Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “ATLAS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 883 records · Page 49

The solar spectrum

The UV-IR solar spectrum is presented and discussed with a view to the comparative value of the data and their application in atomic or molecular spectroscopy and in solar, atmospheric, planetary, cometary, or stellar physics. Attention is given to intensity spectra, terrestrial atmospheric spectra, the 296-1300 nm Solar Flux Atlas of Kurucz et al. (1984), and line identifications.

Kurucz, Robert L.↗

A new solar irradiance calibration from 3295 A to 8500 A derived from absolute spectrophotometry of Vega

By imaging sunlight diffracted by 20- and 30-micron diameter pinholes onto the entrance aperture of a photoelectric grating scanner, the solar spectral irradiance was determined relative to the spectrophotometric standard star Vega, observed at night with the same instrument. Solar irradiances are tabulated at 4 A increments from 3295 A to 8500 A. Over most of the visible spectrum, the internal error of measurement is less than 2 percent. This calibration is compared with earlier irradiance measurements by Neckel and Labs (1984) and by Arvesen et al. (1969) and with the high-resolution solar atlas by Kurucz et al. The three calibrations agree well in visible light but differ by as much as 10 percent in the ultraviolet.

Lockwood, G. W.↗

The Saturn V F-1 engine revisited

This paper describes how the Saturn V F-1 engine could be resurrected for potential use in a new heavy lift launch vehicle (HLLV). Performance, history, and reliability of the F-1 will be discussed and a 1990s F-1 engine configuration presented. The status of residual hardware, production capability, test-stand availability, and a general program plan to accomplish this restart will be presented. Similarities between restarting the F-1 program and restarting the Atlas and Delta engine programs will be discussed.

Shelton, B. W.↗

ELV payload environment; Proceedings of the NASA-Industry Conference on Launch Environments of ELV Payloads, Elkridge, MD, June 4-6, 1990

Various papers on the ELV payload environment are presented. Individual topics addressed include: EnviroNET: the Space Environment Information Service, ELV Payload Environments Study, perspective of GSFC Orbital Launch Services Office, Cosmic Background Explorer, the Standard Booster Interface, MLV Standard Interface Study, future payload requirements, General Dynamics Atlas family, Delta II Launch Vehicle environments, Titan vibroacoustics, Titan IV, the Scout Launch Vehicle, Pegasus.

Lauriente, Michael↗

A step towards space-station user operations - An operational test-bed

A joint ESA/NASA project for researching and evaluating various remote payload operations for Space Station Freedom, using the ATLAS-1 Solar Constant (SOLCON) experiment as a representative payload and the MSFC Payload Operations Center (POCC) command and telemetry system as the base operations system, is described. A basic remote-user-center capability is to be implemented within the Columbus Crew Workstation facility at ESTEC in Noordwijk (NL), to demonstrate the ability to monitor real-time payload operations remotely and allow some command and control functions through the MSFC POCC. After the test-bed system is demonstrated for SOLCON, it is proposed to improve the capability and make it a standard service for Spacelab operations. This paper discusses POCC telemetry, command, and operations issues, NASA communications issues, SOLCON experiment-specific issues, NASA/ESA procedural issues, and system verification issues relating to the project.

Biddis, G. T.↗

Exploration of Pluto

Two NASA-sponsored cost-constrained mission implementations for the exploration of Pluto are described. One is the Pluto Fast Flyby (PFF) mission, which utilizes an 83 kg spacecraft to be launched in 1998 aboard a Titan IV (Solid Rocket Motor Upgrade)/Centaur) for an about 7-year-long direct trajectory to Pluto, which will carry an integrated CCD-imaging/UV spectrometer, with a possible integrated IR spectrometer. The other is the Pluto-350 spacecraft, weighing about 316 kg, which will carry a broader instrument set, greater redundancy, and which will require greater than 11 year flight time. Pluto-350 will be launched in 2001 aboard a Delta or Atlas, toward earth and Jupiter swingbys to provide the energy to reach Pluto.

Staehle, Robert L.↗

Production of SSM/I data sets

This Final Report is a summary of the work that was performed under Contract NAS8-38075 between NASA Marshall Space Flight Center and Remote Sensing Systems from September 1989 to September 1992. The primary accomplishment was the delivery of Special Sensor Microwave/Imager (SSM/I) data tapes containing sensor and geophysical products. In all, 515 tapes (80 gigabytes) were delivered. These tapes contained the F08 SSM/I data for the period from July 1988 through December 1991 and the F10 SSM/I data for the period from December 1990 through December 1991. For the F08 SSM/I, a data inventory was compiled and an engineering assessment was done. Ephemeris tables for the F08 and F10 spacecrafts were computed. Scientific studies on the oceanic wind vector and water vapor field were published, and color atlases of monthly ocean products were produced. This investigation was part of NASA's WETNET program.

