Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “load power”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 865 records · Page 48

Rapid Evaluation and Response to Impacts on Critical End-Use Loads Following Natural Hazard-Driven Power Outages: A Modular and Responsive Geospatial Technology

The disparate nature of data for electric power utilities complicates the emergency recovery and response process. The reduced efficiency of response to natural hazards and disasters can extend the time that electrical service is not available for critical end-use loads, and in extreme events, leave the public without power for extended periods. This article presents a methodology for the development of a semantic data model for power systems and the integration of electrical grid topology, population, and electric distribution line reliability indices into a unified, cloud-based, serverless framework that supports power system operations in response to extreme events. An iterative and pragmatic approach to working with large and disparate datasets of different formats and types resulted in improved application runtime and efficiency, which is important to consider in real time decision-making processes during hurricanes and similar catastrophic events. This technology was developed initially for Puerto Rico, following extreme hurricane and earthquake events in 2017 and 2020, but is applicable to utilities around the world. Given the highly abstract and modular design approach, this technology is equally applicable to any geographic region and similar natural hazard events. In addition to a review of the requirements, development, and deployment of this framework, technical aspects related to application performance and response time are highlighted.

24 POWER TRANSMISSION AND DISTRIBUTION↗

The Pulse Width Modulator ASIC for Deep Space Missions

The Jet Propulsion Laboratory has started the development of a Pulse Width Modulator Application Specific Integrated Circuit (PWMA). This development is leveraging the previous development of the Switch Control ASIC (SCA). The purpose of the development is to provide the control for a selected range of power converter topologies and to meet the stringent environmental requirements of deep space missions. The PWMA will include several power control functions that are not normally included on the off-the-shelf components available today. One key functional requirement is the ability to implement an N + K redundant power converter with the ability to control the charging of a battery. Other applications will be the typical point of load isolated and non-isolated power converters. The purpose the development is not only to provide a much needed flight part, but also to accelerate the engineering process by using a standard cell library from previous ASIC developments. Under previous developments with Boeing and Lockheed Martin, JPL has produced three ASICs. Each ASIC has been implemented by using an analog standard cell library. One such development was the SCA, which is design to provide a floating power switch control. The functional verification of this ASIC has been completed and the cells used have been targeted for the new development of the PWMA. The primary function of the PWMA is to provide the control function of a point of load power converter. The design is an isolated 60 W converter with a 33 V output. In architecting the design, several functions were left up to the power converter design in order to make the ASIC more generic. The ASIC can be used for several power converter topologies and power levels. Some additional features have been added to the ASIC to provide the interfaces for multi-phase topologies and battery control functions. An N+K fault tolerant strategy has been implemented in order to provide the battery control functions. The PWMA has been developed to provide an ASIC with several functions not normally available in the off the shelf controllers. These functions have been added to enable the power converter designers to achieve fault tolerant designs and battery control functions.

Pulse Width Modulator Application Specific Integra↗

FAST.Farm load validation for single wake situations at alpha ventus

The main objective of the presented work is the validation of the simulation tool FAST.Farm for the calculation of power and structural loads in single wake situations; the basis for the validation is the measurement database of the operating offshore wind farm alpha ventus. The approach is described in detail and covers the calibration of the aeroelastic turbine model, transfer of environmental conditions to simulations, and comparison between simulations and adequately filtered measurements. It is shown that FAST.Farm accurately predicts power and structural load distributions over wind direction with discrepancies of less than 10 % for most of the cases compared to the measurements. Additionally, the frequency response of the structure is investigated, and it is calculated by FAST.Farm in good agreement with the measurements. In general, the calculation of fatigue loads is improved with a wake-added turbulence model added to FAST.Farm in the course of this study.

