Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “grid operators”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 865 records · Page 48

Opportunities to Enable Electrolytic H2 Projects for Ammonia in the United States

Integration of large-scale electrolysis with the grid provides value to hydrogen and ammonia markets as well as the electricity system. Electrolysis has the potential to provide an alternative source of low-cost hydrogen by utilizing low-price electricity that may have limited availability, resulting in possible economic benefits for ammonia production. The use of that low-price electricity can simultaneously benefit the grid by reducing the price suppression that may occur with increased penetration of variable renewable generation. In addition, the rapid-response characteristics of electrolyzers enables them to provide ancillary services to the grid, such as operating reserves and frequency control. However, electrolyzer capital cost reductions, favorable electricity pricing structures, or other technology or market advancements are likely needed to achieve hydrogen prices competitive with incumbent production technologies. We discuss near-term, niche prospects where low-cost electrolytic hydrogen and ammonia could be produced, possible applications for those products, and further opportunities and drivers that might enable them.

39 EE - Hydrogen and Fuel Cell Technologies (EE-3F↗

Island Power Systems With High Levels of Inverter-Based Resources: Stability and Reliability Challenges

As many island power systems seek to integrate high levels of renewable energy, they face new challenges on top of the existing difficulties of operating an isolated grid. With their drastically declining cost, variable renewables, such as wind and photovoltaics (PVs), are increasingly being integrated into island grids to reduce the use of imported fuels. These deployments of renewable energy are dominated by PV and wind generators, which bring unique challenges of their own.

IBRs↗

Hydropower Role in a Power Grid with a High Proportion of Variable Renewables

The importance of hydropower increases as the power grid evolves with the higher variable renewable contribution. As conventional thermal power plants are retired, the importance of hydropower contribution increases to balance the variability of solar and wind generation. However, reservoir water resources are constrained by multiple constraints, and variability of water inflow to the reservoirs creates limitations to dam water releases for power grid needs. Coordination of multiple tools, including water resources modeling, ecological modeling, and technical and economic power grid modeling, informs dam water releases. Better representation of ecological constraints and other water use details in the suit of power grid models are required to identify the hydropower flexibility to provide multiple power grid services. Impacts of water planning and hydropower operation changes to a power grid are better understood by production cost model simulations with technical and economic data, including unserved energy, reserve failures, transmission congestion to serve load, and local marginal price increases. Similarly, PCM simulation of current and future projected power grid information, including LMP, and carbon emission rates, informs short-term water release plans and long-term investments for power plant upgrades for technical and ecological needs. Hydropower operations of several case studies are simulated to understand operation patterns, revenue, water release decisions in multiple time scales (month, day, minutes), hydropower contracts scheduling, and water variability impacts.

environmental↗

Optimal Electric Grid Black Start Restoration Subject to Intentional Threats

Efficient restoration of the electric grid from significant disruptions – both natural and manmade – that lead to the grid entering a failed state is essential to maintaining resilience under a wide range of threats. Restoration follows a set of black start plans, allowing operators to select among these plans to meet the constraints imposed on the system by the disruption. Restoration objectives aim to restore power to a maximum number of customers in the shortest time. Current state-of-the-art for restoration modeling breaks the problem into multiple parts, assuming a known network state and full observability and control by grid operators. These assumptions are not guaranteed under some threats. This paper focuses on a novel integration of modeling and analysis capabilities to aid operators during restoration activities. A power flow-informed restoration framework, comprised of a restoration mixed-integer program informed by power flow models to identify restoration alternatives, interacts with a dynamic representation of the grid through a cognitive model of operator decision-making, to identify and prove an optimal restoration path. Application of this integrated approach is illustrated on exemplar systems. Validation of the restoration is performed for one of these exemplars using commercial solvers, and comparison is made between the steps and time involved in the commercial solver, and that required by the restoration optimization in and of itself, and by the operator model in acting on the restoration optimization output. Publications and proposals developed under this work, along with a path forward for additional expansion of the work, and summary of what was achieved, are also documented.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Field Verification of Grid-Forming Inverter-Based Power Plant Performance for Transmission System Reliability

This report describes some examples of the operation of two grid-forming (GFM) inverter-based photovoltaic-battery hybrid power plants connected to the electric system of the island of Kauai in Hawaii. Both plants are photovoltaic power plants with battery energy storage and are connected to the networked transmission system operated by Kauai Island Utility Cooperative (KIUC), along with several other power plants including an oil-fired plant, diesel generators, small hydroelectric plants, a biofuel plant, and several other photovoltaic plants.

