Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “building operations”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 865 records · Page 48

Test Rack Development for Extended Operation of Advanced Stirling Convertors at NASA Glenn Research Center

The U.S. Department of Energy (DOE), Lockheed Martin Space Company (LMSC), Sun power Inc., and NASA Glenn Research Center (GRC) have been developing an Advanced Stirling Radioisotope Generator (ASRG) for use as a power system on space science missions. This generator will make use of free-piston Stirling convertors to achieve higher conversion efficiency than currently available alternatives. NASA GRC's support of ASRG development includes extended operation testing of Advanced Stirling Convertors (ASCs) developed by Sunpower Inc. In the past year, NASA GRC has been building a test facility to support extended operation of a pair of engineering level ASCs. Operation of the convertors in the test facility provides convertor performance data over an extended period of time. Mechanical support hardware, data acquisition software, and an instrumentation rack were developed to prepare the pair of convertors for continuous extended operation. Short-term tests were performed to gather baseline performance data before extended operation was initiated. These tests included workmanship vibration, insulation thermal loss characterization, low-temperature checkout, and fUll-power operation. Hardware and software features are implemented to ensure reliability of support systems. This paper discusses the mechanical support hardware, instrumentation rack, data acquisition software, short-term tests, and safety features designed to support continuous unattended operation of a pair of ASCs.

Dugala, Gina M.↗

Data Reliability in BIM and Performance Analytics: A Survey of Contemporary AECO Practice

As awareness around building energy consumption increases, practitioners are encouraged to consider performance aspects regarding the built environment more closely and find ways to improve its efficiency. Improvements in building information modeling (BIM) and building performance simulation (BPS) tools present opportunities to facilitate information communication with a wider range of stakeholders. The building sector can benefit from the integration of performance informatics; however, there has been limited success in utilizing available technologies that promote data integration and management in favor of enriching our knowledge and understanding of buildings as artifacts of information. This phenomenon was investigated by conducting a survey, together with a review of relevant literature, to depict the relevant challenges and opportunities for the architecture, engineering, construction, and owner-operated (AECO) industry, as it undergoes digital transformation, as well as the working practices that have formed around them. It is argued that the current tools available to practitioners do not support effective data serialization between design and analytics processes, affecting the collaboration between team members. Lastly, a series of functional goals are proposed to support a higher level of reliability in the ways information is mobilized, by rethinking the technologies and methods for organizing information systems.

42 ENGINEERING↗

Techno-Economic and life cycle assessment of standalone Single-Stream material recovery facilities in the United states

Material Recovery Facilities (MRFs) are crucial players in achieving a circular economy. MRFs receive complex waste streams and separate valuable recyclables from these mixtures. This study conducts techno-economic analysis (TEA) to estimate the net present value (NPV) and life cycle assessment (LCA) to estimate different environmental impacts of a commercial scale standalone, single-stream MRF to assess the economic feasibility and environmental impacts of recovering valuable recyclables from an MRF processing 120,000 tonnes per year (t/y). The TEA employs a discounted cash flow rate of return (DCFROR) analysis over a 20-year facility lifetime, along with a sensitivity analysis on the impact of different operating and economic parameters. Results show that the total fixed cost of building the MRF facility is $\$ $23 MM, and the operating cost is $\$ $45.48/tonne. Further the NPV of the MRF can vary from $\$ $3.57 MM to $\$ $60 MM, while 100-year global warming potential can range from 5.98 to 8.53 kg carbon dioxide equivalents (CO2-eq) per tonne of MSW. We have also found that MSW composition (arising from regional effects) significantly impacts costs, 100-year global warming potential, and other impact categories such as acidification potential, eutrophication potential, ecotoxicity, ozone depletion, photochemical oxidation, carcinogenic effects, and non-carcinogenic effects. Sensitivity and uncertainty analysis indicate that waste composition and market prices significantly impact the profitability of the MRF, and the waste composition mostly impacts global warming potential. Our analysis also indicates that facility capacity, fixed capital cost, and waste tipping fees are vital parameters that affect the economic viability of MRF operations.

