Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “system reliability”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 865 records · Page 48

A Historical Review of Logistics Mass and Crew Time Demands for ISS Operations

Following over 20 years of continuously crewed operations on the International Space Station (ISS), NASA is planning to return to the Moon and eventually send humans to Mars. ISS operations provide vital data to inform mission analysts as NASA prepares for longer and more complex missions with increased mission endurance. Endurance, defined as crewed operating time between cargo deliveries (or crew launch and return to Earth), is an important metric when analyzing mission needs. NASA is developing architectures to support sustained deep-space habitats in cislunar space, the lunar surface, Mars transit, and the surface of Mars. Unlike the ISS, these systems will not be continuously crewed, and unlike the Space Shuttle, these systems will not return to Earth for regular refurbishment between missions. Lunar systems will routinely go through long uncrewed periods between crewed missions. The systems on board will need to survive these dormancy periods with no crew present to provide maintenance. Mars systems will experience significantly longer endurance than past experience. Additionally, the inability to have quick aborts to return to Earth increases the need for system reliability, redundancy, and maintainability, as well as plans for contingency operations. This paper examines the historical logistics and crew time demand for ISS operations and mission objectives and provides an overview of missions to the ISS over its operating history, the mass and items delivered with the missions, and the crew time spent during missions. These parameters provide insight and valuable data to inform logistics and crew time estimates for future long-endurance crewed exploration missions.

Crew Logistics↗

Status of the Four Bed Carbon Dioxide Scrubber ISS Technology Demonstration 2023-2024

The Four Bed Carbon Dioxide Scrubber (FBCO2) flight demonstration is presently operating as a primary CO 2 removal system onboard the International Space Station (ISS). After activation in October 2021, FBCO2 has been removing metabolic CO 2 from the ISS cabin where it is supplementing or fully replacing the heritage systems. This paper describes the past year’s accomplishments and forward outlook. The performance of the new blower, efforts toward closed-loop operation, and further on-orbit modifications will also be detailed. System reliability, software changes, and ongoing efforts will be summarized.

Life Support↗

Providing Ancillary Services with Photovoltaic Generation in Multi-Timescale Grid Operation: Preprint

With photovoltaic (PV) generation substantially increases, electric power systems need more flexible resources that can provide ancillary services to mitigate the variability and uncertainty of the PV generation. On the one hand, the increase of PV generation necessitates the needs of more flexible resources. On the other hand, PV generation, because of its low operation cost, has been replacing the conventional generation in the system which is the main flexible resources in the current system. Consequently, there is a trend to require the renewable generation including PV to provide flexible ancillary services to further accommodate more PV integration. This paper proposes a multi-timescale grid operation model considering the various control strategies of PV providing different ancillary services. Numerical case studies demonstrate that with PV providing both regulation reserve and primary frequency reserve, the system operating costs and PV curtailment will be reduced significantly. It shows that not only the system reliability but also PV's profitability can be improved with PV providing more ancillary services.

41 EE - Solar Energy Technologies Office (EE-4S)↗

Modular High Temperature Gas-cooled Reactor: Accident Analysis

Types of Potential Accidents and Reactor Response Codes and Tools Experimental Validation Safety Analysis Approach Licensing Modernization Project Use of PRA in LMP, ASME/ANS, Non-LWR PRA Standard Methods for Incorporating Passive System Reliability into a PRA

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Emulation and Adversarial Analysis of EV Charging Networks

