Final Report Summary of DM1200 Operation at VSL

The principal objective of this report was to summarize the testing experience on the DuraMelter 1200 (DMI200), which is the High Level Waste (HLW) Pilot Melter located at the Vitreous State Laboratory (VSL). Further objectives were to provide descriptions of the history of all modifications and maintenance, methods of operation, problems and unit failures, and melter emissions and performance while processing a variety of simulated HL W and low activity waste (LAW) feeds for the Hanford Waste Treatment and Immobilization Plant (WTP) and employing a variety of operating methods. All of these objectives were met. The River Protection Project - Hanford Waste Treatment and Immobilization Plant (RPP-WTP) Project has undertaken a 'tiered' approach to vitrification development testing involving computer-based glass formulation, glass property-composition models, crucible melts, and continuous melter tests of increasing, more realistic scales. Melter systems ranging from 0.02 to 1.2 m{sup 2} installed at the Vitreous State Laboratory (VSL) have been used for this purpose, which, in combination with the 3.3 m{sup 2} low activity waste (LAW) Pilot Melter at Duratek, Inc., span more than two orders of magnitude in melt surface area. In this way, less-costly small-scale tests can be used to define the most appropriate tests to be conducted at the larger scales in order to extract maximum benefit from the large-scale tests. For high level waste (HLW) vitrification development, a key component in this approach is the one-third scale DuraMelter 1200 (DM 1200), which is the HLW Pilot Melter that has been installed at VSL with an integrated prototypical off-gas treatment system. That system replaced the DM1000 system that was used for HLW throughput testing during Part B1. Both melters have similar melt surface areas (1.2 m{sup 2}) but the DM1200 is prototypical of the present RPP-WTP HLW melter design whereas the DM1000 was not. In particular, the DM1200 provides for testing on a vitrification system with the specific train of unit operations that has been selected for both HLW and LAW RPP-WTP off-gas treatment.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Rigorous Kinetic Modeling and Optimization Study of a Modified Claus Unit for an Integrated Gasification Combined Cycle (IGCC) Power Plant with CO{sub 2} Capture

The modified Claus process is one of the most common technologies for sulfur recovery from acid gas streams. Important design criteria for the Claus unit, when part of an Integrated Gasification Combined Cycle (IGCC) power plant, are the ability to destroy ammonia completely and the ability to recover sulfur thoroughly from a relatively low purity acid gas stream without sacrificing flame stability. Because of these criteria, modifications to the conventional process are often required, resulting in a modified Claus process. For the studies discussed here, these modifications include the use of a 95% pure oxygen stream as the oxidant, a split flow configuration, and the preheating of the feeds with the intermediate pressure steam generated in the waste heat boiler (WHB). In the future, for IGCC plants with CO{sub 2} capture, the Claus unit must satisfy emission standards without sacrificing the plant efficiency in the face of typical disturbances of an IGCC plant, such as rapid change in the feed flow rates due to load-following and wide changes in the feed composition because of changes in the coal feed to the gasifier. The Claus unit should be adequately designed and efficiently operated to satisfy these objectives. Even though the Claus process has been commercialized for decades, most papers concerned with the modeling of the Claus process treat the key reactions as equilibrium reactions. Such models are validated by manipulating the temperature approach to equilibrium for a set of steady-state operating data, but they are of limited use for dynamic studies. One of the objectives of this study is to develop a model that can be used for dynamic studies. In a Claus process, especially in the furnace and the WHB, many reactions may take place. In this work, a set of linearly independent reactions has been identified, and kinetic models of the furnace flame and anoxic zones, WHB, and catalytic reactors have been developed. To facilitate the modeling of the Claus furnace, a four-stage method was devised so as to determine which set of linearly independent reactions would best describe the product distributions from available plant data. Various approaches are taken to derive the kinetic rate expressions, which are either missing in the open literature or found to be inconsistent. A set of plant data is used for optimal estimation of the kinetic parameters. The final model agrees well with the published plant data. Using the developed kinetics models of the Claus reaction furnace, WHB, and catalytic stages, two optimization studies are carried out. The first study shows that there exists an optimal steam pressure generated in the WHB that balances hydrogen yield, oxygen demand, and power generation. In the second study, it is shown that an optimal H{sub 2}S/SO{sub 2} ratio exists that balances single-pass conversion, hydrogen yield, oxygen demand, and power generation. In addition, an operability study has been carried out to examine the operating envelope in which both the H{sub 2}S/SO{sub 2} ratio and the adiabatic flame temperature can be controlled in the face of disturbances typical for the operation of an IGCC power plant with CO{sub 2} capture. Impact of CO{sub 2} capture on the Claus process has also been discussed.