36 MATERIALS SCIENCE↗

Operational aspects of a spacecraft planning/scheduling expert system

Various operational aspects of the Earth Radiation Budget Satellite (ERBS) Tracking and Data Relay Satellite System (TDRSS) are described. The ERBS-TDRSS Contract Planning System is an expert system which has been used operationally since June 1987 by the ERBS Flight Operations Team (FOT) at Goddard Space Flight Center to build weekly schedules of requests for service from the TDRSS. The basic operation of the system and significant enhancements and changes are discussed.

Mclean, David R.↗

The International Lunar Network (ILN) Anchor Nodes Mission Update

NASA s Science Mission Directorate (SMD) established the Lunar Quest Program (LQP) to accomplish lunar science objectives embodied in the National Academies report The Scientific Context for Exploration of the Moon (2007) and the NASA Advisory Council-sponsored Workshop on Science Associated with the Lunar Exploration Architecture (2007). A major element of LQP's lunar flight projects is the International Lunar Network (ILN), a network of small geophysical nodes on the lunar surface. NASA plans to provide the first two stations around 2014 and a second pair in the 2016-2017 timeframe. International involvement to provide additional stations will build up the network so that 8-10 nodes could be simultaneously operating. This flight project complements SMD's initiatives to build a robust lunar science community through R&A lines and increases international participation in NASA's robotic exploration of the moon.

Cohen, B. A.↗

Optimal electric-distribution-grid planning considering the demand-side flexibility of thermal building systems for a test case in Singapore

The planning of district-scale electric grids, i.e., distribution grids, has traditionally relied on finding the most cost-effective design such that they are able to supply the peak loads in a district. With the advent of electric demand side flexibility (DSF), there is the opportunity to reshape peak loads such that the investment cost of the electric grid decreases in exchange for a minor increase in the operation cost. This paper formulates an optimal planning approach for the electric grid at the district scale, which incorporates the DSF from thermal building systems, e.g., heating ventilation and air-conditioning (HVAC) systems. The problem is formulated as a mixed-integer linear program (MILP) and aims at minimizing the investment cost for the grid along with the operation cost of the flexible loads. This is subjected to the fixed electricity demand and thermal comfort constraints of building occupants. To this end, linear models for the thermal comfort in the buildings and the power flow in electric grid are considered. The approach is tested on a district planning test case based in Singapore, where the results show up to 30.9 % reductions in investment cost and up to 3.7 % reduction in total annualized cost. Urban planning authorities, developers and utility companies can all benefit from the presented approach to make optimized investment decisions. For building operators, the results point to the need of adopting their control systems for DSF.

Troitzsch, Sebastian↗

Spaceflight Operations Services Grid (SOSG) Prototype Implementation and Feasibility Study

Science Operations Services Grid is focusing on building a prototype grid-based environment that incorporates existing and new spaceflight services to enable current and future NASA programs with cost savings and new and evolvable methods to conduct science in a distributed environment. The Science Operations Services Grid (SOSG) will provide a distributed environment for widely disparate organizations to conduct their systems and processes in a more efficient and cost effective manner. These organizations include those that: 1) engage in space-based science and operations, 2) develop space-based systems and processes, and 3) conduct scientific research, bringing together disparate scientific disciplines like geology and oceanography to create new information. In addition educational outreach will be significantly enhanced by providing to schools the same tools used by NASA with the ability of the schools to actively participate on many levels in the science generated by NASA from space and on the ground. The services range from voice, video and telemetry processing and display to data mining, high level processing and visualization tools all accessible from a single portal. In this environment, users would not require high end systems or processes at their home locations to use these services. Also, the user would need to know minimal details about the applications in order to utilize the services. In addition, security at all levels is an underlying goal of the project. The Science Operations Services Grid will focus on four tools that are currently used by the ISS Payload community along with nine more that are new to the community. Under the prototype four Grid virtual organizations PO) will be developed to represent four types of users. They are a Payload (experimenters) VO, a Flight Controllers VO, an Engineering and Science Collaborators VO and an Education and Public Outreach VO. The User-based services will be implemented to replicate the operational voice, video, telemetry and commanding systems. Once the User-based services are in place, they will be analyzed to establish feasibility for Grid enabling. If feasible then each User-based service will be Grid enabled. The remaining non-Grid services if not already Web enabled will be so enabled. In the end, four portals will be developed one for each VO. Each portal will contain the appropriate User-based services required for that VO to operate.