In the effort of decarbonization and evolution of the modern electrical grid, electric vehicles (EVs) play a key part to transform the grid. However, due to the rapid adoption of EVs and the demand of the charging infrastructure required to power said EVs, risk of a cyber-attack may impose serious consequences. There is a need to analyze and protect the charging ecosystem infrastructure from cyber threats before it reaches wide-scale deployment. In an effort to secure vehicle to grid (V2G) communications, standardization is necessary for continued reliable system operation. The protocol ISO 15118 outlines controls and practices that should be implemented for secure vehicle to grid (V2G) communications. The standard is gaining momentum for American markets as the demand for EV infrastructure grows. The adoption of ISO 15118 in American markets poses several challenges: the deployment of a public key infrastructure (PKI) as outlined within the standard, interoperability of charging different EVs with chargers from different manufactures using the PKI, and scaling the ecosystem to meet the demand while managing risks. This project was created to understand potential cyber and scaling challenges of PKI for EV infrastructure through utilizing a series of emulated components mapping to what exists in the EV ecosystem today, and the components of the PKI that are under development. The key nodes within the emulation that are under development are: electric vehicle (EV), electric vehicle supply equipment (EVSE), charge network operator (CNO), certificate authority (CA), and online certificate status protocol (OCSP) that must all interact using secure and trusted communications. With these emulated components and utilizing orchestration methods to rapidly deploy and scale the components, the ability to analyze risks of the ecosystem and address gaps before the PKI ecosystem is fully deployed to production should yield a more robust and mature production charging infrastructure. Our approach will use a modular architecture of virtual machines within an orchestration platform and will target scales of 100s, 1000s, and 10,000s of entities interacting. The core research questions trying to be answered with this scope of work are: what are the impacts of a rogue CA, what are the risks of certificate revocation list (CRL) management, what is the value of OCSP stapling, what components are vulnerable to DOS attacks, and what test effective payloads may impact the components.

charging ecosystem↗

Data-Driven Scalable Emulation of Hydropower Using Real-Time Hardware-in-the-Loop

This presentation covers Motivation: (1) With the increased grid integration of inverter-based resources, hydropower plays a crucial role in maintaining the bulk power system reliability and resilience; and (2) A more dynamic response and new control designs are required to meet the grid requirements. To evaluate any modification, control-prototyping, performance validation and de-risking grid integration of hydropower, a high-fidelity environment is required. Also covers Objectives: (1) To develop data-driven emulation of hydropower using hardware-in-the-loop for different size, types of hydro plants; and (2) To characterize hardware and obtain accurate dynamic response for shaft speed, torque, and power. Provide a mechanical power interface with emulated dynamics of a hydro-turbine shaft that can be coupled to electrical generators for mechanical and electrical PHIL.

electrical↗

ICRH operations and experiments during the JET-ILW tritium and DTE2 campaigns

2021 has culminated with the completion of the JET-ILW DTE2 experimental campaign. This contribution summarizes Ion Cyclotron Resonance Heating (ICRH) operations from system and physics point of view. Improvements to the (ICRH) system, to operation procedures and to real time RF power control were implemented to address specific constraints from tritium and deuterium-tritium operations and increase the system reliability and power availability during D-T pulses. ICRH was operated without the ITER-Like Antenna (ILA) because water leaked from an in-vessel capacitor into the vessel on day-2 of the D-T campaign. Three weeks were required to identify and isolate the leak and resume plasma operations. Dedicated RF-Plasma Wall Interaction (PWI) experiments were conducted; tritium plasmas exhibit a higher level of Be sputtering on the outer wall and impurity content when compared to deuterium or hydrogen plasmas. The JET-DTE2 campaigns provided the opportunity to characterize ICRH schemes foreseen for the ITER operation, in the ITER like wall environment in ELMy H-mode scenarios aiming at maximizing fusion performance. The second harmonic tritium resonance heating and to a lesser extent minority 3He heating (ITER D-T ICRH reference schemes) lead to improved ion temperature and fusion performance when compared to hydrogen minority ICRH. However, these discharges suffered from a lack of stationarity and gradual impurity accumulation potentially because of a deficit of ICRH power when using JET antennas at lower frequencies. Fundamental deuterium ICRH was used in tritium-rich plasmas and with deuterium Neutral Beam Heating; this ICRH scheme proved to be very efficient boosting ion temperature and fusion performance in these plasmas.

