Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “building technologies program”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 865 records · Page 48

EngenuitySC Commercialization and Entrepreneurial Training Project

A team led by EngenuitySC has performed education and outreach on development of advanced energy markets that will enable wider use of clean energy technologies. This report details the efforts that have made significant advances to improve the market place through education, outreach, and increased communications between industry members. The project resulted in two self-funded industry clusters known as the Fuel Cell Collaborative and NuHub. This project has focused on building and strengthening the leading clean energy clusters in South Carolina: nuclear energy and fuel cell technologies. For the nuclear industry, a new cluster was developed that is now known as NuHub. This cluster has already engaged over 25 nuclear industry leaders or suppliers, four public sector partners, six community economic development foundations, and nearly ten academic partners in a 175 mile radius between Augusta, Georgia and Charlotte, North Carolina. Our outreach has touched over 2,000 stakeholders through the website alone, not including the public audiences and members of the business community reached through news stories and releases that were distributed to over 620 print and online publications. NuHub has established a formal leadership structure, developed subcommittees to focus on industry issues, instituted educational programs for the workforce, and created an industry funding structure that will sustain the industry cluster and mission. NuHub has participated in a wide-variety of community building and outreach activities since its formation under this grant. In the two years since its creation in 2010, we have initiated efforts focused in four main areas that correlate with the four NuHub subcommittees including: innovation, workforce development, industry engagement, and marketing and communications. NuHub successfully raised over $\$$160,000 in both public and private funding, which has supported work to grow the cluster and engage partners including NuScale, Fluor, and Holtec International for research about deployment of advanced small modular reactor (SMR) technologies. The workforce training efforts from NuHub have focused on assisting existing industry to fill positions needed to construct and operate new nuclear plants being built at the VC Summer plant in Jenkinsville, SC and at Plant Votgle in Augusta, Georgia both of whom are constructing the first nuclear reactors (Westinghouse AP 1000 units), to be built in over 30 years. This includes a partnership with Midlands Technical College to train reactor operators and the development of training facilities to support workforce development activities. It is anticipated that approximately 70 students a year will be trained through these programs in the next five years, and it will be expanded to meet new industry needs.

08 HYDROGEN↗

Preliminary Tritium Management Design Activities at ORNL

Interest in salt-cooled and salt-fueled reactors has increased over the last decade (Forsberg et al. 2016). Several private companies and universities in the United States, as well as governments in other countries, are developing salt reactor designs and/or technology. Two primary issues for the development and deployment of many salt reactor concepts are (1) the prevention of tritium generation and (2) the management of tritium to prevent release to the environment. In 2016, the US Department of Energy (DOE) initiated a research project under the Advanced Reactor Technology Program to (1) experimentally assess the feasibility of proposed methods for tritium mitigation and (2) to perform an engineering demonstration of the most promising methods. This document describes results from the first year’s efforts to define, design, and build an experimental apparatus to test potential methods for tritium management. These efforts are focused on producing a final design document as the basis for the apparatus and its scheduled completion consistent with available budget and approvals for facility use.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Space Shuttle main engine product improvement

The current design of the Space Shuttle Main Engine has passed 11 certification cycles, amassed approximately a quarter million seconds of engine test time in 1200 tests and successfully launched the Space Shuttle 17 times of 51 engine launches through May 1985. Building on this extensive background, two development programs are underway at Rocketdyne to improve the flow of hot gas through the powerhead and evaluate the changes to increase the performance margins in the engine. These two programs, called Phase II+ and Technology Test Bed Precursor program are described. Phase II+ develops a two-tube hot-gas manifold that improves the component environment. The Precursor program will evaluate a larger throat main combustion chamber, conduct combustion stability testing of a baffleless main injector, fabricate an experimental weld-free heat exchanger tube, fabricate and test a high pressure oxidizer turbopump with an improved inlet, and develop and test methods for reducing temperature transients at start and shutdown.

Lucci, A. D.↗

Experimental Internet Environment Software Development

Geographically distributed project teams need an Internet based collaborative work environment or "Intranet." The Virtual Research Center (VRC) is an experimental Intranet server that combines several services such as desktop conferencing, file archives, on-line publishing, and security. Using the World Wide Web (WWW) as a shared space paradigm, the Graphical User Interface (GUI) presents users with images of a lunar colony. Each project has a wing of the colony and each wing has a conference room, library, laboratory, and mail station. In FY95, the VRC development team proved the feasibility of this shared space concept by building a prototype using a Netscape commerce server and several public domain programs. Successful demonstrations of the prototype resulted in approval for a second phase. Phase 2, documented by this report, will produce a seamlessly integrated environment by introducing new technologies such as Java and Adobe Web Links to replace less efficient interface software.