14 SOLAR ENERGY↗

Securing Grid Communications Infrastructure: Addressing Gaps Beyond NERC CIP Facility Perimeters

The North American electric grid relies on a complex communications infrastructure that extends beyond facility perimeters traditionally covered by NERC Critical Infrastructure Protection (CIP) standards. While CIP requirements have significantly strengthened cybersecurity within Electronic Security Perimeters, many operational communications—such as those between control centers, substations, and third-party networks—fall outside current regulatory scope. As grid modernization introduces new technologies and connectivity models, these external pathways present evolving security challenges. This brief explores the nature of these challenges, including emerging attack vectors and supply chain considerations, and highlights how ongoing grid transformation increases exposure to sophisticated threats. It outlines practical strategies and policy options to complement existing standards, such as expanding secure communications practices, enhancing supply chain transparency, and fostering collaboration among federal, state, and industry stakeholders. Near-term actions like encryption, authentication, and contractual safeguards can help reduce risk while longer-term frameworks are developed to ensure resilient and secure grid operations.

24 - POWER TRANSMISSION AND DISTRIBUTION↗

User-Focused Tools to Enhance IT/OT Cyber Resilience within the Power Grid

The power grid is undergoing several changes that are increasing its complexity as nexuses between electric-gas, transmission-distribution, and energy-communications continue to become increasingly critical. This system is heavily dependent on communication infrastructure and controls, and it relies on humans in operational technology (OT) and information technology (IT) roles to manage the increasing breadth, depth, and speed of data. Many technical challenges have presented themselves and will need to be addressed to provide reliable grid operations. With increased reliance on distributed controls and communication infrastructure, cybersecurity becomes an inherent requirement. When considering current cyber-physical security solutions for the power grid, one can notice a clear divide between information technology and operation technology networks. However, in real-life applications, these networks are interdependent. This work presents results of interviews with key utility cybersecurity personnel, analyzes the results, and makes recommendations towards solution of existing technical and operational challenges realized. Existing workflows are presented, wireframe interviews are discussed, and tool requirements are described. The existence of easy-to-implement solutions, based on existing energy management systems, highlight the potential for real-life applications.

cybersecurity, resilience, user-centered design, p↗

Model Predictive Control for a Grid-interactive Efficient Thermal Storage-integrated Heat Pump System

Building heating and cooling systems can be used to overcome the mismatch between the intermittent supply of renewable power and the fluctuating demand for electricity. A novel underground thermal energy storage integrated with a dual-source heat pump has been proposed to mitigate the mismatch while meeting the thermal demand of buildings efficiently. Conventional thermostat control with heuristic rules cannot provide intelligent decisions to maximize the thermal efficiency and flexibility of the proposed system. Advanced control strategies like model predictive control (MPC) have provided a new paradigm for grid-interactive efficient building operation with the advancement of computation and sensing. This study developed an MPC for the proposed system to provide grid service for Demand Side Management and minimize the operating cost of building owners. A control-oriented dynamic model of the proposed system has been developed. Given an objective function and proper constraints, an optimization problem is formulated to determine the optimal control strategy of the system. Dynamic Programming is adopted to solve the optimization problem. A rule-based control (RBC) is also developed to achieve similar goals. Short-term simulations are conducted to compare the system performance resulting from the two controls. The simulation results indicate that the MPC performs more intelligently than the RBC in charging thermal energy storage and selecting heat pump sources by taking advantage of the predicted cooling demands of the building and the performance of the integrated system. As a result, the MPC could save energy and reduce operating costs compared with the RBC. A case study shows that, for a 3-day operation, the MPC saves 36.9% energy and reduces 38.5% operating cost compared with the RBC.

