Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “environmental requirements program”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 865 records · Page 48

Integrated Weed Control for Land Stewardship at Legacy Management's Rocky Flats Site in Colorado - 13086

Land stewardship is one of nine sustainability programs in the U.S. Department of Energy's Environmental Management System. Land stewardship includes maintaining and improving ecosystem health. At the Rocky Flats Site near Westminster, Colorado, land stewardship is an integral component of the Office of Legacy Management's post-closure monitoring and management at the site. Nearly 263 hectares (650 acres) were disturbed and re-vegetated during site cleanup and closure operations. Proactive management of revegetation areas is critical to the successful reestablishment of native grasslands, wetlands, and riparian communities. The undisturbed native plant communities that occur at the site also require active management to maintain the high-quality wetlands and other habitats that are home to numerous species of birds and other wildlife such as elk and deer, rare plant communities, and the federally listed threatened Preble's meadow jumping mouse. Over the past several decades, an increase of Noxious weeds has impacted much of Colorado's Front Range. As a result, weed control is a key component of the land stewardship program at Rocky Flats. Thirty-three species of state-listed Noxious weeds are known to occur in the Central and Peripheral Operable Units at Rocky Flats, along with another five species that are considered invasive at the site. Early detection and rapid response to control new invasive species is crucial to the program. An integrated weed control/vegetation management approach is key to maintaining healthy, sustainable plant communities that are able to resist Noxious weed invasions. Weed mapping, field surveys, and field-staff training sessions (to learn how to identify new potential problem species) are conducted to help detect and prevent new weed problems. The integrated approach at Rocky Flats includes administrative and cultural techniques (prevention), mechanical controls, biological controls, and chemical controls. Several species of biocontrol insects have been released to assist with control of different target weed species. Monitoring is conducted to evaluate the effectiveness of control efforts and to provide information for future control efforts. The effective implementation of this integrated approach has reduced the infestation levels of many species and has kept several newly discovered invasive species from spreading and becoming larger problems at the site. (authors)

54 ENVIRONMENTAL SCIENCES↗

The need for health impact assessment in China: Potential benefits for public health and steps forward

Health impact assessment (HIA) is a useful tool to predict and estimate the potential health impact associated with programs, projects, and policies by comprehensively identifying relevant health determinants and their consequences. China is undergoing massive and rapid socio-economic changes leading to environment and population health challenges such as a large increase in non-communicable diseases, the emergence and re-emergence of infectious diseases, new health risks associated with environmental pollutants and escalating health inequality. These health issues are affected by multiple determinants which can be influenced by planned policies, programs, and projects. This paper discusses the needs for health impact assessment in China in order to minimize the negative health consequences from projects, programs and policies associated with rapid social and economic development. It first describes the scope of China's current impact assessment system and points out its inadequacy in meeting the requirements of population health protection and promotion. It then analyses the potential use of HIA and why China needs to develop and apply HIA as a tool to identify potential health impacts of proposed programs, projects and policies so as to influence decision-making early in the planning process. Thus, the paper recommends the development of HIA as a useful tool in China to enhance decision-making for the protection and promotion of population health. For this to happen, the paper outlines steps necessary for the establishment and successful implementation of HIA in China: beginning with the establishment of a HIA framework, followed by workforce capacity building, methodology design, and intersectoral collaboration and stakeholder engagement.

54 ENVIRONMENTAL SCIENCES↗

Waste management technology development and demonstration programs at Brookhaven National Laboratory

Two thermoplastic processes for improved treatment of radioactive, hazardous, and mixed wastes were developed from bench scale through technology demonstration: polyethylene encapsulation and modified sulfur cement encapsulation. The steps required to bring technologies from the research and development stage through full scale implementation are described. Both systems result in durable waste forms that meet current Nuclear Regulatory Commission and Environmental Protection Agency regulatory criteria and provide significant improvements over conventional solidification systems such as hydraulic cement. For example, the polyethylene process can encapsulate up to 70 wt pct. nitrate salt, compared with a maximum of about 20 wt pct. for the best hydraulic cement formulation. Modified sulfur cement waste forms containing as much as 43 wt pct. incinerator fly ash were formulated, whereas the maximum quantity of this waste in hydraulic cement is 16 wt pct.

