Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “schedules”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 865 records · Page 48

Scheduling language and algorithm development study. Volume 1: Study summary and overview

A high level computer programming language and a program library were developed to be used in writing programs for scheduling complex systems such as the space transportation system. The objectives and requirements of the study are summarized and unique features of the specified language and program library are described and related to the why of the objectives and requirements.

Source record↗

Scheduling language and algorithm development study. Appendix: Study approach and activity summary

The approach and organization of the study to develop a high level computer programming language and a program library are presented. The algorithm and problem modeling analyses are summarized. The approach used to identify and specify the capabilities required in the basic language is described. Results of the analyses used to define specifications for the scheduling module library are presented.

Source record↗

Tug fleet and ground operations schedules and controls. Volume 1: Executive summary

This study presents Tug Fleet and Ground Operations Schedules and Controls plan. This plan was developed and optimized out of a combination of individual Tug program phased subplans, special emphasis studies, contingency analyses and sensitivity analyses. The subplans cover the Tug program phases: (1) Tug operational, (2) Interim Upper Stage (IUS)/Tug fleet utilization, (3) and IUS/Tug payload integration, (4) Tug site activation, (5) IUS/Tug transition, (6) Tug acquisition. Resource requirements (facility, GSE, TSE, software, manpower, logistics) are provided in each subplan, as are appropriate Tug processing flows, active and total IUS and Tug fleet requirements, fleet management and Tug payload integration concepts, facility selection recommendations, site activation and IUS to Tug transition requirements. The impact of operational concepts on Tug acquisition is assessed and the impact of operating Tugs out of KSC and WTR is analyzed and presented showing WTR as a delta. Finally, cost estimates for fleet management and ground operations of the DDT&E and operational phases of the Tug program are given.

Source record↗

Tug fleet and ground operations schedules and controls. Volume 2: part 2, addenda

The results of a study to assess the tug safing requirements at postlanding are presented. The study considered the normal (green light) conditions from orbiter landing to completion of preparations for the next launch. Normal tug ground turnaround operations include handling and transportation activities and the performance of inspections, tests, and checkout functions. These activities dictate that hazards to ground personnel, the tug, GSE, facilities, and ecology be reduced to the lowest practical level consistent with program objectives, cost, and schedules. During flight operations, the tug contains energy sources that constitute potential hazards but are required for mission accomplishment. These potential hazards have been reduced to an acceptable level for flight operation by design features and by providing for control of energy sources.

Source record↗

A study of the financial history of the U.S. scheduled airlines and the improvement of airline profitability through technology

The financial history of the U.S. scheduled airline industry was investigated to determine the causes of the erratic profit performance of the industry and to evaluate potential economic gains from technology advances of recent years. Operational and economic factors affecting past and future profitability of the industry are discussed, although no attempt was made to examine the profitability of individual carriers. The results of the study indicate that the profit erosion of the late 1960's and early 1970's was due more to excess capacity than to inadequate fare levels, but airline problems were severely compounded by the rapid fuel price escalation in 1974 and 1975. Near-term solutions to the airline financial problems depend upon the course of action by the industry and the CAB and the general economic health of the nation. For the longer term, the only acceptable alternative to continued fare increases is a reduction in unit operating costs through technological advance. The next generation of transports is expected to incorporate technologies developed under Government sponsorship in the 1960's and 1970's with significant improvements in fuel consumption and operating costs.

Wilcox, D. E.↗

Set covering algorithm, a subprogram of the scheduling algorithm for mission planning and logistic evaluation

A computer program using Lemke, Salkin and Spielberg's Set Covering Algorithm (SCA) to optimize a traffic model problem in the Scheduling Algorithm for Mission Planning and Logistics Evaluation (SAMPLE) was documented. SCA forms a submodule of SAMPLE and provides for input and output, subroutines, and an interactive feature for performing the optimization and arranging the results in a readily understandable form for output.

Chang, H.↗

Automated mixed traffic vehicle control and scheduling study

The operation and the expected performance of a proposed automatic guideway transit system which uses low speed automated mixed traffic vehicles (AMTVs) were analyzed. Vehicle scheduling and headway control policies were evaluated with a transit system simulation model. The effect of mixed traffic interference on the average vehicle speed was examined with a vehicle pedestrian interface model. Control parameters regulating vehicle speed were evaluated for safe stopping and passenger comfort. Some preliminary data on the cost and operation of an experimental AMTV system are included. These data were the result of a separate task conducted at JPL, and were included as background information.

