Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “plant operations”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 865 records · Page 48

Modular high temperature gas reactor core modeling with RELAP5-3D/PHISICS – Optimization schemes for load following

The objective of this study is to develop a 3D/NK model to study the load following operation of a Modular High-Temperature Gas-Cooled Reactor (MHTGR). The selected design is the 350 MW prismatic, graphite moderated, helium cooled thermal reactor based on the MHTGR-350 transient benchmark led by the High-Temperature Gas-Cooled Reactor (HTGR) Methods Core Simulation Group at Idaho National Laboratory (INL) in the framework of the Organization for Economic Cooperation and Development Nuclear Energy Agency (OECD/NEA). This kind of reactor usually reacts very slowly to the perturbation of the core parameters due to the large amount of graphite in the core. This kind of behavior promotes the reactor stability but on the other hand limits the reactor load-following operability. Recently advances in gas reactor designs have made load-following in gas reactors a feasible and achievable goal. Modern nuclear reactors (such as the MHTGR-350) are designed to withstand the structural stresses associated with load-following. Operating the reactor in load-following mode will inevitably reduce the load factor. Although a higher load factor means more revenue and the best usage of the fuel, following the variable energy demand will increase the maximum achievable fraction of generated nuclear power, being no more limited to the base load power generation. In general, if low impact on material aging and the safe operability are demonstrated the plant economics will be minimally affected. In order to ensure that the system can be safely operated in a load-following mode an extensively study has been carried out. Some tests with linear coolant mass flow rate change demonstrated that the reactor behavior is suitable for operation in load following mode. This assumption has been confirmed by a 4 days load following transient test in which the reactor supplied the requested power with a negligible error.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Analysis of a Disturbance Event with Inverter-Based Resources Using EMT Simulations

Increasing penetration of inverter-based resources (IBRs) necessitates newer methods of planning and analysis of disturbances. The existing phasor-domain transient stability (TS) analysis may not capture the dynamics of IBRs during fault events. Here, in this paper, electromagnetic transient (EMT) simulations using high-fidelity detailed model of power grid and one of the affected photovoltaic (PV) plants during the Angeles Forest disturbance in 2018 are performed. In these simulations, the processes to develop EMT models of power grid from traditional phasor-domain TS data and PV plant from collected data are described. Thereafter, using these simulations, the response of the PV plant during the fault event in 2018 is replicated and a sensitivity analysis is performed. The sensitivity analysis consists of making changes to the components within the PV plant and in the power grid to evaluate the impact they have on the response observed by the PV plant during the fault event. This analysis provides an understanding of the components that impact the operation of a PV plant during fault events and provide guidance to system planners on the studies that need to be performed to maintain a reliable power grid as new IBR plants are integrated.

42 ENGINEERING↗

Floating photovoltaic power plants: A review of energy yield, reliability, and operation and maintenance

Photovoltaic (PV) systems are essential for the transition to sustainable energy, reducing fossil fuel dependence and mitigating climate change. Although PV requires minimal land area — PV can meet the European Union's energy needs using only 0.26% of its land — space for deployment is often scarce in densely populated regions. Floating photovoltaics (FPV) offer an effective solution to land-use challenges by installing PV systems on floating structures in water bodies. FPV is a growing niche within PV with a cumulative installed capacity reaching 7.7 GW globally by 2023. Almost 90% of the installed FPV capacity is in Asia, with close to 50% of in China alone, while the Netherlands and France are the largest markets outside Asia. FPV shows strong potential to support climate targets, but still faces challenges like regulatory barriers, cost competitiveness compared to ground-based PV (GPV), and uncertainties about environmental impacts and system reliability. FPV systems are currently installed mainly on sheltered inland waters, such as quarry lakes, irrigation ponds and reservoirs. FPV technical standards are still being developed. Guidelines have been published by the World Bank, DNV, and Solar Power Europe, and emerging national standards from South Korea, China, and Singapore address design, components, and safety. The International Electrotechnical Commission (IEC) is working on formal standards for floats, mooring systems, and electrical connectors. However, the published best practices lack quantitative guidance for yield modelling and reliability, which this report aims to address. It provides data-driven insights, models, and parameters essential for accurate energy yield, reliability, and maintenance predictions over FPV systems' lifetimes.