20 FOSSIL-FUELED POWER PLANTS↗

Life Extension Program for the Modular Caustic Side Solvent Extraction Unit at Savannah River Site - 13179

Caustic Side Solvent Extraction (CSSX) is currently used at the U.S. Department of Energy (DOE) Savannah River Site (SRS) for removal of cesium from the high-level salt-wastes stored in underground tanks. Currently, the Actinide Removal Process (ARP) and the CSSX process are deployed in the (ARP)/Modular CSSX Unit (MCU), to process salt waste for permanent disposition. The CSSX technology utilizes a multi-component organic solvent and annular centrifugal contactors to extract cesium from alkaline salt waste. The original plant was permitted for a three year design life; however, given the successful operation of the plant, a life extension program was completed to continue operations. The program included detailed engineering analyses of the life-expectancy of passive and active components, resulting in component replacement and/or maintenance and monitoring program improvements. The program also included a review of the operations and resulted in a series of operational improvements. Since the improvements have been made, an accelerated processing rate has been demonstrated. In addition, plans for instituting a next-generation solvent are in place and will enhance the decontamination factors. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Actual Waste Demonstration of the Nitric-Glycolic Flowsheet for Sludge Batch 9 Qualification

For each sludge batch that is processed in the Defense Waste Processing Facility (DWPF), the Savannah River National Laboratory (SRNL) performs qualification testing to demonstrate that the sludge batch is processable. Testing performed by the Savannah River National Laboratory has shown glycolic acid to be effective in replacing the function of formic acid in the DWPF chemical process. The nitric-glycolic flowsheet reduces mercury, significantly lowers the catalytic generation of hydrogen and ammonia which could allow purge reduction in the Sludge Receipt and Adjustment Tank (SRAT), stabilizes the pH and chemistry in the SRAT and the Slurry Mix Evaporator (SME), allows for effective rheology adjustment, and is favorable with respect to melter flammability. In order to implement the new flowsheet, SRAT and SME cycles, designated SC-18, were performed using a Sludge Batch (SB) 9 slurry blended from SB8 Tank 40H and Tank 51H samples. The SRAT cycle involved adding nitric and glycolic acids to the sludge, refluxing to steam strip mercury, and dewatering to a targeted solids concentration. Data collected during the SRAT cycle included offgas analyses, process temperatures, heat transfer, and pH measurements. The SME cycle demonstrated the addition of glass frit and the replication of six canister decontamination additions. The demonstration concluded with dewatering to a targeted solids concentration. Data collected during the SME cycle included offgas analyses, process temperatures, heat transfer, and pH measurements. Slurry and condensate samples were collected for subsequent analysis

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The feasibility study of hot cell decontamination by the PFC spray method