Maddux, Gary A.↗

High Altitude Supersonic Decelerator Test Vehicle

The Low Density Supersonic Decelerator (LDSD) project is tasked by NASA's Office of the Chief Technologist (OCT) to advance the state of the art in Mars entry and descent technology in order to allow for larger payloads to be delivered to Mars at higher altitudes with better accuracy. The project will develop a 33.5 m Do Supersonic Ringsail (SSRS) parachute, 6m attached torus, robotic class Supersonic Inflatable Aerodynamic Decelerator (SIAD-R), and an 8 m attached isotensoid, exploration class Supersonic Inflatable Aerodynamic Decelerator (SIAD-E). The SSRS and SIAD-R should be brought to TRL-6, while the SIAD-E should be brought to TRL-5. As part of the qualification and development program, LDSD must perform a Mach-scaled Supersonic Flight Dynamics Test (SFDT) in order to demonstrate successful free flight dynamic deployments at Mars equivalent altitude, of all three technologies. In order to perform these tests, LDSD must design and build a test vehicle to deliver all technologies to approximately 180,000 ft and Mach 4, deploy a SIAD, free fly to approximately Mach 2, deploy the SSRS, record high-speed and high-resolution imagery of both deployments, as well as record data from an instrumentation suite capable of characterizing the technology induced vehicle dynamics. The vehicle must also be recoverable after splashdown into the ocean under a nominal flight, while guaranteeing forensic data protection in an off nominal catastrophic failure of a test article that could result in a terminal velocity, tumbling water impact.

Cook, Brant T.↗

U.S. Spacesuit Knowledge Capture – Creation, Curation, and Dissemination

The U.S. spacesuit is a special system that has intrigued and fascinated the world since Neil Armstrong set foot on the Moon in 1969. With over 50 years since that momentous achievement, NASA is planning to land the first woman and next man on the Moon in the near future. This goal begets the need to build a new spacesuit, a spacesuit created from the legacy knowledge of the Extravehicular Mobility Unit (EMU), combined with knowledge gained from technology development over the decades. As NASA transitions to its new horizon, the U.S. Spacesuit Knowledge Capture (SKC) Program is poised to help. The SKC Program’s primary function has been to capture, curate, and disseminate spacesuit-related knowledge among scientists, engineers, and technicians. The SKC Program was created in 2007 to capture knowledge primarily from spacesuit subject-matter experts (SMEs) who were retiring from NASA. These SMEs had 30 to 50 years of spacesuit knowledge. Over the years, the SKC Program has evolved and expanded its scope with a current focus on complementing the buildup of the Exploration EMU (xEMU) at the Johnson Space Center. As part of this focus, the SKC Program recently teamed with the xEMU Community of Practice (CoP) for knowledge sharing. The xEMU CoP provides a forum where early career engineers, professionals new to human spaceflight, and the xEMU community can come together regularly to seek guidance, share knowledge, meet their peers, discover resources, and ask questions. The CoP created an environment where the knowledge can be easily and routinely captured and recorded. The recorded events are archived and curated in an SKC Program library and disseminated as appropriate. This paper details the roles that the SKC Program and CoP play in the xEMU buildup, along with the navigation of the creation, curation, and dissemination processes.

Cinda Chullen↗

Lunanet Position, Navigation, and Timing Services and Signals, Enabling the Future of Lunar Exploration