14 SOLAR ENERGY↗

Environmental, Health and Safety Assessment Application of a Heat Integrated, Post-combustion CO2 Capture System Using Monoethanolamine and Hitachi H3-1 Solvent at the E.W. Brown Coal-fired Power Plant

An Environmental Health and Safety (EH&S) Assessment was completed for operation of a pilot scale carbon dioxide (CO2) capture system (CCS) at the Louisville Gas & Electric (LG&E) and Kentucky Utilities (KU) Energy, LLC (LG&E-KU) E. W. Brown Generating Station in Harrodsburg, Mercer County, Kentucky. The pilot system was evaluated using two CO2 capture solvents, monoethanolamine (MEA) and Hitachi’s H3-1 solvent. The purpose of the EH&S Assessment was to determine if there were any unacceptable environmental, health or safety concerns that may prevent operation or environmental permitting of a larger scale pilot scale plant. The assessment included review of process flow diagrams, input and output flow rates for primary materials, literature describing similar processes and chemicals used or created during the process, actual air emission and wastewater test data and air emission calculations. The evaluation included identification of risks related to hazardous chemicals, air emissions, wastewater discharges, solid wastes generated and employee hazards. Most potential EH&S issues that were identified are commonly found and successfully managed at large industrial facilities. No risks were identified that could not be successfully managed or would likely prevent implementation or environmental permitting of the pilot or larger scale plant. Potential exposures and resulting health risks from exposure to low concentrations of nitrosamines generated from degradation of the Hitachi H3-1 and possibly MEA solvents may be a health concern for site workers, but additional investigation is needed to accurately assess this risk. Applying the information gained from operating the pilot plant, performing air emission testing and used solvent testing to a large-scale facility at a commercial coal-fired electric generating plant suggests additional air emission control measures may be necessary to reduce potential site worker health risks and possibly community risks. Depending upon the location and regional air quality, considerable effort may be required to obtain the necessary air permit for construction and operation of a similarly configured large-scale PCCCS facility.

gas separation↗

Environmental, Health and Safety Assessment Application of a Heat Integrated, Post-combustion CO 2 Capture System Using Monoethanolamine and Hitachi H3-1 Solvent at the E.W. Brown Coal-Fired Power Plant

An Environmental Health and Safety (EH&S) Assessment was completed for operation of a pilot scale carbon dioxide (CO 2 ) capture system (CCS) at the Louisville Gas & Electric (LG&E) and Kentucky Utilities (KU) Energy, LLC (LG&E-KU) E. W. Brown Generating Station in Harrodsburg, Mercer County, Kentucky. The pilot system was evaluated using two CO 2 capture solvents, monoethanolamine (MEA) and Hitachi’s H3-1 solvent. The purpose of the EH&S Assessment was to determine if there were any unacceptable environmental, health or safety concerns that may prevent operation or environmental permitting of a larger scale pilot scale plant. The assessment included review of process flow diagrams, input and output flow rates for primary materials, literature describing similar processes and chemicals used or created during the process, actual air emission and wastewater test data and air emission calculations. The evaluation included identification of risks related to hazardous chemicals, air emissions, wastewater discharges, solid wastes generated and employee hazards. Most potential EH&S issues that were identified are commonly found and successfully managed at large industrial facilities. No risks were identified that could not be successfully managed or would likely prevent implementation or environmental permitting of the pilot or larger scale plant. Potential exposures and resulting health risks from exposure to low concentrations of nitrosamines generated from degradation of the Hitachi H3-1 and possibly MEA solvents may be a health concern for site workers, but additional investigation is needed to accurately assess this risk. Applying the information gained from operating the pilot plant, performing air emission testing and used solvent testing to a large-scale facility at a commercial coal-fired electric generating plant suggests additional air emission control measures may be necessary to reduce potential site worker health risks and possibly community risks. Depending upon the location and regional air quality, considerable effort may be required to obtain the necessary air permit for construction and operation of a similarly configured large-scale PCCCS facility.

