Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “execution time”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 865 records · Page 48

Mission Planning for Trident: Discovery proposal to Neptune’s moon, Triton

Trident was one of the four Discovery-class Step-1 mission proposals selected by NASA in 2020 for further development and study; however, in 2021, the Step-2 proposal was not down-selected to transition into the next phase of mission development, i.e., a mission for flight.Neptune’s largest moon, Triton, was the primary focus of study for Trident. Triton’s physical and orbital characteristics make it a unique planetary target for scientific exploration, providing opportunities for investigations in a wide variety of scientific fields, including geomorphological, atmospheric, geophysical, magnetospheric, and ionospheric studies. The science objectives of the Trident mission encompassed an in-depth interior-to-exterior set of objectives, focused on multiple outstanding questions resulting from the 1989 encounter of Voyager 2, and subsequent analysis.Ball Aerospace Corp. was tasked with building the Trident spacecraft, with JPL responsible for providing Engineering Support (Mission Design & Navigation, Mission Planning, Flight Operations, Ground Data Systems, Systems Engineering) and leading Project Management. The observatory would carry a wide-ranging suite of scientific instruments onboard, including an Infrared Spectrometer (IRS) and Narrow Angle Camera (NAC) to be provided by Ball Aerospace Corp., a Wide Angle Camera (WAC) from JPL, a Magnetometer from UCLA, a contributed Plasma Science Suite from IRF (Sweden), and a contributed Radio Science instrument from ASI (Italy). All of these instruments would be used to collect unique datasets during the Triton encounter. Trident would have taken advantage of an ~13-yr, nearly-ballistic trajectory to Triton, utilizing a timely Jupiter Gravity Assist, to execute a 10-day long encounter in the Neptunian system. Launch was planned for October 2025, with Triton arrival scheduled for December 2038. The timeline for this mission would have been sub-divided into seven major phases: Launch, Commissioning, Inner Planet Cruise, Outer Planet Cruise, Approach, Encounter, and Science Data Return. Multiple planetary flybys were planned to be performed during the cruise, including three Earth flybys and one Venus flyby in the Inner Planet Cruise phase, and one Jupiter flyby in the Outer Planet Cruise phase. Along with conventional (Range and Doppler) tracking data, Delta-DOR and Optical Navigation data were also to be acquired to assist with spacecraft navigation during the Approach and Encounter phases. A 3 meter X-Band High Gain Antenna would allow playback of all science data at 1 kbps within 1 year after the Triton Encounter. The Mission Planning element on Trident encompassed and informed multiple aspects of this proposal, ranging from science observation planning during the Triton Encounter phase, to generation of activity timelines for all mission phases; performing ground coverage analysis for science observations to be acquired by all instruments and tracing them to science requirements; evaluation of spacecraft resources including data volume stored onboard, power/energy consumption, telecom (commanding/telemetry) requirements, and overall, working at the interface of science and engineering teams on the mission. All of these functions that were performed by the Mission Planning team on this proposal are discussed in this paper.

Prockter, Louise↗

Dynamical Decoupling for Measuring and Suppressing Crosstalk

Dynamical decoupling (DD) is a noise-mitigating strategy in which sequences of pulses are applied to single qubits to average out their interaction with the environment. DD has been extensively studied and demonstrated for suppressing single-qubit decoherence and can be tailored for different noise spectrum. We report another important adaptation of DD where crosstalk between qubits are suppressed. We demonstrate the efficiency of this procedure on quantum circuits on superconducting transmon-based quantum devices. We designed a family of syncopated DD sequences that effectively suppress ZZ coupling between qubit pairs, which is the dominating crosstalk form on the device. We insert DD to a quantum circuit whenever single qubits are idle (often during two-qubits gates on other qubits). While standard periodic DD suppress crosstalk between these qubits and their neighbors, the syncopated DD further decouples crosstalk between these qubits. We further designed short sequences that maximize the application of DD without adding time to the quantum circuit execution. Such DD sequences yield significant improvement of the performance of the algorithm on the hardware. The performance is further boosted by combining DD with another mitigation strategy, randomized compilation. Our work demonstrated that syncopated DD is effective and practical way to suppress crosstalk in quantum circuits and serves as a great probe to characterize the crosstalk and inform hardware design.