The International Space Exploration Coordination Group established in 2018 the 3rd edition of the Global Exploration Roadmap (ISECG, 2018) that aims to achieve Mars human surface activities and identifies the exploration of the Moon as a critical intermediate step. A supplement covering updates on surface exploration scenarios was released in 2020 (ISECG, 2020). The Artemis Accords (NASA Artemis, 2020), first signed in October 2020, now includes over two dozen nations, in an agreement on the principles for best practices, including interoperability. In September 2022 the National Aeronautics and Space Administration (NASA) introduced the Moon to Mars Objectives highlighting recurring tenets of collaboration with international and industry partners and interoperability, along with infrastructure objectives for Position, Navigation, and Timing (PNT). The successful Artemis 1 mission paved the way to the ambitious plans to establish a sustainable human presence on the Moon. Just a few months after Artemis 1 launch (NASA, 2022), iSpace HAKUTO-R Mission1 (iSpace, 2022) launched, being the first-ever mission launched by a commercial launch service provider aiming to land on the lunar surface. The NASA Artemis program plans initial crewed landings and surface traverses in 2025, supported by the Lunar Gateway. Regular launches will follow to build the lunar systems for a sustained presence as presented in the Artemis Plan (NASA Artemis Plan, 2020), (NASA, 2022). NASA’s contracts with commercial providers through the Commercial Lunar Payload Services program (CLPS, (NASA, n.d.)) will deliver science and technology demonstration missions to the Moon starting in November 2023. The European Space Agency (ESA) Argonaut (ESA Argonaut, 2022) program plans to have recurrent missions to bring payloads to the lunar surface, supporting lunar exploration. These are just a few examples of planned missions that will target Earth’s natural satellite in the next decade, with forecasts of tens of missions per year (NSR, 2022), (Euroconsult, 2020). The large number of missions and the complexity of landing and operating are expected to demand a change of paradigm from the current Earth-based communication and navigation services, that may be combined with onboard sensors. In recent years, several agencies have proposed to deploy cislunar communication and navigation services to support lunar missions (NASA LCRNS, 2022), (ESA Moonlight, 2022), (JAXA, 2022)). All these proposals seek to deploy service-providing satellites in lunar orbit to ease the user missions’ operations. The PNT services objective is to support all types of lunar users (e.g.: orbiters, landers, ascent vehicles, surface crew, rovers, and deployed science payloads). At the same time, NASA and ESA initiated an effort to define a common framework to ensure interoperability among different service providers: the LunaNet framework. The LunaNet Interoperability Specification (NASA and ESA, 2023) covers communication, PNT, and auxiliary services, by establishing a common set of requirements to ensure interoperability. This conference contribution will present the LunaNet PNT services, focusing on the Lunar Augmented Navigation Service (LANS) that would be provided by a system that resembles the Global Navigation Satellite System (GNSS) concept on Earth: constellations of satellites broadcasting a radio navigation signal synchronized to a common reference clock, with augmentations to accommodate users’ needs in an environment away from Earth. This paper includes a description of the high-level LANS concept, and the basic principles defined to ensure interoperability. In addition, it will describe the common S-band PNT Augmented Forward Signal (AFS) and common messages to be adopted for compliance with the LunaNet framework, and the justification of the selected approach.

LunaNet↗

U.S. Department of Energy Solar Decathlon

The U.S. Department of Energy Solar Decathlon is an award-winning program that challenges 20 collegiate teams to design, build, and operate solar-powered houses that are cost-effective, energy-efficient, and attractive. In addition to showcasing the cost savings and environmental benefits of market-ready solar technologies, the event encourages participating students to think in new ways about incorporating practical, affordable clean-energy solutions into residential applications.

U.S. Department of Energy Solar Decathlon↗

Tracking the Sun II: The Installed Cost of Photovoltaics in the U.S. from 1998-2008

Installations of solar photovoltaic (PV) systems have been growing at a rapid pace in recent years. In 2008, 5,948 MW of PV was installed globally, up from 2,826 MW in 2007, and was dominated by grid-connected applications. The United States was the world's third largest PV market in terms of annual capacity additions in 2008, behind Spain and Germany; 335 MW of PV was added in the U.S. in 2008, 293 MW of which came in the form of grid-connected installations. Despite the significant year-on-year growth, however, the share of global and U.S. electricity supply met with PV remains small, and annual PV additions are currently modest in the context of the overall electric system. The market for PV in the U.S. is driven by national, state, and local government incentives, including up-front cash rebates, production-based incentives, requirements that electricity suppliers purchase a certain amount of solar energy, and Federal and state tax benefits. These programs are, in part, motivated by the popular appeal of solar energy, and by the positive attributes of PV - modest environmental impacts, avoidance of fuel price risks, coincidence with peak electrical demand, and the location of PV at the point of use. Given the relatively high cost of PV, however, a key goal of these policies is to encourage cost reductions over time. Therefore, as policy incentives have become more significant and as PV deployment has accelerated, so too has the desire to track the installed cost of PV systems over time, by system characteristics, by system location, and by component. To address this need, Lawrence Berkeley National Laboratory initiated a report series focused on describing trends in the installed cost of grid-connected PV systems in the U.S. The present report, the second in the series, describes installed cost trends from 1998 through 2008. The analysis is based on project-level cost data from more than 52,000 residential and non-residential PV systems in the U.S., all of which are installed at end-use customer facilities (herein referred to as 'customer-sited' systems). The combined capacity of systems in the data sample totals 566 MW, equal to 71% of all grid-connected PV capacity installed in the U.S. through 2008, representing the most comprehensive source of installed PV cost data for the U.S.9 The report also briefly compares recent PV installed costs in the U.S. to those in Germany and Japan. Finally, it should be noted that the analysis presented here focuses on descriptive trends in the underlying data, and is primarily summarized in tabular and graphical form; later analysis may explore some of these trends with more-sophisticated statistical techniques. The report begins with a summary of the data collection methodology and resultant dataset (Section 2). The primary findings of the analysis are presented in Section 3, which describes trends in installed costs prior to receipt of any financial incentives: over time and by system size, component, state, customer segment (residential vs. commercial vs. public-sector vs. non-profit), application (new construction vs. retrofit), and technology type (building-integrated vs. rack-mounted, crystalline silicon vs. thin-film, and tracking vs. rack-mounted). Section 4 presents additional findings related to trends in PV incentive levels over time and among states (focusing specifically on state and utility incentive programs as well as state and Federal tax credits), and trends in the net installed cost paid by system owners after receipt of such incentives. Brief conclusions are offered in the final section.