The characteristics of per-fluorocarbon compounds (PFC) are colorless, non-toxic, easily vaporized and nonflammable. Also, some of them are liquids of a high density, low surface tension, low latent heat and low specific heat. These particular chemical and physical properties of fluoro-organic compounds permit their use in very different fields such as electronics, medicine, tribology, nuclear and material science. The Sonatol process was developed under a contract with the DOE. The Sonatol process uses an ultrasonic agitation in a PFC solution that contains a fluorinated surfactant to remove radioactive particles from surfaces. Filtering the suspended particles allows the solutions to be reused indefinitely. They applied the Sonatol process to the decontamination of a heterogeneous legacy Pu-238 waste that exhibited an excessive hydrogen gas generation, which prevents a transportation of such a waste to a Waste Isolation Pilot Plant. Korea Atomic Energy Research Institute (KAERI) is developing dry decontamination technologies applicable to a decontamination of a highly radioactive area loosely contaminated with radioactive particles. This contamination has occurred as a result of an examination of a post-irradiated material or the development of the DUPIC process. The dry decontamination technologies developed are the carbon dioxide pellet spray method and the PFC spray method. As a part of the project, PFC ultrasonic decontamination technology was developed in 2004. The PFC spray decontamination method which is based on the test results of the PFC ultrasonic method has been under development since 2005. The developed PFC spray decontamination equipment consists of four modules (spray, collection, filtration and distillation). Vacuum cup of the collection module gathers the contaminated PFC solution, then the solution is moved to the filtration module and it is recycled. After a multiple recycling of the spent PFC solution, it is purified in the distillation module. A performance test on each module was executed and the results have been reported. A combined test of the four modules, however, has not been performed as yet. The main objective of the present study is to demonstrate the feasibility of the full PFC spray decontamination process. Decontamination of the inside of the IMEF hot cell by the PFC spray method was also performed. PFC spray decontamination process was demonstrated by using a surrogate wall contaminated with Eu{sub 2}O{sub 3} powder. The spray pressure was 41 kgf/cm{sup 2}, the orifice diameter was 0.2 mm and the spray velocity was 0.2 L/min. And, the decontaminated area was 100 cm{sup 2}. From previous test results, we found that the decontamination factor of the PFC spray method was in the range from 9.6 to 62.4. When the decontamination efficiency of Co-60 was high, then the decontamination efficiency of Cs-137 was also high. As the surface roughness of the specimen increased, the PFC spray decontamination efficiency decreased. Inferring from the previous results, the surface of the surrogate wall was cleaned by the PFC spray method. The vacuum cup of the collection module operated well and gathered more than 99 % of the PFC solution. Also, filtration and distillation modules operated well. All the filtered PFC solution flowed to the storage chamber where some of the PFC solution was distilled. The coolant of the distillation module was a dry ice. And, the recycled solution was transferred to the spray module by a high pressure pump. To evaluate the PFC spray decontamination efficiency, a smear device was fabricated and operated by a manipulator. Before and after decontamination, a smear test was performed. The tested area was 100 cm{sup 2} and the radioactivity was estimated indirectly by measuring the radioactivity of the filter paper. The average decontamination factor was in the range between 10 and 15. One application time was 2 minutes. The sprayed PFC solution was collected by the vacuum cup and it was stored in the collection equipment. After the termination of the decontamination test, the flexible hose was cut near a toboggan. The collection equipment that contained the spent PFC solution, vacuum cup, spray nozzle and the flexible hose was stored in a radioactive waste storage tank. A feasibility study for the PFC spray decontamination method for an application to a hot cell surface was performed. The decontamination equipment that consisted of four modules operated well in the hot cell. The collection module gathered the sprayed PFC solution. The solution was purified in the filtration or distillation modules. The main characteristic of the distillation module is the use of dry ice as a coolant. The decontamination factor of IMEF hot cell was in the range from 10 to 15. It was difficult to measure the radioactivity accurately at a given time. We, however, concluded that the PFC spray decontamination method is a promising technology. It generated a small amount of secondary waste and used a non-toxic and non-conducting material. Decontamination work was performed with a little loss of the main decontamination agent. Based on the test results, we are developing an improved PFC spray decontamination process.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

New characterisation method of electrical and electronic equipment wastes (WEEE)

Highlights: ► A novel method of characterisation of components contained in WEEE has been developed. ► This technique was applied on several samples generated from different recycling plants. ► Handheld NIR and XRF were used to determine types of plastics and flame retardants. ► WEEE processing flow-sheet was suggested. - Abstract: Innovative separation and beneficiation techniques of various materials encountered in electrical and electronic equipment wastes (WEEE) is a major improvement for its recycling. Mechanical separation-oriented characterisation of WEEE was conducted in an attempt to evaluate the amenability of mechanical separation processes. Properties such as liberation degree of fractions (plastics, metals ferrous and non-ferrous), which are essential for mechanical separation, are analysed by means of a grain counting approach. Two different samples from different recycling industries were characterised in this work. The first sample is a heterogeneous material containing different types of plastics, metals (ferrous and non-ferrous), printed circuit board (PCB), rubber and wood. The second sample contains a mixture of mainly plastics. It is found for the first sample that all aluminium particles are free (100%) in all investigated size fractions. Between 92% and 95% of plastics are present as free particles; however, 67% in average of ferromagnetic particles are liberated. It can be observed that only 42% of ferromagnetic particles are free in the size fraction larger than 20 mm. Particle shapes were also quantified manually particle by particle. The results show that the particle shapes as a result of shredding, turn out to be heterogeneous, thereby complicating mechanical separation processes. In addition, the separability of various materials was ascertained by a sink–float analysis and eddy current separation. The second sample was separated by automatic sensor sorting in four different products: ABS, PC–ABS, PS and rest product. The fractions were characterised by using the methodology described in this paper. The results show that the grade and liberation degree of the plastic products ABS, PC–ABS and PS are close to 100%. Sink–float separation and infrared plastic identification equipment confirms the high plastic quality. On the basis of these findings, a global separation flow sheet is proposed to improve the plastic separation of WEEE.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Customer service model for waste tracking at Los Alamos National Laboratory