Wentz, Frank J.↗

B supergiants in open clusters and associations

The final report on project NAG5-78, 'IUE Observations of B Supergiants in the Large Magellanic Cloud', a collaborative effort between Garmany (U. of Colorado), Sonneborn (Goddard Space Flight Center) and Fitzpatrick (Princeton Univ.) is presented. Over 90 B supergiants in the Large Magellanic Cloud with the IUE satellite, using the low dispersion mode were observed. These stars were chosen because they resemble the precursor star to SN 1987a, and a data base in the continuing effort to understand why the precursor star was a blue, not a red supergiant was needed. The observations were all reduced and made into an atlas, and efforts to understand the evolutionary history of stars of the H-R diagram are underway.

Garmany, C. D.↗

Design definition of the Laser Atmospheric Wind Sounder (LAWS), phase 2. Volume 1: Executive summary

The LAWS phase 1 and phase 2 studies have been completed on schedule and have led to significant advances in CO2 laser development. The Phase 2 Design Definition Study has shown that a large scanning mirror/high pulse energy laser LAWS Instrument is feasible and within the existing technology. The capability to monitor wind velocities with backscatter ratios of 10(exp 11) m(exp -1) SR(exp -1) is feasible. The weight budget allocated for the baseline LAWS is adequate, and sufficient reserves exist with the potential downsized configuration. With the possible decrease in available power from the baseline of 2.2 kW guideline, power and shot management is critical for the baseline configuration (15 to 20 J). This is particularly true during the 100 day occultation period each year. With the downsized configurations (5 to 7 J), power management is still necessary during the occultation but is primarily limited to shot management over the polar regions. The breadboard effort has produced significant laser advances for a tight 18 month schedule and the minimum budgets available from NASA, Lockheed, and TDS. Using the NASA funds and Lockheed and TDS fixed assets budgets, the breadboard was designed, fabricated, and brought on-line with first laser light within 16 months after ATP. First laser beam was obtained on 21 April 1992 at a 5 J power level. Tests since then have been conducted at sustained, repetitive pulse levels of over 7 J and 20 Hz. This is an increase of over two or three times greater than any system previously developed from this type laser. Increased power levels and additional life tests will be accomplished in the next LAWS phase. The Lockheed LAWS design will operate in the gravity gradient mode on-orbit, and all possible instrument vibration and jitter modes have been considered. Adequate pointing stability and control is state-of-the-art technology for the critical time periods, frequency rates, and control responses required by LAWS. Lockheed recommends a 6-1/2 year phase C/D program for LAWS to provide adequate feedback from the engineering unit and the qualification unit to the final flight unit. Assuming a one year period for LAWS integration to the spacecraft, followed by a six-month period for launch vehicle integration, LAWS could be successfully developed and launched in eight years. Our baseline design or downsized design can be accommodated by either the Atlas 2AS or the Delta launch vehicles. Lockheed's recommendation is that, based on the successful phase 2 design study and breadboard program, a follow-on 18 month extended breadboard testing program and additional system engineering studies, primarily in interfacing with a to be defined platform, be initiated. This should be immediately followed by the phase C/D program, leading to a LAWS launch in late 2001 or early 2002.

Source record↗

Definition and preliminary design of the LAWS (Laser Atmospheric Wind Sounder). Volume 1, phase 2: Executive summary

The objective of phase 1 of the LAWS study was to define and perform a preliminary design for the Laser Atmospheric Wind Sounder (LAWS) instrument. The definition phase consisted of identifying realistic concepts for LAWS and analyzing them in sufficient detail to be able to choose the most promising one for the LAWS application. System and subsystem configurations were then developed for the chosen concept. The concept and subsequent configurations were to be compatible with two prospective platforms--the Japanese Polar Orbiting Platform (JPOP) and as an attached payload on the Space Station Freedom. After a thorough and objective concept selection process, we chose a heterodyne detection Doppler lidar using a CO2 laser transmitter operating at 9.1 microns over a 2.1 micron solid state system. The choice of the CO2 approach over solid-state reflects the advanced state of development of CO2 lasers, its maturity in ground-based systems and the eased subsystem requirements associated with the longer wavelength. The CO2 lidar concept was then analyzed in detail to arrive at a configuration for the instrument and its major subsystems. Our approach throughout the configuration design was to take a systems perspective and trade requirements between subsystems, wherever possible, to arrive at configurations which made maximum use of existing, proven technology or relatively straightforward extensions to existing technology to reduce risk and cost. At the conclusion of Phase 1 we arrived at a configuration for LAWS which meets the performance requirements, yet which is less complex than previous designs of space-based wind sensors (e.g. Windsat), employs lightweight technologies to meet its weight goals (less than 800kg) and sufficiently flexible to offer various operational scenarios with power requirements from about 2 kW to 3 kW. The Phase 1 Final Report was released in March 1990. The 21-month Phase 2 began in October 1990. The requirement to accommodate LAWS as an attached payload on Space Station Freedom was deleted and the orbit altitude for the Japanese polar orbiting platform was changed from 824 km to 705 km. The power allocated to LAWS was reduced to 2.2 kW from 3 kW. Subsequently the availability of a Japanese Polar Orbiting Platform was called into question and LAWS accommodation studies were continued using a conceptual, ATLAS-launched platform supplied by MSFC. In March 1991 a modification to the original contracts was funded to provide a LAWS laser breadboard which could demonstrate all the performance requirements of the LAWS laser. Also funded as part of the same contract extension was a lifetest demonstration using an existing laser at STI. The breadboard extension was an eighteen month effort and the period of performance was therefore extended to September 30, 1992.

