Life Cycle Management of Radioactive Materials Packaging

The objective of life cycle management of radioactive materials packaging is to ensure the safety functions (i.e. containment of radioactivity, protection against radiation, and criticality safety for fissile contents) during the entire life cycle of the packaging in storage, transportation and disposal. A framework has been developed for life cycle management regarding type B radioactive and fissile materials packaging, drawing upon current US Department of Energy (DOE) storage standards and examples from interim storage of Pu bearing materials in model 9975 transportation packagings. Key issues highlighted during long term storage of Pu bearing materials included gas generation and stability of PuO 2+x ; other operation safety issues highlighted for interim storage of model 9975 transportation packagings included the need to consider a facility design basis fire event and the long-term behaviour of packaging components such as Celotex and elastomeric O-ring seals. The principles of aging management are described, and the key attributes and examples of effective aging management programmes are provided based on the guidance documents for license renewal of nuclear power plants. The Packaging Certification Program of DOE Environmental Management, Office of Safety Management and Operations, plans to expand its mission into packaging certification for storage and aging management, as well as application of advanced technology, such as radiofrequency identification, for life cycle management of radioactive materials packagings.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Final Report - Certifying the Performance of Small Wind Turbines

The Small Wind Certification Council (SWCC) created a successful accredited certification program for small and medium wind turbines using the funding from this grant. SWCC certifies small turbines (200 square meters of swept area or less) to the American Wind Energy Association (AWEA) Small Wind Turbine Performance and Safety Standard (AWEA Standard 9.1 – 2009). SWCC also certifies medium wind turbines to the International Electrical Commission (IEC) Power Performance Standard (IEC 61400-12-1) and Acoustic Performance Standard (IEC 61400-11).

17 WIND ENERGY↗

NLR CSP Optical Facilities: Illuminating the Path Forward Through Innovation and Impact: Agreement 38490

This initiative is a multi-faceted project at the National Laboratory of the Rockies (NLR) aimed at strengthening its Concentrating Solar Power (CSP) Optical Facilities to advance the development of low-cost, high-performance materials for solar and other applications. The project's strategy is built on three pillars: strategic stakeholder engagement, diligent facility maintenance and utilization, and the development of new research capabilities. The overarching goal is to ensure the facilities remain state-of-the-art resources for industry and academia, thereby accelerating the conversion of concentrated sunlight into energy. A key driver of the project is an international Advisory Board, which provides critical guidance on research priorities and industry needs, leading to new collaborations and secured funding. This external engagement, combined with proactive outreach to industry partners, ensures the lab's work remains aligned with real-world challenges, including materials durability and performance certification. Significant efforts in facility maintenance have addressed challenges with aging infrastructure. Notable achievements include the complete refurbishment of the hail-damaged Ultra-Accelerated Weathering System (UAWS) and the successful replacement of a failing 15-year-old Lambda 1050 spectrophotometer with a new-generation model, substantially upgrading material characterization capabilities. These maintenance activities were complemented by achieving a prestigious ISO 9001:2015 certification for the Advanced Optical Materials Labs, formally recognizing the quality and reliability of NLR's measurement capabilities. Despite these successes, challenges remain, including high demand for the High Flux Solar Furnace (HFSF) and intermittent failures of other key instruments. The project has delivered major advancements in research techniques and capabilities. At the Flatirons campus, a new indoor laboratory, was established to house advanced deflectometry and photogrammetry systems for heliostat characterization. For on-sun testing, a novel, actively cooled turning mirror was developed for the HFSF, enabling more realistic testing of particle receivers and components. A collaboration with Virginia Tech successfully demonstrated the high-temperature durability of a new solar absorber coating through extensive cyclic testing. Concurrently, new modeling took place to better predict material degradation on rough, fractal surfaces. In summary, this project has systematically enhanced NLR's CSP Optical Facilities through strategic upgrades, rigorous maintenance, and stakeholder-guided research. By overcoming equipment failures, budgetary constraints, and logistical hurdles, the project has reinforced NLR's role as a central hub for CSP innovation and materials testing. Future work will focus on securing diverse funding, expanding collaborations, and continuing to provide the critical infrastructure needed to accelerate the development and deployment of next-generation technologies.