Quantum Computing↗

Mission Design Strategies for Rendezvous and Servicing of Sun-Earth Libration Point Missions

With the launch of the James Webb Space Telescope (JWST) and future launches of the Roman Space Telescope (RST) and larger telescopes such as the proposed Habitable Worlds Observatory (HWO), the questions of where and how to rendezvous to enable servicing of these telescope missions arise. To aid in determining the allowable locations to rendezvous for servicing from a trajectory design approach, our previous research and analysis has shown feasible transfer trajectories between the Sun-Earth Libration L2 region (Quasi-Halo orbit) and the Earth Moon vicinity (Distant Retrograde Orbit (DRO), Quasi-Halo Orbit, Halo Orbit, and Near Rectilinear Halo Orbit (NRHO)), along with the related transfer constraints and the corresponding total fuel mass costs. We now focus on operational-like optimal scenarios for these transfers to complete a rendezvous to permit servicing at various Libration orbit locations. In this paper, we address how operational navigation and maneuver execution uncertainties impact the rendezvous timing and fuel mass (via ΔV). While optimization techniques are applied to ensure minimal ΔVs, we also analyze various transfer trajectory durations and rendezvous arrival geometries. The analysis presented includes dynamical system approaches and applies optimization through several tools including the Adaptive Trajectory Design (ATD) module as an initial guess, numerical computation using the General Mission Analysis Tool (GMAT) and Systems Tool Kit (STK) with higher fidelity perturbation modeling, and recently developed optimization tools that incorporate dynamical systems directly into the optimization process. Transfer trajectory options examined include a direct transfer from Earth versus departures from the previously examined Earth-Moon regime orbits, e.g. NRHOs and DROs. A return from Sun-Earth to lunar vicinity for a complete servicing after a rendezvous in Sun-Earth orbit is also considered. The resultant ΔV’s for each scenario is provided with discussions on various transfer trades, rendezvous considerations, and orbital limitations from the dynamical systems. A Poincare-like mapping of trajectory and rendezvous conditions categorize feasible and optimum transfer approaches, dependent on Sun-Earth orbit mission parameters. The focus of this research addresses questions for upcoming trades regarding servicing options for current and future Sun-Earth L1 and L2 missions. By doing a comprehensive analysis approach (dynamical systems + high fidelity optimization with true operational constraints), this paper will serve as a guide for mission architecture and operational trade considerations.

Maneuver Design↗

Summary of Technical Interchange Meetings (TIMs) Designed to Enable Earth Independent Medical Operations (EIMO)

The Exploration Medical Capability Element (ExMC) in NASA’s Human Research Program hosted a series of TIMs in 2023-2024 designed to stimulate discussion around specific topics with the goal of enabling EIMO. In context of the thematic constituent elements of EIMO, namely pre-mission planning, acute/emergent/prolonged medical decision making, supply/resource management and task load management, subject matter experts from industry, academia and government (NASA and other Agencies) provided valuable and actionable guidance and recommendations. Earth-based medical experts will remain indispensable for pre-mission planning, however, management of acute/emergent medical contingencies will require a gradual transition of medical care and decision making from terrestrial to space-based assets to enable support of astronaut health and performance and reduce overall mission risk. Key to achieving these enhancements is providing an integrated data system platform capable of utilizing multiple data streams in concert with a variety of on-board databases and passive monitoring of video and wearable sensors to enable a multi-modal, agentic AI-based clinical decision support system (CDSS) to support crew medical officer (CMO) medical decision-making. The EIMO series of TIMs (I-V) have proven to be instructive and portend a significant paradigm shift will be necessary to maintain crew health and performance on exploration class missions. Importantly, since the expected paradigm shift will be significantly different from the methods of operation that have been employed for the majority of missions from the inception of human spaceflight to date, any proposed methods must be deployed in the setting of ongoing operations early and be “tested, reviewed and practiced” while reliable back-up is available to facilitate an Enterprise-wide level of comfort and acceptance. Serious constraints on data transmission coupled with a large and expanding universe of on-board medical informatics data streams will necessitate implementation of a CDSS to supplant the current reliance on support provided by ground-based SMEs. Establishment of trust in the system by CMO/crew and the ground-based medical support team will be essential. Co-development of a CDSS with industry partners will assure that state of the art tools can be employed, and industry efficiencies can be leveraged. Training regimens, materials and tools must evolve to be responsive (just-in-time training) and facilitate autonomous execution of procedures. Proficiency metrics should be established and be based on validated competencies or milestones as opposed to a prescribed number of training hours. Training should be prioritized for broad, translatable skills that have universal application across a variety of medical conditions. Repetition was deemed to be the key to achieving proficiency and emphasis should lie in procedural training which is known to extinguish more rapidly than diagnostic skills. Advanced tools, e.g., extended reality, can provide more realistic and effective training. Use of advanced probabilistic risk assessment tools will be essential to optimize the medical system capability while carefully balancing risk relative to mass/power/volume limitations. Importance of factoring use-life of medical supplies and maintaining awareness of redundancy and opportunity to re-purpose under off nominal situations was emphasized. Consideration of adopting optimized performance standards vs. “good-enough” performance thresholds is warranted. The use of legacy systems as opposed to creating new systems may be preferable. Managing task load and associated cognitive load will be essential to maintain operational safety and behavioral health. ExMC aspires to create a shared EIMO paradigm and strategic vision for advancing medical system design through novel technologies, training, protocols, and support capabilities, built upon the spirit of successful strategies and innovations over the past six decades of space medicine operations.