Shi, Liang↗

Demonstration of a Novel Technology to Manage Electricity Demand in Grid-Independent Military Microgrids

This research was conducted by the National Renewable Energy Laboratory (NREL) in collaboration with the S&C Electric Inc. through funding provided by the ESTCP. The project demonstrates use of cybersecure Automated Demand Response (ADR) technology to effectively manage microgrid loads during grid-independent, also known as "islanded," operation. When military microgrids become isolated from the main electrical grid, they are required to balance electricity supply and demand locally. Given that local generation may be constrained, the prevailing strategy involves shedding all but the most critical loads by tripping smart circuit breakers, which then necessitate manual resetting. This approach is generally implemented at the building level, which means that the buildings with mission-critical activities are exempt from load management and remain fully powered, whereas those deemed non-critical can experience a complete loss of service. In this research we developed a method that allows building automation systems to selectively control their assets in response to load shedding request from a microgrid controller, avoiding total loss of service in contrast to the conventional control approach. A commercial OpenADR client server by GridFabric is used for communication between the microgrid controller and the building management system (BMS). The microgrid controller monitors both generation capacity and various assets within the microgrid and issues a demand reduction request when necessary. This request is communicated to the OpenADR server via Modbus. Upon receiving the request, the OpenADR server forwards it to the BMS utilizing the OpenADR protocol. The BMS is pre-configured with various levels of load reduction strategies based on the controllable assets available, allowing for a nuanced approach to demand reduction. Both lab and field tests were performed that considered load shedding needed to achieve closed transition into island mode and to accommodate changing loads and power source availability while islanded. A commercial microgrid controller was used for these tests with normal programming within the expected constraints of the system capabilities. That is, the solution did not require any specialized modification to the code base of the controller. Given the latency of the round-trip communication path between the microgrid controller and the various devices involved with the load shed processes, there are certain scenarios for which the demonstrated solution are appropriate and some which are not. The methods described in this report can be used for load shedding/restoration during transitions between islanded and grid-tied modes of operation, as well as accommodating normal variations in load and the need to remove a power source from operation for maintenance. These methods should not be used for scenarios that require load shedding within a second or two such as sudden and unanticipated significant load increases or loss of power sources through equipment faults.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Enhanced Frequency Support Scheme of Generic Inverter-Based Resource Models for Renewable-Dominated Power Grids

The frequency response of SG-dominated power grids is predictable ahead of an occurrence of a frequency event because the frequency response of SGs is consistent, and it can be inferred from the swing equation [1]. However, increasing the portion of IBRs in an SG-dominated power grid might make the characteristics of the conventional power grids no longer valid because this changing resource mix affects grid dynamics and controls [2]. Thus, maintaining these characteristics greatly benefits the control and operation of the power grids with high penetration of IBRs. To maintain these characteristics in IBR-dominated power grids, IBRs should have frequency response capability similar to that of an SG. The WECC modeling validation subcommittee has developed generic IBR models for large system planning [3]-[5]. These models can represent various vendors' dynamic behavior for WTG, PV, and ESS [5]. The current generic IBR models approved by WECC can provide frequency response only from droop control loops in REPC models [6], [7]. The contribution of the loops is proportional to the frequency deviation from the nominal frequency. Thus, it presents an insufficient contribution to arrest frequency variation compared to the frequency response of SGs because it allows a high ROCOF in the early stage of frequency events. This shortfall will become greater as the PL of IBRs increases in power grids. Controller enhancement for the generic IBR models is required to secure the frequency stability under high PL of IBRs as in the SG-dominated power grids. This paper proposes a control extension for the generic IBR models to enhance the frequency support capabilities and discusses the classification of frequency support for the different types of IBR considering their operating constraints. An inertial control scheme is implemented in the REPC and REEC models of the generic IBR models to achieve these objectives. The inertial control scheme includes the following stages: Control area data acquisition, inertia time constant estimation, IBR-related constraint check, IBR contribution determination, and inertial response provision. In the scheme, a REPC acquires control area data from a system operator and estimates a total inertia time constant for the control area the applicable IBR power plant belongs. Then, the estimated inertial time constant is transferred to each IBR controller—REEC—within the power plant. Each REEC checks the availability of applicable IBR for inertial response participation. If the IBR is available, the REEC amplifies the estimated inertial time constant to utilize it for inertial response provision. In this way, the proposed inertial response scheme extends the functionality of the generic IBR models to provide SG-like frequency response within their constraints. Various scenarios considering different IBR types, IBR penetration levels, and frequency control schemes were simulated and compared in an IEEE 39-bus system using PSCAD simulator to verify the effectiveness of the proposed scheme.