14 SOLAR ENERGY↗

RH Packaging Program Guidance

The purpose of this program guidance document is to provide the technical requirements for use, operation, inspection, and maintenance of the RH-TRU 72-B Waste Shipping Package (also known as the "RH-TRU 72-B cask") and directly related components. This document complies with the requirements as specified in the RH-TRU 72-B Safety Analysis Report for Packaging (SARP), and Nuclear Regulatory Commission (NRC) Certificate of Compliance (C of C) 9212. If there is a conflict between this document and the SARP and/or C of C, the C of C shall govern. The C of C states: "...each package must be prepared for shipment and operated in accordance with the procedures described in Chapter 7.0, Operating Procedures, of the application." It further states: "...each package must be tested and maintained in accordance with the procedures described in Chapter 8.0, Acceptance Tests and Maintenance Program of the Application." Chapter 9.0 of the SARP tasks the Waste Isolation Pilot Plant (WIPP) Management and Operating (M&O) Contractor with assuring the packaging is used in accordance with the requirements of the C of C. Because the packaging is NRC-approved, users need to be familiar with Title 10 Code of Federal Regulations (CFR) §71.8, "Deliberate Misconduct." Any time a user suspects or has indications that the conditions of approval in the C of C were not met, the U.S. Department of Energy (DOE) Carlsbad Field Office (CBFO) shall be notified immediately. The CBFO will evaluate the issue and notify the NRC if required.In accordance with 10 CFR Part 71, "Packaging and Transportation of Radioactive Material," certificate holders, packaging users, and contractors or subcontractors who use, design, fabricate, test, maintain, or modify the packaging shall post copies of (1) 10 CFR Part 21, "Reporting of Defects and Noncompliance," regulations, (2) Section 206 of the Energy Reorganization Act of 1974, and (3) NRC Form 3, Notice to Employees. These documents must be posted in a conspicuous location where the activities subject to these regulations are conducted. This document details the instructions to be followed to operate, maintain, and test the RH-TRU 72-B packaging. This Program Guidance standardizes instructions for all users. Users shall follow these instructions or equivalent approved instructions. Following these instructions assures that operations meet the requirements of the SARP.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

CH Packaging Program Guidance

The purpose of this document is to provide the technical requirements for preparation for use, operation, inspection, and maintenance of a Transuranic Package Transporter Model II (TRUPACT-II), a HalfPACT shipping package, and directly related components. This document complies with the minimum requirements as specified in the TRUPACT-II Safety Analysis Report for Packaging (SARP), HalfPACT SARP, and U.S. Nuclear Regulatory Commission (NRC) Certificates of Compliance (C of C) 9218 and 9279, respectively. In the event of a conflict between this document and the SARP or C of C, the C of C shall govern. The C of Cs state: "each package must be prepared for shipment and operated in accordance with the procedures described in Chapter 7.0, Operating Procedures, of the application." They further state: "each package must be tested and maintained in accordance with the procedures described in Chapter 8.0, Acceptance Tests and Maintenance Program of the Application." Chapter 9.0 of the SARP charges the U.S. Department of Energy (DOE) or the Waste Isolation Pilot Plant (WIPP) management and operating (M&O) contractor with assuring packaging is used in accordance with the requirements of the C of C. Because the packaging is NRC-approved, users need to be familiar with Title 10 Code of Federal Regulations (CFR) §71.8. Any time a user suspects or has indications that the conditions of approval in the C of C were not met, the Carlsbad Field Office (CBFO) shall be notified immediately. The CBFO will evaluate the issue and notify the NRC if required.In accordance with 10 CFR Part 71, certificate holders, packaging users, and contractors or subcontractors who use, design, fabricate, test, maintain, or modify the packaging shall post copies of (1) 10 CFR Part 21 regulations, (2) Section 206 of the Energy Reorganization Act of 1974, and (3) NRC Form 3, Notice to Employees. These documents must be posted in a conspicuous location where the activities subject to these regulations are conducted.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