17 WIND ENERGY↗

Multiobjective Dynamic Optimization for Optimal Load-Following of Natural Gas Combined Cycle Power Plants under Stress Constraints

With the increasing penetration of intermittent renewable energy sources into the electric grid, there is an associated need for conventional thermal power plants that are designed to operate at base-load conditions to cycle their load rapidly and frequently and operate under low-load conditions. Fast load-following operations lead to plant efficiency loss and the reduction of equipment life. A high-fidelity dynamic model of a natural gas combined cycle power plant, with rigorous equipment level submodels, is developed to capture the plant transient performance and the thermomechanical stress evolution at the high-pressure drum is computed to assess the drum life consumption. Stress evolution is modeled for the location of the edge at the drum/downcomer junction that experiences high circumferential stress amplitude during the fast load-following operation, leading to higher fatigue damage than locations considered under existing design standards. A dynamic optimization problem is solved for optimal load-following operation. Depending on the value of the stress constraint and the desired ramp rate, satisfying the desired stress constraint may be infeasible without relaxing the ramp rate. A multiobjective dynamic optimization problem is solved using a lexicographic approach that minimizes ramp rate relaxation and maximizes efficiency while satisfying stress constraints, avoiding spraying to saturation, and maintaining main steam and reheat steam temperature within bounds. It was observed that the optimal ramp rate can be highly nonlinear as opposed to the industry-standard linear ramp rate. Nonlinear optimal ramp-rate profiles not only help to avoid stress constraints that may be unavoidable by using the linear profile but also result in higher efficiency than the linear profile. Furthermore, the study shows that there is a strong tradeoff between the relaxation in the plant ramp rate and the time-average thermal efficiency.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

FPGA for Power Control of MSL Avionics

A PLGT FPGA (Field Programmable Gate Array) is included in the LCC (Load Control Card), GID (Guidance Interface & Drivers), TMC (Telemetry Multiplexer Card), and PFC (Pyro Firing Card) boards of the Mars Science Laboratory (MSL) spacecraft. (PLGT stands for PFC, LCC, GID, and TMC.) It provides the interface between the backside bus and the power drivers on these boards. The LCC drives power switches to switch power loads, and also relays. The GID drives the thrusters and latch valves, as well as having the star-tracker and Sun-sensor interface. The PFC drives pyros, and the TMC receives digital and analog telemetry. The FPGA is implemented both in Xilinx (Spartan 3- 400) and in Actel (RTSX72SU, ASX72S). The Xilinx Spartan 3 part is used for the breadboard, the Actel ASX part is used for the EM (Engineer Module), and the pin-compatible, radiation-hardened RTSX part is used for final EM and flight. The MSL spacecraft uses a FC (Flight Computer) to control power loads, relays, thrusters, latch valves, Sun-sensor, and star-tracker, and to read telemetry such as temperature. Commands are sent over a 1553 bus to the MREU (Multi-Mission System Architecture Platform Remote Engineering Unit). The MREU resends over a remote serial command bus c-bus to the LCC, GID TMC, and PFC. The MREU also sends out telemetry addresses via a remote serial telemetry address bus to the LCC, GID, TMC, and PFC, and the status is returned over the remote serial telemetry data bus.

Wang, Duo↗

Demonstrating Structural Adequacy of Nuclear Power Plant Containment Structures for Beyond Design-Basis Pressure Loadings

ABSTRACT Demonstrating the structural integrity of U.S. nuclear power plant (NPP) containment structures, for beyond design-basis internal pressure loadings, is necessary to satisfy Nuclear Regulatory Commission (NRC) requirements and performance goals. This paper discusses methods for demonstrating the structural adequacy of the containment for beyond design-basis pressure loadings. Three distinct evaluations are addressed: (1) estimating the ultimate pressure capacity of the containment structure (10 CFR 50 and US NRC Standard Review Plan, Section 3.8) ; (2) demonstrating the structural adequacy of the containment subjected to pressure loadings associated with combustible gas generation (10 CFR 52 and 10 CFR 50); and (3) demonstrating the containment structural integrity for severe accidents (10 CFR 52 as well as SECY 90-016, SECY 93-087, and related NRC staff requirements memoranda (SRMs)). The paper describes the technical basis for specific aspects of the methods presented. It also presents examples of past issues identified in licensing activities related to these evaluations.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