Source record↗

Hybrid rocket performance

A hybrid rocket is a system consisting of a solid fuel grain and a gaseous or liquid oxidizer. Figure 1 shows three popular hybrid propulsion cycles that are under current consideration. NASA MSFC has teamed with industry to test two hybrid propulsion systems that will allow scaling to motors of potential interest for Titan and Atlas systems, as well as encompassing the range of interest for SEI lunar ascent stages and National Launch System Cargo Transfer Vehicle (NLS CTV) and NLS deorbit systems. Hybrid systems also offer advantages as moderate-cost, environmentally acceptable propulsion system. The objective of this work was to recommend a performance prediction methodology for hybrid rocket motors. The scope included completion of: a literature review, a general methodology, and a simplified performance model.

Frederick, Robert A., Jr.↗

An overview of autonomous rendezvous and docking system technology development at General Dynamics

The Centaur avionics suite is undergoing a dramatic modernization for the commercial, DoD Atlas and Titan programs. The system has been upgraded to the current state-of-the-art in ring laser gyro inertial sensors and Mil-Std-1750A processor technology. The Cruise Missile avionic system has similarly been evolving for many years. Integration of GPS into both systems has been underway for over five years with a follow-on cruise missile system currently in flight test. Rendezvous and Docking related studies have been conducted for over five years in support of OMV, CTV, and Advanced Upper Stages, as well as several other internal IR&D's. The avionics system and AR&D simulator demonstrated to the SATWG in November 1990 has been upgraded considerably under two IR&D programs in 1991. The Centaur modern avionics system is being flown in block upgrades which started in July of 1990. The Inertial Navigation Unit will fly in November of 1991. The Cruise Missile avionics systems have been fully tested and operationally validated in combat. The integrated AR&D system for space vehicle applications has been under development and testing since 1990. A Joint NASA / GD ARD&L System Test Program is currently being planned to validate several aspects of system performance in three different NASA test facilities in 1992.

Kuenzel, Fred↗

Candidate Technologies for the Integrated Health Management Program

The purpose of this report is to assess Vehicle Health Management (VHM) technologies for implementation as a demonstration. Extensive studies have been performed to determine technologies which could be implemented on the Atlas and Centaur vehicles as part of a bridging program. This paper discusses areas today where VHM can be implemented for benefits in reliability, performance, and cost reduction. VHM Options are identified and one demonstration is recommended for execution.

Johnson, Neal F., Jr.↗

STS-45 Space Shuttle mission report

The STS-45 Space Shuttle Program Mission Report contains a summary of the vehicle subsystem operations during the forty-sixth flight of the Space Shuttle Program and the eleventh flight of the Orbiter Vehicle Atlantis (OV-104). In addition to the Atlantis vehicle, the flight vehicle consisted of the following: an External Tank (ET) designated as ET-44 (LWT-37); three Space Shuttle main engines (SSME's), which were serial numbers 2024, 2012, and 2028 in positions 1, 2, and 3, respectively; and two Solid Rocket Boosters (SRB's) designated as BI-049. The lightweight redesigned Solid Rocket Motors (RSRM's) installed in each of the SRB's were designated as 360L021A for the left SRM and 360W021B for the right SRM. The primary objective of this mission was to successfully perform the planned operations of the Atmospheric Laboratory for Applications and Science-1 (ATLAS-1) and the Shuttle Solar Backscatter Ultraviolet Instrument (SSBUV) payloads. The secondary objectives were to successfully perform all operations necessary to support the requirements of the following: the Space Tissue Loss-01 (STL-01) experiment; the Radiation Monitoring Equipment-3 (RME-3) experiment; the Visual Function Tester-2 (VFT-2) experiment; the Cloud Logic to Optimize use of Defense System (CLOUDS-1A) experiment; the Shuttle Amateur Radio Experiment 2 (SAREX-2) Configuration B; the Investigation into Polymer Membranes Processing experiment; and the Get-Away Special (GAS) payload G-229. The Ultraviolet Plume Instrument (UVPI) was a payload of opportunity that required no special maneuvers. In addition to the primary and secondary objectives, the crew was tasked to perform as many as 10 Development Test Objectives (DTO'S) and 14 Detailed Supplementary Objectives (DSO's).