CH Packaging Program Guidance

The purpose of this document is to provide the technical requirements for preparation for use, operation, inspection, and maintenance of a Transuranic Package Transporter Model II (TRUPACT-II), a HalfPACT shipping package, and directly related components. This document complies with the minimum requirements as specified in the TRUPACT-II Safety Analysis Report for Packaging (SARP), HalfPACT SARP, and U.S. Nuclear Regulatory Commission (NRC) Certificates of Compliance (C of C) 9218 and 9279, respectively. In the event of a conflict between this document and the SARP or C of C, the C of C shall govern. The C of Cs state: "each package must be prepared for shipment and operated in accordance with the procedures described in Chapter 7.0, Operating Procedures, of the application." They further state: "each package must be tested and maintained in accordance with the procedures described in Chapter 8.0, Acceptance Tests and Maintenance Program of the Application." Chapter 9.0 of the SARP charges the U.S. Department of Energy (DOE) or the Waste Isolation Pilot Plant (WIPP) management and operating (M&O) contractor with assuring packaging is used in accordance with the requirements of the C of C. Because the packaging is NRC-approved, users need to be familiar with Title 10 Code of Federal Regulations (CFR) §71.8. Any time a user suspects or has indications that the conditions of approval in the C of C were not met, the Carlsbad Field Office (CBFO) shall be notified immediately. The CBFO will evaluate the issue and notify the NRC if required. In accordance with 10 CFR Part 71, certificate holders, packaging users, and contractors or subcontractors who use, design, fabricate, test, maintain, or modify the packaging shall post copies of (1) 10 CFR Part 21 regulations, (2) Section 206 of the Energy Reorganization Act of 1974, and (3) NRC Form 3, Notice to Employees. These documents must be posted in a conspicuous location where the activities subject to these regulations are conducted. This document provides the instructions to be followed to operate, maintain, and test the TRUPACT-II and HalfPACT packaging. The intent of these instructions is to standardize operations. All users will follow these instructions or equivalent instructions that assure operations are safe and meet the requirements of the SARPs.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

CH Packaging Program Guidance

The purpose of this document is to provide the technical requirements for preparation for use, operation, inspection, and maintenance of a Transuranic Package Transporter Model II (TRUPACT-II), a HalfPACT shipping package, and directly related components. This document complies with the minimum requirements as specified in the TRUPACT-II Safety Analysis Report for Packaging (SARP), HalfPACT SARP, and U.S. Nuclear Regulatory Commission (NRC) Certificates of Compliance (C of C) 9218 and 9279, respectively. In the event of a conflict between this document and the SARP or C of C, the C of C shall govern. The C of Cs state: "each package must be prepared for shipment and operated in accordance with the procedures described in Chapter 7.0, Operating Procedures, of the pplication." They further state: "each package must be tested and maintained in accordance with the procedures described in Chapter 8.0, Acceptance Tests and Maintenance Program of the Application." Chapter 9.0 of the SARP charges the U.S. Department of Energy (DOE) or the Waste Isolation Pilot Plant (WIPP) management and operating (M&O) contractor with assuring packaging is used in accordance with the requirements of the C of C. Because the packaging is NRC-approved, users need to be familiar with Title 10 Code of Federal Regulations (CFR) §71.8. Any time a user suspects or has indications that the conditions of approval in the C of C were not met, the Carlsbad Field Office (CBFO) shall be notified immediately. The CBFO will evaluate the issue and notify the NRC if required. In accordance with 10 CFR Part 71, certificate holders, packaging users, and contractors or subcontractors who use, design, fabricate, test, maintain, or modify the packaging shall post copies of (1) 10 CFR Part 21 regulations, (2) Section 206 of the Energy Reorganization Act of 1974, and (3) NRC Form 3, Notice to Employees. These documents must be posted in a conspicuous location where the activities subject to these regulations are conducted. This document provides the instructions to be followed to operate, maintain, and test the TRUPACT-II and HalfPACT packaging. The intent of these instructions is to standardize operations. All users will follow these instructions or equivalent instructions that assure operations are safe and meet the requirements of the SARPs.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

RH Packaging Program Guidance (Rev. 3)

