Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “phase engineering”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 865 records · Page 48

Design, fabrication, test, qualification and price analysis for third generation design solar cell modules

An updated program plan is presented showing the task descriptions depicting the work, progress, achievements, and the cause of any deviations from the original plan (SC-1), and how this impacted on the original schedule of the program. In addition there is an update documenting all design alterations made during the pre-production phase and a complete up to date set of engineering and manufacturing documentation (CM-1). The purpose of the work in the original plan was to explore, design, develop, test, and deliver 1000 watts of prototype flat plate, photovoltaic modules appropriate for use in applications in the 20 to 500 kilowatt range and which show potential for meeting the 1986 cost goals.

Source record↗

The quiet short-haul research aircraft

The design concepts, performance capabilities, and projected applications of the Quiet Short-Haul Research Aircraft (QSRA) are discussed. The propulsive lift system of the QSRA provides the lift required for short field operations at low community noise levels. This system consists of four high bipass ratio, geared turbofan engines mounted so that the engine exhaust flows across the upper surface of the wing (upper surface blowing). Large specially shaped flaps behind each engine control the direction of the flow for each phase of flight. A 95 passenger short haul transport based on this technology could operate out of a 2500 foot runway with a combined takeoff and landing 90 EPNdB footprint area of 2.7 sq mi.

Cochrane, J. A.↗

NASA-Ames Summer High School Apprenticeship Research Program (SHARP)

The function of SHARP is to recognize high school juniors who have demonstrated unusually high promise for sucess in mathemtics and science. Twenty academically talented students who will be seniors in high school in September were chosen to participate in SHARP 83. Mentors were selected to provide students with first-hand experiences in a research and development environment in order that each student might try out his or her tentative professional career choice. Some special features of SHARP included field trips to private industries doing similar and related research, special lectures on topics of research here at ARC, individual and group counseling sessions, written research papers and oral reports, and primarily the opportunity to be exposed to the present frontiers in space exploration and research. The long-range goal of SHARP is to contribute to the future recruitment of needed scientists and engineers. This final report is summary of all the phases of the planning and implemenation of the 1983 Summer High School Apprenticeship Research Program (SHARP).

Powell, P.↗

NSI directed to continue SPAN's functions

During a series of network management retreats in June and July 1990, representatives from NASA Headquarters Codes O and S agreed on networking roles and responsibilities for their respective organizations. The representatives decided that NASA Science Internet (NSI) will assume management of both the Space Physics Analysis Network (SPAN) and the NASA Science Network (NSN). SPAN is now known as the NSI/DECnet, and NSN is now known as the NSI/IP. Some management functions will be distributed between Ames Research Center (ARC) and Goddard Space Flight Center (GSFC). NSI at ARC has the lead role for requirements generation and networking engineering. Advanced Applications and the Network Information Center is being developed at GSFC. GSFC will lead the NSI User Services, but NSI at Ames will continue to provide the User Services during the transition. The transition will be made as transparent as possible for the users. DECnet service will continue, but is now directly managed by NSI at Ames. NSI will continue to work closely with routing center managers at other NASA centers, and has formed a transition team to address the change in management. An NSI/DECnet working group had also been formed as a separate engineering group within NSI to plan the transition to Phase 5, DECnet's approach to Open System Integration (OSI). Transition is not expected for a year or more due to delays in produce releases. Plans to upgrade speeds in tail circuits and the backbone are underway. The proposed baseline service for new connections is up to 56 Kbps; 9.6 Kbps lines will gradually be upgraded as requirements dictate. NSI is in the process of consolidating protocol traffic, tail circuits, and the backbone. Currently NSI's backbone is fractional T1; NSI will go to full T1 service as soon as it is feasible.

Rounds, Fred↗

Advanced Launch Development Program status

The Advanced Launch System is a joint NASA - Air Force program originally directed to define the concept for a modular family of launch vehicles, to continue development programs and preliminary design activities focused primarily on low cost to orbit, and to offer maturing technologies to existing systems. The program was restructed in the spring of 1990 as a result of funding reductions and renamed the Advanced Launch Development Program. This paper addresses the program's status following that restructuring and as NASA and the Air Force commence a period of deliberation over future space launch needs and the budgetary resources available to meet those needs. The program is currently poised to protect a full-scale development decision in the mid-1990's through the appropriate application of program resources. These resources are concentrated upon maintaining the phase II system contractor teams, continuing the Space Transportation Engine development activity, and refocusing the Advanced Development Program demonstrated activities.