Bradford, Robert N.↗

GOES-R Lithium-Ion Battery Life Test & Workhorse Battery Performance

The GOES R series lithium-ion battery life test results are presented for the next-generation GOES R series weather satellites. Lockheed Martin is under contract to NASA Goddard to build and deliver four GOES-R series satellites which are operated by NOAA. In addition, Lockheed Martin is required to build a GOES R series flight battery to flight drawings and processes and perform an accelerated geosynchronous earth-orbiting (GEO) life test consisting of 30 real-time eclipse seasons and 30 accelerated solstice seasons. The GOES R series batteries are designed and built by Saft America, Inc. Space and Defense Division in Cockeysville, MD with Saft VL48E cells. The GOES R series life test battery which has been built to flight drawings and processes has undergone 21 seasons of accelerated GEO testing (which is equivalent to over 10 years on-orbit). This presentation includes a description of the life test and latest test results through season 20. The life test battery capacity measurements prior to cycling and after seasons 4, 10, and 20 which have shown little or no change are summarized. In addition, the performance of the GOES R series workhorse batteries performance are presented. These GOES R series workhorse batteries are used during spacecraft testing and have shown no discernable capacity loss after 7 years of mostly ambient operation and cold storage since activation. An overview of the electrical power subsystem and battery charge is, also, addressed.

Tucker, Jon↗

Building the Traffic, Navigation, and Situation Awareness System (T-NASA) for Surface Operations

We report the results of a part-task simulation evaluating the separate and combined effects of an electronic moving map display and newly developed HUD symbology on ground taxi performance, under moderate- and low-visibility conditions. Twenty-four commercial airline pilots carried out a series of 28 gate-to-runway taxi trials at Chicago O'Hare. Half of the trials were conducted under moderate visibility (RVR 1400 ft), and half under low visibility (RVR 700 ft). In the baseline condition, where navigation support was limited to surface features and a Jeppesen paper map, navigation errors were committed on almost half of the trials. These errors were virtually abolished when the electronic moving map or the HUD symbology was available; in addition, compare, the baseline condition, both forms of navigation aid yielded an increase in forward taxi speed. The speed increase was greater for HUD than the electronic moving map, and greater under low visibility than under moderate visibility. These results suggest that combination of electronic moving map and HUD symbology has the potential to greatly increase the efficiency of ground operations, particularly under low-visibility conditions.

McCann, Robert S.↗

A Modularized Urban Scale Building Energy Modeling Framework Designed with An Open Mind

In recent years, physics-based building energy modeling (BEM) has started being used to evaluate the performance of buildings in the context of connected communities and on an urban scale to study their aggregated energy use, interactions, and impacts on the energy supply infrastructure and environment. The development of urban-scale BEM solutions needs extensive effort. Existing attempts tend to focus on different aspects of BEM on an urban scale, such as collecting as-built building data from different information sources, integrating geometry modeling with geographic information systems (GISs), representing operational and occupancy profiles, automating workflow, processing and visualizing the results, and conducting large-scale simulations. Urban-scale BEM development would benefit from multi-disciplinary research areas and from an open platform to adopt advancements on data sources and tools. For these purposes, this research proposes a modularized bottom-up model creation and simulation framework that is built on the state-of-the-art BEM tools and can accommodate different building stock data. This framework uses a standardized schema to describe building design and operational characteristics, and it can be instantiated from different building survey datasets with heterogeneous structures. The paper demonstrates how thousands of surveyed buildings from the 2012 U.S. Energy Information Administration’s Commercial Buildings Energy Consumption Survey (CBECS) were one-to-one converted to EnergyPlus models through the schema and the model generation process, then simulated with distributed computing, and their results are summarized.