14 SOLAR ENERGY↗

Program helps pick site for renewable energy generation

Monthly economic diversity column for Tri-City Herald - excerpt pasted below: Sunshine and wind are two things we know well in the Tri-Cities area and beyond. My own backyard is a perpetual vortex of breezy fun, for example, to the point that it almost seems silly not to harness it for something useful. But I recently learned that when we're talking about building renewable energy generation capacity, it's not quite as simple as 'If you build it, they will come.' In fact, according to renewable energy expert and Pacific Northwest National Laboratory researcher John DeSteese, there are several criteria that make a piece of property suitable for this kind of development. DeSteese and his team recently completed an assessment regarding the use of specific land for renewable power generation through PNNL's Technology Assistance Program.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Lift Fan Nozzle for Joint Strike Fighter Tested in NASA Lewis' Powered Lift Rig

Under a nonreimbursable space act agreement between the NASA Lewis Research Center and the Allison Advanced Development Company, Allison tested a lift fan nozzle in Lewis' Powered Lift Rig. This test was in support of the Joint Strike Fighter program (formerly the Joint Advanced Strike Technology) sponsored by the Department of Defense, which will develop and field an affordable, multirole, next-generation, strike fighter aircraft for the Navy, Air Force, Marine Corps, and foreign allies. Allison, along with Pratt & Whitney Company, is part of the Lockheed Martin Corporation team that is scheduled to build a concept demonstrator aircraft by fiscal year 2001. The test was initiated in April and successfully completed in mid-July of 1997. Allison supplied a one-third-scale model of the lift fan nozzle, and Lewis provided the facility and the necessary support team. Various configurations, including pitching vectored angles ranging from 15deg forward to 60deg backward, were tested over a range of nozzle pressure ratios. Nozzle flow rates, thrust, and static pressures were measured for each of the configurations. Results from the test met the design requirements for the Joint Strike Fighter program and were in agreement with Allison's internal computational fluid dynamics (CFD) analyses. Data obtained from this test will also be used in the full-scale design of the lift fan system.

Lam, David W.↗

Carbon Fiber Prepreg Recycling- Automated Perform Manufacturing Equipment (Final Technical Report)

