Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “operating costs”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 865 records · Page 48

Non-Fouling, Low Cost Electrolytic Coagulation & Disinfection for Treating Flowback and Produced Water for Reuse

Executive Summary This Final Report is composed of two major sections. The first section presents experimental results obtained in the laboratory during Budget Period 1. The second section presents results from the field test conducted during Budget Period 2. Laboratory Results This research investigated a novel electrochemical process for producing a ferric iron coagulant for use in treating flowback and produced water from hydraulic fracturing and oil production operations. The treatment system improves the effectiveness and lowers the cost of coagulation processes using Fe3+ as the coagulant. The electrolytic coagulant generation (ECG) system uses an electrochemical cell to produce acid and base from oilfield brine solutions. The acid is used to dissolve scrap iron to provide a Fe3+ coagulating agent. The base is used to neutralize the treated water. Compared to conventional electrocoagulation (EC), the main advantage of the ECG system is an order of magnitude lower cost for the source of iron. The second advantage over conventional EC is that it can deliver Fe3+ doses greater than 1 mM, since it is not limited by the amount of dissolved oxygen in the water required to oxidize ferrous to ferric iron. The capital costs for conventional EC and the ECG system are similar, but the operational costs for the ECG system are an order of magnitude lower than conventional EC. The combined costs for iron and electrical energy for treating 1 m3 of FPW with 1 mM Fe3+ is estimated to be $0.87 for conventional EC, and $0.087 for the ECG system. The estimated all-in cost for treating FPW with a 2 mM Fe3+ dose is $0.73/m3 ($0.12/bbl). Field Test Results The field test was conducted at the Paul Foster Central Tank Battery (CTB) in Lea County, New Mexico from November 10, 2022 through December 15, 2022. The feed water to the system was produced water from the Tatanka 1H formation. After approximately two weeks of testing, the initial batch of produced water had been treated and no untreated produced water was available. Thus, after this time, the feed water to the system consisted of previously treated water (i.e., recycled water). The recycled water had nearly all colloidal particles removed, and had a much lower alkalinity due to precipitation of carbonate minerals during the first pass through the system. Although the recycled water was not an ideal test solution due to its low particulate concentrations, its lower alkalinity did allow us to identify the main problem with the treatment system. The main problem with the treatment system was caused by the high alkalinity of the initial feed water (5.4 meq/L) that consumed a significant fraction of the electrochemically generated acid. This resulted in pH values exiting the iron contact tank that were too high to dissolve enough iron to effectively treat the produced water. Tests performed with recycled water with lower alkalinity did not have this issue, and dissolved iron concentrations greater than 20 mM could be achieved. One consistent observation was that effluent water from the iron contact tank was always free of particulates, even when fed with circumneutral solutions. This suggests that there is no need to dissolve high concentrations of iron if all the water to be treated is passed through the scrap iron canister. In this case, dissolved O2 and hypochlorous acid can promote sufficient iron corrosion to provide an effective coagulating agent – even in neutral pH water. This solves the problem resulting from highly alkaline produced water. Modifications to the design of the treatment system were made based on the field test results. These modifications will add minimal additional cost, and were tested in bench-scale laboratory experiments. In short-term testing, the modified treatment process was able to remove colloidal FeS particulates to levels below detection. Long-term, steady state testing will be required to determine whether the modified process is suitable for commercial treatment systems.

54 ENVIRONMENTAL SCIENCES↗

Membrane Adsorbents Comprising Self-Assembled Inorganic Nanocages (SINCs) for Super-fast Direct Air Capture Enabled by Passive Cooling