Lei, Xuechen↗

The Applications of NASA Mission Technologies to the Greening of Human Impact

I will give an overview talk about flight software systems, robotics technologies and modeling for energy minimization as applied to vehicles and buildings infrastructures. A dominant issue in both design and operations of robotic spacecraft is the minimization of energy use. In the design and building of spacecraft increased power is acquired only at the cost of additional mass and volumes and ultimately cost. Consequently, interplanetary spacecrafts are designed to have the minimum essential power and those designs often incorporate careful timing of all power use. Operationally, the availability of power is the most influential constraint for the use of planetary surface robots, such as the Mars Exploration Rovers. The amount of driving done, the amount of science accomplished and indeed the survivability of the spacecraft itself is determined by the power available for use. For the Mars Exploration Rovers there are four tools which are used: (1) models of the rover and it s thermal and power use (2) predictive environmental models of power input and thermal environment (3) fine grained manipulation of power use (4) optimization modeling and planning tools. In this talk I will discuss possible applications of this methodology to minimizing power use on Earth, especially in buildings.

Sims, Michael H.↗

Comprehensive Total Cost of Ownership Quantification for Vehicles with Different Size Classes and Powertrains

In order to accurately compare the costs of two vehicles, the total cost of ownership (TCO) should consist of all costs related to both purchasing and operating the vehicle. This TCO analysis builds on previous work to provide a comprehensive perspective of all relevant vehicle costs of ownership. In this report, we present what we believe to be the most comprehensive explicit financial analysis of the costs that will be incurred by a vehicle owner. This study considers vehicle cost and depreciation, financing, fuel costs, insurance costs, maintenance and repair costs, taxes and fees, and other operational costs to formulate a holistic total cost of ownership and operation of multiple different vehicles. For each of these cost parameters that together constitute a comprehensive TCO, extensive literature review and data analysis were performed to find representative values in order to build a holistic TCO for vehicles of all size classes. The light- and heavy-duty vehicles selected for analysis in this report are representative of those that are on the road today and expected to be available in the future. Important additive analyses in this study include systematic analysis of vehicle depreciation, in-depth examination of insurance premium costs, comprehensive maintenance and repair estimates, analysis of all relevant taxes and fees, and considerations of specific costs applicable to commercial vehicles. We find that cars depreciate faster than light trucks and that older plug-in electric vehicles have a greater depreciation rate than newer electric vehicles. Light-duty vehicle (LDV) insurance costs show comparable costs for different powertrains, and lower costs for larger size classes. Medium- and heavy-duty vehicle (MHDV) insurance costs vary significantly by vocation. Electric and electrified powertrains have lower maintenance and repair costs than internal combustion engine (ICE) powertrains for all vehicle sizes, relative to vehicle price. MHDV maintenance and repair costs depend heavily on vocation and duty cycle. LDV taxes and fees are comparable across powertrain types and size classes, though marginally higher registration fees exist for alternative fuel vehicles. MHDV fees depend on the vocation, weight rating, and state. Many electric tractor trailers would be affected by additional battery weight, reducing the available payload capacity, and this cost can be substantial. Electric vehicle charging for commercial vehicles can be time-consuming; labor rates can cause this cost to dominate TCO. With improved knowledge of each of the cost components, we calculate a lifetime TCO for comparison across vehicles of different types and attributes. For a simulated small sport utility vehicle in 2025, modeled using Autonomie, the hybrid electric vehicle (HEV) has the lowest cost, followed by the conventional ICE vehicle. For MHDV, TCO can be drastically different depending on the vocation. Long-haul vehicles typically have the lowest per-mile costs. Excluding labor costs, the class 4 delivery has a comparable TCO to the day cab. Vocational trucks, refuse trucks, and transit buses have a high per-mile cost of ownership due to maintenance and insurance. For all of these vehicles, the cost of operating the vehicle is heavily weighted by the labor of the driver, followed by the fuel costs. While the HEV begins as the lowest cost powertrain for passenger vehicles, fuel cells are forecast to reach cost parity by 2030 when hydrogen prices reach $\$ 5$/kg while battery electric vehicles (BEV) reach cost parity by 2035 at a battery cost of $\$ 98$ per usable kWh of capacity, with these two technologies being the lowest cost in 2050. For the class 8 day cab tractor, the HEV and ICE vehicle begin as the lowest cost powertrains, and the 250-mile BEV reduces in cost from the most expensive to the least expensive by 2030.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Deep-Learning-Based Multi-Timescale Load Forecasting in Buildings: Opportunities and Challenges from Research to Deployment