Colgrove, Roger↗

Benefits gained and lessons learned from NASA's Small Explorer (SMEX) Program

NASA's Small Explorer Program (SMEX) is a sustained program of scientific satellites limited in mass to 200-300 kg (depending on orbital inclination) for a 500-km circular orbit. The SMEX program was undertaken to obtain the benefits of scientific yield, short development time, and high flight rate, with the goal to launch a mission every year. NASA also uses the program to train engineers and managers in designing and developing spacecraft. The phases of a SMEX mission life cycle are described including the competitive selection of missions through announcement of opportunity and evaluation of proposals, the definition of mission and system requirements, design and development of the spacecraft, testing, launch, and operations. Program content of some SMEX missions is then reviewed. The first SMEX mission was the Solar, Anomalous, and Magnetospheric Particle Explorer, which confirmed that anomalous cosmic rays are only partially ionized atoms. The Fast Auroral Snapshot Explorer was intended to measure the electric, magnetic, and time-variable fields and to record particle flow in the auroral acceleration region. A future mission is the Submillimeter Wave Astronomy Satellite to examine low-level molecular transitions.

Gilman, David↗

On the Accuracy of Probabilistic Bucking Load Prediction

The buckling strength of thin-walled stiffened or unstiffened, metallic or composite shells is of major concern in aeronautical and space applications. The difficulty to predict the behavior of axially compressed thin-walled cylindrical shells continues to worry design engineers as we enter the third millennium. Thanks to extensive research programs in the late sixties and early seventies and the contributions of many eminent scientists, it is known that buckling strength calculations are affected by the uncertainties in the definition of the parameters of the problem such as definition of loads, material properties, geometric variables, edge support conditions, and the accuracy of the engineering models and analysis tools used in the design phase. The NASA design criteria monographs from the late sixties account for these design uncertainties by the use of a lump sum safety factor. This so-called 'empirical knockdown factor gamma' usually results in overly conservative design. Recently new reliability based probabilistic design procedure for buckling critical imperfect shells have been proposed. It essentially consists of a stochastic approach which introduces an improved 'scientific knockdown factor lambda(sub a)', that is not as conservative as the traditional empirical one. In order to incorporate probabilistic methods into a High Fidelity Analysis Approach one must be able to assess the accuracy of the various steps that must be executed to complete a reliability calculation. In the present paper the effect of size of the experimental input sample on the predicted value of the scientific knockdown factor lambda(sub a) calculated by the First-Order, Second-Moment Method is investigated.

Arbocz, Johann↗

The Test and Evaluation of Non-Chromate Finishing Agent

Clark Atlanta University (CAU) has engaged a team comprised of university faculty members, student research assistants, and consultants from industrial and technology firms in order to ensure that NASA receives a quality product on time and within budget. In addition to the current related expertise which CAU possess, we have enlisted materials and aid from several other agencies, and machine manufacturers to assist us in completing the project on time and according to plan and budget. The research team is employing sound engineering principles in its approach to this project. Each phase of the project is preceded by a thorough and complete planning session that details the work plan and provide a comprehensive review of the work to be accomplished during the particular phase and by whom. Maximum use is being made of existing or already planned capabilities to ensure maximum economy, and frequent online reviews are being held to measure progress and to identify a potential problem in sufficient time to allow for corrective action.

Okhio, Cyril↗

Ascent, Stage Separation and Glideback Performance of a Partially Reusable Small Launch Vehicle

An integrated analysis is presented for ascent, stage separation and glide back performance of a small, partially reusable launch vehicle sized for a payload of about 330 lbs to a 150 nm polar orbit. The altitude margin was used a performance metric for the glideback performance. Aerodynamic databases for each of these three phases of flight were developed using a combination of engineering level code, free stream and proximity wind tunnel test data and Euler CFD results. The ascent and glideback trajectories were generated using POST and the stage separation simulation was done using the in-house software Sep-Sim as a front end to the commercially available multi-body dynamic simulation code ADAMS. The payload to the designated polar orbit was optimized subject to the constraints imposed by stage separation and adequate performance reserve for the glideback booster in addition to the usual ascent trajectory constraints.