The objectives of the proposed project were to develop highly porous membrane adsorbents comprising CO 2 -philic polymers and self-assembled inorganic nanocages (SINCs) for rapid temperature swing adsorption using electricity-free solar heating and radiative cooling, enabling an economically viable approach for direct air capture (DAC). Our core technical activities combine three key innovations. (1) Highly porous flat-sheet membrane adsorbents contain CO 2 -philic amines that can be easily produced using a phase inversion method. (2) CO 2 -philic SINCs can be easily dispersed in the polymers with great stability (compared with the metal-organic frameworks or MOFs). (3) The adsorption and desorption are integrated with solar heating and radiative cooling for rapid continuous operation, in contrast to traditional long-cycle separate operation. The membrane adsorbents containing amines, polymers, and SINCs were produced using a one-step industrial process. The porous membranes coupled with porous SINCs offer low resistance for gas flow and fast CO 2 sorption/desorption cycles, while the incorporation of the additional amine groups provides high CO 2 sorption capacity. The key achievements are summarized below. (1) Membrane adsorbents with high PEI loading (>40%), high porosity of >80%, and low gasflow resistance were prepared in one step using commercially available, low-cost materials. (2) Membrane adsorbents based on Solupor and PEI show CO 2 sorption capacity of >1.5 mmol/g using air containing 400 ppm at a relative humidity of 15%. (3) Effect of the adsorbent compositions (such as PEI type, PEI content, SINC content, porosity) on the CO 2 sorption was systematically investigated. (4) Effect of the processing conditions (such as CO 2 content, temperature, and relative humidity) on the CO 2 sorption was systematically investigated; (5) The stability of the membrane adsorption against many cycles of sorption and desorption was studied. The higher molecular weight of PEI (PEI25k) shows better stability than PEI800. (6) Advanced materials with radiative cooling were developed, which can decrease the temperature by 5-7 °C compared to the ambient temperature. (7) Preliminary techno-economic analysis shows that our process may achieve a capture cost of $1,343/tonne CO 2 with a total OPEX cost of $1,112/tonne CO 2 . The adsorbent replacement cost accounted for 52% of the total OPEX cost. Membrane adsorbents with lower costs and longer operation life can significantly decrease the cost. The proposed project directly addresses the requirement of DE-FOA-0002188, i.e., novel materials with CO 2 adsorption capacity for direct air capture with integrated solar heating and radiative cooling to reduce the cost of the DAC. Our future work will focus on the development of low-cost adsorbents that can be stable at the sorption and desorption conditions for long term.

14 SOLAR ENERGY↗

Predictive Analytics for Hydropower Fleet Intelligence

A primary challenge in hydropower industry is the ability to maintain cost-competitiveness, reliability, and security of hydropower assets through evolving power system contexts and aging of the fleet. Maintaining cost-effective and reliable operations under these conditions is expected to require new modernization and maintenance paradigms for changing contexts. Changes in existing practices for O&M will require an understanding of the current state and health of hydropower assets, and the impact of changing paradigms on asset health and reliability. The Hydropower Fleet Intelligence project is developing and evaluating standardized methodologies and analysis tools for data-driven asset reliability and management technologies for hydropower, leading to eventual predictive maintenance planning, repair/replacement decision making, and asset-reliability and cost-optimized operations. A key question is the feasibility of using existing data sets at hydropower facilities to perform assessments of asset reliability. This document uses data from hydropower facilities to assess the potential for using available analytics methods for asset reliability estimates. In addition to reliability assessments, the feasibility of using existing analytics techniques for several other potential applications is discussed. Finally, a case study that a data-driven model is trained to learn nominal operations via vibration data from an asset of a certain plant, and then utilized to identify anomalies on a similar asset from a different plant, highlighting the generic use of proposed Prognostics and Health Management (PHM) approaches.

Yucesan, Yigit↗

Chapter 14 - Reliability of Wind Turbines

The global wind energy industry has grown at a fast pace during the past half-decade. Advancements from design and manufacturing to operation and maintenance have led to reduced capital and maintenance costs, which make wind power an indispensable source for a comprehensive solution to global electricity needs. Once wind turbines are installed, the opportunity to lower wind power costs is mainly through improved operation and maintenance practices. Modern wind turbines are equipped with tens or hundreds of measurement channels and are generating an abundance of data, with lot of efforts being put into data analysis by both the research community and the industry. One type of analysis is through the exploration of reliability engineering methods based on readily available data or maintenance records collected at typical wind power plants. If adopted and conducted appropriately, these analyses can quickly save operation and maintenance costs in a potentially impactful manner. The wind industry has adopted this discipline more broadly in recent years. This chapter discusses wind turbine reliability by highlighting the methodology of reliability engineering life data analysis. It first briefly discusses the fundamentals of wind turbine reliability and the current industry status. Then, the reliability engineering method for life analysis, including data collection, model development, and forecasting, is presented in detail and illustrated through two case studies. The chapter concludes with some remarks on potential opportunities to improve wind turbine reliability. An owner and operator's perspective is taken and mechanical components are used to exemplify the potential benefits of reliability engineering analysis to improve wind turbine reliability and availability.