Electricity load forecasting for buildings and campuses is becoming increasingly important as the penetration of distributed energy resources (DERs) grows. Efficient operation and dispatch of DERs require reasonably accurate predictions of future energy consumption in order to conduct near-real-time optimized dispatch of on-site generation and storage assets. Electric utilities have traditionally performed load forecasting for load pockets spanning large geographic areas, and therefore, forecasting has not been a common practice by buildings and campus operators. Given the growing trends of research and prototyping in the grid-interactive efficient buildings domain, characteristics beyond simple algorithm forecast accuracy are important in determining the algorithm's true utility for smart buildings. Other characteristics include the overall design of the deployed architecture and the operational efficiency of the forecasting system. In this work, we present a deep-learning-based load forecasting system that predicts the building load at 1-hour intervals for 18 hours in the future. We also discuss challenges associated with the real-time deployment of such systems as well as the research opportunities presented by a fully functional forecasting system that has been developed within the National Renewable Energy Laboratory's Intelligent Campus program.

building load forecasting↗

Optimizing Grid-interactive Efficient Building Designs with Stacked Value Streams

Grid-interactive efficient buildings (GEBs) are those characterized by the combination of energy efficiency and demand flexibility with smart technologies and communications to not only deliver greater affordability and comfort to buildings, but also help utilities manage grid operations and lower system costs. This paper presents an innovative techno-economic assessment framework to effectively examine different GEB design options, explore various use cases, define technically achievable benefits, and thereby assist in informed decision-making. In particular, building load flexibility, thermal storage, and battery energy storage are considered. Advanced optimal dispatch problem is formulated to maximize the stacked value streams from multiple, competing use cases, subject to the physical capabilities and operational flexibility associated with different designs and configurations. Comprehensive case studies were performed for a real-world building to evaluate the cost-effectiveness of different GEB designs and offer in-depth insights. It was found that the proposed assessment method could effectively capture the costs and benefits linked to each GEB design option. Furthermore, the study revealed that outage mitigation and demand response are the two most significant sources of benefits for GEBs.

Ma, Xu↗

Report Series: Finding of Effect, and Mitigation Documentation for Building 23-702, Mercury, Area 23, Nevada National Security Site, Nye County, Nevada

The U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Field Office (NNSA/NFO) plans to demolish Building 23-702 in the town of Mercury (Nevada State Historic Preservation Office [SHPO] Resource No. B15278), which is on the Nevada National Security Site (NNSS) in Nye County, Nevada (see Figure 1). The purpose of the undertaking is related to the modernization of Mercury for future mission needs. The NNSA/NFO will implement this undertaking in accordance with the Programmatic Agreement between the National Nuclear Security Administration Nevada Field Office and the Nevada State Historic Preservation Officer Regarding Modernization and Operational Maintenance of the Nevada National Security Site, at Mercury in Nye County, Nevada, hereafter referred to as the Mercury PA. Building 23-702 was built in 1965 as a foil handling building for the Los Alamos Scientific Laboratory (LASL), who worked on the design and engineering of nuclear weapons and other nuclear experiments. The building appeared to have secondarily functioned as a storage for radioactive sources in the 1980s and 1990s. The building was operational until 2004, then deactivated sometime between 2005 and 2014. The town of Mercury and the immediate surrounding area have been formally determined eligible for listing in the National Register of Historic Places (National Register, NRHP) as the Mercury Historic District (MHD, SHPO Resource No. D230) under Criteria A and C for its importance in supporting nuclear testing and scientific research from 1951 through 1992. Building 23-702 was identified as a contributing element to the MHD in a 2018 architectural survey of the district (Reno et al.) and recorded on a Nevada Architectural Resource Assessment (ARA) form (Reno et al. 2017). Building 23-702 was also identified in Appendix C of the Mercury PA as a Category I contributing element, indicating that it might be individually eligible for the NRHP. It is a historic property for the purposes of compliance with Section 106 of the National Historic Preservation Act (NHPA) and subject to the stipulations of the Mercury PA.