The goal is to transition from five legacy database systems that have reached end-of-life to a single inventory system that supports workflow, data, and reporting for all waste streams. Plutonium Processing Facility (TA-55) Waste Team provides a high quality system that insures safe, efficient and compliant management of all radioactive and hazardous wastes generated, including waste characterization and repackaging of Transuranic Waste (TRU) and TRU mixed waste for shipment to the Waste Isolation Pilot Plant (WIPP).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Ion Exchange Column Thermal Modeling: Prevention of Process Effluent Boiling - 18577

The Savannah River Site treats and disposes of legacy high-level waste, which resulted from 60 years of nuclear material production, medical research, and other nuclear related work. Complex mixtures of soluble and insoluble solids occupy tanks of which the South Carolina Department of Health and Environmental Control recognizes as the single largest environmental risk state-wide. The risk is reduced through removal, treatment, and solidification of decontaminated salt waste. Presently, SRS decontaminates the soluble salt component of the waste, a solution containing actinides and cesium, via implementation of the Actinide Removal Process and the Modular Caustic Side Solvent- Extraction Unit. Caustic solvent extraction is set to increase in scale by late 2018, with startup of the newly constructed Salt Waste Processing Facility. In conjunction with Salt Waste Processing Facility startup, Savannah River Remediation has been tasked by the Department of Energy to demonstrate modular ion exchange technology. The Tank Closure Cesium Removal project aims to demonstrate the feasibility of modular ion exchange processes for future Department of Energy applications. The Tank Closure Cesium Removal system is scheduled to begin operation in mid-2018. Dissolved salt solution, or influent, will be fed through a filter and ion exchange columns in lead-lag configuration, producing effluent. The effluent is fed to a separate high-level waste tank, for future disposition at Salt-stone Production Facility. Once the demonstration project is complete, the loaded ion exchange columns will be purged, dried, and placed in interim safe storage, awaiting final disposition. The ion exchange media selected for the Tank Closure Cesium Removal system is Honeywell UOP IONSIV{sup C} R-9120. The media is a prime candidate for separation of cesium from radioactive high-level waste. UOP R-9120{sup C} is inorganic and has high capacity, selectivity, and affinity for cesium. During operation, influent is fed to the ion exchange columns, contacting UOP R-9210{sup C} packed within the media vessel. Contact initiates loading of isotopes, and given ample time the solid phase (ion exchange media) and solution achieve thermodynamic equilibrium. UOP R-9120{sup C} is a prime candidate for separation of cesium and dissolved fission products. Although the properties of UOP R-9120{sup C} are favorable for separation, the same properties lead to accumulation of a heat source in the ion exchange bed. Cesium-137 and its daughter product, barium-137 m, generate a clear majority of heat (i.e. ∼ 94%). During operation salt solution flows through each column and transports heat from the ion exchange bed. Once operation is terminated, the effluent contained within the porous bed volume becomes essentially static. In the absence of engineering controls, the heat generated may boil the effluent. Rapid vaporization of aqueous salt solution would lead to bed over pressurization. Over pressurization and an associated release of high-level waste would result in adverse impacts to human health and the environment. This paper focuses on modeling the heat transfer associated with the Tank Closure Cesium Removal system ion exchange column. The model evaluates the maximum heat generation and the associated radionuclide loadings that prevent boiling within of the media vessel, under no flow conditions. A safety significant control, maintaining loadings less than the established loading limit ensures associated impacts to human health and the environment are prevented. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Waste feed delivery planning at Hanford