Discontinuous fiber composites have a compelling business case as related to light metals such as aluminum and magnesium machined or die cast components. DFC’s have been in commercial production using carbon fiber/epoxy prepreg for both commercial aircraft and for military applications for a number of years and their usage is expanding into automotive and consumer goods components. Reasons for this include significantly lower cost as compared to continuous fiber composites easier design and understanding of the material by metal traditionalists, higher degree of part complexity with relatively simple and low cost molds when compared to high-pressure die casting, and potential for near zero waste. IACMI’s 10-year goals of reduction in carbon fiber reinforced plastics manufacturing cost by 25%, reduction in their embodied energy by 50%, and recyclability of 95% can all be advanced through robust recycling. With recycling We have shown that a 15% contribution in manufacturing cost reduction is feasible, that a significant reduction in embodied energy (over 90% for the recycled fraction) is achievable, and that when combined with primary pyrolysis recycling, the 95% target can be met. Large-scale application of advanced composites began with the aerospace industry, and CRTC’s location in Washington State provided access to a waste stream of nearly 900 tonnes/year that was going to landfill. As the aerospace industry has automated parts production, their material forms have become significantly easier to recycle, and some evidence of this exists for the future automotive and wind turbine components as well. CRTC decided to focus on re-purposing the carbon fiber/epoxy aerospace scrap streams through materials reformatting and reuse, and not on primary recycling (pyrolysis mainly) as this technology is commercially available. The main reasons for this were that it offers a route to effective use of the most widely available and consistent feedstock called edge-trim, as well as allows creation of complex and low-cost parts using rapid and cost-effective compression molding technologies. The reasons also include leading the way for potential automotive pre-preg recycling as the combination of roughly 85% virgin pre-preg and 15% recycled pre-preg directly supports IACMI’s goals and enables significant part cost reduction and a path to zero-waste composite manufacturing at the OEMs or Tier 1’s. The purpose of the project was to develop equipment and technology to transform continuous fiber pre-preg in roll forms into smaller chip-format DFC feedstock, and to determine impacts on moldability and performance based on lessons learned along the path. The availability of scrap from pre-preg manufacturers was a significant value to the program even though the aerospace pre-preg is designed to be autoclave molded thus has handling, tackiness, and processing factors that are not ideal for DFCs. The scope of the project was to develop a Phase 1 system that could identify and resolve some of the major hurdles, determine where to focus effort on building a commercial-scale Phase 2 system, and develop technology for handling a wide variety of incoming scrap materials to produce the most usable product. A chopping system was developed and reduced to practice via an experimental approach that enabled all forms of scrap coming from the pre-preg manufacturers and some forms of the scrap coming from OEM production lines to be very effectively re-purposed. The systems that were developed were not considered to be production robust but rather identified and resolved some of the major technical hurdles, and demonstrated the path towards effective full-scale commercialization.

36 MATERIALS SCIENCE↗

Analysis of Space-Conditioning Loads in Commercial Buildings

Space conditioning end-uses, which include heating, cooling, and ventilation, represent a significant fraction of commercial building energy use, with a wide variety of heating and cooling technology options available in the market. In the interest of improving the overall efficiency of heating, ventilation and air-conditioning (HVAC) technologies, governments, utilities and private sector entities have implemented a variety of market transformation policies that aim to influence consumer purchase decisions. To evaluate the costs and benefits of such programs, analysts typically postulate a hypothetical default equipment choice, and compare it to one that provides comparable service with lower energy and/or power use. The corresponding reduced operating cost provides a benefit that offsets the potential higher cost of improved efficiency. Typically, life-cycle cost or cash-flow analyses are used to quantify the net economic benefit. These analyses require the capability to assess how a given equipment design would perform across a broad range of characteristics, both of the building and of the local weather. While these assessments can be performed using customized building simulations, it is generally not practical to develop and validate detailed building simulation code to cover all the potential variations of equipment design and installation. An alternative, and somewhat simpler, approach is to solely use detailed building simulations to generate time series of heating and cooling loads in commercial buildings. These loads can then be used as input to more detailed, stand-alone engineering models that simulate HVAC system performance under different equipment designs. This approach was used to evaluate a range of high-efficiency commercial packaged air conditioner design options for the Department of Energy’s Appliance and Equipment Standards Program (DOE-EERE 2015). While there may be some loss of precision relative to full simulation, the accuracy of this approach is sufficient for practical applications of cost-benefit analysis. This report describes the development of a database of commercial building heating and cooling loads, generated using the EnergyPlus software package, a whole building energy use model supported by the Department of Energy (DOE-EERE 2020a). EnergyPlus takes as input a set of configuration files that describe the building itself (size, zoning, envelope characteristics, etc.) and the various systems within it (HVAC, lighting, water heating, etc.). This analysis uses a publicly available collection of commercial reference buildings (CRB), comprised of sixteen building types and three vintages (DOE-EERE 2020b; Deru et al 2011). Each building is simulated in eighteen different locations, covering a wide range of climatic conditions. The prototype building description files assign the type of HVAC equipment used, and capacities across climate zones.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Increasing the Number of Installed Residential Heat Pump Water Heaters in the USA Through Improved Technology and Utility Programs