database↗

Site demonstration and performance evaluation of MPC for a large chiller plant with TES for renewable energy integration and grid decarbonization

Thermal energy storage (TES) for a cooling plant is a crucial resource for load flexibility. Traditionally, simple, heuristic control approaches, such as the storage priority control which charges TES during the nighttime and discharges during the daytime, have been widely used in practice, and shown reasonable performance in the past benefiting both the grid and the end-users such as buildings and district energy systems. However, the increasing penetration of renewables changes the situation, exposing the grid to a growing duck curve, which encourages the consumption of more energy in the daytime, and volatile renewable generation which requires dynamic planning. The growing pressure of diminishing greenhouse gas emissions also increases the complexity of cooling TES plant operations as different control strategies may apply to optimize operations for energy cost or carbon emissions. This paper presents a model predictive control (MPC), site demonstration and evaluation results of optimal operation of a chiller plant, TES and behind-meter photovoltaics for a campus-level district cooling system. The MPC was formulated as a mixed-integer linear program for better numerical and control properties. Compared with baseline rule-based controls, the MPC results show reductions of the excess PV power by around 25%, of the greenhouse gas emission by 10%, and of peak electricity demand by 10%.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

FECM/NETL CO 2 Transport Cost Model (2024): Description and User’s Manual

This is the user's manual for the 2024 version of the FECM/NETL CO 2 Transport Cost Model (CO2_T_COM). CO2_T_COM is an Excel-based tool that estimates revenues and capital, operating, and financing costs for transporting liquid phase CO 2 by pipeline. It is assumed that the CO 2 delivered to the pipeline meets pipeline specifications for purity. Costs are estimated for a single point-to-point pipeline, which may have pumps along the pipeline to boost the pressure. The model can be accessed here: https://www.netl.doe.gov/energy-analysis/details?id=42e3c409-b88f-467f-bff0-fadb92a68676 .

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Prognosis of Wind Turbine Gearbox Bearing Failures Using SCADA and Modeled Data

Predictive maintenance and condition monitoring systems for wind turbines have seen increased adoption to minimize downtime, reducing operation and maintenance costs. On today’s wind power plants, the integrated supervisory control and data acquisition (SCADA) system provides low- frequency operational data that can be leveraged to quantify a wind turbine’s health. The aim of this study is to utilize machine-learning techniques to predict axial cracking failures in wind turbine gearbox bearings up to 1 month ahead of time. The failures are assumed to have occurred when the investigated bearing was replaced. While current SCADA systems show the overall condition of a wind turbine, often they do not allow for the investigation of specific gearbox bearings’ health. To enrich bearing fault signatures, additional data are computed through physics-based models using gearbox design information. Based on SCADA data, modeled data, and bearing failure log data from an actual wind plant, the performances of different machine-learning models on unseen data are then evaluated using industry-standard metrics such as precision, recall, and F1 score. Results show the overall system performance enhancement in predicting bearing failure when modeled data are included with SCADA data. The reduction in terms of false alarms is about 50%, and improvement in terms of precision and F1 score is about 33% and 12% respectively, based on the best modeling case in this study.

49 EE - Wind and Water Power Program - Wind (EE-4W↗

Report on the Use and Function of the Integrated Operations Capability Analysis Platform (ICAP) and the LWRS Innovation Portal (IP)

The commercial nuclear power industry has achieved excellent safety and reliability performance but is struggling to survive in an electricity market that is increasingly dominated by subsidized renewables and cheap natural gas. These challenges have forced utilities to explore previously uncharted avenues to drastically reduce the operations and maintenance costs of their plants which are the primary drivers of the total cost to produce electricity. The petrochemical industry faced similar challenges some years ago as the costs of extraction and processing were rising while their reservoirs were being depleted along with a drop-in commodity prices that resulted in unsustainable operations. In this challenging climate, they developed a business model called Integrated Operations (IO) that sought to utilize technology to enable news ways of working through the integration of people, technology, process and governance changes. The Light Water Reactor Sustainability (LWRS) program, working with IFE have developed an operating model via transferable learnings from the North Sea O&G industry. This framework is termed “Integrated Operations for Nuclear” (ION). ION is a transformation model that integrates the benefits and features of four principal factors: People, Technology, Process and Governance. The purpose of this report is to describe how to generate an ION business process analysis and utilize this information to reduce O&M costs. In order to make this job easier, DOE LWRS has created a suite of tools that will allow a person who is involved in a transformation effort at their company to build a solid documented business case for embarking on a major transformation effort. These tools, the Integrated Operations Capability Analysis Model (ICAP) and the LWRS Innovation Portal (IP) are described herein with instructions on their use. Instructions on how the interface with the EPRI Business Case Analysis Method (BCAM) are also provided.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Operating Strategies for Dispatchable PEM Electrolyzers that Enable Low-Cost Hydrogen Production