10 CFR 830 Major Modification Determination for the ATR Diesel Bus (E-3) and Switchgear Replacement

Near term replacement of aging and obsolescent original ATR equipment has become important to ensure ATR capability in support of NE’s long term national missions. To that end, a mission needs statement has been prepared for a non-major system acquisition which is comprised of three interdependent subprojects. The first project, subject of this determination, will replace the existent diesel-electrical bus (E-3) and associated switchgear. More specifically, INL proposes transitioning ATR to 100% commercial power with appropriate emergency backup to include: • Provide commercial power as the normal source of power to the ATR loads currently supplied by diesel-electric power. • Provide backup power to the critical ATR loads in the event of a loss of commercial power. • Replace obsolescent critical ATR power distribution equipment, e.g., switchgear, transformers, motor control centers, distribution panels. Completion of this and two other age-related projects (primary coolant pump and motor replacement and emergency firewater injection system replacement) will resolve major age related operational issues plus make a significant contribution in sustaining the ATR safety and reliability profile. The major modification criteria evaluation of the project pre-conceptual design identified several issues make the project a major modification: 1. Evaluation Criteria #2 (Footprint change). The addition of a new PC-4 structure to the ATR Facility to house safety-related SSCs requires careful attention to maintaining adherence to applicable engineering and nuclear safety design criteria (e.g., structural qualification, fire suppression) to ensure no adverse impacts to the safety-related functions of the housed equipment. 2. Evaluation Criteria #3 (Change of existing process). The change to the strategy for providing continuous reliable power to the safety-related emergency coolant pumps requires careful attention and analysis to ensure it meets a project primary object to maintain or reduce CDF and does not negatively affect the efficacy of the currently approved strategy. 3. Evaluation Criteria #5 (Create the need for new or revised safety SSCs). The change to the strategy for providing continuous reliable power to the safety-related emergency coolant pumps, based on the pre-conceptual design, will require the addition of two quick start diesel generators, their associated power coordination/distribution controls, and a UPS to the list of safety-related SSCs. Similarly to item 1 above, the addition of these active SSCs to the list of safety-related SSCs and replacement of the E-3 bus requires careful attention to maintaining adherence to applicable engineering and nuclear safety design criteria (e.g., seismic qualification, isolation of redundant trains from common fault failures) to ensure no adverse impacts to the safety-related functions.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Fuel-cell based power generating system having power conditioning apparatus

A power conditioner includes power converters for supplying power to a load, a set of selection switches corresponding to the power converters for selectively connecting the fuel-cell stack to the power converters, and another set of selection switches corresponding to the power converters for selectively connecting the battery to the power converters. The power conveners output combined power that substantially optimally meets a present demand of the load.

Mazumder, Sudip K↗

Time histories of horizontal-tail loads, elevator loads, and deformations on a jet-powered bomber airplane during abrupt pitching maneuvers at approximately 20,000 feet

Time histories are presented of horizontal-tail loads, elevator loads, and deformations on a jet-powered bomber during abrupt pitching maneuvers at a pressure altitude of approximately 20,000 feet. The normal and pitching accelerations measured varied from -0.90b to 3.41g and from -0.73 to 0.80 radian per second per second (sic), respectively, with a Mach number variation of from 0.40 to o.75. The maximum horizontal-tail load measured was 17,250 pounds down. The maximum elevator load was 1900 pounds up. The stabilizer twisted a maximum of 0.76 degrees leading edge down at the tip. The greatest fuselage deflection at the tail was about 1.7 inches down.

Wiener, Bernard↗

Flexible Geothermal Power Generation utilizing Geologic Thermal Energy Storage (Final Seedling Project Report)

