is described in reference 3, where the authors disclosed this configuration to gain improved sensitivity for holdup measure of U-235 in a ten-chamber oven. The oven was a piece of process equipment used in the Savannah River Plant M-Area Uranium Fuel Fabrication plant for which a U-235 holdup measurement was necessary for its decontamination and decommissioning in 2003.4 In reference 4 the authors calibrated a bare NaI detector for these U-235 holdup measurements. In references 5 and 6 the authors calibrated a bare HpGe detector in a cylindrical shell configuration for improved sensitivity measurements of U-235 in other M-Area process equipment. Sensitivity was vastly improved compared to a close field view of the sample, with detection efficiency of greater than 1% for the 185.7-keV {gamma}-ray from U-235. In none of references 3 - 7 did the authors resolve the exact calculus descriptions of the acquisition configurations. Only the empirical efficiency for detection of the 185.7-keV photon from U-235 decay was obtained. Not until the 2010 paper of reference 1 did the authors derive a good theoretical description of the flux of photons onto the front face of a detector from an axially symmetric cylindrical shell. Subsequent to publication of 1, the theoretical treatment of the cylindrical shell and disk source acquisition sources was recognized by the Los Alamos National Laboratory as suitable for including in the Safeguards Training Program.8 Therefore, we felt it was important to accurately demonstrate the calculus describing the cylindrical shell configuration for the HpGe detector and to theoretically account for the observed bare-detector efficiencies measured in references (3-6). In this paper we demonstrate the applicability of the cylindrical shell derivation to a flexible planar sheet of known Am-241, Eu-152, and Cs-137 activity that we rolled into a symmetrical cylindrical shell of radioactivity. Using the geometry correction equation of reference 1, we calculate geometry correction values using the known detector and source dimensions combined with source to detector distances. We then compare measured detection efficiencies from a cylindrical shell of activity for the 185.7-keV photon (U-235) and for the 414.3-keV photon (Pu-239) with those determined for a 12-inch point source(2,7) to demonstrate agreement between experiment and the theoretically calculated values derived by the Savannah River National Laboratory (SRNL) authors of reference 1. We demonstrate this geometry correction first for the 185.7- and 414.3-keV {gamma}-rays. But because the detector was point source calibrated at 12 inches for the energy range (60 -1700) keV (using two distinct sources) to map its intrinsic efficiency, the geometry correction for any acquisition configuration holds for all photon energies.2 We demonstrate that for ten photon energies in the range 121 keV to 967 keV. The good agreement between experiment and calculation is demonstrated at five source to detector distances using the identical shielded HpGe detector of references 4-7 as well as with a separate HpGe detector. We then extend the measurement to include a single acquisition where the flexible source is wrapped around the bare detector in a symmetrical cylinder that radiates on both faces of the detector as well as on to the detector's cylindrical sides of known dimensions. We derive the exact calculus to calculate the flux of the source on to the cylindrical sides of the detector. We then demonstrate outstanding agreement between the measured efficiency for the two primary U-235 and Pu-239 photons in this oven source configuration compared to the point source of activity for which the detector was originally calibrated.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Immobilization of Cesium Traps from the BN-350 Fast Reactor (Aktau, Kazakhstan)

During BN-350 reactor operations and also during the initial stages of decommissioning, cesium traps were used to decontaminate the reactor’s primary sodium coolant. Two different types of carbon-based trap were used – the MAVR series, low ash granulated graphite adsorber (LAG) contained in a carrier designed to be inserted into the reactor core during shutdown; and a series of ex-reactor trap accumulators(TAs) which used reticulated vitreous carbon (RVC) to reduce Cs-137 levels in the sodium after final reactor shutdown. In total four MAVRs and seven TAs were used at BN-350 to remove an estimated cumulative 755 TBq of cesium. The traps, which also contain residual sodium, need to be immobilized in an appropriate way to allow them to be consigned as waste packages for long term storage and, ultimately, disposal. The present paper reports on the current status of the implementation phase, with particular reference to the work done to date on the trap accumulators, which have the most similarity with the cesium traps used at other reactors.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Third International Meeting on Next Generation Safeguards:Safeguards-by-Design at Enrichment Facilities

The Third International Meeting on Next Generation Safeguards (NGS3) was hosted by the U.S. Department of Energy (DOE)/National Nuclear Security Administration's (NNSA) Office of Nonproliferation and International Security (NIS) in Washington, D.C. on 14-15 December 2010; this meeting focused on the Safeguards-by-Design (SBD) concept. There were approximately 100 participants from 13 countries, comprised of safeguards policy and technical experts from government and industry. Representatives also were present from the Brazilian-Argentine Agency for Accounting and Control of Nuclear Materials (ABACC), the European Atomic Energy Agency (Euratom), and the International Atomic Energy Agency (IAEA). The primary objective of this meeting was to exchange views and provide recommendations on implementation of the SBD concept for four specific nuclear fuel cycle facility types: gas centrifuge enrichment plants (GCEPs), GEN III and GEN IV reactors, aqueous reprocessing plants, and mixed oxide fuel fabrication facilities. The general and facility-specific SBD documents generated from the four working groups, which were circulated for comment among working group participants, are intended to provide a substantive contribution to the IAEA's efforts to publish SBD guidance for these specific types of nuclear facilities in the near future. The IAEA has described the SBD concept as an approach in which 'international safeguards are fully integrated into the design process of a new nuclear facility from the initial planning through design, construction, operation, and decommissioning.' As part of the Next Generation Safeguards Initiative (NGSI), the DOE is working to establish SBD as a global norm through DOE laboratory studies, international workshops, engagement with industry and the IAEA, and setting an example through its use in new nuclear facilities in the United States. This paper describes the discussion topics and final recommendations of the Enrichment Facilities Working Group. The working group participants were tasked with providing recommendations for facility operators and designers, while promoting the IAEA's objectives of: (1) avoiding costly and time-consuming redesign work or retrofits of new nuclear facilities and (2) providing for more effective and efficient implementation of international safeguards.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Underground nuclear energy complexes - technical and economic advantages