Jay Lemery↗

Latest Developments in PM Systems and Methods and their Application to WM Projects - 20364

How do you improve on an industry that is well established yet often misses the mark on key metrics demonstrating effective planning and execution of project scope, schedule and budget? With the increased complexity of DOE projects relative to either poorly kept records of what wastes are stored or the lack of specific knowledge relative to the waste concentrations/quantities, this is a question continually asked and investigated by many. In fact, in 2017, the GAO's report to Congress indicated that although the DOE has made some progress on its monitoring effectiveness and demonstrating progress criteria, these goals were not met and there needs to be more improvement and monitoring. This paper will offer some insights into the latest developments in project management methodologies and the possible application of these to waste management projects. Traditional data generated via a project schedule that utilizes critical path methodology (CPM) and additional earned value management (EVM) data needs to be accurate and enable the project manager to better understand the probability of project success. Although this data has readily been available on most large-scale projects, success as measured by various stakeholder groups including the client, project team, regulators, etc. is less than optimal. Therefore, an urgent need exists to explore how traditional project data (CPM and EVM) coupled with new methodologies allows for better planning and execution by the project team. Many new approaches/methodologies can even be used to predict the success of options prior to full implementation on the actual project. Three approaches/methodologies will be discussed: - Artificial Intelligence; - Change Management; - Blend of Traditional Management (Gantt chart) and Agile Methodologies. As market forces change, so will the direction of project management. The days of 'one size fits all' are no longer valid. A combination of predictive and adaptive approaches in the management of projects is essential to enable execution of project deliverables on time, under budget, and within the contractual scope. This paper is intended to provide the reader with insight to the close relationship of project management trends and business management trends, and to provoke critical thinking about what it means to align project management strategy with an environment of non-stop innovation. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

ClimGen: Learning the Forcing-Response Relationship in Climate System

Solar Radiation Management (SRM) is emerging as a potential geoengineering strategy to address the anthropogenic impact on climate, but its effective implementation requires an iterative and large ensemble of highly accurate and efficient climate projections. Traditional climate projections rely on executing computationally demanding and time-consuming numerical climate models. Recent advances in machine learning (ML) aim to enhance these approaches by emulating traditional methods. In this work, we propose a novel framework for directly learning the relationship between solar radiation flux at the top of the atmosphere and the corresponding surface temperature response. To evaluate the feasibility of this direct ML-based projection, we developed a dataset using an intermediate complexity model, incorporating a comprehensive suite of different forcing patterns and evaluation metrics to rigorously assess the ML model’s performance. We introduce a Conditional Denoising Diffusion Probabilistic Model (cDDPM) for this task, which demonstrates encouraging skill in representing climate statistics under previously unseen forcing patterns. This approach provides a promising pathway for direct climate projections by accurately learning the forcing-response relationship, with a wide range of applications in impact mitigation, emissions policy design, and SRM strategies.