Kalb, Paul D.↗

Metering Plan: Intelligent Operational Strategies Through Enhanced Metering Systems

The Sustainability Program at Pacific Northwest National Laboratory (PNNL) has adopted a “triple-bottom-line” approach of environmental stewardship, social responsibility, and economic prosperity to its operations. Metering at PNNL works in support of all three, specifically to measure and inform building energy use and greenhouse gas emissions and minimize water use. The foundation for metering at PNNL is a core goal set, which consists of four objectives: providing accurate data without interruption, analyzing data while it is still new, providing actionable recommendations to operations management, and ensuring PNNL’s compliance with contract metering requirements. These core objectives guide the decisions that we make during annual planning and as we operate throughout the year. This 2016 edition of the Metering Plan conveys the metering practices for and vision of the Sustainability Program. Changes in this plan from the 2015 edition include updated tables and an enhanced discussion on energy tracking systems used at PNNL. This plan also discusses updated benchmarking strategies using PNNL’s graphics and analytics tool, BuildingOS by Lucid Design Group. This plan presents our progress toward the metering goals shared by all federal agencies and highlights our successful completion of metering requirements. Currently, PNNL is fully compliant with the applicable legislative and Executive Order metering requirements. PNNL’s approach to the installation of new meters will be discussed. Perhaps most importantly, this plan details the analysis techniques utilized at PNNL that rely on the endless streams of data newly available as a result of increased meter deployment over the last several years. Previous Metering Plans have documented specific meter connection schemes as PNNL focused on deploying meters in a first step toward managing energy and water use. This plan serves not only to highlight PNNL’s successful completion of agency metering goals, but also can be used as a guideline for meter installation and data analysis.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Marine carbon dioxide removal (mCDR) test site needs: A joint PNNL-PMEL workshop report

This workshop report summarizes testing and capability needs for marine Carbon Dioxide Removal (mCDR) research identified by researchers from DOE’s Pacific Northwest National Laboratory (PNNL) and NOAA’s Pacific Marine Environmental Laboratory (PMEL) as essential to advancing the state of the science and technology. A one-day workshop was held for 36 hybrid participants on June 2, 2023 at PNNL’s Marine and Coastal Sciences Laboratory in Sequim, WA. The workshop began with DOE and NOAA leadership offering perspectives on the mission alignment and long-term implementation of mCDR research within NOAA’s Office of Ocean and Atmospheric Research (OAR), DOE’s Water Power Technologies Office (WPTO), and DOE’s Office of Fossil Energy and Carbon Management (FECM). As identified by the participants and by program leadership at both agencies, many mCDR strategies are in early stages of development making it difficult to reliably estimate their impact. The essential next step in proving the efficacy, safety, and sustainability of these solutions and identifying market potential requires studies under field-relevant conditions.

13 HYDRO ENERGY↗

The thioredoxin TRX-1 regulates adult lifespan extension induced by dietary restriction in Caenorhabditis elegans

