Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “issues management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 865 records · Page 48

Development and Implementation of Real-Time Information Delivery Systems for Emergency Management

The disaster management community has an on-going need for real-time data and information, especially during catastrophic events. Currently, twin engine or jet aircraft with limited altitude and duration capabilities collect much of the data. Flight safety is also an issue. Clearly, much of the needed data could be delivered via over-the-horizon transfer through a uninhabited aerial vehicles (UAV) platform to mission managers at various locations on the ground. In fact, because of the ability to stay aloft for long periods of time, and to fly above dangerous situations, UAV's are ideally suited for disaster missions. There are numerous situations that can be considered disastrous for the human population. Some, such as fire or flood, can continue over a period of days. Disaster management officials rely on data from the site to respond in an optimum way with warnings, evacuations, rescue, relief, and to the extent possible, damage control. Although different types of disasters call for different types of response, most situations can be improved by having visual images and other remotely sensed data available. "Disaster Management" is actually made up of a number of activities, including: - Disaster Prevention and Mitigation - Emergency Response Planning - Disaster Management (real-time deployment of resources, during an event) - Disaster / Risk Modeling All of these activities could benefit from real-time information, but a major focus for UAV-based technology is in real-time deployment of resources (i.e., emergency response teams), based on changing conditions at the location of the event. With all these potential benefits, it is desirable to demonstrate to user agencies the ability to perform disaster management missions as described. The following demonstration project is the first in a program designed to prove the feasibility of supporting disaster missions with UAV technology and suitable communications packages on-board. A several-year program is envisioned, in which a broad range of disaster-related activities are demonstrated to the appropriate user communities.

Wegener, Steve↗

Converged Computing: A Best of Both Worlds of High-Performance Computing and Cloud

Collaboration between Cloud and High Performance Computing (HPC) communities has accelerated in the last half decade. A common goal to run batch workloads combined with a desire for reproducibility, automation, and optimization has led to successful projects that range from container technologies to workload management and security. This span of current and future work defines a novel “Converged Computing” paradigm that aims to combine the best of both worlds, both from a technological and cultural standpoint. Furthermore, in this Special Issue, we review common themes in the space, showcasing current work and encouraging a continued effort toward innovative ideas that will enable the next generations of scientific discovery.

97 MATHEMATICS AND COMPUTING↗

Background issues for on-line aircraft documentation

Currently, almost all aircraft documentation in commercial aircraft cockpits is presented via hardcopy manuals. Several recent projects are aimed at eliminating all paper documentation in cockpits using electronic libraries. Electronic libraries encompass diverse information bases including aircraft system documentation, operations and procedures, checklists, maintenance logs, minimum equipment lists, maps and charts, and flight management information. These electronic libraries are envisioned to be embedded in the avionics so as to provide real time monitoring and display of information. Background issues are examined (motivation, information retrieval models, and preliminary designs) for the on-line presentation of aircraft systems documentation including operations, procedures, and checklists.

Russell, C. Ray↗

Compendium of meteorology scientific issues of 1950 still outstanding

The Compendium of Meteorology was published in 1951 by the American Meteorological Society. A review was made of the Compendium of Meteorology to identify the studies and future needs which the authors expressed in their papers. The needs as seen by the authors are organized into sections and papers following the format of the Compendium of Meteorology. In some cases the needs they identified are as valid today as they were in 1951. In other cases one will easily be able to identify examples where significant progress has been made. It is left to the individual scientists and scientific program managers to assess whether significant progress has been made over the past thirty-five years on these outstanding scientific issues.