Hydrogen is a pathway to enabling decarbonization across multiple economic sectors that cannot be directly decarbonized with electricity including heat for industrial operations, medium- and heavy-duty transportation applications, long-duration energy storage, and as a feedstock for chemical synthesis. Producing hydrogen at low costs and carbon footprint is likely essential to economically decarbonize these otherwise "hard to decarbonize" sectors. Low-temperature polymer electrolyte membrane (PEM) electrolysis produces hydrogen from water and electricity and is a rapidly developing pathway towards making hydrogen at the scales required for decarbonization applications. The levelized cost of electrolytic hydrogen is dependent on the capital cost, efficiency, and durability of the electrolyzer system as well as the price of electricity supplied to the electrolyzer and the annual utilization of the electrolyzer (capacity factor). Electricity price and capacity factor depend on the source of energy that the system uses and impact other economic factors. Electricity price and capacity factor and the connections between other aspects of hydrogen production via PEM electrolyzers are the focus of this work. PEM electrolyzers have conventionally been operated at high capacity factors using electricity purchased from utilities with a constant price throughout the year. To achieve lower effective electricity prices, recent work has investigated opportunities for electrolyzers to purchase electricity in wholesale markets, where the cost of electricity varies hourly. This option can lead to lower electricity costs when the electrolyzer is a controllable load that ramps up and down rapidly and turns on and off frequently. This configuration and operating strategy capitalizes on times of low wholesale electricity prices and results in lower hydrogen levelized costs than constant operation due to reduced electricity costs even though the reduced capacity factor increases the cost of recovering the capital investment. Cycling on and off frequently also has implications for electrolyzer durability. An electrolyzer configuration where it is directly connected to renewable generation such as wind or solar, only running when the generator is producing energy, has similar implications on operating strategy, hydrogen levelized cost, capacity factor, and durability. This work provides insight into the relationships between dispatchable electrolyzer operating strategies and the cost of producing hydrogen from these systems, outlining strategies and opportunities to minimize production costs while minimizing operations that are likely to negatively impact system durability and efficiency. We find strategies that minimize electrolyzer cycling and the resulting durability impacts while increasing the hydrogen levelized cost only slightly above the minimum. We also find opportunities for batteries to minimize the number of cycles in systems directly connected to renewable generation. These findings outline key opportunities for future electrolyzer deployments and the synergistic benefits between electrolyzers and increased deployment of renewable energy generation like wind and solar. They also inform research and development that is reducing electrolyzer capital cost while managing durability impacts.

electricity markets↗

EverGREEN 2045: An Energy Mix to Decarbonize Washington State

Washington State’s future resource mix is likely to be comprised of intermittent renewables and carbon-free generation including hydropower by 2045. Generation will likely be comprised of wind, solar photovoltaic (PV), batteries, pumped storage hydropower (PSH), existing nuclear power plants, and potentially enhanced geothermal systems and advanced nuclear reactor technologies. To assess the cost and stability of the future resource mix, we partner with X-energy (advanced reactor design) and AltaRock Energy (enhanced geothermal system) for proprietary cost data. After estimating the costs of these two new technologies, we design plausible future resource mix scenarios to meet Washington State’s Clean Energy Transformation Act which transitions the state to carbon-free generation by 2045. We assess the cost and stability of the future resource mix with power system analysis tools, finding revenues are sufficient to cover variable operating and maintenance costs for most technologies providing power in 2030 and 2045, but capacity payments or power purchase agreements will likely be necessary for flexible resources, including enhanced geothermal systems and advanced nuclear reactors, to participate in the future resource mix.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Least-Cost Storage Mix for Low-Carbon Operations