gas separation↗

Hydropower Capital and O&M Costs: An Exploration of the FERC Form 1 Data

This report explores the potential for using responses from the Federal Energy Regulatory Commission’s (FERC’s) “Electric Utility Annual Report,” also known as FERC Form 1, as a cost database for conventional and pumped storage hydropower (PSH). The report outlines the process used to compile an easy-to-access database from the original FERC Form 1 data and discusses the historical cost/performance data. The steps for developing the database include downloading the annual FoxPro files from the FERC website (FERC, 2020), reading them into an Excel format, and reconciling naming issues across years, repeated entries, and shared assets, among others. The cleaned and compiled Form 1 database is available on Oak Ridge National Laboratory’s (ORNL’s) HydroSource website. For this report, the compiled Form 1 database was linked to two other hydropower databases, the National Inventory of Dams and the ORNL Existing Hydropower Assets, that provide additional information on the characteristics and other features of plants in the Form 1 data. Explorations of the plant characteristics, performance, capital costs, and operation and maintenance (O&M) cost data in the combined database were presented separately for conventional hydropower and PSH projects. Form 1 has several advantages as a hydropower cost database. First, the cost data is reported directly by plant owners. Second, Form 1 provides cost breakdowns of capital and operating costs for large conventional and PSH plants enabling more detailed tracking of hydropower costs compared with typical total cost estimates. Third, although the Form 1 data is not reported by all operational hydropower plants in the United States, the available data represents a wide range of plant characteristics and a sizable proportion of the hydropower fleet (61% of PSH plants and 22% of conventional hydropower plants by capacity). The lower proportion of the conventional hydropower fleet is because Form 1 reporting requirements apply only to private utilities that meet given size thresholds, leaving out federally owned facilities and many smaller hydropower plants. Overall, the Form 1 cost database represents a unique, publicly available database on hydropower asset capital and O&M costs. This report leads to a compiled database for the reporting years 1994 to 2020 that helps resolve issues with accessibility and use of the FERC Form 1 data by hydropower plant owners, project developers, technology developers, and regulators.

13 HYDRO ENERGY↗

Dynamic probabilistic risk assessment and game theory for cyber security risk analysis in nuclear power plants

Nuclear Power Plants and energy systems have become more prone to cyber-attacks with their digitalization and the increased use of smart equipment. Hence, it is important to quantify the risk associated with cyber-attacks in such systems. Dynamic Probabilistic Risk Assessment which involves studying the evolution of a system due to random events and operator and attacker actions during a cyber-attack by employing a physics-based model of the system is a suitable framework to quantify cybersecurity risk in nuclear power plants. In addition to the plant dynamics, it is also important to model the strategies of the attackers and plant operators for an effective cybersecurity risk assessment. Game theory provides a set of necessary tools to model such strategic interactions. In this research, a framework that integrates dynamic probabilistic risk assessment with game theory for cybersecurity risk analysis in nuclear power plants is presented. The mathematical formulation is derived based on the theory of continuous event trees. We propose a game theory based action model, that utilizes physics-based rewards to define the strategies of attackers and operators at every decision epoch. As a case study, the risk associated with cyber-attacks on the digital components in the secondary side of a pressurized water reactor is studied using a reduced order model. A set of attacker actions and a set of operator actions are defined for the system. The operator and attacker interactions were modelled using simultaneous game, their action policies were computed using the concept of mixed strategy Nash equilibrium and the evolution of the system was studied.

97 MATHEMATICS AND COMPUTING↗

Assessing the Impact of the Inflation Reduction Act on Nuclear Plant Power Uprate and Hydrogen Cogeneration

On August 16, 2022, Congress passed the Inflation Reduction Act (IRA) to promote investment in new, carbon-free power generation and sustainable operation of existing carbon-free assets. Specifically, the IRA includes both a production tax credit (PTC – Section 45Y of the IRA) and an investment tax credit (ITC – Section 48E) which utilities may leverage to offset the costs of power uprate. Further, the IRA includes a provision (Section 45V) for a PTC associated with carbon-free hydrogen cogeneration. These tax credits, along with recent legislation efforts to decarbonize the country, have re-emphasized the importance of maintaining and optimizing the existing nuclear plant operating fleet. As a result, utilities are reexamining the possibility of uprating their existing nuclear assets to further maximize carbon-free electricity generation.