Pamadi, Bandu N.↗

Modeling uncertainty in requirements engineering decision support

One inherent characteristic of requrements engineering is a lack of certainty during this early phase of a project. Nevertheless, decisions about requirements must be made in spite of this uncertainty. Here we describe the context in which we are exploring this, and some initial work to support elicitation of uncertain requirements, and to deal with the combination of such information from multiple stakeholders.

risk analysis↗

Space Operations for a New Era of Exploration Launch Vehicles

Since 2005, Ares has made substantial progress on designing, developing, and testing the Ares I crew launch vehicle and has continued its in-depth studies of the Ares V cargo launch vehicles. The combined Ares I/Ares V architecture was designed to reduce the complexity and labor intensity of ground operations for America s next journeys beyond low-Earth orbit (LEO). The Ares Projects goal is to instill operability as part of the vehicles requirements development, design, and operations. Since completing the Preliminary Design Review in 2008, work has continued to push the Ares I beyond the concept phase and into full vehicle development, while tackling fresh engineering challenges and performing pathfinding activities related to vehicle manufacturing and ground operations.

Davis, Daniel J.↗

Calcium-Magnesium-Aluminosilicate (CMAS) Reactions and Degradation Mechanisms of Advanced Environmental Barrier Coatings

The thermochemical reactions between calcium-magnesium-aluminosilicate- (CMAS-) based road sand and several advanced turbine engine environmental barrier coating (EBC) materials were studied. The phase stability, reaction kinetics and degradation mechanisms of rare earth (RE)-silicates Yb2SiO5, Y2Si2O7, and RE-oxide doped HfO2 and ZrO2 under the CMAS infiltration condition at 1500 C were investigated, and the microstructure and phase characteristics of CMAS-EBC specimens were examined using Scanning Electron Microscopy (SEM) and X-ray Diffraction (XRD). Experimental results showed that the CMAS dissolved RE-silicates to form crystalline, highly non-stoichiometric apatite phases, and in particular attacking the silicate grain boundaries. Cross-section images show that the CMAS reacted with specimens and deeply penetrated into the EBC grain boundaries and formed extensive low-melting eutectic phases, causing grain boundary recession with increasing testing time in the silicate materials. The preliminary results also showed that CMAS reactions also formed low melting grain boundary phases in the higher concentration RE-oxide doped HfO2 systems. The effect of the test temperature on CMAS reactions of the EBC materials will also be discussed. The faster diffusion exhibited by apatite and RE-doped oxide phases and the formation of extensive grain boundary low-melting phases may limit the CMAS resistance of some of the environmental barrier coatings at high temperatures.

Ahlborg, Nadia L.↗

A Scenario-Based Process for Requirements Development: Application to Mission Operations Systems

The notion of using operational scenarios as part of requirements development during mission formulation (Phases A & B) is widely accepted as good system engineering practice. In the context of developing a Mission Operations System (MOS), there are numerous practical challenges to translating that notion into the cost-effective development of a useful set of requirements. These challenges can include such issues as a lack of Project-level focus on operations issues, insufficient or improper flowdown of requirements, flowdown of immature or poor-quality requirements from Project level, and MOS resource constraints (personnel expertise and/or dollars). System engineering theory must be translated into a practice that provides enough structure and standards to serve as guidance, but that retains sufficient flexibility to be tailored to the needs and constraints of a particular MOS or Project. We describe a detailed, scenario-based process for requirements development. Identifying a set of attributes for high quality requirements, we show how the portions of the process address many of those attributes. We also find that the basic process steps are robust, and can be effective even in challenging Project environments.