The Integrated Waste Feed Delivery Plan (IWFDP) describes how waste feed will be delivered to the Waste Treatment and Immobilization Plant (WTP) to safely and efficiently accomplish the River Protection Project (RPP) mission. The IWFDP, which is integrated with the Baseline Case operating scenario, is comprised of three volumes. Volume 1 - Process Strategy provides an overview of waste feed delivery (WFD) and describes how the WFD system will be used to prepare and deliver feed to the WTP based on the equipment configuration and functional capabilities of the WFD system. Volume 2 - Campaign Plan describes the plans for the first eight campaigns for delivery to the WTP, evaluates projected feed for systematic issues, projects 242-A Evaporator campaigns, and evaluates double-shell tank (DST) space and availability of contingency feed. Volume 3 - Project Plan identifies the scope and timing of the DST and infrastructure upgrade projects necessary to feed the WTP, and coordinates over 30 projectized projects and operational activities that comprise the needed WFD upgrades.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Waste Feed Delivery Planning at Hanford - 13232

The Integrated Waste Feed Delivery Plan (IWFDP) describes how waste feed will be delivered to the Waste Treatment and Immobilization Plant (WTP) to safely and efficiently accomplish the River Protection Project (RPP) mission. The IWFDP, which is integrated with the Baseline Case operating scenario, is comprised of three volumes. Volume 1 - Process Strategy provides an overview of waste feed delivery (WFD) and describes how the WFD system will be used to prepare and deliver feed to the WTP based on the equipment configuration and functional capabilities of the WFD system. Volume 2 - Campaign Plan describes the plans for the first eight campaigns for delivery to the WTP, evaluates projected feed for systematic issues, projects 242-A Evaporator campaigns, and evaluates double-shell tank (DST) space and availability of contingency feed. Volume 3 - Project Plan identifies the scope and timing of the DST and infrastructure upgrade projects necessary to feed the WTP, and coordinates over 30 projectized projects and operational activities that comprise the needed WFD upgrades. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Development of pyro-processing technology at CRIEPI for carving out the future of nuclear fuel cycle

Pyro-processing has been attracting increasing attention as a promising candidate as an advanced nuclear fuel cycle technology. It provides economic advantage as well as reduction in proliferation risk and burden of long live radioactive waste, especially when it is combined with advanced fuels such as metallic or nitride fuel which gives excellent burning efficiency of minor actinides (MA). CRIEPI has been developing pyro-processing technology since late eighties with both domestic and international collaborations. In the early stage, electrochemical and thermodynamic properties in LiCl-KCl eutectic melt, and fundamental feasibility of core technology like electrorefining were chiefly investigated. Currently, stress in the process chemistry development is also placed on supporting technologies, such as treatment of anode residue and high temperature distillation for cathode product from electrorefining, and so on. Waste treatment process development, such as studies on adsorption behavior of various FP elements into zeolite and conditions for the fabrication of glass-bonded sodalite waste form, are steadily improved as well. In parallel, dedicated pyro-processing equipment such as zeolite column for treatment of spent electro-refiner salt is currently in progress. Recently, an integrated engineering-scale fuel cycle tests were performed funded by Japanese government (MEXT) as an important step before proceeding to large scale hot demonstration of pyro-processing. Oxide fuels can be readily introduced into the pyro-processing by reducing them to metals by adoption of electrochemical reduction technique. Making use of this advantage, the pyro-processing is currently under preliminary evaluation for its applicability to the treatment of the corium, mainly consisting of (U,Zr)O{sub 2}, formed in different composition during the accident of the Fukushima Daiichi nuclear power plant. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Case Study: Hybrid Carbon Conversion Using Low-Carbon Energy Sources in Coal-Producing States