Heat pump water heaters (HPWHs) offer an efficient alternative to electric resistance water heaters, but they suffer from limited market penetration. This paper reviews the current state of HPWHs in the USA, focusing on technology developments and programs to increase adoption. What technological improvements are needed to make HPWHs a good fit in more homes? Additionally, what are the best ways of promoting HPWHs to consumers? Improved communication and controls will allow HPWHs to provide demand response and follow dynamic utility rates. To enable fuel-switching, HPWHs are being developed that only need a standard 120V outlet. Split HPWHs can alleviate the cooling and noise that limit the use of HPWHs in small homes, multifamily buildings, and cold climates. Additionally, new utility programs aim to train installers and provide incentives to distributors to increase the number of HPWHs installed. Some utilities offer novel incentive programs that have led to increased customer uptake. Those advances, coupled with improved controls for load shifting and new products such as split HPWHs and HPWHs that can run on 120V power, may finally move the market forward.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Integrated Solutions for Optimized Performance (ISOP) Final Technical Report

The goal of this project was to demonstrate technical feasibility of an integrated approach for deep energy retrofits by packaging innovative technologies with smart communicating controls that represent the next generation of energy efficiency. The integrated solutions for optimized performance (ISOP) package integrates (i) advanced lighting and plug load controls; (ii) intelligent daylight harvesting through automated self-powered shades and window films; (iii) advanced HVAC controls sequences (ASHRAE Guideline (GDL) 36); and (iv) fault detection and diagnosis (FDD) and continuous commissioning (CCx) using advanced analytics. These technologies address energy use across multiple building end uses that represent more than 60% of the energy consumption in all commercial buildings. The project was structured to be implemented over three budget periods: Budget Period 1 scope included site selection, project design, site-specific customization of technology packages, procurement of technologies, initiation of installation of technologies, the development of a measurement and verification plan and collection of pre-retrofit data collection. The first year go/no-go decision was based on securing host sites representing 250,000 sq. ft. of occupied operational spaces, savings analysis, technology procurement and initiation of installation. Budget Period 2 planned to complete technology installations and initiate data collection of post-retrofit performance data. The second year go/no-go was to be the completion of technology installations and commissioning, metering and data collecting to support the requirements laid out in site specific M&V plans. Budget Period 3 planned to collect and analyze post-retrofit performance data and provide data and reporting to support energy efficiency rebate programs. After the team completed activities planned for Budget Period 1, the team reached a Go/No-Go Decision Point. At that point, TRC recommended that DOE discontinue the project without prejudice due to challenges with securing demonstration sites to meet the full 250,000 sf of occupied operational spaces and DOE concurred. In Budget Period 1, the TRC team developed criteria to recruit and evaluate potential demonstration host sites. TRC worked with Princeton University, the project demonstration partner, to identify buildings on their campus as potential candidates for the demonstration. Following the selection of demonstration sites, the TRC team customized energy technology packages according to the needs and characteristics of each site. TRC defined technology specifications, identified vendors, and conducted analysis to estimate energy and cost savings potential. The project team then developed schedules for technology procurement processes and scheduled for installation at all selected demonstration sites. The project team worked with Princeton University and DOE to develop an approach to verify energy savings achieved through measurement and verification (M&V) 2.0 methods. Princeton University initiated open bids to procure the necessary materials and installation contractors. Bid results came back higher than estimates due to a couple of factors – lack of familiarity of the bidders with the proposed technologies and lack of local trained installers to execute the installation of these new measures. Due to the higher bids, projects no longer met the internal cost-effectiveness criteria used by Princeton to proceed with procurement of the full suite of technologies as proposed in ISOP. Princeton had already procured parts of the ISOP package as part of a campus-wide initiative for FDD and lighting retrofits, but with the higher costs for other ISOP components, Princeton could no longer commit to the full ISOP package on the selected sites. Based on this, the team reached the Go/No-Go decision point, where they decided not to proceed with the project. Princeton is separately installing portions of the ISOP package where they individually meet Princeton’s payback criteria but on a different schedule than would have been needed for the DOE ISOP project. The team has learned several lessons from project progress in the first budget period. The team will utilize these lessons in future projects, as should any team which proceeds with a project around the ISOP technology. The first lesson is that more information about the proposed sites is required earlier in the process (perhaps even at the proposal stage) in order to have a successful demonstration. Technical details not evident earlier in the process (such as the TLED limitations for ALCS) can derail project execution. The second lesson is that pricing of emerging technologies is highly variable due to lack of familiarity of local installers and distributor with the proposed technologies as well as alternate bids using products they were more familiar with, but that cost more than the ones proposed by TRC. Finally, the last major lesson is that the host site’s internal project criteria is of critical importance. Based on these higher installed costs and lack of an informed installer base for the products proposed for this project, the project does not meet Princeton’s simple payback goals of five years.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