This report concludes that there is a cost-effective strategy for seasonal storage of heat that will provide firm, but dispatchable, electrical generating capacity in times when other renewable energy is not available to meet demand. Deployment of the technology appears to require no new technology, but instead combines solar, geothermal, and conventional oil and gas drilling technologies in a novel way. The study basis is the use of sedimentary geologic formations as a medium for thermal energy storage (TES), specifically for heat collected in concentrating solar collectors. The study identifies methodologies that could be used to transport this heat into and out of the subsurface in order to produce dispatchable electrical power, and reports on initial optimization results. The GeoTES system (heat input, storage, heat recovery, and heat to electric conversion) described in this analysis has the potential to provide a unique pathway for increasing the grid penetration of renewable energy in large blocks of power and across many states and regions. Further, the system can be used both to meet the nation’s flexible energy needs while also improving grid stability and reliability. The present study evaluated the use of a large number of dedicated wells to store and recover the heat, essentially creating a synthetic geothermal reservoir. The use of sedimentary geology allows the wells to be drilled at low cost. Dedicated hot and cold wells are used, arranged in a five-spot well pattern with each hot or cold well surrounded at an appropriate distance by the opposite type of well. In large numbers this becomes alternating rows of hot and cold wells. Each hot and cold well is operated using a push-pull strategy. This configuration provides the ability to immediately recover stored hot fluid from a GeoTES reservoir, or to store the heat over many months for recovery at low loss when needed. This is a practical approach for managing the system’s fluid inventory and reducing parasitic load. The production and injection power requirements are reduced because the rows of wells operating in “push” mode provide help to the wells operating in “pull” mode, and vice-versa. Initial charging of a GeoTES system increases the heat recovery temperature. Increasing the duration of the charging period decreases the magnitude of the temperature fluctuations that occur following prolonged system operation. Because of direct contact of the heated water with the reservoir formation, the production of both hot water and steam from the TES, and the temperature ranges of the recovered fluid (190 – 230°C or 375 – 445°F), conventional geothermal power cycles were used to convert the stored heat to electricity. A power cycle configuration for the GeoTES system was selected following a screening study of a number of flash, and flash/binary hybrid options. This analysis concluded that, of the configurations evaluated, a dual-stage flash steam cycle provides the lowest capital costs per unit net power generation with an acceptable hot brine inlet fluid flow rate. The evaluation included the power plant cost estimate, the cost and number of wells and the associated parasitic loads. Annual power generation performance was simulated to evaluate capacity factor and LCOE. The LCOE calculated for the inherently high capacity GeoTES system was $\$$0.13/kWhe. This value was calculated for the case where the solar thermal collector was sized in such a way that the solar collectors permitted an annual power plant capacity factor of up to 97%. The power cycle was able to provide power to the grid every night of the year, and flexible base-load power during the winter, if needed. This LCOE value compares favorably with reported values for solar photovoltaic plus battery energy storage (PV+BES) systems in the open literature, i.e. $\$$0.148/kWhe for a PV+BES system with 4 hours of electrochemical battery energy storage capacity. Addition of battery energy storage with more hours of storage would further increase PV+BES system LCOE and increase the separation between GeoTES and PV+BES. A GeoTES system would therefore provide superior economics for high capacity and long duration solar energy storage.

14 SOLAR ENERGY↗

The Future Impact of Wind on BPA Power System Ancillary Services

Wind power is growing in a very fast pace as an alternative generating resource. As the ratio of wind power over total system capacity increases, the impact of wind on various system aspects becomes significant. This paper presents a methodology to study the future impact of wind on BPA power system ancillary services including load following and regulation. Existing approaches for similar analysis include dispatch model simulation and standard deviation evaluation. The methodology proposed in this paper uses historical data and stochastic processes to simulate the load balancing processes in BPA power system. Then capacity, ramp rate and ramp duration characteristics are extracted from the simulation results, and load following and regulation requirements are calculated accordingly. It mimics the actual power system operations therefore the results can be more realistic yet the approach is convenient to perform. Further, the ramp rate and ramp duration data obtained from the analysis can be used to evaluate generator response or maneuverability and energy requirement, respectively, additional to the capacity requirement.

17 WIND ENERGY↗

System for energy harvesting and/or generation, storage, and delivery

A device and method for harvesting, generating, storing, and delivering energy to a load, particularly for remote or inaccessible applications. The device preferably comprises one or more energy sources, at least one supercapacitor, at least one rechargeable battery, and a controller. The charging of the energy storage devices and the delivery of power to the load is preferably dynamically varied to maximize efficiency. A low power consumption charge pump circuit is preferably employed to collect power from low power energy sources while also enabling the delivery of higher voltage power to the load. The charging voltage is preferably programmable, enabling one device to be used for a wide range of specific applications.

Trainor, John T.↗

System for energy harvesting and/or generation, storage, and delivery

A device and method for harvesting, generating, storing, and delivering energy to a load, particularly for remote or inaccessible applications. The device preferably comprises one or more energy sources, at least one supercapacitor, at least one rechargeable battery, and a controller. The charging of the energy storage devices and the delivery of power to the load is preferably dynamically varied to maximize efficiency. A low power consumption charge pump circuit is preferably employed to collect power from low power energy sources while also enabling the delivery of higher voltage power to the load. The charging voltage is preferably programmable, enabling one device to be used for a wide range of specific applications.