The demand for more carbon efficient power sources and a decrease in natural gas prices has decreased the desire for coal power. This decrease in demand has led to massive job losses in coal mining regions over the past decade. The purpose of this project is to develop a hybrid energy system utilizing both a coal power plant and advanced reactor, which is competitive with natural gas by improving on profitability and decreasing carbon emissions. This report details the problem with a summary of the impact on the coal industry and the availability of renewable energy sources in the Appalachian region. Because of the geography of the region, variable renewable energy sources are not available without significant size and siting restrictions. However, biomass in the form of wood waste is abundant and can be used as a carbon neutral energy source. Combining biomass and coal processing, in addition to thermal power plants, can increase system profits and efficiency by providing peaking power and conversion opportunities for secondary markets. The electric load is based on publicly available demand data from Appalachian Power, which services the western Virginia and southern West Virginia in the Appalachian region. The demand information is combined by service, normalized, and scaled to an average demand of 1000 kW, which will be the basis for sizing the hybrid energy system. A traditional screening curve analysis for a coal plant and advanced reactor shows that the least cost design varies significantly based on the assumed discount rate and capital recovery period. An optimization program to size the design in TEAL based on the load curve gives 10 optimal designs, all with a negative resulting net present value (NPV) and a coal plant capacity of less than 15%. Including profits from selling captured carbon at a flat rate results in a positive NPV; however, the coal capacity factor only increases to about 40%. There are limitations with this optimization as well since the price of CO2 is likely to decrease as more is sold to the conversion market. The suggested design will combine coal power, an advanced reactor, and coal and biomass coprocessing to produce a variety of products that can be sold to the conversion market while increasing system efficiency. The analysis of conversion pathways for coal and biomass reveals that multiple options will need to be included in the analysis to produce the optimal system design. Three systems will be optimized and compared to determine the best design based on the figures of merit of total NPV and cost of carbon avoided. The first system will include a coal power plant and an advanced reactor that will sell electricity to the grid to meet demand and sell captured carbon to the conversion market. The second system adds a high-temperature steam electrolysis plant, which will utilize electricity during times of low demand to produce hydrogen and sell it to the conversion market. The third system adds biomass and coal processing with options for hydrocarbon oils, syngas to be produced for the conversion market, and electricity generation to power components within the system or provide peaking power. This analysis will be based on a new approach that combines traditional screening curve methods with a dispatch algorithm that optimizes the system based on the opportunity cost of different production options. The resulting optimization algorithm should provide results with less processing time than HERON’s decision tree method. The results from this analysis will determine an optimal design and reinforce the benefits of coal power when used in a hybrid energy system. The initial results show that the addition of a secondary market for carbon sales could result in a positive NPV and increases the capacity factor of the coal plant as compared to a design with only sales to the electricity market. The addition of more markets and additional coal consumption from biomass coprocessing could increase NPV further, replace carbon in other markets through the sale of biomass-derived hydrocarbons, and demonstrate the value of coal power technology.

01 COAL, LIGNITE, AND PEAT↗

Requirements for a Dynamic Solvent Extraction Module to Support Development of Advanced Technologies for the Recycle of Used Nuclear Fuel

The Department of Energy's Nuclear Energy Advanced Modeling and Simulation (NEAMS) Program has been established to create and deploy next generation, verified and validated nuclear energy modeling and simulation capabilities for the design, implementation, and operation of future nuclear energy systems to improve the U.S. energy security. As part of the NEAMS program, Integrated Performance and Safety Codes (IPSC's) are being produced to significantly advance the status of modeling and simulation of energy systems beyond what is currently available to the extent that the new codes be readily functional in the short term and extensible in the longer term. The four IPSC areas include Safeguards and Separations, Reactors, Fuels, and Waste Forms. As part of the Safeguards and Separations (SafeSeps) IPSC effort, interoperable process models are being developed that enable dynamic simulation of an advanced separations plant. A SafeSepss IPSC 'toolkit' is in development to enable the integration of separation process modules and safeguards tools into the design process by providing an environment to compose, verify and validate a simulation application to be used for analysis of various plant configurations and operating conditions. The modules of this toolkit will be implemented on a modern, expandable architecture with the flexibility to explore and evaluate a wide range of process options while preserving their stand-alone usability. Modules implemented at the plant-level will initially incorporate relatively simple representations for each process through a reduced modeling approach. Final versions will incorporate the capability to bridge to subscale models to provide required fidelity in chemical and physical processes. A dynamic solvent extraction model and its module implementation are needed to support the development of this integrated plant model. As a stand-alone application, it will also support solvent development of extraction flowsheets and integrated safeguards approaches within the Fuel Cycle Research and Development (FCR&D) Program. The purpose of this document is to identify the requirements for this dynamic solvent extraction model to guide process modelers and code developers to produce a computational module that meets anticipated future needs.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Characterization of Highly Active Cells in Preparation for Post Operational Clean Out at Sellafield - 18139