MOS↗

Game Changing Development Program - Next Generation Life Support Project: Oxygen Recovery From Carbon Dioxide Using Ion Exchange Membrane Electrolysis Technology

This report summarizes the Phase I research and development work performed during the March 13, 2015 to July 13, 2016 period. The proposal for this work was submitted in response to NASA Research Announcement NNH14ZOA001N, "Space Technology Research, Development, Demonstration, and Infusion 2014 (SpaceTech-REDDI-2014)," Appendix 14GCD-C2 "Game Changing Development Program, Advanced Oxygen Recovery for Spacecraft Life Support Systems Appendix" The Task Agreement for this Phase I work is Document Control Number: GCDP-02-TA-15015. The objective of the Phase I project was to demonstrate in laboratories two Engineering Development Units (EDU) that perform critical functions of the low temperature carbon dioxide electrolysis and the catalytic conversion of carbon monoxide into carbon and carbon dioxide. The low temperature carbon dioxide electrolysis EDU was built by the University of Delaware with Dr. Feng Jiao as the principal investigator in charge of this EDU development (under NASA Contract NNC15CA04C). The carbon monoxide catalytic conversion EDU was built by the NASA Glenn Research Center with Kenneth Burke as the principal investigator and overall project leader for the development of both EDUs. Both EDUs were successfully developed and demonstrated the critical functions for each process. The carbon dioxide electrolysis EDU was delivered to the NASA Johnson Space Center and the carbon monoxide catalytic conversion EDU was delivered to the NASA Marshall Spaceflight Center.

Oxygen Recovery↗

Comparisons of Mixed-Phase Icing Cloud Simulations with Experiments Conducted at the NASA Propulsion Systems Laboratory

This paper builds on previous work that compares numerical simulations of mixed-phase icing clouds with experimental data. The model couples the thermal interaction between ice particles and water droplets of the icing cloud with the flowing air of an icing wind tunnel for simulation of NASA Glenn Research Centers (GRC) Propulsion Systems Laboratory (PSL). Measurements were taken during the Fundamentals of Ice Crystal Icing Physics Tests at the PSL tunnel in March 2016. The tests simulated ice-crystal and mixed-phase icing that relate to ice accretions within turbofan engines.

Bartkus, Tadas↗

Psyche Early Project Verification & Validation Planning Development

The Psyche mission to the asteroid (16) Psyche was selected as the fourteenth mission in the Discovery program in January 2017. The Psyche mission will determine if (16) Psyche is the core of a larger differentiated body. As part of the development of this mission a Verification and Validation (V&V) engineer was assigned early in the project’s design Phase B. This paper will discuss some of the strategies that the Psyche team is using to take full advantage of the early planning for V&V on flight projects and specifically how the Psyche mission is approaching these tasks. This paper will discuss the effects of having a V&V mindset on: 1) The Psyche requirements development process, and how focusing not only on how the team will verify these requirements but also on developing the tools necessary to track and monitor that verification feeds back into the requirement development process. 2) The Psyche testbed development, and how using a verification mindset is useful for identifying holes in the testbed development process, including the required testbed speed and how to think about testbed certification early in the process while encouraging trades and developing relationships with the testbed team. 3) Developing new V&V Tools for Psyche, and how developing tools early in the project development process means that they can influence the development of other requirement and scheduling tools. 4) Verification Activity Planning, which is typically done to a preliminary level during Phase B of the project, and is important for understanding the major testing that is needed to ensure that the system as built represents the design. On Psyche we are not only focused on bringing this planning to a preliminary level, we are also developing a V&V focused schedule to help us de-conflict V&V activities that may require similar resources early on in the program’s development. 5) Validation Planning, for which we are working with the testbed and model development teams to ensure that their models can be effectively validated and that the plans to do so are in place. In this paper we will describe how the Psyche mission is approaching each of these V&V areas and identify lessons that can be taken by other space missions trying to decide how much effort should be put into V&V early in the project lifecycle.

Solish, Benjamin↗

2024 Nasa Lunabotics University Competition: Site Preparation With Bulk Regolith

Lunabotics provides accredited in-stitutions of higher learning students (vocational-technical, college, university) an opportunity to apply the NASA systems engineering process to design and build a prototype robot. This robot would be capable of performing the proposed operations on the Lunar sur-face in support of future Artemis mission goals. Lunabotics features a systems engineering design challenge to engage students in the next phase of hu-man space exploration supporting the Artemis missions. This two-semester event encourages students to design and build an autonomous or telerobotic robot designed to traverse the simulated Lunar surface and complete the assigned construction tasks. The number of teams accepted into this challenge is not predetermined but is based on the scores and overall quality of the Project Management Plans received and other factors.

Lunabotics↗