Trainor, John T.↗

C-band high power RF generation and extraction using a dielectric loaded waveguide.

We report on design, fabrication, and beam test of a 7.8 GHz power extractor recently conducted at the Argonne Wakefield Accelerator (AWA) facility. The wakefields are excited using an electron beam travels through a dielectric loaded waveguide, and the generated RF power is then subsequently extracted with a properly designed RF coupler. In the experiment, 30 MW of output power is excited by a 66 nC single electron bunch, and wakefield superposition by a train consisting of four bunches is also demonstrated. Both results agree very well with theoretical predictions. Future tests include more charge transmission for higher RF power, and more bunches in a train for longer RF pulses.

36 MATERIALS SCIENCE↗

Fast 704 MHz Ferroelectric Tuner for Superconducting Cavities

The Omega-P SBIR project described in this Report has as its goal the development, test, and evaluation of a fast electrically-controlled L-band tuner for BNL Energy Recovery Linac (ERL) in the Electron Ion Collider (EIC) upgrade of the Relativistic Heavy Ion Collider (RHIC) at Brookhaven National Laboratory (BNL). The tuner, that employs an electrically-controlled ferroelectric component, is to allow fast compensation to cavity resonance changes. In ERLs, there are several factors which significantly affect the amount of power required from the wall-plug to provide the RF-power level necessary for the operation. When beam loading is small, the power requirements are determined by (i) ohmic losses in cavity walls, (ii) fluctuations in amplitude and/or phase for beam currents, and (iii) microphonics. These factors typically require a substantial change in the coupling between the cavity and the feeding line, which results in an intentional broadening of the cavity bandwidth, which in turn demands a significant amount of additional RF power. If beam loading is not small, there is a variety of beam-drive phase instabilities to be managed, and microphonics will still remain an issue, so there remain requirements for additional power. Moreover ERL performance is sensitive to changes in beam arrival time, since any such change is equivalent to phase instability with its vigorous demands for additional power. In this Report, we describe the new modular coaxial tuner, with specifications suitable for the 704 MHz ERL application. The device would allow changing the RF-coupling during the cavity filling process in order to effect significant RF power savings, and also will provide rapid compensation for beam imbalance and allow for fast stabilization against phase fluctuations caused by microphonics, beam-driven instabilities, etc. The tuner is predicted to allow a reduction of about ten times in the required power from the RF source, as compared to a compensation system with narrower bandwidth. It is planned to build a 704 MHz version of the tuner, to check its underlying principles, and to make high-power tests at power densities aimed towards controlling 50 kW of average power. Steps towards this goal will be limited by, among other factors, losses in the actual ferroelectric elements in the ferroelectric assemblies. As the ferroelectric material loss tangent is reduced through efforts by the supplier Euclid TechLabs LLC, the concomitant power loss in its ferroelectric assemblies will drop, and the average power-handling capability of the Omega-P tuner will rise. It can thus be anticipated that the Phase II development project of the 704 MHz tuner will be iterative, but the pace and ultimate power-handling level of the tuner is difficult to predict at this early stage in Euclid's development program. Fortunately, since Omega-P's conceptual tuner is a simple module (nominally rated for 5 kW), so that the number of modules required in each tuner can be chosen, depending upon the cavity power level needed, plus the power for tuner losses.

43 PARTICLE ACCELERATORS↗

The cells of giant airplanes

This report presents a discussion of the Rohrbach type of giant airplane. The problems considered are structural drag, wing loading and divided power plants.