The Highly Active Liquor Evaporation and Storage (HALES) Plant at Sellafield receives highly active (HA) raffinate liquors from the Magnox and Thermal Oxide (THoRP) Reprocessing Plants. These liquors are concentrated through evaporation into Highly Active Liquor (HAL), conditioned and stored in HALES before immobilisation in glass in the Waste Vitrification Plant (WVP). Reprocessing operations at Sellafield are nearing completion and hence these liquor feeds will soon cease. Therefore, HALES is starting its planning and preparation phases for Post Operational Clean Out (POCO) and decommissioning. POCO is a transitional phase between operations and decommissioning and encompasses activities undertaken to remove residual inventory and activity from the facility. Key drivers for POCO include risk and hazard reduction and facilitating subsequent decommissioning activities (including potential surveillance and maintenance or care and maintenance regimes). Characterization is a critical enabler for development and implementation of effective POCO. In addition to the key drivers above characterization within HALES will be used to: - Define the start and end points of POCO (radiological condition, inventory sources and location, configuration, etc.); - Develop and technically underpin the wash out strategy (volumes, rates, reagent types, etc.; - Monitor the effectiveness of POCO activities (reduction in inventory/activity, points of diminishing return, confirmation of end points for POCO). There are a number of significant challenges that present to characterization of the HALES facilities. Perhaps the most significant of these is the radiological status of the facility. HALES is an HA facility meaning that the high dose rates limit not only the technology selection for characterization (i.e. those with a very high radiation tolerance) but also place constraints on the access and deployment for the selected technology. Additionally, parts of the facility are circa 60 years old which brings its own challenges such as poor quality construction drawings and limited operational knowledge. Finally, limited sampling capability and minimal data regarding historic operations has resulted in uncertainties that will need to be addressed in order to undertake POCO as efficiently and effectively as possible. The solution to this challenge requires a novel and innovative approach and an example of this is the technique which is described in this paper. This is a radiometric characterization technique which utilizes remotely deployed dosimetry to determine the activity distribution within the vessels of interest to POCO. The results to date have been extremely promising, and the ability to produce concise visual representation of these results has already begun to facilitate better informed discussions around the POCO of the facility. It is expected that in the future this technique will be applicable to other areas of Sellafield which face similar characterization challenges. This paper presents a summary of the development and implementation of the solution along with the results obtained so far. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

SDI CFD MODELING ANALYSIS

The Savannah River Remediation (SRR) Organization requested that Savannah River National Laboratory (SRNL) develop a Computational Fluid Dynamics (CFD) method to mix and blend the miscible contents of the blend tanks to ensure the contents are properly blended before they are transferred from the blend tank; such as, Tank 50H, to the Salt Waste Processing Facility (SWPF) feed tank. The work described here consists of two modeling areas. They are the mixing modeling analysis during miscible liquid blending operation, and the flow pattern analysis during transfer operation of the blended liquid. The transient CFD governing equations consisting of three momentum equations, one mass balance, two turbulence transport equations for kinetic energy and dissipation rate, and one species transport were solved by an iterative technique until the species concentrations of tank fluid were in equilibrium. The steady-state flow solutions for the entire tank fluid were used for flow pattern analysis, for velocity scaling analysis, and the initial conditions for transient blending calculations. A series of the modeling calculations were performed to estimate the blending times for various jet flow conditions, and to investigate the impact of the cooling coils on the blending time of the tank contents. The modeling results were benchmarked against the pilot scale test results. All of the flow and mixing models were performed with the nozzles installed at the mid-elevation, and parallel to the tank wall. From the CFD modeling calculations, the main results are summarized as follows: (1) The benchmark analyses for the CFD flow velocity and blending models demonstrate their consistency with Engineering Development Laboratory (EDL) and literature test results in terms of local velocity measurements and experimental observations. Thus, an application of the established criterion to SRS full scale tank will provide a better, physically-based estimate of the required mixing time, and elevation of transfer pump for minimum sludge disturbance. (2) An empirical equation for a tank with no cooling coils agrees reasonably with the current modeling results for the dual jet. (3) From the sensitivity study of the cooling coils, it was found that the tank mixing time for the coiled tank was about two times longer than that of the tank fluid with no coils under the 1/10th scale, while the coiled tank required only 50% longer than the one without coils under the full scale Tank 50H. In addition, the time difference is reduced when the pumping U{sub o}d{sub o} value is increased for a given tank. (4) The blending time for T-shape dual jet pump is about 20% longer than that of 15{sup o} upward V-shape pump under the 1/10th pilot-scale tank, while the time difference between the two pumps is about 12% for the full-scale Tank 50H. These results are consistent with the literature information. (5) A transfer pump with a solid-plate suction screen operating at 130 gpm can be located 9.5 inches above settled sludge for 2 in screen height in a 85 ft waste tank without disturbing any sludge. Detailed results are summarized in Table 13. Final pump performance calculations were made by using the established CW pump design, and operating conditions to satisfy the two requirements of minimum sludge disturbance, and adequate blending of tank contents. The final calculation results show that the blending times for the coiled and uncoiled tanks coupled with the CW pump design are 159 and 83 minutes, respectively. All the results are provided in Table 16.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Microbial dynamics in anaerobic digestion reactors for treating organic urban residues during the start-up process