Klepper, C. Christopher↗

Plasma heating technology

The operational environment for plasma heating systems presents unprecedented challenges for the success of magnetic fusion. This chapter discusses the current state of ion cyclotron and electron cyclotron heating systems and the research and development priorities needed to establish working solutions for these systems. While much progress has been made, there is much more work to be done to make fusion energy commercially viable. Research and development priorities include radiation-resistant structural and plasma facing materials, advanced manufacturing methods, new cooling methods, first-wall integrated actuators, improvements in power source efficiency, higher frequency gyrotrons, and improved overall system reliability.

Caughman, John↗

Supporting U.S. National Security Through Cybersecurity Partnerships

At NLR, we're studying energy evolutions and threats to understand the challenges they pose and uncover ways to leverage grid advancements to achieve more secure, defensible, and reliable systems. Our integrated research approach bridges the gap between cyber threats and real-world consequences to deliver actionable solutions that reduce vulnerabilities and help strengthen U.S. national security.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Demand response of loads having thermal reserves

Systems and methods are described herein that improve grid performance by smoothing demand using thermal reserves. The smoothed demand can reduce peak loads as well as the ramp rate of demand that will otherwise require the use of inefficient, expensive generation sources. These improvements are tied to the selective switching on or off electrical loads that are coupled to thermal reserves, effectively using the thermal reserves as an energy storage mechanism. Historical data of past usage can be used to create load model and ensure that effects on customer comfort are minimized while still accomplishing the beneficial effects for the overall grid, which enables grid owners to both reduce their operational cost by avoiding expensive generation and improve system reliability by achieving more predictable power demand.

Ren, Wei↗

Techno-Economic Analysis of Geologically Connected Seawater Air Conditioning (GeoSWAC) Concept for District Cooling at the University of Puerto Rico at Rio Piedras: Preprint

At the University of Puerto Rico at Rio Piedras, a central chilled water plant supplies cooling to several campus buildings, contributing significantly to electricity demand during daytime peak hours, particularly in the summer months. These operational challenges are exacerbated by Puerto Rico's tropical rainforest climate and a power grid vulnerable to frequent disruptions caused by hurricanes and tropical storms. This study presents a techno-economic analysis of the existing chilled water plant serving four representative campus buildings and introduces a conceptual alternative: the Geologically connected Seawater Air Conditioning (GeoSWAC) system. GeoSWAC leverages stable low temperatures of deep ocean water (~1 km depth), hydraulically connected to an inland well, to deliver cooling without the use of vapor-compression refrigeration. Using modeled annual cooling loads and chiller performance data, capital costs, energy consumption, and levelized cost of cooling (LCOC) were evaluated for both systems. While GeoSWAC showed higher capital costs than the chiller-based scenario, operational costs were significantly lower at $26k-$53k annually, resulting in a lower LCOC between $2.3/MWh and $8.2/MWh compared to $30.2/MWh-$33.6/MWh for the chiller scenario. These results suggest that the GeoSWAC system offers a promising, low-energy, and climate-resilient alternative for large-scale cooling in tropical coastal environments, with significant potential to reduce peak electricity demand and improve long-term system reliability.

15 GEOTHERMAL ENERGY↗

REFRACTORY COMPACT HEAT EXCHANGERS WITH EMBEDDED SENSORS ENABLED BY HYBRID ADVANCED SINTERING AND ADDITIVE APPROACH

Structural health monitoring (SHM) of compact heat exchangers (CHXs) operating in extreme environments is essential for ensuring system reliability, safety, and longevity. This study presents the development of high-temperature sensors fabricated via aerosol jet printing (AJP) using platinum ink, selected for its exceptional thermal stability, oxidation resistance, and electrical conductivity. AJP enables precise deposition of fine-feature sensor patterns onto complex geometries, making it well-suited for integration within CHX architectures. To enhance sensor durability, an alumina-based ceramic protective layer was printed over the platinum sensing elements. The sensors demonstrated stable, repeatable performance up to 900?°C during extended thermal cycling. A custom test setup was developed to evaluate sensor accuracy and robustness under steady-state and transient conditions. Substrate screening identified HG-1 ceramic-coated stainless steel as the most effective platform, offering strong adhesion and low resistance. Furthermore, electric field-assisted sintering (EFAS) was employed to embed the sensors into stainless steel 316L matrices without degrading their functionality. Post-embedding electrical tests confirmed sensor integrity, and initial characterization suggests strong potential for in-situ monitoring. This work provides a scalable strategy for integrating high-performance temperature sensors directly into refractory components, advancing embedded SHM technologies for harsh operating environments.