Highlights: {yields} First in vivo data for thioredoxin in dietary-restriction-(DR)-induced longevity. {yields} Thioredoxin (trx-1) loss suppresses longevity of eat-2 mutant, a genetic DR model. {yields} trx-1 overexpression extends wild-type longevity, but not that of eat-2 mutant. {yields} Longevity by dietary deprivation (DD), a non-genetic DR model, requires trx-1. {yields} trx-1 expression in ASJ neurons of aging adults is increased in response to DD. -- Abstract: Dietary restriction (DR) is the only environmental intervention known to extend adult lifespan in a wide variety of animal models. However, the genetic and cellular events that mediate the anti-aging programs induced by DR remain elusive. Here, we used the nematode Caenorhabditis elegans to provide the first in vivo evidence that a thioredoxin (TRX-1) regulates adult lifespan extension induced by DR. We found that deletion of the gene trx-1 completely suppressed the lifespan extension caused by mutation of eat-2, a genetic surrogate of DR in the worm. However, trx-1 deletion only partially suppressed the long lifespan caused by mutation of the insulin-like receptor gene daf-2 or by mutation of the sensory cilia gene osm-5. A trx-1::GFP translational fusion expressed from its own promoter in ASJ neurons (Ptrx-1::trx-1::GFP) rescued the trx-1 deletion-mediated suppression of the lifespan extension caused by mutation of eat-2. This rescue was not observed when trx-1::GFP was expressed from the ges-1 promoter in the intestine. In addition, overexpression of Ptrx-1::trx-1::GFP extended lifespan in wild type, but not in eat-2 mutants. trx-1 deletion almost completely suppressed the lifespan extension induced by dietary deprivation (DD), a non-genetic, nutrient-based model of DR in the worm. Moreover, DD upregulated the expression of a trx-1 promoter-driven GFP reporter gene (Ptrx-1::GFP) in ASJ neurons of aging adults, but not that of control Pgpa-9::GFP (which is also expressed in ASJ neurons). We propose that DR activates TRX-1 in ASJ neurons during aging, which in turn triggers TRX-1-dependent mechanisms to extend adult lifespan in the worm.

60 APPLIED LIFE SCIENCES↗

An Assessment of Energy Potential at Non-Powered Dams in the United States

The United States has produced clean, renewable electricity from hydropower for more than 100 years, but hydropower-producing facilities represent only a fraction of the infrastructure development that has taken place on the nation’s waterways. In contrast to the roughly 2,500 dams that provide 78 gigawatts (GW) 1 of conventional and 22 GW of pumped-storage hydropower, the United States has more than 80,000 non-powered dams (NPDs)—dams that do not produce electricity—providing a variety of services ranging from water supply to inland navigation. Importantly, many of the monetary costs and environmental impacts of dam construction have already been incurred at NPDs, so adding power to the existing dam structure can often be achieved at lower cost, with less risk, and in a shorter timeframe than development requiring new dam construction. The abundance, cost, and environmental favorability of NPDs, combined with the reliability and predictability of hydropower, make these dams a highly attractive source for expanding the nation’s renewable energy supply. To better characterize this unique national resource, the U.S. Department of Energy (DOE) Wind and Water Power Program has undertaken a national-scale analysis of U.S. dams to determine the ability of NPDs to provide hydroelectric power. DOE’s Oak Ridge National Laboratory (ORNL), with input from DOE’s Idaho National Laboratory, quantified the potential capacity and generation available from adding power production capability to U.S. NPDs. Of the more than 80,000 NPDs throughout the U.S., 54,391 dams were analyzed, with remaining dams eliminated from consideration due to erroneous geographic information, or erroneous flow or drainage area attributes that could not be resolved and corrected through independent investigation of maps and records. Anecdotal information suggests that these dams with missing or erroneous information are likely to be relatively small or have low potential to produce hydroelectric energy. Dams with a reported height of less than five feet were also excluded from analysis. A thorough quality control and review process ensured that the 54,391 remaining NPDs were analyzed and characterized as accurately as possible. Figure ES-1 demonstrates the spatial and capacity potential distribution of the nation’s NPDs. Electric generating capacities included in the report were calculated using the assumption that all water passing a facility would be available for conversion into electrical energy and that hydraulic head at the facility would remain constant. The analysis did not consider the economic feasibility of developing each unpowered facility. The assessment provides preliminary information for stakeholders (such as developers, municipal planners, and policymakers), who can further evaluate the potential to increase hydropower production at NPD sites. Developers could use the information provided in this assessment to focus on more detailed analysis of sites that demonstrate a reasonable potential for being developed. Adding power to U.S. NPDs has the potential to add up to 12 GW (12,000 megawatts or MW) of new renewable capacity—a potential equivalent to increasing the size of the existing conventional hydropower fleet by 15%. A majority of this potential is concentrated in just 100 NPDs, which could contribute approximately 8 GW of clean, reliable hydropower; the top 10 facilities alone could add up to 3 GW of new hydropower. Eighty-one of the 100 top NPDs are U.S. Army Corps of Engineers (USACE) facilities, many of which, including all of the top 10, are navigation locks on the Ohio River, Mississippi River, Alabama River, and Arkansas River, as well as their major tributaries. This study also shows that dams owned by the U.S. Bureau of Reclamation hold the potential to add approximately 260 MW of capacity; the Bureau has also engaged in an effort to conduct a more detailed evaluation of its own facilities.