Anaerobic digestion of organic residues offers economic benefits via biogas production, still methane (CH 4 ) yield relies on the development of a robust microbial consortia for adequate substrate degradation, among other factors. In this study, we monitor biogas production and changes in the microbial community composition in two semi-continuous stirred tank reactors during the setting process under mesophilic conditions (35°C) using a 16S rDNA high-throughput sequencing method. Reactors were initially inoculated with anaerobic granular sludge from a brewery wastewater treatment plant, and gradually fed organic urban residues (4·0 kg VS m -3 day -1 ) . The inocula and biomass samples showed changes related to adaptations of the community to urban organic wastes including a higher relative proportion of Clostridiales, with Ruminococcus spp. and Syntrophomonas spp. as recurrent species. Candidatus Cloacamonas spp. (Spirochaetes) also increased from ~2·2% in the inoculum to >10% in the reactor biomass. The new community consolidated the cellulose degradation and the propionate and amino acids fermentation processes. Acetoclastic methanogens were more abundant in the reactor, where Methanosaeta spp. was found as a key player. This study demonstrates a successful use of brewery treatment plant granular sludge to obtain a robust consortium for methane production from urban organic solid waste in Mexico.This study describes the selection of relevant bacteria and archaea in anaerobic digesters inoculated with anaerobic granular sludge from a brewery wastewater treatment plant. Generally, these sludge granules are used to inoculate reactors digesting organic urban wastes. Though, it is still not clearly understood how micro-organisms respond to substrate variations during the reactor start-up process. After feeding two reactors with organic urban residues, it was found that a broader potential for cellulose degradation was developed including Bacteroidetes, Firmicutes and Spirochaetes. These results clarify the bacterial processes behind new reactors establishment for treating organic wastes in urban areas.

59 BASIC BIOLOGICAL SCIENCES↗

Methodology of Qualification of CCIM Vitrification Process Applied to the High- Level Liquid Waste from Reprocessed Oxide Fuels - 12438

The vitrification of high-level liquid waste from reprocessed oxide fuels (UOX fuels) by Cold Crucible Induction Melter is planed by AREVA in 2013 in a production line of the R7 facility at La Hague plant. Therefore, the switch of the vitrification technology from the Joule Heated Metal Melter required a complete process qualification study. It involves three specialties, namely the matrix formulation, the glass long-term behavior and the vitrification process development on full-scale pilot. A new glass frit has been elaborated in order to adapt the redox properties and the thermal conductivity of the glass suitable for being vitrified with the Cold Crucible Induction Melter. The role of cobalt oxide on the long term behavior of the glass has been described in the range of the tested concentrations. Concerning the process qualification, the nominal tests, the sensitivity tests and the study of the transient modes allowed to define the nominal operating conditions. Degraded operating conditions tests allowed to identify means of detecting incidents leading to these conditions and allowed to define the procedures to preserve the process equipments protection and the material quality. Finally, the endurance test validated the nominal operating conditions over an extended time period. This global study allowed to draft the package qualification file. The qualification file of the UOX package is currently under approval by the French Nuclear Safety Authority. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Bioregenerative food system cost based on optimized menus for advanced life support

Optimized menus for a bioregenerative life support system have been developed based on measures of crop productivity, food item acceptability, menu diversity, and nutritional requirements of crew. Crop-specific biomass requirements were calculated from menu recipe demands while accounting for food processing and preparation losses. Under the assumption of staggered planting, the optimized menu demanded a total crop production area of 453 m2 for six crew. Cost of the bioregenerative food system is estimated at 439 kg per menu cycle or 7.3 kg ESM crew-1 day-1, including agricultural waste processing costs. On average, about 60% (263.6 kg ESM) of the food system cost is tied up in equipment, 26% (114.2 kg ESM) in labor, and 14% (61.5 kg ESM) in power and cooling. This number is high compared to the STS and ISS (nonregenerative) systems but reductions in ESM may be achieved through intensive crop productivity improvements, reductions in equipment masses associated with crop production, and planning of production, processing, and preparation to minimize the requirement for crew labor.

Non-NASA Center↗