Chen, Tse-Chun [BATTELLE (PACIFIC NW LAB)] (ORCID:↗

Personal Computer Transport Analysis Program

The Personal Computer Transport Analysis Program (PCTAP) is C++ software used for analysis of thermal fluid systems. The program predicts thermal fluid system and component transients. The output consists of temperatures, flow rates, pressures, delta pressures, tank quantities, and gas quantities in the air, along with air scrubbing component performance. PCTAP s solution process assumes that the tubes in the system are well insulated so that only the heat transfer between fluid and tube wall and between adjacent tubes is modeled. The system described in the model file is broken down into its individual components; i.e., tubes, cold plates, heat exchangers, etc. A solution vector is built from the components and a flow is then simulated with fluid being transferred from one component to the next. The solution vector of components in the model file is built at the initiation of the run. This solution vector is simply a list of components in the order of their inlet dependency on other components. The component parameters are updated in the order in which they appear in the list at every time step. Once the solution vectors have been determined, PCTAP cycles through the components in the solution vector, executing their outlet function for each time-step increment.

DiStefano, Frank, III↗

Autonomy Architectures for a Constellation of Spacecraft

Until the past few years, missions typically involved fairly large expensive spacecraft. Such missions have primarily favored using older proven technologies over more recently developed ones, and humans controlled spacecraft by manually generating detailed command sequences with low-level tools and then transmitting the sequences for subsequent execution on a spacecraft controller. This approach toward controlling a spacecraft has worked spectacularly on previous missions, but it has limitations deriving from communications restrictions - scheduling time to communicate with a particular spacecraft involves competing with other projects due to the limited number of deep space network antennae. This implies that a spacecraft can spend a long time just waiting whenever a command sequence fails. This is one reason why the New Millennium program has an objective to migrate parts of mission control tasks onboard a spacecraft to reduce wait time by making spacecraft more robust. The migrated software is called a "remote agent" and has 4 components: a mission manager to generate the high level goals, a planner/scheduler to turn goals into activities while reasoning about future expected situations, an executive/diagnostics engine to initiate and maintain activities while interpreting sensed events by reasoning about past and present situations, and a conventional real-time subsystem to interface with the spacecraft to implement an activity's primitive actions. In addition to needing remote planning and execution for isolated spacecraft, a trend toward multiple-spacecraft missions points to the need for remote distributed planning and execution. The past few years have seen missions with growing numbers of probes. Pathfinder has its rover (Sojourner), Cassini has its lander (Huygens), and the New Millenium Deep Space 3 (DS3) proposal involves a constellation of 3 spacecraft for interferometric mapping. This trend is expected to continue to progressively larger fleets. For example, one mission proposed to succeed DS3 would have 18 spacecraft flying in formation in order to detect earth-sized planets orbiting other stars. A proposed magnetospheric constellation would involve 5 to 500 spacecraft in Earth orbit to measure global phenomena within the magnetosphere. This work describes and compares three autonomy architectures for a system that continuously plans to control a fleet of spacecraft using collective mission goals instead of goals or command sequences for each spacecraft. A fleet of self-commanding spacecraft would autonomously coordinate itself to satisfy high level science and engineering goals in a changing partially-understood environment making feasible the operation of tens or even a hundred spacecraft (such as for interferometry or plasma physics missions). The easiest way to adapt autonomous spacecraft research to controlling constellations involves treating the constellation as a single spacecraft. Here one spacecraft directly controls the others as if they were connected. The controlling "master" spacecraft performs all autonomy reasoning, and the slaves only have real-time subsystems to execute the master's commands and transmit local telemetry/observations. The executive/diagnostics module starts actions and the master's real-time subsystem controls the action either locally or remotely through a slave. While the master/slave approach benefits from conceptual simplicity, it relies on an assumption that the master spacecraft's executive can continuously monitor the slaves' real-time subsystems, and this relies on high-bandwidth highly-reliable communications. Since unintended results occur fairly rarely, one way to relax the bandwidth requirements involves only monitoring unexpected events in spacecraft. Unfortunately, this disables the ability to monitor for unexpected events between spacecraft and leads to a host of coordination problems among the slaves. Also, failures in the communications system can result in losing slaves. The other two architectures improve robustness while reducing communications by progressively distributing more of the other three remote agent components across the constellation. In a teamwork architecture, all spacecraft have executives and real-time subsystems - only the leader has the planner/scheduler and mission manager. Finally, distributing all remote agent components leads to a peer-to-peer approach toward constellation control.