Kim, Jinho↗

Competitiveness Metrics for Electricity System Technologies

The relative economic competitiveness of power generation technologies is a topic of much interest to diverse electric industry participants. However, assessing competitiveness can be challenging as it requires considering both total costs and total system value of each technology, which are complicated by the (1) numerous and diverse grid services needed to operate a reliable power system; (2) variations in the economic value of the grid services with system state and location, and over multiple timescales, due to the challenges of transporting and storing electricity; and (3) the unique characteristics of different electric system assets. Ideally, metrics designed or used to convey technology competitiveness must consider these complexities, but existing metrics often fall short. For example, the levelized cost of energy does not consider the system economic value of the various technologies nor does it consider services beyond electricity production. Various other metrics have been designed with the purpose of more-accurately communicating the economic viability of electric system technologies. In this report, we summarize the primary sources and components of costs and value and review the known competitiveness metrics by presenting their definitions, applications, advantages, and disadvantages. We also introduce a new set of competitiveness metrics, which we refer to as System Profitability metrics, that more-directly applies the economic principles of return-on-investment to electric system technologies. We use conceptual examples to show how the System Profitability metrics better reflect economic viability and relative technology competitiveness compared with existing metrics. We also describe how competitiveness metrics can be quantified using optimization-based models and demonstrate this capability using a U.S. electric sector capacity expansion model.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Efficient Reformulation and Optimization for SC-ACOPF with Line Switching

This project aims to develop efficient and robust computational methods for solving the security-constrained alternating current optimal power flow problem (SC-ACOPF). The SC-ACOPF problem is a central problem in operating the electric power grids in the United States. It determines the most economically efficient way to operate the generation and transmission system to meet daily electricity demand. The solution found by solving an SC-ACOPF problem must satisfy the physics of the alternating current (AC) power flows, various generator and network operational constraints, and must maintain secure operation under various contingency scenarios, where a generator, a transmission branch, or a transformer may unexpectedly trip offline.

97 MATHEMATICS AND COMPUTING↗

Modeling and Power-Hardware-in-the-Loop Validation of Synchronous Machine Governor

This paper introduces the development of a high-fidelity gas turbine governor model using a programmable logic controller for power-hardware-in-the-loop (PHIL) validation. The governor model is integrated with the National Renewable Energy Laboratory's (NREL) PHIL test bed, featuring a 2-MVA synchronous machine and a 2.5-MW variable-speed drive, to emulate NG-driven HRSGs and CTs under various operational scenarios. The primary objective of this research is to study the grid-connected and islanding operations of conventional generation sources, with representative startup sequences including turbine purge, ignition, speed ramp-up, synchronization, and breaker closure. Preliminary results of the generator governor model on NREL PHIL platform, particularly using the 2.5-MW dynamometer system, offered significant insights into the modeling techniques, hardware integration, scaling, and real-world simulation dynamics.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Measurement placement in electric power transmission and distribution grids: Review of concepts, methods, and research needs