Vaughan, W. W.↗

ASK Magazine

What makes a successful team? In this issue our contributors look closely at the subject and come up with several answers. Working on team chemistry is the "Activation Energy" Dr. Owen Gadeken's story is about. Scott Cameron thinks it's getting to know people one to one. Tony Maturo says it's getting the most out of your support staff. Dr. Michael Hecht finds the best people he can and build the team around their talents. Teamwork is a theme we explore often in Academy Sharing Knowledge (ASK), but never so directly as in this issue. You'll not only find formulas for building successful teams, you'll see examples of ones in action, strategies for how project managers can motivate their teams, and expert advice on how to choose who to work with and who not to work with. It seems like all the stories make one common point: everyone on a team counts. Few project managers can pull off a project alone, and when the whole team is performing to everyone's potential, the chances of pulling off a successful project goes up exponentially. If that doesn't seem like enough by itself, listen to this... Discerning fans of ASK will note the last two issues our Special Feature was "There are no Mistakes, Only Lessons." We have not abandoned this feature, but for now we want to broaden our repertoire. In this issue we add a new Special Feature, "My Metaphor," starting with Paul Espinosa's article "My Big Wall" about his rock climbing adventures on El Capitan in Yosemite National Park. If you think getting to Mars is work, read what it's like to scale a 3,000-foot rock face. This issue we're also welcoming two new members to our Review Board, Hugh Woodward and Jody Kusek. Hugh and Jody are our first reviewers from outside NASA, and we are delighted to have them on our team. Read their bios on the ASK Review Board page and see why we feel privileged to have them on our team.

Post, Todd↗

Mission Operations Report (MOR) for the Solar, Anomalous, and Magnetosphere Particle Explorer (SAMPEX)

MISSION OPERATIONS REPORTS are published for use by NASA senior management, as required by NASA Headquarters Management Instruction HQMI 8610. lC, effective November 26, 1991. The purpose of these reports is to provide a documentation system that represents an internal discipline to establish critical discriminators selected in advance to measure mission accomplishment, provide a formal written assessment of mission accomplishment, and provide an accountability of technical achievement. Prelaunch reports are prepared and issued for each flight project just prior to launch. Following launch, updating (Post Launch) reports are issued to provide mission status and progress in meeting mission objectives. Primary distribution of these reports is intended for personnel having program/project management responsibilities.

Source record↗

Re-Engineering the ISS Payload Operations Control Center During Increased Utilization and Critical Onboard Events

With an increase in the utilization and hours of payload operations being executed onboard the International Space Station (ISS), upgrading the NASA Marshall Space Flight Center (MSFC) Huntsville Operations Support Center (HOSC) ISS Payload Control Area (PCA) was essential to gaining efficiencies and assurance of current and future payload health and science return. PCA houses the Payload Operations Integration Center (POIC) responsible for the execution of all NASA payloads onboard the ISS. POIC Flight Controllers are responsible for the operation of voice, stowage, command, telemetry, video, power, thermal, and environmental control in support of ISS science experiments. The methodologies and execution of the PCA refurbishment were planned and performed within a four month period in order to assure uninterrupted operation of ISS payloads and minimal impacts to payload operations teams. To vacate the PCA, three additional HOSC control rooms were reconfigured to handle ISS realtime operations, Backup Control Center (BCC) to Mission Control in Houston, simulations, and testing functions. This involved coordination and cooperation from teams of ISS operations controllers, multiple engineering and design disciplines, management, and construction companies performing an array of activities simultaneously and in sync delivering a final product with no issues that impacted the schedule. For each console operator discipline, studies of Information Technology (IT) tools and equipment layouts, ergonomics, and lines of sight were performed. Infusing some of the latest IT into the project was an essential goal in ensuring future growth and success of the ISS payload science returns. Engineering evaluations led to a state of the art media wall implementation and more efficient ethernet cabling distribution providing the latest products and the best solution for the POIC. These engineering innovations led to cost savings for the project. Constraints involved in the management of the project included executing over 450 crew-hours of ISS real-time payload operations including a major onboard communications upgrade, SpaceX un-berth, a Soyuz launch, roll-out of ISS live video and interviews from the POIC, annual BCC certification and hurricane season, and ISS simulations and testing. Continuous ISS payload operations were possible during the PCA facility modifications with the reconfiguration of four control rooms and standup of two temporary control areas. Another major restriction to the project was an ongoing facility upgrade that included a NASA Headquarters mandated replacement of all electrical and mechanical systems and replacement of an external generator. These upgrades required a facility power outage during the PCA upgrades. The project also encompassed console layout designs and ordering, amenities selections and ordering, excessing of old equipment, moves, disposal of old IT equipment, camera installations, facility tour re-schedules, and contract justifications. These were just some of the tasks needed for a successful project.