Barrett, Anthony↗

Robust rendezvous maneuver point conditions

This study develops rendezvous maneuver point conditions that are robust to one dimensional errors in state estimation and burn execution. Allowing small deviations in the time of intercept provides a degree of freedom that can be used to compensate for these errors. The direction of allowable burn deviation is developed for errors in state estimation and burn execution. The maneuver points for which the error is aligned with the insensitive direction provide excellent rendezvous initiation points. The method is applied to sample rendezvous for vehicles in circular and elliptic orbits. Robust maneuver points are selected and the vehicles' relative motion plotted, demonstrating the validity of the maneuver points. Finally, a graphical illustration of the error focusing effect is demonstrated by means of a Monte Carlo simulation.

Fogle, Debra Ann↗

Grid2: A Program for Rapid Estimation of the Jovian Radiation Environment: A Numeric Implementation of the GIRE2 Jovian Radiation Model for Estimating Trapped Radiation for Mission Concept Studies

Grid2 is a program that utilizes the Galileo Interim Radiation Electron model 2 (GIRE2) Jovian radiation model to compute fluences and doses for Jupiter missions. (Note: The iterations of these two softwares have been GIRE and GIRE2; likewise Grid and Grid2.) While GIRE2 is an important improvement over the original GIRE radiation model, the GIRE2 model can take as long as a day or more to compute these quantities for a complete mission. Grid2 fits the results of the detailed GIRE2 code with a set of grids in local time and position thereby greatly speeding up the execution of the model--minutes as opposed to days. The Grid2 model covers the time period from 1971 to 2050and distances of 1.03 to 30 Jovian diameters (Rj). It is available as a direct-access database through a FORTRAN interface program. The new database is only slightly larger than the original grid version: 1.5 gigabytes (GB) versus 1.2 GB.

Europa↗

Real-time control for manufacturing space shuttle main engines: Work in progress

During the manufacture of space-based assemblies such as Space Shuttle Main Engines, flexibility is required due to the high-cost and low-volume nature of the end products. Various systems have been developed pursuing the goal of adaptive, flexible manufacturing for several space applications, including an Advanced Robotic Welding System for the manufacture of complex components of the Space Shuttle Main Engines. The Advanced Robotic Welding System (AROWS) is an on-going joint effort, funded by NASA, between NASA/Marshall Space Flight Center, and two divisions of Rockwell International: Rocketdyne and the Science Center. AROWS includes two levels of flexible control of both motion and process parameters: Off-line programming using both geometric and weld-process data bases, and real-time control incorporating multiple sensors during weld execution. Both control systems were implemented using conventional hardware and software architectures. The feasibility of enhancing the real-time control system using the problem-solving architecture of Schemer is investigated and described.

Ruokangas, Corinne C.↗

Evaluation of Crew-Centric Onboard Mission Operations Planning and Execution Tool: Year 2