The purpose of this program guidance document is to provide the technical requirements for use, operation, inspection, and maintenance of the Remote Handled-Transuranic (RH-TRU) 72-B Waste Shipping Package (also known as the "RH-TRU 72-B") and directly related components. This document complies with the requirements as specified in the RH-TRU 72-B Safety Analysis Report for Packaging (SARP), and Nuclear Regulatory Commission (NRC) Certificate of Compliance (C of C) 9212. If there is a conflict between this document and the SARP and/or C of C, the C of C shall govern. The C of C states: "...each package must be prepared for shipment and operated in accordance with the procedures described in Chapter 7.0, Operating Procedures, of the application." It further states: "...each package must be tested and maintained in accordance with the procedures described in Chapter 8.0, Acceptance Tests and Maintenance Program of the Application." Chapter 9.0 of the SARP tasks the Waste Isolation Pilot Plant (WIPP) Management and Operating (M&O) Contractor with assuring the packaging is used in accordance with the requirements of the C of C. Because the packaging is NRC-approved, users need to be familiar with Title 10 Code of Federal Regulations (CFR) §71.8, "Deliberate Misconduct." Any time a user suspects or has indications that the conditions of approval in the C of C were not met, the U.S. Department of Energy (DOE) Carlsbad Field Office (CBFO) shall be notified immediately. The CBFO will evaluate the issue and notify the NRC if required. In accordance with 10 CFR Part 71, "Packaging and Transportation of Radioactive Material," certificate holders, packaging users, and contractors or subcontractors who use, design, fabricate, test, maintain, or modify the packaging shall post copies of (1) 10 CFR Part 21, "Reporting of Defects and Noncompliance," regulations, (2) Section 206 of the Energy Reorganization Act of 1974, and (3) NRC Form 3, Notice to Employees. These documents must be posted in a conspicuous location where the activities subject to these regulations are conducted. This document details the instructions to be followed to operate, maintain, and test the RH-TRU 72-B packaging. This Program Guidance standardizes instructions for all users. Users shall follow these instructions or equivalent approved instructions. Following these instructions assures that operations meet the requirements of the SARP.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

RH Packaging Program Guidance (Rev. 3.1)

The purpose of this program guidance document is to provide the technical requirements for use, operation, inspection, and maintenance of the Remote-Handled Transuranic (RH-TRU) 72-B Waste Shipping Package (also known as the "RH-TRU 72-B") and directly related components. This document complies with the requirements as specified in the RH-TRU 72-B Safety Analysis Report for Packaging (SARP), and Nuclear Regulatory Commission (NRC) Certificate of Compliance (C of C) 9212. If there is a conflict between this document and the SARP and/or C of C, the C of C shall govern. The C of C states, "each package must be prepared for shipment and operated in accordance with the procedures described in Chapter 7.0, Operating Procedures, of the application." It further states: "…each package must be tested and maintained in accordance with the procedures described in Chapter 8.0, Acceptance Tests and Maintenance Program of the Application." Chapter 9.0 of the SARP tasks the Department of Energy Carlsbad Field Office or the Waste Isolation Pilot Plant (WIPP) Management and Operating (M&O) Contractor with assuring the packaging is used in accordance with the requirements of the C of C. Because the packaging is NRC approved, users need to be familiar with Title 10 Code of Federal Regulations (CFR) §71.8, "Deliberate Misconduct." Any time a user suspects or has indications that the conditions of approval in the C of C were not met, the U.S. Department of Energy (DOE) Carlsbad Field Office (CBFO) shall be notified immediately. The CBFO will evaluate the issue and notify the NRC if required. In accordance with 10 CFR Part 71, "Packaging and Transportation of Radioactive Material," certificate holders, packaging users, and contractors or subcontractors who use, design, fabricate, test, maintain, or modify the packaging shall post copies of (1) 10 CFR Part 21, "Reporting of Defects and Noncompliances," regulations, (2) Section 206 of the Energy Reorganization Act of 1974, and (3) NRC Form 3, Notice to Employees. These documents must be posted in a conspicuous location where the activities subject to these regulations are conducted. This document details the instructions to be followed to operate, maintain, and test the RH-TRU 72-B packaging. This Program Guidance standardizes instructions for all users. Users shall follow these instructions or equivalent approved instructions. Following these instructions assures that operations meet the requirements of the SARP.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Effects of Mid-Level Ethanol Blends on Conventional Vehicle Emissions