Peng, T. K. C.↗

HEAO-A nominal scanning observation schedule

The HEAO-A observatory, scheduled for launch in late June 1977, will spend most of its orbital lifetime in a scanning mode, spining from 0.03 to 0.1 rpm about an axis aligned with the sun. The dates of availability in the scan band are given for a list of 248 X-ray sources. Celestial maps of source locations and scan planes, and examples of the nighttime elevation of available sources are presented. This document is intended to aid ground-based observers in planning coordinated observations with HEAO-A.

Fishman, G. J.↗

Airborne monitoring of crop canopy temperatures for irrigation scheduling and yield prediction

Airborne and ground measurements were made on April 1 and 29, 1976, over a USDA test site consisting mostly of wheat in various stages of water stress, but also including alfalfa and bare soil. These measurements were made to evaluate the feasibility of measuring crop temperatures from aircraft so that a parameter termed stress degree day, SDD, could be computed. Ground studies have shown that SDD is a valuable indicator of a crop's water needs, and that it can be related to irrigation scheduling and yield. The aircraft measurement program required predawn and afternoon flights coincident with minimum and maximum crop temperatures. Airborne measurements were made with an infrared line scanner and with color IR photography. The scanner data were registered, subtracted, and color-coded to yield pseudo-colored temperature-difference images. Pseudo-colored images reading directly in daily SDD increments were also produced. These maps enable a user to assess plant water status and thus determine irrigation needs and crop yield potentials.

Millard, J. P.↗

Feasibility study of an Integrated Program for Aerospace-vehicle Design (IPAD) system. Volume 6: Implementation schedule, development costs, operational costs, benefit assessment, impact on company organization, spin-off assessment, phase 1, tasks 3 to 8

A baseline implementation plan, including alternative implementation approaches for critical software elements and variants to the plan, was developed. The basic philosophy was aimed at: (1) a progressive release of capability for three major computing systems, (2) an end product that was a working tool, (3) giving participation to industry, government agencies, and universities, and (4) emphasizing the development of critical elements of the IPAD framework software. The results of these tasks indicate an IPAD first release capability 45 months after go-ahead, a five year total implementation schedule, and a total developmental cost of 2027 man-months and 1074 computer hours. Several areas of operational cost increases were identified mainly due to the impact of additional equipment needed and additional computer overhead. The benefits of an IPAD system were related mainly to potential savings in engineering man-hours, reduction of design-cycle calendar time, and indirect upgrading of product quality and performance.

Garrocq, C. A.↗

Airborne monitoring of crop canopy temperatures for irrigation scheduling and yield prediction

The aim of the program discussed was to develop techniques for remotely measuring crop irrigation needs and predicting crop yields, with emphasis on wheat. Airborne measurements, using an IR line scanner and color IR photography, were made to evaluate the feasibility of measuring minimum and maximum (dawn and afternoon) crop temperatures to compute a parameter, termed 'stress degree day' (SDD) - a valuable indicator of crop water needs, which can be related to irrigation scheduling and yield. Crop canopy temperature measurements by airborne IR techniques revealed the superiority of thermal IR data over color IR photography. Water stress undetected in the latter technique was clearly detected in thermal imagery. Color IR photography, however, is valuable in discerning vegetation. The pseudo-colored temperature-difference images (and pseudo-colored images, reading directly in daily SDD increments) are shown to be well suited for assessing plant water status and, thus, for determining the irrigation needs and crop yield potentials.

Millard, J. P.↗

Cost and schedule management on the quiet short-haul research aircraft project

The Quiet Short-Haul Research Aircraft (QSRA) Project, one of the largest aeronautical programs undertaken by NASA to date, achieved a significant cost underrun. This is attributed to numerous factors, not the least of which were the contractual arrangement and the system of cost and schedule management employed by the contractor. This paper summarizes that system and the methods used for cost/performance measurement by the contractor and by the NASA project management. Recommendations are made for the use of some of these concepts in particular for future programs of a similar nature.

Wilcox, D. E.↗

Scheduling Algorithm for Mission Planning and Logistics Evaluation (SAMPLE). Volume 3: The GREEDY algorithm

The functional specifications, functional design and flow, and the program logic of the GREEDY computer program are described. The GREEDY program is a submodule of the Scheduling Algorithm for Mission Planning and Logistics Evaluation (SAMPLE) program and has been designed as a continuation of the shuttle Mission Payloads (MPLS) program. The MPLS uses input payload data to form a set of feasible payload combinations; from these, GREEDY selects a subset of combinations (a traffic model) so all payloads can be included without redundancy. The program also provides the user a tutorial option so that he can choose an alternate traffic model in case a particular traffic model is unacceptable.

Dupnick, E.↗