08 HYDROGEN↗

Masking of photovoltaic system performance problems by inverter clipping and other design and operational practices

We describe how performance problems can be “masked,” or not readily evident by several causes: by photovoltaic (PV) system configuration (such as the size of the PV array capacity relative to the size of the inverter and the resultant clipped operating mode); by instrumentation design, installation, and maintenance (such as a misaligned or dirty pyranometer); by contract clauses (when operational availability is transformed to contractual availability, which excludes many factors); and by identified management and operational practices (such as reporting on a portfolio of plants rather than individually). A simple method based on a duration curve is introduced to overcome shortcomings of Performance Ratio based on nameplate capacity and Performance Index based on hourly simulation when quantifying masking effects, and inverter clipping and pyranometer soiling are presented as two examples of the new method. With a better understanding of the non-transparency of masking issues, stakeholders can better interpret performance data and deliver improved AC and DC plant conditions through PV system operation and maintenance (O&M) for improved performance, reduced O&M costs, and a more consistently delivered, and reduced, levelized cost of energy (LCOE).

14 SOLAR ENERGY↗

Energy Infrastructure Futures: A Multiscale Evaluation of Projected Power Plant Siting Across the Western Interconnection

The US Western Interconnection is facing unprecedented challenges in the form of less predictable peak demand, increasingly diverse generating resources, and fast-growing loads due to the onset of artificial intelligence, hyperscale computing, and electrification. Projecting where future generation may be developed is critical to maintaining a robust and resilient electric grid under this mounting uncertainty and variability. Using an integrated multisectoral, multiscale modeling framework that links a human-Earth systems model, an hourly load model, a geospatial power plant siting model, and an hourly grid operations model, we evaluate the power plant landscape evolution under eight alternative futures between 2020 and 2055. These futures represent a wide but plausible range of atmospheric conditions, emissions constraints, and economic, technological, and population growth assumptions. We find that local-level development can vary substantially both by generation type and capacity buildout across these futures. Specific regions of the Western Interconnection are projected to see large amounts of capacity development regardless of the future scenario. We additionally determine that projected power plant locations are more heavily influenced by the cost to interconnect to the electric grid than the locational energy value.

Mongird, Kendall↗

Probing Particle Impingement in Boilers Using High-Performance Computing with Parallel CPUs and GPUs

The major goals of the project are to calculate and analyze particle impingement within boilers, quantify effects of particulates in boilers, and predict damage rates of boilers under different cycling modes. Collectively, these initiatives develop insight into existing coal plant challenges using advanced modeling tools, particularly those leveraging high-performance computing resources. High-performance CFD computing forms a central theme in this project that will employ a high degree of coordination and communication between these initiatives to realize a final, rigorously sound, and validated computational capability upon completion. These results will create a holistic, comprehensive, systems-level assessment of damage rates under different cycling modes. Together, these objectives will develop critical insight into damage mechanisms in existing coal plant challenges for accurately and efficiently assessing operating performance in fossil energy power plants.

20 FOSSIL-FUELED POWER PLANTS↗

Expert System Control of Plant Growth in an Enclosed Space

The Expert System is an enclosed, controlled environment for growing plants, which incorporates a computerized, knowledge-based software program that is designed to capture the knowledge, experience, and problem-solving skills of one or more human experts in a particular discipline. The Expert System is trained to analyze crop/plant status, to monitor the condition of the plants and the environment, and to adjust operational parameters to optimize the plant-growth process. This system is intended to provide a way to remotely control plant growth with little or no human intervention. More specifically, the term control implies an autonomous method for detecting plant states such as health (biomass) or stress and then for recommending and implementing cultivation and/or remediation to optimize plant growth and to minimize consumption of energy and nutrients. Because of difficulties associated with delivering energy and nutrients remotely, a key feature of this Expert System is its ability to minimize this effort and to achieve optimum growth while taking into account the diverse range of environmental considerations that exist in an enclosed environment. The plant-growth environment for the Expert System could be made from a variety of structures, including a greenhouse, an underground cavern, or another enclosed chamber. Imaging equipment positioned within or around the chamber provides spatially distributed crop/plant-growth information. Sensors mounted in the chamber provide data and information pertaining to environmental conditions that could affect plant development. Lamps in the growth environment structure supply illumination, and other additional equipment in the chamber supplies essential nutrients and chemicals.