Currently, mission planning for the International Space Station (ISS) is largely affected by ground operators in mission control. The task of creating a week-long mission plan for ISS crew takes dozens of people multiple days to complete, and is often created far in advance of its execution. As such, re-planning or adapting to changing real-time constraints or emergent issues is similarly taxing. As we design for future mission operations concepts to other planets or areas with limited connectivity to Earth, more of these ground-based tasks will need to be handled autonomously by the crew onboard.There is a need for a highly usable (including low training time) tool that enables efficient self-scheduling and execution within a single package. The ISS Program has identified Playbook as a potential option. It already has high crew acceptance as a plan viewer from previous analogs and can now support a crew self-scheduling assessment on ISS or on another mission. The goals of this work, a collaboration between the Human Research Program and the ISS Program, are to inform the design of systems for more autonomous crew operations and provide a platform for research on crew autonomy for future deep space missions. Our second year of the research effort have included new insights on the crew self-scheduling sessions performed by the crew through use on the HERA (Human Exploration Research Analog) and NEEMO (NASA Extreme Environment Mission Operations) analogs. Use on the NEEMO analog involved two self-scheduling strategies where the crew planned and executed two days of EVAs (Extra-Vehicular Activities). On HERA year two represented the first HERA campaign where we were able to perform research tasks. This involved selected flexible activities that the crew could schedule, mock timelines where the crew completed more complex planning exercises, usability evaluation of the crew self-scheduling features, and more insights into the limit of plan complexity that the crew could effectively self-schedule. In parallel we have added in new features and functionality in the Playbook tool based off of our insights from crew self-scheduling in the NASA analogs. In particular this year we have added in the ability for the crew to add, edit, and remove their own activities in the Playbook tool, expanding the type of planning and re-planning possible in the tool and opening up the ability for more free form plan creation. The ability to group and manipulate groups of activities from the plan task list was also added, allowing crew members to add predefined sets of activities onto their mission timeline. In addition we also added a way for crew members to roll back changes in their plan, in order to allow an undo like capability. These features expand and complement the initial self-scheduling features added in year one with the goal of making crew autonomous planning more efficient. As part of this work we have also finished developing the first version of our Playbook Data Analysis Tool, a research tool built to interpret and analyze the unobtrusively collected data obtained during the NASA analog missions through Playbook. This data which includes user click interaction as well as plan change information, through the Playbook Data Analysis Tool, allows us to playback this information as if a video camera was mounted over the crewmember's tablet. While the primary purpose of this tool is to allow usability analysis of crew self-scheduling sessions used on the NASA analog, since the data collected is structured, the tool can automatically derive metrics that would be traditionally tedious to achieve without manual analysis of video playback. We will demonstrate and discuss the ability for future derived metrics to be added to the tool. In addition to the current data and results gathered in year two we will also discuss the preparation and goals of our International Space Station (ISS) onboard technology demonstration with Playbook. This technology demonstration will be preformed as part of the CAST payload starting in late 2016.

onboard planning↗

Flight Test Exploration of Integrated Wildfire Response Operations with Crewed and Uncrewed Air Assets

Since 2016, Japan Aerospace Exploration Agency (JAXA) and NASA have partnered to investigate the safe and efficient integration of uncrewed aircraft systems (UAS) in disaster relief operations. Current disaster response operations would benefit from the use of UAS but are limited by the need for safe airspace integration technologies and enabling regulations. The work presented in this paper focuses on the safe integration of UAS and helicopters in active wildfire disaster response operations. The authors propose the use of mission planning and traffic management technologies, including onboard pilot situation awareness support technologies, to coordinate airspace operations between crewed and uncrewed aircraft (e.g., UAS). A representative wildfire scenario including a helicopter and UAS was developed. The helicopter mission included a flight path that mimicked the siphoning of water from a natural water reservoir (lake) and a subsequent water drop over vegetation along the progressing edge of a fire perimeter. Simulated UAS were assumed to conduct aerial ignition flights in the vicinity as part of a controlled burn of the vegetation ahead of the fire front to create a natural barrier between the fire and a nearby populated area. A situation awareness tool was developed and used to support the helicopter pilots’ task to stay clear of the volume of airspace where the UAS was conducting its operation while efficiently conducting the fire suppression mission. A flight test using JAXA’s experimental helicopter was conducted in August 2022 to validate the developed technology. The advantages of the developed technology were demonstrated, and pilot feedback confirmed that real-time awareness of the UAS operation airspace helped the flight planning and execution of a safe mission that minimized the flight time loss due to the potential interference with the UAS. Post-flight interviews with the pilots indicated no sufficient increase in the pilots’ workload and provided ideas for future technology development. Future research will provide recommendations to standards development organizations to support considerations for crewed-uncrewed interactions in disaster-response operations.

disaster response↗

ECP Milestone Memo WBS 2.3.4.13 ECP/VTK-m FY18Q4 [MS-18/09-10] Dynamic Types / Rendering Topologies STDA05-16

The STDA05-16 milestone comprises the following 3 distinct deliverables. OpenMP VTK-m currently supports three types of devices: serial CPU, TBB, and CUDA. To run algorithms on multicore CPU-type devices (such as Xeon and Xeon Phi), TBB is required. However, there are known issues with integrating a software product using TBB with another one using OpenMP. Therefore, we will add an OpenMP device to the VTK-m software. When engaged, this device will run parallel algorithms using OpenMP directives. This will mesh more nicely with other code also using OpenMP. Rendering Topological Entities VTK-m currently supports surface rendering by tessellation of data structures,and rendering the resulting triangles. We will extend current functionality to include face, edge, and point rendering. Better Dynamic Types Impl For the best efficiency across all platforms, VTK-m algorithms use static typing with C++ templates. However, many libraries like VTK, ParaView, and Visit use dynamic types with virtual functions because data types often cannot be determined at compile time. We have an interface in VTK-m to merge these two typing mechanisms by generating all possible combinations of static types when faced with a dynamic type. Although this mechanism works, it generates very large executables and takes a very long time to compile. As we move forward, it is clear that these problems will get worse and become infeasible at exascale. We will rectify the problem by introducing some level of virtual methods, which require only a single code path, within VTK-m algorithms. This first milestone produces a design document to propose an approach to the new system.