LOADS - ROHRBACH - ENLARGED↗

AGGREGATE: dAta-driven modelinG preservinG contRollable dEr for outaGe mAnagemenT and rEsiliency (Final Report)

The AGGREGATE project team successfully developed and validated various modules for outage management. Brief summaries of each module are provided to showcase their strength for outage management and restoration for a distribution system with a high penetration of connected distribution energy resources (DERs). In recent years, inverter-based DERs have been widely deployed in distribution system. A most of behind-the-meter (BTM) solar power generation is not visible to the utility. The data-driven DER and load estimation modules are using machine learning (ML) and artificial intelligence (AI) to manage this issue, which provides an opportunity for distribution system operators (DSOs) to operate systems and make decisions in real-time for a distribution system with a high penetration of DERs deployed. Also, the estimated DER and true load can be further leveraged in network aggregation and cold-load pick up estimation for reducing the computing complexity and providing for fast restoration. After load demand and DER power generations have been estimated, the information will support topology and state estimation (SE). The topology estimation module demonstrated the viability of mixed integer linear programming (MILP) formulation to estimate the most likely operational radial topology and outage sections using power flow measurements, historical/estimated load and DERs data and smart meter ping measurements. Formulation includes continuous (power flow, load and DERs data) and binary measurements (smart meter ping measurements) in a single formulation. Errors in continuous data and binary data are modeled as normal distribution and Bernoulli distribution, respectively. In the future distribution grid, the power injection from controllable DERs will be essential for efficient and resilient grid operation. However, determining the optimal DER injections and restoration actions is dependent on knowledge of the system states. State estimation (SE), already the cornerstone of transmission energy management systems, will become commonplace in distribution management systems as more measurements become available from deployment of automated metering infrastructure (AMI). Observability analysis is the first step in SE, as it determines the sufficiency of the available measurements for accurately estimating the current system states. A new type of pseudo-measurement called a Correlational Measurement (CM) is introduced in this module, to enhance the observability of the system to enable more accurate SE. CMs encapsulate knowledge of correlation between demand patterns for similar classes of loads as well as injection patterns for same-technology renewable DERs. During grid contingency scenarios, DERs have been traditionally disconnected, without any fault ride-through capabilities. However, with new regulations and better technology, it is feasible for these resources to contribute to the grid’s restoration after an adverse event and hence enhance resilience. The controllability module proposes a two-step restoration scheme for the power system restoration process by leveraging additional degrees of freedom in power electronics interfaced DERs for mitigating voltage problems. In a resilience mode without the utility system, the distribution grid relies on DERs to serve critical load. In such a severe event with multiple faults on the distribution feeders, actuation of various protective devices (PDs) divides the distribution system into electrical islands. The undetected actuated PDs due to fault current contributions from DERs can delay the restoration process, thereby reducing the system resilience. The Advanced Outage Management (AOM) and the Advanced Feeder Restoration (AFR) modules developed in this project provide improved system resilience with multiple DERs. AOM identifies the faulted sections and actuated PDs in a distribution system with DERs by incorporating smart meter data. The most credible outage scenario including fault locations, PD actuations, and fault indicator (FI) failures is identified by a set of binary integer linear programming incorporating hypotheses. The AFR module serves to restore a distribution system with available energy resources taking into consideration the availability of utility sources and DERs. By partitioning the system into islands, critical load will be served with the available generation resources within islands based on the solution of a MILP. When the utility systems become available, the optimal path will be determined by a spanning tree search algorithm that reconnects these islands back to substations and restores the remaining load. The transmission and distribution (T&D) co-simulation module was used to validate the effect of a control action performed on the distribution side assets as it propagates to the transmission side. This ensures that the control action performed results in a feasible operating point on both the transmission and the distribution system. In addition to validation, the team used the T&D co-simulation module to demonstrate how distribution system assets can be used to mitigate issues on the transmission system. Specifically, the team demonstrated that appropriate switching operations on the distribution side can alleviate the line overload condition on the transmission side without causing new operational constraint violations.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Machine learning based energy management system for grid disaster mitigation

The recent increase in infiltration of distributed resources has challenged the traditional operation of power systems. Simultaneously, devastating effects of recent natural disasters have questioned the resilience of power infrastructure for an electricity dependent community. In this study, a solution has been presented in the form of a resilient smart grid network which utilizes Distributed Energy Resources (DERs) and Machine Learning (ML) algorithms to improve the power availability during disastrous events. In addition to power electronics with load categorization features, the presented system utilizes ML tools to use the information from neighbouring units and external sources to make complicated logical decisions directed towards provide power to critical loads at all times. Furthermore, provided model encourages consideration of ML tools as a part of smart grid design process together with power electronics and controls, not as an additional feature.

24 POWER TRANSMISSION AND DISTRIBUTION↗