May, George↗

Impacts of LEU+ and ATF on Fresh Fuel Storage Criticality Safety

The use of increased fuel enrichment, which is still in the realm of low-enriched uranium (LEU) fuel, has been of interest to commercial light water reactor operators as part of the next iteration in fuel cycle technological advances and research and development. Using increased enrichment fuel, or high-assay LEU (HALEU), in power plants has clear benefits for being able to load cores with additional power-producing fuel. Although HALEU enrichments can range up to 20%, the more guarded approach of investigating enrichments above current fuels within 10% enrichment is referred to as LEU plus (LEU+) to reflect the less drastic change in operating conditions and requirements and similarity to current fuel cycles. Of additional interest and increasing maturity is the incorporation of accident-tolerant fuel (ATF) concepts, which are also applicable to the current fleet. This class of technologies involves changes such as cladding (e.g., chromium coating or FeCrAl) and fuel composition (e.g., chromia dopant) alterations to demonstrate improved fuel performance under accident scenarios. The ability to properly store fuel before and after residence time in the reactor is crucial to plant operation. Typically, this is done in either a new fuel vault (NFV) or spent fuel pool (SFP). Storing, loading, and unloading dozens of fuel assemblies within the same general area provides opportunities for obvious criticality concerns. These concerns are addressed with regulations to the subcriticality margin that the NFV and SFP must maintain in certain conditions. Adopting LEU+ fuel results in inherent reactivity increases, which are extremely relevant for safe fuel storage. Therefore, a clear understanding of the effects of LEU+ fuel and ATF on criticality safety margins to regulatory limits is required, as well as an understanding of the degree of absorber crediting under normal and accident conditions.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Digital Twin Framework for the Resilient Remote Monitoring and Operation of Nuclear Microreactors

The nuclear industry is developing new advanced reactor technologies, and many companies are conceptualizing designs for microreactors, a class of nuclear reactor with a sub-20 MWth power output designed to be factory fabricated, easily transportable, and simple to control. Microreactors offer promising solutions to several use cases for which large-scale plants would not be suitable, and conventional power generation means, notably diesel electric generators, are expensive and logistically difficult. Many of the potential use cases are in isolated locations such as arctic communities, remote mines, and military installations. Therefore, the cost of microreactor deployment and traditional onsite operations pose a challenge that requires new technical solutions to address. One solution that has the potential to greatly improve economics is to operate and monitor microreactors remotely from a centralized location. Remote monitoring and operation are novel concepts to the nuclear industry and will greatly alter the tasks and responsibilities associated with current commercial nuclear power plant operators. As such, it is important to perform research on potential technological solutions and the impacts those solutions have on operations with end-goal of defining a safe and effective remote concept of operations. This paper proposes a framework for resilient remote operation of microreactors enabled by a novel digital twin implementation.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Design of high performance multivariable control systems for supermaneuverable aircraft at high angle of attack

The main motivation for the work under the present grant was to use nonlinear feedback linearization methods to further enhance performance capabilities of the aircraft, and robustify its response throughout its operating envelope. The idea was to use these methods in lieu of standard Taylor series linearization, in order to obtain a well behaved linearized plant, in its entire operational regime. Thus, feedback linearization was going to constitute an 'inner loop', which would then define a 'design plant model' to be compensated for robustness and guaranteed performance in an 'outer loop' application of modern linear control methods. The motivation for this was twofold; first, earlier work had shown that by appropriately conditioning the plant through conventional, simple feedback in an 'inner loop', the resulting overall compensated plant design enjoyed considerable enhancement of performance robustness in the presence of parametric uncertainty. Second, the nonlinear techniques did not have any proven robustness properties in the presence of unstructured uncertainty; a definition of robustness (and performance) is very difficult to achieve outside the frequency domain; to date, none is available for the purposes of control system design. Thus, by proper design of the outer loop, such properties could still be 'injected' in the overall system.

Valavani, Lena↗