Marsh, Angela L.↗

Re-Engineering the ISS Payload Operations Control Center During Increased Utilization and Critical Onboard Events

With an increase in utilization and hours of payload operations being executed onboard the International Space Station (ISS), upgrading the NASA Marshall Space Flight Center (MSFC) Huntsville Operations Support Center (HOSC) ISS Payload Control Area (PCA) was essential to gaining efficiencies and assurance of current and future payload health and science return. PCA houses the Payload Operations Integration Center (POIC) responsible for the execution of all NASA payloads onboard the ISS. POIC Flight Controllers are responsible for the operation of voice, stowage, command, telemetry, video, power, thermal, and environmental control in support of ISS science experiments. The methodologies and execution of the PCA refurbishment were planned and performed within a four-month period in order to assure uninterrupted operation of ISS payloads and minimal impacts to payload operations teams. To vacate the PCA, three additional HOSC control rooms were reconfigured to handle ISS real-time operations, Backup Control Center (BCC) to Mission Control in Houston, simulations, and testing functions. This involved coordination and cooperation from teams of ISS operations controllers, multiple engineering and design disciplines, management, and construction companies performing an array of activities simultaneously and in sync delivering a final product with no issues that impacted the schedule. For each console operator discipline, studies of Information Technology (IT) tools and equipment layouts, ergonomics, and lines of sight were performed. Infusing some of the latest IT into the project was an essential goal in ensuring future growth and success of the ISS payload science returns. Engineering evaluations led to a state of the art Video Wall implementation and more efficient ethernet cabling distribution providing the latest products and the best solution for the POIC. These engineering innovations led to cost savings for the project. Constraints involved in the management of the project included executing over 450 crew-hours of ISS real-time payload operations including a major onboard communications upgrade, SpaceX un-berth, a Soyuz launch, roll-out of ISS live video and interviews from the POIC, annual BCC certification and hurricane season, and ISS simulations and testing. Continuous ISS payload operations were possible during the PCA facility modifications with the reconfiguration of four control rooms and standup of two temporary control areas. Another major restriction to the project was an ongoing facility upgrade that included a NASA Headquarters mandated replacement of all electrical and mechanical systems and replacement of an external generator. These upgrades required a facility power outage during the PCA upgrades. The project also encompassed console layout designs and ordering, amenities selections and ordering, excessing of old equipment, moves, disposal of old IT equipment, camera installations, facility tour re-schedules, and contract justifications. These were just some of the tasks needed for a successful project. This paper describes the logistics and lessons learned in upgrading a control center capability in the middle of complex real-time operations. Combining the efficiencies of controller interaction and new technology infusion were prime drivers for this upgrade to handle the increased utilization of science research on ISS. The success of this project could not jeopardize the current operations while these facility upgrades occurred.

Dudley, Stephanie R. B.↗

Office of Equal Opportunity Programs

The NASA Glenn Office of Equal Opportunity Programs works to provide quality service for all programs and/or to assist the Center in becoming a model workplace. During the summer of 2004, I worked with Deborah Cotleur along with other staff members to create and modify customer satisfaction surveys. This office aims to assist in developing a model workplace by providing functions as a change agent to the center by serving as an advisor to management to ensure equity throughout the Center. In addition, the office serves as a mediator for the Center in addressing issues and concerns. Lastly, the office provides assistance to employees to enable attainment of personal and organizational goals. The Office of Equal Opportunities is a staff office which reports and provides advice to the Center Director and Executive Leadership, implements laws, regulations, and presidential executive orders, and provides center wide leadership and assistance to NASA GRC employees. Some of the major responsibilities of the office include working with the discrimination complaints program, special emphasis programs (advisory groups), management support, monitoring and evaluation, contract compliance, and community outreach. During my internship in this office, my main objective was to create four customer satisfaction surveys based on EO retreats, EO observances, EO advisory boards, and EO mediation/counseling. I created these surveys after conducting research on past events and surveys as well as similar survey research created and conducted by other NASA centers, program for EO Advisory group members, leadership training sessions for supervisors, preventing sexual harassment training sessions, and observance events. I also conducted research on the style and format from feedback surveys from the Marshall Equal Opportunity website, the Goddard website, and the main NASA website. Using the material from the Office of Equal Opportunity Programs at Glenn Research Center along with my previous research, I created four customer satisfaction surveys. Additional information is included in the original extended abstract.