13 HYDRO ENERGY↗

Annual Waste Minimization Summary Report, Calendar Year 2009

This report summarizes the waste minimization efforts undertaken by National Security Technologies, LLC, for the U. S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO), during calendar year 2009. This report was developed in accordance with the requirements of the Nevada Test Site Resource Conservation and Recovery Act Permit (No. NEV HW0021), and as clarified in a letter dated April 21, 1995, from Paul Liebendorfer of the Nevada Division of Environmental Protection to Donald Elle of the U.S. Department of Energy, Nevada Operations Office. The NNSA/NSO Pollution Prevention (P2) Program establishes a process to reduce the volume and toxicity of waste generated by NNSA/NSO activities and ensures that proposed methods of treatment, storage, and/or disposal of waste minimize potential threats to human health and the environment. The following information provides an overview of the P2 Program, major P2 accomplishments during the reporting year, a comparison of the current year waste generation to prior years, and a description of efforts undertaken during the year to reduce the volume and toxicity of waste generated by NNSA/NSO.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Advanced supersonic transport design developments

Advanced technology studies have indicated a major payload/range improvement for the next generation supersonic transport while meeting stringent environmental requirements. The major technology advance is the variable-cycle engine. When integrated with efficient aerodynamic and structural concepts, the variable-cycle engine airplane will attain a design range of 5500 nautical miles with no penalty for take-off noise or subsonic missions. The goal - not achievable in past programs - will allow one airplane to compete subsonic in over-land sonic boom prohibited areas as well as over-water supersonic routes. This goal will not be achieved without an aggressive technology development program.

Driver, C.↗

A user's guide to the Flexible Spacecraft Dynamics and Control Program

A guide to the use of the Flexible Spacecraft Dynamics Program (FSD) is presented covering input requirements, control words, orbit generation, spacecraft description and simulation options, and output definition. The program can be used in dynamics and control analysis as well as in orbit support of deployment and control of spacecraft. The program is applicable to inertially oriented spinning, Earth oriented or gravity gradient stabilized spacecraft. Internal and external environmental effects can be simulated.

Fedor, J. V.↗

Space station long-term lubrication analysis

The objectives of this program are: (1) to perform a complete tribology survey of every point of contact in the space station subject to relative motion regarding the materials, environment, and operation characteristics, (2) to review each point of relative motion regarding the selected materials and lubricants from the standpoint of the required operating characteristics and environmental conditions, (3) to make recommendations for improvements where the lubricants and/or materials are not considered optimum, and (4) to perform or recommend simulated or full-scale tests on components where problems are possible or likely because of new designs, significant design extensions beyond current practice, or sensitivity of other components to problems with a particular point of contact. The project is to be conducted over a 3-year time frame in two phases. Phase 1 will be a preliminary analysis conducted during the preliminary design phases of the Space Station. Phase 2 will be a more detailed analysis conducted during the period when the design becomes more established.

Dufrane, K. F.↗

The X-15/HL-20 operations support comparison

During the 1960's, the United States X-15 rocket-plane research program successfully demonstrated the ability to support a reusable vehicle operating in a near-space environment. The similarity of the proposed HL-20 lifting body concept in general size, weight, and subsystem composition to that of the X-15 provided an opportunity for a comparison of the predicted support manpower and turnaround times with those experienced in the X-15 program. Information was drawn from both reports and discussions with X-15 program personnel to develop comparative operations and support data. Based on the assumption of comparability between the two systems, the predicted staffing levels, skill mix, and refurbishment times of an operational HL-20 appear to be similar to those experienced by the X-15 for ground support. However, safety, environmental, and support requirements have changed such that the HL-20 will face a different operating environment than existed at Edwards during the 1950's and 1960's. Today's operational standards may impose additional requirements on the HL-20 that will add to the maintenance and support burden estimate based on the X-15 analogy.