54 ENVIRONMENTAL SCIENCES↗

Commercial Zero Code Plug-In: Zero Energy and Operational Emissions Overlay for Model Energy Codes (Technical Brief)

Model energy codes (MEC) describe requirements needed to demonstrate building energy performance compliance. They can be readily adopted by states and local jurisdictions to support desirable energy efficiency investment in new buildings and major renovations. This report provides commercial building energy code language as an overlay to current MEC, which is recognized by the U.S. DOE as ASHRAE Standard 90.1 2022. The code language provides a performance-based compliance path for achieving net zero energy or net zero operational energy emissions buildings with MEC. The path requires meeting two compliance metric target values: 1) a required minimum level of efficiency and 2) a measure of zero energy or emissions. The supporting documentation illustrates the magnitude of needed efficiency improvement and the additional offsets to be achieved from renewable energy sources.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Defining Services, Functions, and Capabilities for an Advanced Air Mobility (AAM) In-time Aviation Safety Management System (IASMS)

NASA’s vision for Advanced Air Mobility (AAM) Mission is to help emerging aviation markets to safely develop an air transportation system that moves people and cargo between places previously not served or underserved by aviation. The integration of new operational paradigms and vehicle classes in this system requires a transformation of the National Airspace System (NAS) that includes substantive changes critical for assuring safety. These changes are compelled by unique challenges posed by AAM to the safety management system (SMS). These challenges were assessed by committees of the National Academies in their reports on a vision for an In-time Aviation Safety Management System (IASMS) and a blueprint for AAM [1,2]. In their description of an IASMS, the top recommendation was development of a concept of operations (ConOps) for IASMS. This paper describes the high-priority recommendations from the National Academies for its IASMS vision and how they are addressed through a distributed system-of-systems architecture. The IASMS architecture is structured on the services, functions, and capabilities (SFCs) necessary for In-time System-wide Safety Assurance (ISSA)initially developed for urban air mobility (UAM). The paper then posits where these SFCs would reside across vehicles, airspace, or service suppliers such as Supplemental Data Service Providers (SDSPs), and how SFCs scale with increasing complexity in design and operations of AAM. SFCs are foundational building blocks for a system that targets an individual or family of risks using a Monitor-Assess-Mitigate risk paradigm for anomalies, precursors and trends. An IASMS could be conceived that uses a portfolio of SFCs for AAM in general or prioritizes SFCs for a specific domain or operation.

K Ellis↗

Space shuttle orbiter auxiliary power unit development challenges

When the flying spacecraft was approved for development, a power unit for the hydraulic system had to be developed. Unlike other systems on the orbiter, there was no precedent in earlier spacecraft for a hydraulic system nor for the power unit to drive the hydraulic pumps. The only prototypes available were airplane auxiliary power units (APU), which were not required to operate in the severe environments of a spacecraft nor to have the longevity of an orbiter hydraulic power unit. The challenge was to build a hydraulic power unit which could operate in 0g or 3g, in a vacuum or at sea level pressure, and at -65 F or 225 F, which would be capable of restarting while hot, and which would be capable of sustaining the hydraulic loads for the life of the orbiter. The basic approach to providing hydraulic power for the orbiter was to use a small, high speed, monopropellant fueled turbine power unit to drive a conventional aircraft type hydraulic pump. The stringent requirements imposed on the orbiter APU quickly made this machine different from existing aircraft APUs.

Lance, R.↗