Chin, Jennifer L.↗

A geospatial environmental and techno-economic framework for sustainable phosphorus management at livestock facilities

Nutrient pollution of waterbodies is a major worldwide water quality problem. Excessive use and discharge of nutrients can lead to eutrophication and algal blooms in fresh and marine waters, resulting in environmental problems associated with hypoxia, public health issues related to the release of toxins and freshwater scarcity. A promising option to address this problem is the recovery of nutrient releases prior to being discharged into the environment. Driven by the sustainable materials management concept, the COW2NUTRIENT (Cattle Organic Waste to NUTRIent and ENergy Technologies) framework is developed for the techno-economic evaluation and selection of nutrient recovery systems at livestock facilities. Furthermore, environmental vulnerability to nutrient pollution determined through a geographic information system (GIS)-based model and techno-economic information of different state-of-the-art nutrient management technologies are combined in a multi-criteria decision analysis (MCDA) model, resulting in the selection and economic analysis of the most suitable process for each studied livestock facility. This framework has been employed for studying the implementation of sustainable phosphorus management systems at 2,217 livestock facilities in the Great Lakes area, resulting in capital expenses of 2.5 billion USD if only phosphorus recovery technologies are installed, and up to 5.2 billion USD if nutrient management is combined with biogas and power production. However, considering potential economic incentives for the recovery of phosphorus, net revenues up to 230 million USD per year can be achieved. Therefore, the framework presented reveals the potential of implementing nutrient management systems at regional scale for the abatement of phosphorus releases from livestock facilities.

54 ENVIRONMENTAL SCIENCES↗

Integration of the Back End of the Nuclear Fuel Cycle

Management of spent nuclear fuel and high-level radioactive waste consists of three main phases – storage, transportation, and disposal – commonly referred to as the back end of the nuclear fuel cycle. Current practice for commercial spent nuclear fuel management in the United States (US) includes temporary storage of spent fuel in both pools and dry storage systems at operating or shutdown nuclear power plants. Storage pools are filling to their operational capacity, and management of the approximately 2,200 metric tons of spent fuel newly discharged each year requires transferring older and cooler spent fuel from pools into dry storage. Unless a repository becomes available that can accept spent fuel for permanent disposal, projections indicate that the US will have approximately 136,000 metric tons of spent fuel in dry storage systems by mid-century, when the last plants in the current reactor fleet are decommissioned. Current designs for dry storage systems rely on large multi-assembly canisters, the most common of which are so-called “dual-purpose canisters” (DPCs). DPCs are certified for both storage and transportation, but are not designed or licensed for permanent disposal. The large capacity (greater number of spent fuel assemblies) of these canisters can lead to higher canister temperatures, which can delay transportation and/or complicate disposal. This current management practice, in which the utilities continue loading an ever-increasing inventory of larger DPCs, does not emphasize integration among storage, transportation, and disposal. This lack of integration does not cause safety issues, but it does lead to a suboptimal system that increases costs, complicates storage and transportation operations, and limits options for permanent disposal. This paper describes strategies for improving integration of management practices in the US across the entire back end of the nuclear fuel cycle. The complex interactions between storage, transportation, and disposal make a single optimal solution unlikely. However, efforts to integrate various phases of nuclear waste management can have the greatest impact if they begin promptly and continue to evolve throughout the remaining life of the current fuel cycle. A key factor that influences the path forward for integration of nuclear waste management practices is the identification of the timing and location for a repository. The most cost-effective path forward would be to open a repository by mid-century with the capability to directly dispose of DPCs without repackaging the spent fuel into disposalready canisters. Options that involve repackaging of spent fuel from DPCs into disposalready canisters or that delay the repository opening significantly beyond mid-century could add 10s of billions of dollars to the total system life cycle cost.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Initial soil organic carbon stocks govern changes in soil carbon: Reality or artifact?

Abstract Changes in soil organic carbon (SOC) storage have the potential to affect global climate; hence identifying environments with a high capacity to gain or lose SOC is of broad interest. Many cross‐site studies have found that SOC‐poor soils tend to gain or retain carbon more readily than SOC‐rich soils. While this pattern may partly reflect reality, here we argue that it can also be created by a pair of statistical artifacts. First, soils that appear SOC‐poor purely due to random variation will tend to yield more moderate SOC estimates upon resampling and hence will appear to accrue or retain more SOC than SOC‐rich soils. This phenomenon is an example of regression to the mean. Second, normalized metrics of SOC change—such as relative rates and response ratios—will by definition show larger changes in SOC at lower initial SOC levels, even when the absolute change in SOC does not depend on initial SOC. These two artifacts create an exaggerated impression that initial SOC stocks are a major control on SOC dynamics. To address this problem, we recommend applying statistical corrections to eliminate the effect of regression to the mean, and avoiding normalized metrics when testing relationships between SOC change and initial SOC. Careful consideration of these issues in future cross‐site studies will support clearer scientific inference that can better inform environmental management.