Morris, W. Douglas↗

Theoretical study of thermodynamic properties and reaction rates of importance in the high-speed research program

One of the primary goals of NASA's high-speed research program is to determine the feasibility of designing an environmentally safe commercial supersonic transport airplane. The largest environmental concern is focused on the amount of ozone destroying nitrogen oxides (NO(x)) that would be injected into the lower stratosphere during the cruise portion of the flight. The limitations placed on NO(x) emission require more than an order of magnitude reduction over current engine designs. To develop strategies to meet this goal requires first gaining a fundamental understanding of the combustion chemistry. To accurately model the combustor requires a computational fluid dynamics approach that includes both turbulence and chemistry. Since many of the important chemical processes in this regime involve highly reactive radicals, an experimental determination of the required thermodynamic data and rate constants is often very difficult. Unlike experimental approaches, theoretical methods are as applicable to highly reactive species as stable ones. Also our approximation of treating the dynamics classically becomes more accurate with increasing temperature. In this article we review recent progress in generating thermodynamic properties and rate constants that are required to understand NO(x) formation in the combustion process. We also describe our one-dimensional modeling efforts to validate an NH3 combustion reaction mechanism. We have been working in collaboration with researchers at LeRC, to ensure that our theoretical work is focused on the most important thermodynamic quantities and rate constants required in the chemical data base.

Langhoff, Stephen↗

The Passive Optical Sample Assembly (POSA): I Experiment: First Flight Results and Conclusions

The Passive Optical Sample Assembly-I (POSA-I), part of the Mir Environmental Effects Payload (MEEP), was designed to study the combined effects of contamination, atomic oxygen, ultraviolet radiation, vacuum, thermal cycling, and other constituents of the space environment on spacecraft materials. The MEEP program is a Phase 1 International Space Station Risk Mitigation Experiment. SSP 30258 "Thermal Control Architectural Control Document", section 3.1.2 requires that International Space Station (ISS) external materials meet performance requirements when exposed to the external environment as defined in SSP 30426, "Space Station External Contamination Control Requirements." Contamination control documents call for less than 3 x 10(exp -7) gm/sq cm/yr of molecular contamination on a surface at 300 K at the Prime Measurement Points during quiescent periods and less than 1 x 10(exp-6) gm/sq cm/yr during non-quiescent periods. Assuming a density of 1.0 g/cu cm for the contaminant, this is roughly equivalent to 30-100 A per year. A previous Mir flight experiment (Guillaumon et al. 1991) measured 321-716 A per year. Were this to happen on ISS, the radiators would reach end-of-life properties much sooner than the planned 10 years. Therefore, POSA was proposed to expose ISS-baselined materials (such as Z93 white thermal control paint and chromic acid anodized aluminum) to the Mir environment and determine not only the level of contamination from an orbiting, active space station but also the effect of contamination on thermal optical properties. POSA-I consisted of nearly 400 samples of various candidate materials for ISS. Paint samples flown included Z-93 and YB-71 white thermal control paints and a new inorganic bright yellow paint htat can be utilized for astronaut visual aids.

Zwiener, James M.↗

Development of a New Data Tool for Computing Launch and Landing Availability with Respect to Surface Weather