97 MATHEMATICS AND COMPUTING↗

Resource utilization model for the algorithm to architecture mapping model

The analytical model for resource utilization and the variable node time and conditional node model for the enhanced ATAMM model for a real-time data flow architecture are presented in this research. The Algorithm To Architecture Mapping Model, ATAMM, is a Petri net based graph theoretic model developed at Old Dominion University, and is capable of modeling the execution of large-grained algorithms on a real-time data flow architecture. Using the resource utilization model, the resource envelope may be obtained directly from a given graph and, consequently, the maximum number of required resources may be evaluated. The node timing diagram for one iteration period may be obtained using the analytical resource envelope. The variable node time model, which describes the change in resource requirement for the execution of an algorithm under node time variation, is useful to expand the applicability of the ATAMM model to heterogeneous architectures. The model also describes a method of detecting the presence of resource limited mode and its subsequent prevention. Graphs with conditional nodes are shown to be reduced to equivalent graphs with time varying nodes and, subsequently, may be analyzed using the variable node time model to determine resource requirements. Case studies are performed on three graphs for the illustration of applicability of the analytical theories.

Stoughton, John W.↗

Information Systems for Crew-Led Operations Beyond Low-Earth Orbit

On past and present human space missions, the management of vehicle health and status has primarily been executed from Earth. Missions such as Apollo, Space Shuttle, and ISS have relied on a safety net of ground-based experts with access to real-time telemetry data, broad and deep systems expertise, and powerful analytical and computing capabilities. The ground team monitors and manages the vehicle’s health in real-time and responds quickly to critical situations and malfunctions. Ground operators also provide real-time oversight and verbal guidance to flight crew members, especially during complex procedure execution and high-risk activities like extra-vehicular activities. However, this operational paradigm, in place for 60 years, will not transfer to long duration exploration missions beyond low Earth orbit (LEO). Lunar and deep-space crewed missions will encounter delayed communications that prohibit real-time operational and medical support. Additionally, there will be infrequent resupply and a diminished capacity to evacuate or rescue crew members. A small crew must operate independently, managing the vehicle’s state, responding to time-critical events, and executing complex procedures, all without the safety net of real-time support.

data representation↗

Visualization design and verification of Ada tasking using timing diagrams

The use of timing diagrams is recommended in the design and testing of multi-task Ada programs. By displaying the task states vs. time, timing diagrams can portray the simultaneous threads of data flow and control which characterize tasking programs. This description of the system's dynamic behavior from conception to testing is a necessary adjunct to other graphical techniques, such as structure charts, which essentially give a static view of the system. A series of steps is recommended which incorporates timing diagrams into the design process. Finally, a description is provided of a prototype Ada Execution Analyzer (AEA) which automates the production of timing diagrams from VAX/Ada debugger output.

Vidale, R. F.↗

Continual coordination through shared activities

Interacting agents that interleave planning and execution must reach consensus on their commitments to each other. In domains where agents have varying degrees of interaction and different constraints on communication and computation, agents will require different coordination protocols in order to efficiently reach consensus in real time. We briefly describe a largely unexplored class of realtime, distributed planning problems (inspired by interacting spacecraft missions), new challenges they pose, and a general approach to solving the problems. These problems involve self-interested agents that have infrequent communication but collaborate on joint activities. We describe a Shared Activity Coordination (SHAC) framework that provides a decentralized algorithm for negotiating the scheduling of shared activities over the lifetimes of separate missions, a soft, real-time approach to reaching consensus during execution with limited communication, and a foundation for customizing protocols for negotiating planner interactions. We apply SHAC to a realistic simulation of interacting Mars missions and illustrate the simplicity of protocol development.

planning↗