54 ENVIRONMENTAL SCIENCES↗

Bayesian Optimization For Accelerator Tuning

Tuning the accelerator during operational hours is a tedious yet essential aspect of managing any experimental facility. This process significantly reduces the beam time available for experimenters, as diagnosing issues and making corrections can take hours. Automating or facilitating the normal beam line tuning process would be highly beneficial.

43 PARTICLE ACCELERATORS↗

Midwest Regional Carbon Conversion/Utilization Procurement Grant Workshop

https://events.usea.org/events/midwest-regional-carbon-conversionutilization-procurement-grant-workshop As the U.S. economy moves toward clean energy and a lower carbon future, the U.S. Department of Energy (DOE) is seeking to partner with states, communities, and industries to support the procurement and development of carbon conversion products. These efforts have been enabled by provisions included in the Bipartisan Infrastructure Law (BIL). As part of the BIL, supporting the Administration’s goal to achieve a carbon-free power sector by 2035 and putting the United States on a path to a net-zero economy by 2050, a new initiative was established within DOE’s Office of Fossil Energy and Carbon Management through its Carbon Conversion/Utilization Program. The new initiative will establish a demonstration grant program to issue grants to eligible entities to procure commercial and industrial products derived from the conversion of anthropogenic carbon oxides and demonstrate a significant net reduction in life cycle greenhouse gas emissions compared to incumbent technologies, processes, and products. DOE-FECM will establish a demonstration grant program within the Carbon Conversion/Utilization Program to support eligible applicants that procure those commercial and industrial products derived from anthropogenic carbon oxides. Therefore, the Carbon Conversion/Utilization Program, with the assistance of the United States Energy Association (USEA), will conduct a series of workshops (both virtual and in-person) with relevant stakeholders, e.g., product manufacturers, eligible entities, or their representative national organizations (e.g., United States Conference of Mayors, etc.) to solicit input and ideas on challenges and opportunities for a potential grant program.

Larimore, Ryan↗

Management: A continuing literature survey with indexes, 1971

An annotated bibliography of selected reports, journal articles, and other documents on the subject of management is presented. There are 450 references to documents which were originally announced in the 1971 issues of Scientific and Technical Aerospace Reports (STAR) or International Aerospace Abstracts (IAA). Subject, personal author, and corporate source indexes are included.

NASA Scientific and Technical Information Facility↗

Bibliography of Lewis Research Center technical publications announced in 1977

This compilation of abstracts describes and indexes over 780 technical reports resulting from the scientific and engineering work performed and managed by the Lewis Research Center in 1977. All the publications were announced in the 1977 issues of STAR (Scientific and Technical Aerospace Reports) and/or IAA (International Aerospace Abstracts). Documents cited include research reports, journal articles, conference presentations, patents and patent applications, and theses.

Source record↗

Bibliography of Lewis Research Center Technical Publications announced in 1979

This compilation of over 1100 abstracts describes and indexes the technical reporting that resulted from the scientific and engineering work performed and managed by the Lewis Research Center in 1979. All the publications were announced in the 1979 issues of STAR (Scientific and Technical Aerospace Reports) and/or IAA (International Aerospace Abstracts). Research reports, journal articles, conference presentations, patents and patent applications, and theses are included. Subject, author, corporate source, contract number, and report number indexes are provided.

Source record↗

Bibliography of Lewis Research Center technical publications announced in 1984

This compilation of abstracts describes and indexes the technical reporting that resulted from the scientific and engineering work performed and managed by the Lewis Research Center in 1984. All the publications were announced in the 1984 issues of STAR (Scientific and Technical Aerospace Reports) and/or IAA (International Aerospace Abstracts). Included are research reports, journal articles, conference presentations, patents and patent applications, and theses.

Source record↗