The Marshall Space Flight Center Natural Environments Branch has a long history of expertise in the modeling and computation of statistical launch availabilities with respect to weather conditions. Their existing data analysis product, the Atmospheric Parametric Risk Assessment (APRA) tool, computes launch availability given an input set of vehicle hardware and/or operational weather constraints by calculating the climatological probability of exceeding the specified constraint limits, APRA has been used extensively to provide the Space Shuttle program the ability to estimate impacts that various proposed design modifications would have to overall launch availability. The model accounts for both seasonal and diurnal variability at a single geographic location and provides output probabilities for a single arbitrary launch attempt. Recently, the Shuttle program has shown interest in having additional capabilities added to the APRA model, including analysis of humidity parameters, inclusion of landing site weather to produce landing availability, and concurrent analysis of multiple sites, to assist in operational landing site selection. In addition, the Constellation program has also expressed interest in the APRA tool, and has requested several additional capabilities to address some Constellation-specific issues, both in the specification and verification of design requirements and in the development of operations concepts. The combined scope of the requested capability enhancements suggests an evolution of the model beyond a simple revision process. Development has begun for a new data analysis tool that will satisfy the requests of both programs. This new tool, Probabilities of Atmospheric Conditions and Environmental Risk (PACER), will provide greater flexibility and significantly enhanced functionality compared to the currently existing tool.

Burns, K. Lee↗

FUSRAP Maywood Site - Remediation of a Residential Property at 61 Trudy Drive, Lodi, NJ - 17533

The Formerly Utilized Sites Remedial Action Program (FUSRAP) is the U.S. government program started in 1974 to identify, investigate and clean up or control sites that became contaminated as a result of the nation's early atomic programs. The FUSRAP Maywood (New Jersey) Superfund Site (FMSS) consists of 92 designated property parcels known as vicinity properties. 61 Trudy Drive in Lodi, New Jersey is one such vicinity property. Construction planning for a recently-completed remedial excavation at 61 Trudy Drive was predicated on a fundamental question: to remediate the property with the existing home remaining in place or to demolish the exiting home. Answering this question involved detailed engineering and cost analyses, programmatic considerations, and stakeholder input. 61 Trudy Drive was originally addressed under FUSRAP in 1985 by the U.S. Department of Energy (DOE). However, subsequent remediation on an adjacent property by the U.S. Army Corps of Engineers (USACE) in 1998 suggested that residual contamination remained at depth at 61 Trudy. The property owner at that time declined to allow FUSRAP access to the property. However, a property transfer in 2012 presented USACE with an opportunity to address this property. Characterization of the property began in 2013; remedial activities were completed in 2015. The 61 Trudy Drive remediation required an intensive stakeholder communications program tailored for several audiences, including the affected property owner, local government officials and the neighboring community This paper will present the FUSRAP history at 61 Trudy Drive, to provide context for recent FUSRAP actions there. It will then focus on the challenges and complexities of performing environmental remediation in a suburban residential setting, focusing on both construction and communications. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

LDEF/Shuttle capabilities for environmental testing in space

The Long Duration Exposure Facility (LDEF) is being developed to accommodate experiments which require a free-flying exposure in space and which benefit from postflight laboratory analysis of the retrieved experiment hardware. The first LDEF mission, which is planned for a 6- to 12-month stay in space is scheduled in the late 1970s during the Shuttle Orbital Flight Test Program. The LDEF is a simple reusable structure which is three-axis gravity gradient stabilized when free flying in space. The experiments on the LDEF are totally self-contained in trays mounted to the structure. After the LDEF is either revisited or retrieved by the Shuttle, the trays with experiments will be returned to the experimenters for postflight inspection. Attention is given to the fabrication of a second LDEF for a long-term mission planned in 1979, aspects of LDEF orbit life time, the radiation environment, questions of solar exposure, the thermal environment, and the vacuum (atomic particle) environment.

Clark, L. G.↗

Liquid rocket booster study. Volume 2, book 3, appendices 2-5: PPIP, transition plan, AMOS plan, and environmental analysis

This Preliminary Project Implementation Plan (PPIP) was used to examine the feasibility of replacing the current Solid Rocket Boosters on the Space Shuttle with Liquid Rocket Boosters (LRBs). The need has determined the implications of integrating the LRB with the Space Transportation System as the earliest practical date. The purpose was to identify and define all elements required in a full scale development program for the LRB. This will be a reference guide for management of the LRB program, addressing such requirement as design and development, configuration management, performance measurement, manufacturing, product assurance and verification, launch operations, and mission operations support.

Source record↗