36 - MATERIALS SCIENCE↗

On incorporating reliability considerations into control system designs

This paper considers reliability in designing control systems for large orbital structures that are expected to have appreciable flexibility. Reliability is considered for both the control configuration (i.e. selecting sensor and actuator locations over an admissible set) and the ultimate operation of the system. The approach presented is to construct a cost function that indicates the absolute goal of the system and, for a given structural design, to determine the lowest achievable costs conditioned on the failure states of the system (i.e. which actuators and sensors are operational). These costs are then weighted and summed to provide an overall system performance measure. This measure is then minimized over the set of admissible control configurations. The approach is illustrated using a beam that has four actuators with the goal of achieving a given parabolic shape.

Montgomery, R. C.↗

Verification of Triple Modular Redundancy Insertion for Reliable and Trusted Systems

If a system is required to be protected using triple modular redundancy (TMR), improper insertion can jeopardize the reliability and security of the system. Due to the complexity of the verification process and the complexity of digital designs, there are currently no available techniques that can provide complete and reliable confirmation of TMR insertion. We propose a method for TMR insertion verification that satisfies the process for reliable and trusted systems.

Verification↗

RELIABILITY PROGRAMS FOR ''L'' SYSTEMS

The AFSC Program Structure assigns numbers and letters to the various programs in order to identify the efforts for management control. The fact that most of the command and control systems have the designator "L" affixed has prompted the reference to them as the "L" systems. In this paper the mission of "L" systems has been described, the complexity of the equipment indicated, and the importance of these systems to our national defense efforts pointed out. The efforts by the Electronic Systems Division to comply With the Air Force policy that a comprehensive reliability program be required for each contract to assure delivery of reliable systems and equipment to the Air Force inventory are described in considerable detail.

RELIABILITY↗

First Stage of a Highly Reliable Reusable Launch System

Electromagnetic launch assist has the potential to provide a highly reliable reusable first stage to a space access system infrastructure at a lower overall cost. This paper explores the benefits of a smaller system that adds the advantages of a high specific impulse air-breathing stage and supersonic launch speeds. The method of virtual specific impulse is introduced as a tool to emphasize the gains afforded by launch assist. Analysis shows launch assist can provide a 278-s virtual specific impulse for a first-stage solid rocket. Additional trajectory analysis demonstrates that a system composed of a launch-assisted first-stage ramjet plus a bipropellant second stage can provide a 48-percent gross lift-off weight reduction versus an all-rocket system. The combination of high-speed linear induction motors and ramjets is identified, as the enabling technologies and benchtop prototypes are investigated. The high-speed response of a standard 60 Hz linear induction motor was tested with a pulse width modulated variable frequency drive to 150 Hz using a 10-lb load, achieving 150 mph. A 300-Hz stator-compensated linear induction motor was constructed and static-tested to 1900 lbf average. A matching ramjet design was developed for use on the 300-Hz linear induction motor.

Kloesel, Kurt J.↗

The implementation and use of Ada on distributed systems with high reliability requirements

The general inadequacy of Ada for programming systems that must survive processor loss was shown. A solution to the problem was proposed in which there are no syntatic changes to Ada. The approach was evaluated using a full-scale, realistic application. The application used was the Advanced Transport Operating System (ATOPS), an experimental computer control system developed for a modified Boeing 737 aircraft. The ATOPS system is a full authority, real-time avionics system providing a large variety of advanced features. Methods of building fault tolerance into concurrent systems were explored. A set of criteria by which the proposed method will be judged was examined. Extensive interaction with personnel from Computer Sciences Corporation and NASA Langley occurred to determine the requirements of the ATOPS software. Backward error recovery in concurrent systems was assessed.

Knight, J. C.↗