Sensing and measurement systems are quintessential to the safe and reliable operation of electric power grids. Their strategic placement is of ultimate importance because it is not economically viable to install measurement systems on every node and branch of a power grid, though they need to be monitored. An overwhelming number of strategies have been developed to meet oftentimes multiple conflicting objectives. The prime challenge in formulating the problem lies in developing a heuristic or an optimisation model that, though mathematically tractable and constrained in cost, leads to trustworthy technical solutions. Further, large-scale, long-term deployments pose additional challenges because the boundary conditions change as technologies evolve. For instance, the advent of new technologies in sensing and measurement, as well as in communications and networking, might impact the cost and performance of available solutions and shift initially set conditions. Also, the placement strategies developed for transmission grids might not be suitable for distribution grids, and vice versa, because of unique characteristics; therefore, the strategies need to be flexible, to a certain extent, because no two power grids are alike. Despite the extensive literature on the present topic, the focus of published works tends to be on a specific subject, such as the optimal placement of measurements to ensure observability in transmission grids. There is a dearth of work providing a comprehensive picture for developing optimal placement strategies. Because of the ongoing efforts on the modernisation of electric power grids, there is a need to consolidate the status quo while exposing its limitations to inform policymakers, industry stakeholders, and researchers on the research-and-development needs to push the boundaries for innovation. Accordingly, this paper first reviews the state-of-the-art considering both transmission and distribution grids. Then, it consolidates the key factors to be considered in the problem formulation. Finally, it provides a set of perspectives on the measurement placement problem, and it concludes with future research directions.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Criteria for Grid-Forming Inverters Transitioning Between Current Limiting Mode and Normal Operation

Here, this letter focuses on the fault recovery analysis of inverters using multi-loop droop based grid-forming control, taking into account different current limiting strategies. A criterion is proposed to determine when the inverter can exit the current limiting mode after fault clearance. The theoretical findings are verified through electromagnetic transient simulations using the direct (d)-axis priority-based current limiting method, circular current limiting method, and virtual impedance method.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Power Converter Topologies for Electrolyzer Applications to Enable Electric Grid Services

Hydrogen electrolyzers, with their operational flexibility, can be configured as smart dynamic loads which can provide grid services and facilitate the integration of more renewable energy sources into the electrical grid. However, to enable this ability, the electrolyzer system should be able to control both active and reactive power in coordination with the low-level controller of the electrolyzer via the power electronics system interface between the utility grid and electrolyzer. This paper discusses power converter topologies and the control scheme of this power electronics interface for electrolyzer applications to enable electricity grid services. For the sake of unity, in this paper, we consider the power converter system interfacing the utility grid at the line-to-line root mean square (RMS) value of 480 VAC-60 Hz and supplying to the 3500 A-750 kW PEM electrolyzer stack.

electrolyzer↗

Transient Stability Study of a Real-World Microgrid with 100% Renewables

This paper performs a transient stability study of a real-world microgrid that can operate with 100% renewables to better understand the stability and reliability of the microgrid under various dynamic scenarios. In particular, the operation of multiple grid-forming (GFM) and grid-following (GFL) inverters in such a power system is not well understood under dynamic operation conditions, such as islanding and black start; therefore, in this paper, an electromagnetic transient model of the microgrid is developed to investigate the stability of the system under various dynamic operating conditions and to identify potential reliability risks. The PSCAD/EMTDC simulation with the high-fidelity model provides helpful insights into the optimal operation modes of GFM and GFL inverters as well as the stability and reliability of the microgrid. It can also inform field deployment in terms of inverter control parameters and coordination as well as the expected performance of black start and unplanned islanding.

black start↗

Transient Stability Study of a Real-World Microgrid with 100% Renewables

This paper performs a transient stability study of a real-world microgrid that can operate with 100% renewables to better understand the stability and reliability of the microgrid under various dynamic scenarios. In particular, the operation of multiple grid-forming (GFM) and grid-following (GFL) inverters in such a power system is not well understood under dynamic operation conditions, such as islanding and black start; therefore, in this paper, an electromagnetic transient model of the microgrid is developed to investigate the stability of the system under various dynamic operating conditions and to identify potential reliability risks. The PSCAD/EMTDC simulation with the high-fidelity model provides helpful insights into the optimal operation modes of GFM and GFL inverters as well as the stability and reliability of the microgrid. It can also inform field deployment in terms of inverter control parameters and coordination as well as the expected performance of black start and unplanned islanding.

black start↗