As communities plan for high- or ultrahigh-renewable power systems, they face diverse options for energy storage. Each energy storage technology has a unique power capacity and discharge duration, and each community has a unique load, generation mix, and weather pattern. Determining the optimal storage portfolio across these parameters could save planners significant costs when building out high-renewable power systems.

analysis↗

Scale sensitivity of ethanol production via consolidated bioprocessing with consideration of feedstock cost

We examine feedstock cost and minimum selling price for ethanol production from corn stover as a function of scale, stover yield, participation rate, and price incentives for two conversion technologies: a conventional base case featuring thermochemical pretreatment with added cellulase, and an advanced case featuring consolidated bioprocessing with cotreatment (C-CBP). Delivered feedstock cost ranged from $\$85$ Mg −1 at small (10 million gallons year −1 or ~38 million L year −1 ) scale with high yield and participation rates to $\$124$ Mg −1 at large scale (60 million gallons year −1 or 227 million L year −1 ) and low yield and participation rates. The minimum ethanol selling price (MESP) was approximately twofold lower for the advanced case compared with the base case. The payback period was several times lower for the advanced case compared with the base case, with increasing disparity at smaller scales, and was highly sensitive to ethanol price supports. For both C-CBP and the conventional processing paradigm, MESP decreased with increasing scale, indicating that the cost penalty due to higher feedstock transport distances was more than outweighed by lower capital costs. However, the cost penalty for operation at small scale, expressed in $ gallon −1 ethanol, is lower for C-CBP than for the conventional paradigm by roughly twofold. Particularly for initial applications of C-CBP, we speculate that this cost penalty will likely be modest compared with the anticipated benefits of small-scale operation such as increased opportunity to use existing infrastructure, easier plant siting and supply chain establishment, and lower total investment required.

biorefinery scale↗

CO2 Storage Economic Analysis: CarbonSAFE Use Case

Poster on “CO2 Storage Economic Analysis: CarbonSAFE Use Case” for the CCUS 2025 conference held in Houston, Texas March 3-5, 2025. The cost of designing, permitting, constructing, operating, and closing a CO2 storage project is of vital importance to project developers. The National Energy Technology Laboratory has developed the NRAP/SMART Technoeconomic and Liability Evaluation for Storage (TALES) Model to provide quantitative cost-based insights to support developers planning CO2 injection and storage projects. This study presents a collaborative economic analysis applying TALES with data from the San Juan Basin CarbonSAFE Phase III project led by the New Mexico Institute of Mining and Technology to estimate potential costs incurred during the implementation of a real-world commercial-scale carbon storage project. Scenario analysis was implemented in which different operational and cost attributes were varied and the associated cost implications observed. Key results data and project cost summary metrics, first-year breakeven price of CO2 ($/tonne) and net present value (NPV), are presented for base and alternative cases. Output provides a unique perspective for project stakeholders towards evaluating the influence of different operational strategies and financing approaches on overall project cost and financial viability.

carbon storage↗

Optimal economic operation of liquid petroleum products pipeline systems

The majority of overland transport needs for crude petroleum and refined petroleum products are met using pipelines. Numerous studies have developed optimization methods for design of these systems in order to minimize construction costs while meeting capacity requirements. Here, we formulate problems to optimize the operations of existing single liquid commodity pipeline systems subject to physical flow and pump engineering constraints. The objectives are to maximize the economic value created for users of the system and to minimize operating costs. We present a general computational method for this class of continuous, non-convex nonlinear programs, and examine the use of pump operating settings and flow allocations as decision variables. Furthermore, the approach is applied to compute optimal operating regimes and perform engineering economic sensitivity analyses for a case study of a crude oil pipeline developed using publicly available data.

02 PETROLEUM↗

The Real Inputs Behind TCO: Duty Cycle Realism and Opportunity Costs using T3CO

NLR's Transportation Technology Total Cost of Ownership (T3CO) model provides realistic and robust analysis, capturing the impact of real world duty cycles and their variability in operating and opportunity costs. Case studies show that these contributions to costs can be significant and can alter conclusions about technology cost effectiveness.