Tests were conducted in 2008 on 16 late-model conventional vehicles (1999-2007) to determine short-term effects of mid-level ethanol blends on performance and emissions. Vehicle odometer readings ranged from 10,000 to 100,000 miles, and all vehicles conformed to federal emissions requirements for their federal certification level. The LA92 drive cycle, also known as the Unified Cycle, was used for testing because it more accurately represents real-world acceleration rates and speeds than the Federal Test Procedure. Test fuels were splash-blends of up to 20 volume percent ethanol with federal certification gasoline. Both regulated and unregulated air-toxic emissions were measured. For the 16-vehicle fleet, increasing ethanol content resulted in reductions in average composite emissions of both nonmethane hydrocarbons and carbon monoxide and increases in average emissions of ethanol and aldehydes.

09 BIOMASS FUELS↗

Emerging technologies for V&V of ISHM software for space exploration

Systems1,2 required to exhibit high operational reliability often rely on some form of fault protection to recognize and respond to faults, preventing faults' escalation to catastrophic failures. Integrated System Health Management (ISHM) extends the functionality of fault protection to both scale to more complex systems (and systems of systems), and to maintain capability rather than just avert catastrophe. Forms of ISHM have been utilized to good effect in the maintenance phase of systems' total lifecycles (often referred to as 'condition-based mainte-nance'), but less so in a 'fault protection' role during actual operations. One of the impediments to such use lies in the challenges of verification, validation and certification of ISHM systems themselves. This paper makes the case that state-of-the-practice V&V and certification techniques will not suffice for emerging forms of ISHM systems; however, a number of maturing software engineering assurance technologies show particular promise for addressing these ISHM V&V challenges.

fault detection, isolation, and recovery↗

ISS Crew Transportation and Services Requirements Document

Under the guidance of processes provided by Crew Transportation Plan (CCT-PLN-1100), this document with its sister documents, Crew Transportation Technical Management Processes (CCT-PLN-1120), Crew Transportation Technical Standards and Design Evaluation Criteria (CCT-STD-1140), and Crew Transportation Operations Standards (CCT-STD-1150), and International Space Station (ISS) to Commercial Orbital Transportation Services Interface Requirements Document (SSP 50808), provides the basis for a National Aeronautics and Space Administration (NASA) certification for services to the ISS for the Commercial Provider. When NASA Crew Transportation System (CTS) certification is achieved for ISS transportation, the Commercial Provider will be eligible to provide services to and from the ISS during the services phase of the NASA Commercial Crew Program (CCP).

Commercial Crew Program↗

Review of Noise Metric Sensitivities for Analysis of Quiet Supersonic Overflight

Six different noise metrics (PL, ASEL, BSEL, DSEL, ESEL, and ISBAP) are currently used to quantify sonic boom levels from overflight of supersonic aircraft. A previous meta-analysis using laboratory subjective data identified these metrics, each of which correlated well with human perception of low-boom sounds both indoors and outdoors. Because the analysis did not identify a single metric that was significantly superior, no internationally agreed-upon metric has been chosen for the quiet supersonic aircraft noise certification procedures currently under development. Other analyses of metric sensitivities using existing empirical and simulation datasets, however, have shown significant differences between metrics. Variability of metrics due to macro-atmospheric effects and atmospheric turbulence perturbations have been explored, as well as variability in measurements due to microphone setup configurations, array layouts, and ambient noise effects. This paper reviews these prior studies, summarizes the current understanding of metric sensitivities, and discusses how they may impact future downselection of metrics for certification procedures.

sonic boom↗

Safety Assessment of a Machine Learning-Based Aircraft Emergency Braking System: A Case Study

Machine Learning (ML) is revolutionizing many technological fields, but its use in aviation remains restricted due to stringent certification requirements. Efforts by the aviation community to establish standards for certifying ML-based systems are progressing, yet challenges persist, particularly with safety assessment methods for ML-based systems. This research addresses these challenges through a case study of an autonomous emergency braking system utilizing a computer vision deep neural network (DNN). We demonstrate a safety assessment process tailored to ML-specific concerns, such as low integrity and performance variability in quantitative safety analysis. This study can serve as an illustrative example to facilitate the discussion and convergence on certification aspects for ML-based systems within the aviation community.