Underground nuclear power plant parks have been projected to be economically feasible compared to above ground instalIations. This paper includes a thorough cost analysis of the savings, compared to above ground facilities, resulting from in-place entombment (decommissioning) of facilities at the end of their life. reduced costs of security for the lifetime of the various facilities in the underground park. reduced transportation costs. and reduced costs in the operation of the waste storage complex (also underground). compared to the fair share of the costs of operating a national waste repository.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

OVERVIEW OF THE COOPERATION BETWEEN THE CHERNOBYL CENTER'S INTERNATIONAL RADIOECOLOGY LABORATORY IN SLAVUTYCH, UKRAINE AND U.S. RESEARCH CENTERS BETWEEN 2000-2010

The International Radioecology Laboratory (IRL) located in Slavutych, Ukraine was created in 1999 under the initiative of the United States Government and the Government of Ukraine in the framework of international cooperation on evaluation and minimization of consequences of the Chernobyl nuclear power plant (ChNPP) accident. Since the time the IRL was founded, it has participated in a large number of projects, including the following: (1) study of radionuclide accumulation, distribution, and migration in components of various ecological systems of the Chernobyl Exclusion Zone (ChEZ); (2) radiation dose assessments; (3) study of the effects of radiation influence on biological systems; (4) expert analysis of isotopic and quantitative composition of radioactive contaminants; (5) development of new methods and technologies intended for radioecological research; (6) evaluation of future developments and pathways for potential remediation of the ChEZ areas; (7) assistance in provision of physical protection systems for ionizing irradiation sources at Ukrainian enterprises; (8) reviews of open Russian language publications on issues associated with consequences of the ChNPP accident, radioactive waste management, radioecological monitoring, and ChNPP decommissioning; (9) conduct of training courses on problems of radioecology, radiation safety, radioecological characterization of test sites and environmental media, and on research methods; (10) conduct of on-site scientific conferences and workshops on the ChEZ and radioecology problems; participation in off-site scientific conferences and meetings; and (11) preparation of scientific and popular science publications, and interactions with mass media representatives. This article provides a brief overview of the major achievements resulting from this cooperation between the IRL and U.S. research centers.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

RADIATION DOSE ASSESSMENT FOR THE BIOTA OF TERRESTRIAL ECOSYSTEMS IN THE SHORELINE ZONE OF THE CHERNOBYL NUCLEAR POWER PLANT COOLING POND

Radiation exposure of the biota in the shoreline area of the Chernobyl Nuclear Power Plant Cooling Pond was assessed to evaluate radiological consequences from the decommissioning of the Cooling Pond. The article addresses studies of radioactive contamination of the terrestrial faunal complex and radionuclide concentration ratios in bodies of small birds, small mammals, amphibians, and reptiles living in the area. The data were used to calculate doses to biota using the ERICA Tool software. Doses from {sup 90}Sr and {sup 137}Cs were calculated using the default parameters of the ERICA Tool and were shown to be consistent with biota doses calculated from the field data. However, the ERICA dose calculations for plutonium isotopes were much higher (2-5 times for small mammals and 10-14 times for birds) than the doses calculated using the experimental data. Currently, the total doses for the terrestrial biota do not exceed maximum recommended levels. However, if the Cooling Pond is allowed to drawdown naturally and the contaminants of the bottom sediments are exposed and enter the biological cycle, the calculated doses to biota may exceed the maximum recommended values. The study is important in establishing the current exposure conditions such that a baseline exists from which changes can be documented following the lowering of the reservoir water. Additionally, the study provided useful radioecological data on biota concentration ratios for some species that are poorly represented in the literature.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Adaptive Systems Engineering: A Medical Paradigm for Practicing Systems Engineering

From its inception in the defense and aerospace industries, SE has applied holistic, interdisciplinary tools and work-process to improve the design and management of 'large, complex engineering projects.' The traditional scope of engineering in general embraces the design, development, production, and operation of physical systems, and SE, as originally conceived, falls within that scope. While this 'traditional' view has expanded over the years to embrace wider, more holistic applications, much of the literature and training currently available is still directed almost entirely at addressing the large, complex, NASA and defense-sized systems wherein the 'ideal' practice of SE provides the cradle-to-grave foundation for system development and deployment. Under such scenarios, systems engineers are viewed as an integral part of the system and project life-cycle from conception to decommissioning. In far less 'ideal' applications, SE principles are equally applicable to a growing number of complex systems and projects that need to be 'rescued' from overwhelming challenges that threaten imminent failure. The medical profession provides a unique analogy for this latter concept and offers a useful paradigm for tailoring our 'practice' of SE to address the unexpected dynamics of applying SE in the real world. In short, we can be much more effective as systems engineers as we change some of the paradigms under which we teach and 'practice' SE.