Fricke, Robert W.↗

The nature of faint emission-line galaxies

One of the results of faint galaxy redshift surveys is the increased fraction of galaxies which have strong emission-line spectra. These faint surveys find that roughly 50 percent of the galaxies have an equivalent width of (OII), W sub 3727, greater than 20 A while this fraction is less than 20 percent in the DARS survey. This has been interpreted as evidence for strong evolution in the galaxy population at redshifts less than 0.5. In order to further investigate the properties of the galaxies in faint redshift surveys, two important factors must be addressed. The first is the observed correlation between color, luminosity, and W sub 3727. There is a correlation between color and the strength of emission lines, bluer galaxies having stronger emission features, as evident for Markarian galaxies and for galaxies in Kennicutt's spectrophotometric atlas. This correlation also applies galaxies in faint redshift surveys. In addition, low luminosity galaxies have a larger average W sub 3727 (and bluer colors) than higher luminosity galaxies. This is illustrated for Kennicutt's low z late-type galaxies, for the Durham Faint Surveys, and for galaxies in SA68. The second factor which must be incorporated into any interpretation of the faint emission galaxies is the different luminosity functions for galaxies depending on color. This is usually modeled by varying M* for different color classes (or morphological types); however, the shape of the luminosity function is different for galaxies with different colors. Low luminosity, blue galaxies have a much larger number density than low luminosity, red galaxies. Furthermore, the low luminosity end of the blue galaxy luminosity function is not well fit by a Schechter function. These two factors have been included in a very simple, no-evolution, model for the galaxy population. This model uses the luminosity functions from Shanks (1990) and spectral energy distributions (SED's) from Bruzual (1988). W sub 3727 is predicted using the correlation (including dispersion) with color.

Smetanka, John J.↗

Systems engineering studies of on-orbit assembly operation

While the practice of construction has a long history, the underlying theory of construction is relatively young. Very little has been documented as to techniques of logistic support, construction planning, construction scheduling, construction testing, and inspection. The lack of 'systems approaches' to construction processes is certainly one of the most serious roadblocks to the construction of space structures. System engineering research efforts at CSC are aimed at developing concepts and tools which contribute to a systems theory of space construction. The research is also aimed at providing means for trade-offs of design parameters for other research areas in CSC. Systems engineering activity at CSC has divided space construction into the areas of orbital assembly, lunar base construction, interplanetary transport vehicle construction, and Mars base construction. A brief summary of recent results is given. Several models for 'launch-on-time' were developed. Launch-on-time is a critical concept to the assembly of such Earth-orbiting structures as the Space Station Freedom, and to planetary orbiters such as the Mars transfer vehicle. CSC has developed a launch vehicle selection model which uses linear programming to find optimal combinations of launch vehicles of various sizes (Atlas, Titan, Shuttles, HLLV's) to support SEI missions. Recently, the Center developed a cost trade-off model for studying on orbit assembly logistics. With this model it was determined that the most effective size of the HLLV would be in the range of 120 to 200 metric tons to LEO, which is consistent with the choices of General Stafford's Synthesis Group Report. A second-generation Dynamic Construction Activities Model ('DYCAM') process model has been under development, based on our past results in interruptability and our initial DYCAM model. This second-generation model is built on the paradigm of knowledge-based expert systems. It is aimed at providing answers to two questions: (1) what are some necessary or sufficient conditions for judging conceptual designs of spacecraft?, and (2) can a methodology be formulated such that these conditions may be used to provide computer-aided tools for evaluating conceptual designs and planning for space assembly sequences? Early simulation results indicate that the DYCAM model has a clear ability to emulate and simulate human orbital construction processes.

Morgenthaler, George W.↗

The first mission to Mars

NASA's first mission to Mars used an Atlas-Agena D launcher, which left Cape Canaveral on November 28, 1964, to place a Mariner probe capable of telemetering back photographs of the Martian surface. After an 8-month flight of 135 million miles, the spacecraft encountered Mars only 500 miles off the aiming point 6000 miles from the Martian surface. Attention is given to NASA-JPL's solving of problems arising after Mariner's separation from the Agena upper stage, using two competing investigative teams.

James, J. N.↗