Safety certification↗

Assessment of Aircraft Electric Engine Regulatory Special Conditions

This report provides a regulatory gap assessment of the Federal Aviation Administration (FAA) and the European Union Aviation Safety Agency (EASA) Special Conditions (SC) for electric engines. This information is presented to support ongoing international harmonization efforts for electric engine certification, to establish a level of safety consistent across regulatory bodies and equivalent to that of existing combustion engines. HS Advanced Concepts LLC assembled a team of subject-matter experts to develop a comprehensive comparison of the regulatory text of EASA SC E-19 and the FAA special conditions for the certification of electric engines. The team included Mr. Chris Baczynski of BAC Aerospace Inc. and Mr. Zach Kaufman, formerly with magniX.

aircraft certification↗

Renewable Electricity: How Do You Know You Have It?; NREL (National Renewable Energy Laboratory)

When electricity is generated - either from a renewable or non-renewable power plant - the electrons added to the grid are indistinguishable. So, on what basis can a consumer of electricity claim to be using renewables? In the United States, renewable energy certificates (RECs) were developed as states passed renewable portfolio standards (RPSs) and were requiring fuel mix disclosure labels. RECs are also used in the voluntary market, where customers are buying renewables to meet sustainability goals. The concept of RECs is used most widely in the United States, but international markets also have tradable renewable electricity certificates. This fact sheet reviews how to ensure that RECs are not double-counted, roles of electricity regulators, renewable generators and purchasers. It concludes with a discussion of the international use of RECs.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Competitiveness Improvement Project Informational Workshop

This presentation was given at the Competitiveness Improvement Project (CIP) Informational Workshop on December 6, 2017. Topics covered during the workshop include an overview of the CIP, past projects, scoring criteria, technical support opportunities, certification body requirements, standards applicable to distributed wind generators, information on the National Electric Code, certification testing requirements, test site requirements, National Environmental Policy Act, design review, levelized cost of energy, procurement/contracting, project management/deliverables, and outreach materials.

17 WIND ENERGY↗

The AP1000{sup R} China projects move forward to construction completion and equipment installation

The AP1000 design is the only Generation III+ technology to receive design certification from the U.S. Nuclear Regulatory Commission. This evolutionary design provides the highest safety and performance standards and has several distinct advantages over other designs, including improved operations and reduced construction schedule risks through the use of modern, modular, engineering principles that allow construction and fabrication tasks traditionally performed in sequence to be undertaken in parallel. Since the first granting of Design Certification in 2005 by the NRC, the AP1000 design has been modified to meet emergent NRC requirements such as those requiring the design to withstand the impact of an aircraft crash. Both domestic and foreign utilities have turned to the Westinghouse AP1000 plant design to meet their near - and long-term sustainable energy needs. The first ever deployment of this advanced U.S. nuclear power technology began in China in 2007 with the award of a contract to build four AP1000 units, constructed in pairs at the coastal sites of Sanmen (Zhejiang Province) and Haiyang (Shandong Province). Currently, all four units are at an advanced stage of construction. The commercial operation date for Sanmen Unit 1 is November 2013 followed by Haiyang Unit 1 being operational in May 2014. Construction and equipment manufacture is at an advanced stage. Sanmen Unit 1 equipment that has been delivered includes the reactor vessel, the reactor vessel closure head, the passive residual heat removal heat exchanger, the integrated head package, the polar crane, and the refueling machine. The steam generators are also completed. The RV was installed within the containment vessel building in September 2011. The installation of this major equipment will allow the setting of the containment vessel top head. Haiyang Unit 1 is also achieving significant progress. Significant benefits continue to be realized as a result of lessons learned and experience gained from the first-of-a-kind activities for Sanmen Unit 1 and AP1000 equipment design and manufacturing. For example, the nuclear island basemat at Haiyang Units 1 and 2 and Sanmen Unit 2 was laid in less time than that of Sanmen Unit 1, the ultra-large steam generator and RV forging lead times were reduced for the follow on units, and the fabrication of the auxiliary building module for Haiyang Unit 1 took less time than for the Sanmen first unit. These benefits are also being realized by the United States AP1000 project construction and fabrication modules, and equipment. Some difficulties arise from building this first-of-a-kind (advanced passive) type of plant; however, these difficulties are being overcome and the overall schedule remains achievable. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