33 ADVANCED PROPULSION SYSTEMS↗

Potential Advantages to Employing an Onsite Laboratory at FUSRAP Sites Contaminated with Radionuclides and Metals - 20353

Various factors that support an evaluation of the relative costs, advantages and disadvantages of utilizing an onsite laboratory or an offsite laboratory for remediation of Formerly Utilized Sites Remedial Action Program (FUSRAP) sites contaminated with radionuclides and metals are presented. In terms of how much more quickly an onsite laboratory provides results versus an offsite laboratory, the results of this study provide tools for calculating the amount of cost savings per day for excavation of contaminated soils for various scenarios including: - State, municipal or local property remediation where the remediation schedule becomes time-critical due to the extra cost and inconvenience to the town or municipality caused by the need for increased security and safety personnel, possible road closures and detours, and the inconvenience to the public due to modified or decreased services of State or municipal facilities; - Residential property where the remediation schedule becomes time-critical due to the inconvenience to the homeowner as well as the importance of maintaining good community relations; - Commercial property where the remediation schedule becomes time-critical due to the hardship and potential loss of revenue endured by the property owner; - Open area where treatment of excavation water is required, and - Open area where treatment of excavation water is not required. For every scenario, the number of matrices, radionuclide and metal contaminants of concern and the project duration are important factors. The costs for the onsite laboratory included the capital costs associated with setting up the lab such as trailer(s) or building(s), power and water hookup, analytical testing equipment, balances, computers, desks and bookcases; support equipment such as hot plates, filtration assemblies, safety equipment, ovens, etc.; and supplies such as glassware, pipettes, filters, etc. and ongoing costs such as labor, chemicals and reagents, standards, cost of the laboratory obtaining certification and maintenance. Offsite laboratory sample testing costs are generally very competitive and typically substantially lower than onsite laboratory costs if only the sample testing costs are considered. The great disadvantage of using an offsite laboratory is that they often cannot guarantee rapid turnaround times for results which creates project delays associated with the remediation process including delays determining the completeness of the characterization and remediation processes, delays in backfilling a property and additional costs for treating wastewater (excavation water, stormwater or both). These costs will vary greatly depending upon the area of the country in which the project is located due to the wide range of labor costs for the onsite laboratory and field workers, as well as the contaminants of interest, matrices and most importantly the size of the impacted area and the number of properties located in that area. This paper provides guidelines for calculating the cost savings that may be realized if an onsite laboratory can generate results more quickly than an offsite laboratory by estimating the costs associated with the remediation process for the various scenarios noted above such as work crew labor costs, excavator and dump truck equipment rentals, wastewater treatment costs (if applicable) and the additional costs incurred by homeowners, commercial property owners and towns/municipalities that are reimbursed by the potentially responsible parties. Key assumptions involve the typical quickest turnaround time provided by the onsite and offsite laboratories. Costs for the operation of a wastewater treatment system and the remediation of a site area or property were provided by personnel who have been involved in the operation of a large FUSRAP site in New Jersey for many years. This study provides valuable information for determining the most cost-effective approach for analysis of project samples and therefore may be used on upcoming FUSRAP projects. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Smart Planning Support for Nuclear Power Plant Work Planners

Operation and Maintenance costs of a nuclear power plant account for 60% of overall plant costs due to the nuclear industry?s risk-adverse culture (World Nuclear Association, 2020). The industry relies on highly conservative estimates to avoid risk and brute force reactions to manage the unexpected and keep a plant running safely. This approach has kept plants operating safer than any other power source available over the last six decades (Ritchie, 2020). However, these conservative methods have cost the nuclear industry in market competitiveness. The solution? Transform the conservative approaches to accurate, efficient, and still safe data-driven approaches that leverage advanced technologies available in the digital age of operation. This project endeavored to identify two key aspects to successfully incorporate historical work execution data. First, where in the work management process is that information most pertinent? Next, what variables are key to informing the best strategy for organizing the upcoming work? The Smart Planner uses data collected by dynamic work instructions to provide a basis for suggesting requirements of similar, upcoming work packages. Further, it curbs inefficiencies of the work management process by analyzing the likelihood of discovery work, offering suggestions to build a contingency package. All this taking place as the work planner builds work packages that meet the predetermined scope of work to be performed.

99 GENERAL AND MISCELLANEOUS↗